Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PRESSES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,135 records · Page 63

STS-102/Expedition 2 Pre-Flight News Conference

The crew of STS-102 (Commander James Wetherbee, Pilot James Kelly, and Mission Specialists Andrew Thomas and Paul Richards) and Expedition 2 (Commander Yuriy Usachev and Flight Engineers James Voss and Susan Helms) are seen during this prelaunch press conference. Each crewmember describes his or her role in the mission, describing the spacewalks and transfer of supplies from the Leonardo Multi-Purpose Logistics Module to the Destiny Laboratory. They then answer questions from the press.

Source record↗

Expedition 1 Crew News Conference

The crewmembers of Expedition 1, William Shepherd, Yuri Gidzenko, and Sergei Krikalev, are seen during this prelaunch press conference where they describe their preparations and expectations for living on the International Space Station (ISS). They then answer questions from the press.

Source record↗

STS-102/Expedition 2 Mission Overview

John Shannon, STS-102 Lead Flight Director, Bernestine Dickey, STS-102 Launch Package Manager, and Rick La Brode, International Space Station (ISS) Lead Flight Director, give an overview of the STS-102 mission during a prelaunch press conference. Mr. Shannon discusses how the mission came into being and its objectives, including information on the launch and a day-by-day account of mission activities. Ms. Dickey gives details on the payload of STS-102, describing the system racks, cargo elements, and crew supplies delivered via the Leonardo Multi-Purpose Logistics Module. Mr. La Brode describes the current configuration of the ISS and upcoming changes. He also discusses the activities of the Expedition 2 crew during the next four months. Computer simulations show the ISS' current and future (after the STS-102 mission) configurations, the installations of Leonardo, and the move of the Pressurized Mating Adapter from one port to another on the Destiny Laboratory. The panel then answers questions from the press.

Source record↗

STS-102 Expedition 2 Increment and Science Briefing

Merri Sanchez, Expedition 2 Increment Manager, John Uri, Increment Scientist, and Lybrease Woodard, Lead Payload Operations Director, give an overview of the upcoming activities and objectives of the Expedition 2's (E2's) mission in this prelaunch press conference. Ms. Sanchez describes the crew rotation of Expedition 1 to E2, the timeline E2 will follow during their stay on the International Space Station (ISS), and the various flights going to the ISS and what each will bring to ISS. Mr. Uri gives details on the on-board experiments that will take place on the ISS in the fields of microgravity research, commercial, earth, life, and space sciences (such as radiation characterization, H-reflex, colloids formation and interaction, protein crystal growth, plant growth, fermentation in microgravity, etc.). He also gives details on the scientific facilities to be used (laboratory racks and equipment such as the human torso facsimile or 'phantom torso'). Ms. Woodard gives an overview of Marshall Flight Center's role in the mission. Computerized simulations show the installation of the Space Station Remote Manipulator System (SSRMS) onto the ISS and the installation of the airlock using SSRMS. Live footage shows the interior of the ISS, including crew living quarters, the Progress Module, and the Destiny Laboratory. The three then answer questions from the press.

Source record↗

STS-102 Expedition 2 Increment Crew News Conference

Expedition 2 crewmembers Commander Yuriy Usachev and Flight Engineers James Voss and Susan Helms are introduced in this prelaunch press conference. They answer questions from the press about their expectations and activities for the upcoming mission on the International Space Station.

Source record↗

STS-102 Countdown Status

George Diller, NASA Public Affairs, introduces Jeff Spaulding, NASA Test Director, Glenn Chin, Leonardo Payload Manager, and Ed Priselac, Shuttle Weather Officer, in this STS-102 prelaunch press conference. Mr. Spaulding gives an overview of the status of the Discovery Orbiter, including the prelaunch procedures (payload inspection and closure, avionics check, and the loading of the onboard cyrogenic tanks), the countdown and built in time holds, launch window, Discovery launch, and the landing. Mr. Chin discusses the payload status, including specifications on the Multi-Purpose Logistics Module, and the hardware contamination inspection. Mr. Priselac describes the weather forecast for the upcoming launch. The men then answer questions from the press.

