Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operations and Maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,135 records · Page 63

US Participation in the GOME and SCIAMACHY Projects

The research performed during this reporting period includes development and maintenance of scientific software for the GOME retrieval algorithms, consultation on operational software development for GOME, further sensitivity and instrument studies to help finalize the definition of the SCIAMACHY instrument, and consultation on optical and detector issues for both GOME and SCIAMACHY. The Global Ozone Monitoring Experiment was successfully launched on the ERS-2 satellite on April 20, 1995, during this reporting period, and is working in the expected fashion. The European Space Agency has made their selections from responses to the Announcement of Opportunity for GOME validation and science studies, part of the overall ERS AO. The Smithsonian Astrophysical Observatory (SAO) proposal has been selected. These proposals are primarily for access to the data; ESA does not provide research funding for the selected investigations. The SAO activities that are carried out as a result of selection by ESA are funded by the present grant, to the limit that can be accomplished at the present level of funding. SCIAMACHY is currently in Phase C/D. Instrument design is almost finalized and selection of infrared detectors from the initial production run has been made.

Chance, K. V.↗

U.S. Participation in the GOME and SCIAMACHY Projects

This report summarizes research done under NASA Grant NAGW-2541 from April 1, 1996 through March 31, 1997. The research performed during this reporting period includes development and maintenance of scientific software for the GOME retrieval algorithms, consultation on operational software development for GOME, consultation and development for SCIAMACHY near-real-time (NRT) and off-line (OL) data products, and development of infrared line-by-line atmospheric modeling and retrieval capability for SCIAMACHY. SAO also continues to participate in GOME validation studies, to the limit that can be accomplished at the present level of funding. The Global Ozone Monitoring Experiment was successfully launched on the ERS-2 satellite on April 20, 1995, and remains working in normal fashion. SCIAMACHY is currently in instrument characterization. The first two European ozone monitoring instruments (OMI), to fly on the Metop series of operational meteorological satellites being planned by Eumetsat, have been selected to be GOME-type instruments (the first, in fact, will be the refurbished GOME flight spare). K. Chance is the U.S. member of the OMI Users Advisory Group.

Chance, K. V.↗

US Participation in the GOME and SCIAMACHY Projects

This report summarizes research done under NASA Grant NAGW-2541 through September 30, 1997. The research performed under this grant includes development and maintenance of scientific software for the GOME retrieval algorithms, consultation on operational software development for GOME, sensitivity and instrument studies to define GOME and SCIAMACHY instruments, consultation on optical and detector issues for both GOME and SCIAMACHY, consultation and development for SCIAMACHY near-real-time (NRT) and off-line (OL) data products, and development of infrared line-by-line atmospheric modeling and retrieval capability for SCIAMACHY. The European Space Agency selected the SAO to participate in GOME validation and science studies, part of the overall ERS AO. This provided access to all GOME data; The SAO activities that are carried out as a result of selection by ESA were funded by the present grant. The Global Ozone Monitoring Experiment was successfully launched on the ERS- 2 satellite on April 20, 1995, and remains working in normal fashion. SCIAMACHY is currently scheduled for launch in early 2000. The first two European ozone monitoring instruments (OMI), to fly on the q series of operational meteorological satellites being planned by Eumetsat, have been selected to be GOME-type instruments (the first, in fact, will be the refurbished GOME flight spare). K. Chance is the U.S. member of the OMI Users Advisory Group.

Chance, K. V.↗

Satellite-Based Stratospheric and Tropospheric Measurements: Determination of Global Ozone and other Trace Species

This report summarizes research done under NASA Grant NAG5-3461 from November 1, 1996 through December 31, 2000. The research performed during this reporting period includes development and maintenance of scientific software for the GOME retrieval algorithms, consultation on operational software development for GOME, sensitivity and instrument studies to help finalize the definition of the SCIAMACHY instrument, leading the development of the SCIAMACHY Scientific Requirements Document for Data and Algorithm Development, consultation and development for SCIAMACHY near-real-time (NRT) and off-line (OL) data products, radiative transfer model development for utilization in GOME, SCIAMACHY and other programs, development of infrared line-by-line atmospheric modeling and retrieval capability for SCIAMACHY, and participation in GOME and SCIAMACHY validation studies. The Global Ozone Monitoring Experiment was successfully launched on the ERS-2 satellite on April 20, 1995, and remains working in normal fashion. SCIAMACHY is currently planned for launch in late 2001 on the ESA Envisat satellite. Three GOME-2 instruments are now scheduled to fly on the Metop series of operational meteorological satellites (Eumetsat). K. Chance is a member of the reconstituted GOME Scientific Advisory Group, which will guide the GOME-2 program as well as the continuing ERS-2 GOME program.

Chance, K. V.↗

Going Paperless

Sentel Corporation has commercialized NASA's Electronic Portable Information Collection (EPIC) System, which stemmed from a NASA Kennedy Space Center SBIR contract. NASA and Sentel designed, built, and tested work authorization procedures used as a paperless procedures system for Space Shuttle and International Space Station payload processing operations. EPIC is now being applied to various markets including; airplane maintenance, aerospace system data management, shipbuilding industries, shipping industries, law enforcement agencies, and public utilities. KSC is planning a pilot program to use EPIC at the Hypergol Maintenance Facility. In addition, Ames Research Center and KSC are working together to apply EPIC to the area of wireless communication.

