Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PWR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,135 records · Page 63

Ares I Crew Launch Vehicle Upper Stage/Upper Stage Engine Element Overview

The Ares I upper stage is an integral part of the Constellation Program transportation system. The upper stage provides guidance, navigation and control (GN and C) for the second stage of ascent flight for the Ares I vehicle. The Saturn-derived J-2X upper stage engine will provide thrust and propulsive impulse for the second stage of ascent flight for the Ares I launch vehicle. Additionally, the upper stage is responsible for the avionics system of the the entire Ares I. This brief presentation highlights the requirements, design, progress and production of the upper stage. Additionally, test facilities to support J-2X development are discussed and an overview of the operational and manufacturing flows are provided. Building on the heritage of the Apollo and Space Shuttle Programs, the Ares I Us and USE teams are utilizing extensive lessons learned to place NASA and the US into another era of space exploration. The NASA, Boeing and PWR teams are integrated and working together to make progress designing and building the Ares I upper stage to minimize cost, technical and schedule risks.

McArthur, J. Craig↗

Testing for the J-2X Upper Stage Engine

NASA selected the J-2X Upper Stage Engine in 2006 to power the upper stages of the Ares I crew launch vehicle and the Ares V cargo launch vehicle. Based on the proven Saturn J-2 engine, this new engine will provide 294,000 pounds of thrust and a specific impulse of 448 seconds, making it the most efficient gas generator cycle engine in history. The engine's guiding philosophy emerged from the Exploration Systems Architecture Study (ESAS) in 2005. Goals established then called for vehicles and components based, where feasible, on proven hardware from the Space Shuttle, commercial, and other programs, to perform the mission and provide an order of magnitude greater safety. Since that time, the team has made unprecedented progress. Ahead of the other elements of the Constellation Program architecture, the team has progressed through System Requirements Review (SRR), System Design Review (SDR), Preliminary Design Review (PDR), and Critical Design Review (CDR). As of February 2010, more than 100,000 development engine parts have been ordered and more than 18,000 delivered. Approximately 1,300 of more than 1,600 engine drawings were released for manufacturing. A major factor in the J-2X development approach to this point is testing operations of heritage J-2 engine hardware and new J-2X components to understand heritage performance, validate computer modeling of development components, mitigate risk early in development, and inform design trades. This testing has been performed both by NASA and its J-2X prime contractor, Pratt & Whitney Rocketdyne (PWR). This body of work increases the likelihood of success as the team prepares for testing the J-2X powerpack and first development engine in calendar 2011. This paper will provide highlights of J-2X testing operations, engine test facilities, development hardware, and plans.

Buzzell, James C.↗

Three Years of on Orbit ISS Oxygen Generation System Operation 2007-2010

The International Space Station (ISS) United States Orbital Segment (USOS) Oxygen Generation System (OGS) has accumulated 240 days of continuous operation at varied oxygen production rates within the US Laboratory Module (LAB) since it was first activated in July 2007. OGS relocated from the ISS LAB to Node 3 during 20A Flight (February 2010). The OGS rack delivery was accelerated for on-orbit checkout in the LAB, and it was launched to ISS in July of 2006. During the on-orbit checkout interval within the LAB from July 2007 to October 2008, OGS operational times were limited by the quantity of feedwater in a Payload Water Reservoir (PWR) bag. Longer runtimes are now achievable due to the continuous feedwater availability after ULF2 delivery and activation of the USOS Water Recovery System (WRS) racks. OGS is considered a critical function to maintaining six crew capability. There have been a number of failures which interrupted or threatened to interrupt oxygen production. Filters in the recirculation loop have clogged and have been replaced, Hydrogen sensors have fallen out of specifications, a pump delta pressure sensor failed, a pump failed to start, and the voltage on the cell stack increased out of tolerance. This paper will discuss the operating experience and characteristics of the OGS, as well as operational issues and their resolution.