Source record↗

STS-102 Countdown Status Briefing

Joel Wells, NASA Public Affairs, introduces Pete Nickolenko, NASA Test Director, Glenn Chin, Leonardo Mission Manager, and Ed Priselac, Shuttle Weather Officer, in this STS-102 prelaunch press conference. Mr. Nickolenko gives an overview of the countdown and built-in hold times, the launch window, and prelaunch activities (such as activation and checkout of the onboard computer systems, closing the payload bay doors, servicing of the onboard cryogenic cell tanks, main engine tests, and power-up of the ground communications systems). Mr. Chin confirms that the payload is in the final flight configuration and is ready for launch. Mr. Priselac gives the weather forecast for the launch date. The men then answer questions from the press.

Source record↗

STS-102 Extravehicular Activities Briefing

Keith Johnson, STS-102 Lead Extravehicular Activities Officer, gives an overview of the mission's spacewalks in this prelaunch press conference. He describes the activities, objectives, and timeline of the spacewalks during the STS-102 mission. Computerized simulations show the move of the Third Pressurized Mating Adapter (PMA3) and the retrieval of the rigid umbilicals from the payload bay of Discovery. Mr. Johnson then answers questions from the press.

Source record↗

STS-106 TCDT Photo Opportunity

STS-106 crewmembers Commander Terrence W. Wilcutt, Pilot Scott D. Altman, and Mission Specialists Daniel C. Burbank, Edward T. Lu, Richard A. Mastracchio, Yuri Ivanovich Malenchenko, and Boris V. Morukov are seen during the Terminal Countdown and Demonstration Test (TCDT) activity of meeting the press. Each crewmember introduces himself and then they answer questions from the press about the upcoming mission.

Source record↗

STS-101 Mission Overview Briefing

Phil Engelauf, STS-101 Lead Flight Director, Paul Hill, STS-101 ISS Lead Flight Director, and Sharon Castle, STS-101 Package Manager, give an overview of the objectives and activities of the upcoming mission in this preflight press conference. Computerized animations show the configuration of the payload bay and the docking and flyaround of Atlantis and the International Space Station (ISS). Mr. Engelauf, Mr. Hill, and Ms. Castle then answer questions from the press.

Source record↗

A Comprehensive C++ Controller for a Magnetically Supported Vertical Rotor

This manual describes the new FATMaCC (Five-Axis, Three-Magnetic-Bearing Control Code). The FATMaCC (pronounced "fat mak") is a versatile control code that possesses many desirable features that were not available in previous in-house controllers. The ultimate goal in designing this code was to achieve full rotor levitation and control at a loop time of 50 microsec. Using a 1-GHz processor, the code will control a five-axis system in either a decentralized or a more elegant centralized (modal control) mode at a loop time of 56 microsec. In addition, it will levitate and control (with only minor modification to the input/output wiring) a two-axis and/or a four-axis system. Stable rotor levitation and control of any of the systems mentioned above are accomplished through appropriate key presses to modify parameters, such as stiffness, damping, and bias. A signal generation block provides 11 excitation signals. An excitation signal is then superimposed on the radial bearing x- and y-control signals, thus producing a resultant force vector. By modulating the signals on the bearing x- and y-axes with a cosine and a sine function, respectively, a radial excitation force vector is made to rotate 360 deg. about the bearing geometric center. The rotation of the force vector is achieved manually by using key press or automatically by engaging the "one-per-revolution" feature. Rotor rigid body modes can be excited by using the excitation module. Depending on the polarities of the excitation signal in each radial bearing, the bounce or tilt mode will be excited.

Morrison, Carlos R.↗

One-step Tape Casting of Composites via Slurry on Fiber

A process by which metal matrix composites can be made was presented. The process involves putting a powder slurry on fibers to make a precursor green tape. These green tapes are cut, stacked and hot pressed to form the fully dense composite. A computer program was presented which enables complete quantification and control of the process. Once some easily obtained properties of the slurry and its behavior are determined (such as the shrinkage from the wet to green state, and the density of the green tape) modification of the fiber spacing and blade height give the maker precise control of fiber volume fraction, and fiber architecture in the composite. The process was shown to be accurate and flexible through the production of a wide variety of volume fraction fiber composites made from a wide variety of fibers and powders. The most time consuming step of the tape casting process (other than hot pressing) was winding the fiber on the drum. The tape casting techniques developed resulted in high quality metal matrix composites, with ultimate tensile strength in the range of 215 ksi (1477 MPa), a strain at failure of 1.15 percent, and in fatigue at room temperature 0 to 120 ksi, n = 0.3 Hz, a 4-ply Ti-24Al-11Nb/SCS-6, 32 vol% fiber tape cast composite lasted 202,205 cycles with a maximum strain on the 100th cycle of 0.43 percent.