Source record↗

Customer Service Programming

Use of computer program STRCMACS has enabled Illinois Bell Telephone, a subsidiary of American Telephone and Telegraph to cut software development costs about 10 percent by reducing program maintenance and by allowing the department to bring other software into operation more quickly. It has also been useful in company training of programming staff.

Source record↗

Satellite-Based Stratospheric and Tropospheric Measurements: Determination of Global Ozone and Other Trace Species

This grant is an extension to our previous NASA Grant NAG5-3461, providing incremental funding to continue GOME (Global Ozone Monitoring Experiment) and SCIAMACHY (SCanning Imaging Absorption SpectroMeter for Atmospheric CHartographY) studies. This report summarizes research done under these grants through December 31, 2002. The research performed during this reporting period includes development and maintenance of scientific software for the GOME retrieval algorithms, consultation on operational software development for GOME, consultation and development for SCIAMACHY near-real-time (NRT) and off-line (OL) data products, and participation in initial SCIAMACHY validation studies. The Global Ozone Monitoring Experiment was successfully launched on the ERS-2 satellite on April 20, 1995, and remains working in normal fashion. SCIAMACHY was launched March 1, 2002 on the ESA Envisat satellite. Three GOME-2 instruments are now scheduled to fly on the Metop series of operational meteorological satellites (Eumetsat). K. Chance is a member of the reconstituted GOME Scientific Advisory Group, which will guide the GOME-2 program as well as the continuing ERS-2 GOME program.

Chance, Kelly↗

Technology Challenges for Deep-Throttle Cryogenic Engines for Space Exploration

Historically, cryogenic rocket engines have not been used for in-space applications due to their additional complexity, the mission need for high reliability, and the challenges of propellant boil-off. While the mission and vehicle architectures are not yet defined for the lunar and Martian robotic and human exploration objectives, cryogenic rocket engines offer the potential for higher performance and greater architecture/mission flexibility. In-situ cryogenic propellant production could enable a more robust exploration program by significantly reducing the propellant mass delivered to low earth orbit, thus warranting the evaluation of cryogenic rocket engines versus the hypergolic bi-propellant engines used in the Apollo program. A multi-use engine. one which can provide the functionality that separate engines provided in the Apollo mission architecture, is desirable for lunar and Mars exploration missions because it increases overall architecture effectiveness through commonality and modularity. The engine requirement derivation process must address each unique mission application and each unique phase within each mission. The resulting requirements, such as thrust level, performance, packaging, bum duration, number of operations; required impulses for each trajectory phase; operation after extended space or surface exposure; availability for inspection and maintenance; throttle range for planetary descent, ascent, acceleration limits and many more must be addressed. Within engine system studies, the system and component technology, capability, and risks must be evaluated and a balance between the appropriate amount of technology-push and technology-pull must be addressed. This paper will summarize many of the key technology challenges associated with using high-performance cryogenic liquid propellant rocket engine systems and components in the exploration program architectures. The paper is divided into two areas. The first area describes how the mission requirements affect the engine system requirements and create system level technology challenges. An engine system architecture for multiple applications or a family of engines based upon a set of core technologies, design, and fabrication approaches may reduce overall programmatic cost and risk. The engine system discussion will also address the characterization of engine cycle figures of merit, configurations, and design approaches for some in-space vehicle alternatives under consideration. The second area evaluates the component-level technology challenges induced from the system requirements. Component technology issues are discussed addressing injector, thrust chamber, ignition system, turbopump assembly, and valve design for the challenging requirements of high reliability, robustness, fault tolerance, deep throttling, reasonable performance (with respect to weight and specific impulse).

Brown, Kendall K.↗

Volatile Organic Analyzer (VOA) in 2006: Repair, Revalidation, and Restart of Elektron Even

The Volatile Organic Analyzer (VOA) had been providing valuable data on trace contaminants in the atmosphere of the International Space Station (ISS) from January 2002 through May 2003. Component temperature errors, detected by the VOA s software, shut down the unit in May 2003, but in early 2005 on orbit diagnostics verified fuse failures had disabled both VOA channels. An in-flight maintenance (IFM) session in December 2005 returned the VOA to an operational mode by January 2006. This paper will present the on-orbit data from 2006 that were used to revalidate the VOA, and provide an overview of the VOA s contributions during the Elecktron contingency event that occurred on ISS in September 2006.