Diderich, Greg S.↗

The J-2X Fuel Turbopump - Design, Development, and Test

Pratt and Whitney Rocketdyne (PWR), a NASA subcontractor, is executing the design, development, test, and evaluation (DDT&E) of a liquid oxygen, liquid hydrogen two hundred ninety four thousand pound thrust rocket engine initially intended for the Upper Stage (US) and Earth Departure Stage (EDS) of the Constellation Program Ares-I Crew Launch Vehicle (CLV). A key element of the design approach was to base the new J-2X engine on the heritage J-2S engine with the intent of uprating the engine and incorporating SSME and RS-68 lessons learned. The J-2S engine was a design upgrade of the flight proven J-2 configuration used to put American astronauts on the moon. The J-2S Fuel Turbopump (FTP) was the first Rocketdyne-designed liquid hydrogen centrifugal pump and provided many of the early lessons learned for the Space Shuttle Main Engine High Pressure Fuel Turbopumps. This paper will discuss the design trades and analyses performed for the current J-2X FTP to increase turbine life; increase structural margins, facilitate component fabrication; expedite turbopump assembly; and increase rotordynamic stability margins. Risk mitigation tests including inducer water tests, whirligig turbine blade tests, turbine air rig tests, and workhorse gas generator tests characterized operating environments, drove design modifications, or identified performance impact. Engineering design, fabrication, analysis, and assembly activities support FTP readiness for the first J-2X engine test scheduled for July 2011.

Tellier, James G.↗

The J-2X Oxidizer Turbopump - Design, Development, and Test

Pratt and Whitney Rocketdyne (PWR), a NASA subcontractor, is executing the Design, Development, Test, and Evaluation (DDT&E) of a liquid oxygen, liquid hydrogen two hundred ninety-four thousand pound thrust rocket engine initially intended for the Upper Stage (US) and Earth Departure Stage (EDS) of the Constellation Program Ares-I Crew Launch Vehicle (CLV). A key element of the design approach was to base the new J-2X engine on the heritage J-2S engine which was a design upgrade of the flight proven J-2 engine used to put American astronauts on the moon. This paper will discuss the design trades and analyses performed to achieve the required uprated Oxidizer Turbopump performance; structural margins and rotordynamic margins; incorporate updated materials and fabrication capability; and reflect lessons learned from legacy and existing Liquid Rocket Propulsion Engine turbomachinery. These engineering design, analysis, fabrication and assembly activities support the Oxidizer Turbopump readiness for J-2X engine test in 2011.

Brozowski, Laura A.↗

Powerpack Testing of the J2-X Oxidizer Turbopump

The J-2X PPA-2 (Powerpack 2) test series was conducted from February through December 2012 on the A1 test stand at NASA Stennis Space Center in a joint effort between Pratt and Whitney Rocketdyne (PWR) and NASA Marshall Space Flight Center (MSFC). The series consisted of 13 tests for a total hotfire duration close to 6500 seconds. Among the chief test objectives was characterization of the capabilities of the new J-2X turbopumps. This paper concentrates on the test results pertaining specifically to the Oxidizer Turbopump (OTP) operation in liquid oxygen (LOX). The two bladed inducer configuration that was tested had a 0.81% blade height tip clearance and incorporated the B-groove modification to the inducer tunnel outboard of the inducer leading edge. Data was collected on inducer suction performance, pump radial loading, and the pump dynamic environment in LOX. Comparisons were made to prior data collected on two geometrically similar subscale inducers tested in water at NASA MSFC (70% scale) and Concepts NREC (52% scale). In overview, the results of the powerpack testing were consistent with the radial load assessment from the water tests. The inducer performed differently in the other two categories, however. The inducer suction performance capability in LOX was notably improved. This was expected and is probably attributable to thermal suppression head (TSH) effects. While the dynamic environment was similar in most aspects to water test observations, the higher order cavitation (HOC) during the powerpack testing was much more benign.

Jambusaria, Mitul↗

Experimental benchmark of MCNPX calculations against self-interrogation neutron resonance densitometry (SINRD) fresh fuel measurements

We have investigated the use of Self-Interrogation Neutron Resonance Densitometry (SINRD) to measure the {sup 235}U concentration in a PWR 15 x 15 fresh LEU fuel assembly in air. Different measurement configurations were simulated in Monte Carlo N-Particle eXtended transport code (MCNPX) and benchmarked against experimental results. The sensitivity of SINRD is based on using the same fissile materials in the fission chambers as are present in the fuel because the effect of resonance absorption lines in the transmitted flux is amplified by the corresponding (n,j) reaction peaks in fission chamber. Due to the low spontaneous fission rate of {sup 238}U (i.e. no curium in the fresh fuel), {sup 252}Cf sources were used to self-interrogate the fresh fuel pins. The resonance absorption of these neutrons in the fresh fuel pins can be measured using {sup 235}U fission chambers placed adjacent to the assembly. We used ratios of different fission chambers to reduce the number of unknowns we are trying measure because the neutron source strength and detector-fuel assembly coupling cancel in the ratios. The agreement between MCNPX results and experimental measurements confirms the accuracy of the MCNPX models used. The development of SINRD to measure the fissile content in spent fuel is important to the improvement of nuclear safeguards and material accountability. Future work includes the use of this technique to measure the fissile content in LWR spent fuel in water.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Determining plutonium mass in spent fuel with non-destructive assay techniques - NGSU research overview and update on 6 NDA techniques