deGroh, Henry C., III↗

STS-100 Flight Day 12 Highlights

On this twelfth day of the STS-100 mission, the crewmembers of Atlantis, Commander Kent Rominger, Pilot Jeffrey Ashby, and Mission Specialists Chris Hadfield, Scott Parazynski, John Phillips, Umberto Guidoni, and Yuri Valentinovich Lonchakov, are seen in an on-orbit press conference as they answer questions from the press. Also shown is the approach and dock of the Russian Soyuz spacecraft to the International Space Station (ISS). The Expedition 2 crew, Commander Yuriy Usachev and Flight Engineers James Voss and Susan Helms, and the Soyuz crew greet each other and welcome space tourist Dennis Tito to the ISS.

Source record↗

STS-100 Flight Day 9 Highlights

On this ninth day of the STS-100 mission, Commander Kent Rominger and Mission Specialist Chris Hadfield answer questions about the mission in an on-orbit press conference. The Expedition 2 crew, Commander Yuriy Usachev and Flight Engineers James Voss and Susan Helms, answer questions about their mission and the Canadian Robotic Arm in another on-orbit press conference. The Rafaello Logistics Module is removed from the Unity Module on the International Space Station and transfers it to the payload bay of Atlantis.

Source record↗

High-Pressure Synthesis of Metal-Ceramic Nano-Composites

The major problems in fabrication of nano-crystal line materials form nano-powders are: (1), coarsening of the initial nano-size grains, (2), insufficient densification (high concentration of pores), and, (3), conversion of diamond into graphite (for diamond-based ceramics). We have developed a novel technique of the synthesis of nano-composite materials applying very high (up to about 10 GPa) pressures. In this technique, one component is pre-compacted and placed next to another having a lower melting point temperature. The whole sample is pressed and the temperature raised above the melting point of the second component, what results in the melt getting pressed into the (nano-size) pores of the compact. Upon subsequent crystallization the melt forms the second nanophase. The process is fast, on the order of seconds, and the temperatures are relatively low what prevents, or at least significantly reduces coarsening of the starting nanophase grains. Also, conversion of diamond into graphite can be prevented. The technique allows for control of the final product properties through a proper selection of (1) the initial compact density and grain size, (2) chemical composition of the source, and (3) the temperature and pressure of the process. The application of the technique to the synthesis of SiC and diamond with Si, Ge, and different metals. Results of the in-situ investigation of the synthesis process by synchrotron X-ray diffraction technique will be presented.

Gierlotka, S.↗

STS-105 Countdown Status Briefing

Joel Wells, NASA Public Affairs, introduces Steve Altemus, NASA Test Director, Glenn Chin, STS-105 Mission Manager, and Ed Priselac, Shuttle Weather Officer, in this STS-105 prelaunch press conference. An overview is given of the launch countdown, payload status (Leonardo Multipurpose Logistics Module), and weather forecast. The men then answer questions from the press.

Source record↗

STS-104 Countdown Status Briefing

George Diller, NASA Public Affairs, introduces Pete Nickolenko, NASA Test Director, Scott Higginbotham, STS-104 Mission Manager, and Ed Priselac, Shuttle Weather Officer, in this STS-104 launch minus two days press conference. An overview is given of the launch vehicle status, countdown procedures, payload status, and weather forecast. The men then answer questions from the press.

Source record↗

STS-104 Countdown Status Briefing

George Diller, NASA Public Affairs, introduces Jeff Spaulding, NASA Test Director, Louie Garcia, STS-104 Operations Engineer, and Ed Priselac, Shuttle Weather Officer, in this launch minus one day press conference. An overview is given of the launch vehicle status, countdown procedures, payload status, and weather forecast. The men then answer questions from the press.

Source record↗