This poster is one of two complementary posters. The Next Generation Safeguards Initiative (NGSI) of the U.S. DOE has initiated a multi-lab/university collaboration to quantify the plutonium (Pu) mass in, and detect the diversion of pins from, spent nuclear fuel assemblies with non-destructive assay (NDA). This research effort has the goal of quantifying the capability of 14 NDA techniques as well as training a future generation of safeguards practitioners. By November of 2010, we will be 1.5 years into the first phase (2.5 years) of work. This first phase involves primarily Monte Carlo modelling while the second phase (also 2.5 years) will focus on experimental work. The goal of phase one is to quantify the detection capability of the various techniques for the benefit of safeguard technology developers, regulators, and policy makers as well as to determine what integrated techniques merit experimental work, We are considering a wide range of possible technologies since our research horizon is longer term than the focus of most regulator bodies. The capability of all of the NDA techniques will be determined for a library of 64 17 x 17 PWR assemblies [burnups (15, 30, 45, 60 GWd/tU), initial enrichments (2, 3, 4, 5%) and cooling times (1, 5, 20, 80 years)]. The burnup and cooling time were simulated with each fuel pin being comprised of four radial regions. In this paper an overview of the purpose will be given as well as a technical update on the following 6 neutron techniques: {sup 252}Cf Interrogation with Prompt Neutron Detection, Delayed Neutrons, Differential Die-Away, Differential Die-Away Self-Interrogation, Passive Neutron Albedo Reactivity, Self-Integration Neutron Resonance Densitometry. The technical update will quantify the anticipated performance of each technique for the 64 assemblies of the spent fuel library.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ENDF/B-VII.1 Neutron Cross Section Data Testing with Critical Assembly Benchmarks and Reactor Experiments

The ENDF/B-VII.1 library is the latest revision to the United States' Evaluated Nuclear Data File (ENDF). The ENDF library is currently in its seventh generation, with ENDF/B-VII.0 being released in 2006. This revision expands upon that library, including the addition of new evaluated files (was 393 neutron files previously, now 418 including replacement of elemental vanadium and zinc evaluations with isotopic evaluations) and extension or updating of many existing neutron data files. Complete details are provided in the companion paper [1]. This paper focuses on how accurately application libraries may be expected to perform in criticality calculations with these data. Continuous energy cross section libraries, suitable for use with the MCNP Monte Carlo transport code, have been generated and applied to a suite of nearly one thousand critical benchmark assemblies defined in the International Criticality Safety Benchmark Evaluation Project's International Handbook of Evaluated Criticality Safety Benchmark Experiments. This suite covers uranium and plutonium fuel systems in a variety of forms such as metallic, oxide or solution, and under a variety of spectral conditions, including unmoderated (i.e., bare), metal reflected and water or other light element reflected. Assembly eigenvalues that were accurately predicted with ENDF/B-VII.0 cross sections such as unmoderated and uranium reflected 235U and 239Pu assemblies, HEU solution systems and LEU oxide lattice systems that mimic commercial PWR configurations continue to be accurately calculated with ENDF/B-VII.1 cross sections, and deficiencies in predicted eigenvalues for assemblies containing selected materials, including titanium, manganese, cadmium and tungsten are greatly reduced. Improvements are also confirmed for selected actinide reaction rates such as 236U capture. Other deficiencies, such as the overprediction of Pu solution system critical eigenvalues and a decreasing trend in calculated eigenvalue for 233U fueled systems as a function of Above-Thermal Fission Fraction remain. The comprehensive nature of this critical benchmark suite and the generally accurate calculated eigenvalues obtained with ENDF/B-VII.1 neutron cross sections support the conclusion that this is the most accurate general purpose ENDF/B cross section library yet released to the technical community.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Analysis of Spent Fuel Assay with a Lead Slowing Down Spectrometer

Assay of fissile materials in spent fuel that are produced or depleted during the operation of a reactor, is of paramount importance to nuclear materials accounting, verification of the reactor operation history, as well as for criticality considerations for storage. In order to prevent future proliferation following the spread of nuclear energy, we must develop accurate methods to assay large quantities of nuclear fuels. We analyze the potential of using a Lead Slowing Down Spectrometer for assaying spent fuel. We conclude that it is possible to design a system that will provide around 1% statistical precision in the determination of the 239 Pu, 241 Pu and 235 U concentrations in a PWR spent-fuel assembly, for intermediate-to-high burnup levels, using commercial neutron sources, and a system of 238 U threshold fission detectors. Pending further analysis of systematic errors, it is possible that missing pins can be detected, as can asymmetry in the fuel bundle.

07 ISOTOPE AND RADIATION SOURCES↗

UPGRADES TO Monteburns, VERSION 3.0

Monteburns VERSION 3.0 is an upgrade of the existing Monteburns code available through RSICC. The new version includes modern programming style, increased parallel computing, more accurate capture gamma calculations and an automated input generator. This capability was demonstrated through a small PWR core simulation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A COUPLED TH/NEUTRONICS/CRUD FRAMEWORK IN PREDICTION OF CIPS PHENOMENON

A coupled TH/Neutronics/CRUD framework, which is able to simulate the CRUD deposits impact on CIPS phenomenon, was described in this paper. This framework includes the coupling among three essential physics, thermal-hydraulics, CRUD and neutronics. The overall framework was implemented by using the CFD software STAR-CCM+, developing CRUD codes, and using the neutronics code DeCART. The coupling was implemented by exchanging data between softwares using intermediate exchange files. A typical 3 by 3 PWR fuel pin problem was solved under this framework. The problem was solved in a 12 months length period of time. Time-dependent solutions were provided, including CRUD deposits inventory and their distributions on fuels, boron hideout amount inside CRUD deposits, as well as power shape changing over time. The results clearly showed the power shape suppression in regions where CRUD deposits exist, which is a strong indication of CIPS phenomenon.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The Euratom Fast Collar (EFC): A Safeguards Instrument Design to Address Future Fuel Measurement Challenges

Summary of this presentation: (1) EFC instrument design for {sup 235}U verification measurements issued to EURATOM to issue a call for commercial tender; (2) Achieved a fast (Cd mode) measurement with less than 2% relative uncertainty in the doubles neutron counting rate in 10 minutes using a standard source strength; (3) Assay time in fast mode consistent with the needs of an inspector; (4) Extended to realistic calibration range for modern fuel designs - Relatively insensitive to gadolinia content for fuel designs with up to 32 burnable poison rods and 15 wt % gadolinia concentration, which is a realistic maximum for modern PWR fuel; (5) Improved performance over the standard thermal neutron collar with greater than twice the efficiency of the original design; (6) Novel tube pattern to reduce the impact of accidental pile-up; and (7) Joint test of prototype unit - EURATOM-LANL.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Implementation of ASME Code, Section XI, Code Case N-770, on Alternative Examination Requirements for Class 1 Butt Welds Fabricated with Alloy 82/182

In May 2010, the NRC issued a proposed notice of rulemaking that includes a provision to add a new section to its rules to require licensees to implement ASME Code Case N-770, ‘‘Alternative Examination Requirements and Acceptance Standards for Class 1 PWR Piping and Vessel Nozzle Butt Welds Fabricated with UNS N06082 or UNS W86182 Weld Filler Material With or Without the Application of Listed Mitigation Activities, Section XI, Division 1,’’ with 15 conditions. Code Case N-770 contains baseline and inservice inspection (ISI) requirements for unmitigated butt welds fabricated with Alloy 82/182 material and preservice and ISI requirements for mitigated butt welds. The NRC stated that application of ASME Code Case N-770 is necessary because the inspections currently required by the ASME Code, Section XI, were not written to address stress corrosion cracking Alloy 82/182 butt welds, and the safety consequences of inadequate inspections can be significant. The NRC expects to issue the final rule incorporating this code case into its regulations in the spring 2011 time frame. This paper discusses the new examination requirements, the conditions that NRC is imposing , and the major concerns with implementation of the new Code Case.

alloy 82/182↗

In-service Inspection Ultrasonic Testing of Reactor Pressure Vessel Welds for Assessing Flaw Density and Size Distribution per 10 CFR 50.61a, Alternate Fracture Toughness Requirements

Pressurized thermal shock (PTS) events are system transients in a pressurized water reactor (PWR) in which there is a rapid operating temperature cool-down that results in cold vessel temperatures with or without repressurization of the vessel. The rapid cooling of the inside surface of the reactor pressure vessel (RPV) causes thermal stresses that can combine with stresses caused by high pressure. The aggregate effect of these stresses is an increase in the potential for fracture if a pre-existing flaw is present in a material susceptible to brittle failure. The ferritic, low alloy steel of the reactor vessel beltline adjacent to the core, where neutron radiation gradually embrittles the material over the lifetime of the plant, can be susceptible to brittle fracture. The PTS rule, described in the Code of Federal Regulations, Title 10, Section 50.61 (§50.61), “Fracture Toughness Requirements for Protection against Pressurized Thermal Shock Events,” adopted on July 23, 1985, establishes screening criteria to ensure that the potential for a reactor vessel to fail due to a PTS event is deemed to be acceptably low. The U.S. Nuclear Regulatory Commission (NRC) completed a research program that concluded that the risk of through-wall cracking due to a PTS event is much lower than previously estimated. The NRC subsequently developed a rule, §50.61a, published on January 4, 2010, entitled “Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events” (75 FR 13). Use of the new rule by licensees is optional. The §50.61a rule differs from §50.61 in that it requires licensees who choose to follow this alternate method to analyze the results from periodic volumetric examinations required by the ASME Code, Section XI, Rules for Inservice Inspection (ISI) of Nuclear Power Plants. These analyses are intended to determine if the actual flaw density and size distribution in the licensee’s reactor vessel beltline welds are bounded by the flaw density and size distribution values used in the PTS technical basis. Under a contract with the NRC, Pacific Northwest National Laboratory (PNNL) has been working on a program to assess the ability of current inservice inspection (ISI)-ultrasonic testing (UT) techniques, as qualified through ASME Code, Appendix VIII, Supplements 4 and 6, to detect small fabrication or inservice-induced flaws located in RPV welds and adjacent base materials. As part of this effort, the investigators have pursued an evaluation, based on the available information, of the capability of UT to provide flaw density/distribution inputs for making RPV weld assessments in accordance with §50.61a. This paper presents the results of an evaluation of data from the 1993 Browns Ferry Nuclear Plant, Unit 3, Spirit of Appendix VIII reactor vessel examination, a comparison of the flaw density/distribution from this data with the distribution in §50.61a, possible reasons for differences, and plans and recommendations for further work in this area.

alloy 82/182↗

In-Situ Creep Testing Capability for the Advanced Test Reactor

An instrumented creep testing capability is being developed for specimens irradiated in Pressurized Water Reactor (PWR) coolant conditions at the Advanced Test Reactor (ATR). The test rig has been developed such that samples will be subjected to stresses ranging from 92 to 350 MPa at temperatures between 290 and 370 °C up to at least 2 dpa (displacement per atom). The status of Idaho National Laboratory (INL) efforts to develop the test rig in-situ creep testing capability for the ATR is described. In addition to providing an overview of in-pile creep test capabilities available at other test reactors, this paper reports efforts by INL to evaluate a prototype test rig in an autoclave at INL’s High Temperature Test Laboratory (HTTL). Initial data from autoclave tests with 304 stainless steel (304 SS) specimens are reported.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

REVIEW OF RESULTS FOR THE OECD/NEA PHASE VII BENCHMARK: STUDY OF SPENT FUEL COMPOSITIONS FOR LONG TERM DISPOSAL

This paper summarizes the problem specification and compares participants results for the OECD/NEA/WPNCS Expert Group on Burn-up Credit Criticality Safety Phase VII Benchmark Study of Spent Fuel Compositions for Long-Term Disposal. The Phase VII benchmark was developed to study the ability of relevant computer codes and associated nuclear data to predict spent fuel isotopic compositions and corresponding keff values in a cask configuration over the time duration relevant to spent nuclear fuel (SNF) disposal. The benchmark was divided into two sets of calculations: (1) decay calculations out to 1,000,000 years for provided pressurized-water-reactor (PWR) UO2 discharged fuel compositions and (2) burnup credit criticality calculations for a representative cask model at selected time steps. Contributions from 15 organizations and companies in 10 countries were submitted to the Phase VII benchmark exercise. This paper provides a description of the Phase VII benchmark and detailed comparisons of the participants isotopic compositions and keff values that were calculated with a diversity of computer codes and nuclear data sets. Differences observed in the calculated time-dependent nuclide densities are attributed to different decay data or code-specific numerical approximations. The variability of the keff results is consistent with the evaluated uncertainty associated with cross-section data.

Radulescu, Georgeta↗

Multiphysics Simulations for LWR Analysis

Accurate prediction of the neutron and temperature distributions within an operating nuclear reactor requires the solution of multiple coupled physics equations. In a light water reactor (LWR), there is a very strong coupling between the power distribution (governed by the radiation transport equation) and the temperature and density distributions (governed by a thermal diusion equation in combination with a fluid flow model). This study aims to begin to quantify the impact of such feedback mechanisms as well as identify numerical diculties associated with such multiphysics problems. A description of the multiphysics model and current solution strategy within the Exnihilo code package will be presented, along with numerical results for a representative 3 3 PWR mini-assembly.

multi-physics↗