Limero, Thomas↗

SSV Launch Monitoring Strategies: HGDS Design Implementation Through System Maturity

With over 500,000 gallons of liquid hydrogen and liquid oxygen, it is of vital importance to monitor the space shuttle vehicle (SSV) from external tank (ET) load through launch. The Hazardous Gas Detection System (HGDS) was installed as the primary system responsible for monitoring fuel leaks within the orbiter and ET. The HGDS was designed to obtain the lowest possible detection limits with the best resolution while monitoring the SSV for any hydrogen, helium, oxygen, or argon as the main requirement. The HGDS is a redundant mass spectrometer used for real-time monitoring during Power Reactant Storage and Distribution (PRSD) load and ET load through launch or scrub. This system also performs SSV processing leak checks of the Tail Service Mast (TSM) umbilical quick disconnects (QD's), Ground Umbilical Carrier Plate (GUCP) QD's and supports auxiliary power unit (APU) system tests. From design to initial implementation and operations, the HGDS has evolved into a mature and reliable launch support system. This paper will discuss the operational challenges and lessons learned from facing design deficiencies, validation and maintenance efforts, life cycle issues, and evolving requirements

Shoemaker, Marc D.↗

2021-2022 Long-Term Groundwater Monitoring Report Industrial Area Kennedy Space Center, Florida

This report presents the groundwater sampling results from the National Aeronautics and Space Administration (NASA) Industrial Area (IA) 2021-2022 Long-Term Monitoring (LTM) activities and results of the 2023 DPT activities at three of the sites. The NASA IA LTM Program includes the following 14 sites: - Ransom Road Landfill (RRLF) – Solid Waste Management Unit (SWMU) 003 - Orsino Storage Yard (ORSY) – SWMU 004 - Building M7-0505 Treatment Tank Area (M505) – SWMU 039 - Hypergol Maintenance Facility Hazardous Waste South Staging Area (HMF South) – SWMU 070 - Operations and Checkout Building (O&C) – SWMU 076 - Vertical Processing Facility (VPF) – SWMU 077 - Environmental Health Facility (EHF) – SWMU 079 - Kennedy Athletic, Recreation, and Social Park 1 (KARS Park 1) – SWMU 084 - Engineering Development Laboratory (EDL) – SWMU 085 - Launch Equipment Test Facility (LETF) – SWMU 091 - Mobil Service Station (MOBIL) – SWMU 093 - General Services Administration Seized Property (GSSP) – SWMU 095 - Space Station Processing Facility (SSPF) – SWMU 098 - Fuel Storage Area #1 Underground Storage Tank (UST) [Building 1044] (FSA1) – Potential Release Location (PRL) 157 Groundwater levels were gauged at each site during the 2021 and 2022 LTM field activities. Sampling events for the IA LTM Program are conducted seasonally during the dry and wet seasons, which occur in May and November, respectively. The sites in the NASA IA LTM Program are sampled on annual, biennial, or 5-year sampling frequencies based on historical trends. Due to contract transitions and monitoring well installations, 2021 dry season activities were conducted during September 2021, while dry season activities for 2022 resumed in May 2022.

groundwater↗

Using Artificial Intelligence and Machine Learning to Enhance Mission Design and Operations of the Habitable Worlds Observatory (HWO)

One key aspect in the development of HWO is the early deployment of artificial intelligence (AI) and machine learning (ML) to enhance mission science and operations. Our subtask group is part of the HWO AI/ML working group and focuses on AI and ML for mission operations. Our task group seeks to educate other HWO working groups about AI and ML capabilities for mission operations, investigate how to bridge technology gaps, and enable new capabilities particularly in the areas of observational scheduling, instrument health monitoring, and downlink operations. We focus on mission tasking / scheduling both for mission analysis in development and operations. AI and ML for mission scheduling includes: tools to support proposal calls and review, ensuring fairness in calls for proposals, community peer reviews and ease workloads, as well as in-flight and ground software development (e.g., using natural language processing (NLP) to support process automation from requirements). AI and ML for the mission’s development and operations include 1) anomaly detection and prediction (from onboard and ground based tools) to monitor the spacecraft’s health, 2) ground-based automated scheduling for mission operations including long-term and short-term planning and maintenance, and 3) flight system flexible execution (as flight proven for Spitzer and JWST) to enable robust execution despite execution variations, and 4) data analysis for prioritization (e.g., real-time data evaluation leading to autonomous actions and adjustments, high-priority identification, onboard data compression, etc.). Incorporation of ML and AI will enable HWO to address the major science questions related to exoplanet characterization, general astrophysics, and solar system exploration and also extend the boundaries of space mission technologies.

Mark Moussa↗

Assessing Several Non-Traditional Data Sources for Value in Aviation Safety

The NASA System-Wide Safety (SWS) project and its predecessor projects have been developing Machine Learning (ML) algorithms for commercial aviation safety for many years. These algorithms have been applied to Flight Operations Quality Assurance (FOQA); radar track data (e.g., Threaded Track); and safety reports, including Aviation Safety Reporting System (ASRS) and Aviation Safety Action Plan (ASAP). SWS is working with partners to get access to other data that air carriers provide, such as maintenance data, and has been assisting carriers in working with other data, such as Line Operations Safety Audit (LOSA) data, using manual methods. However, the project has discussed whether there are other data that are not traditionally used in aviation safety analysis that may be useful. This paper discusses four sets of data and models that are not traditionally used in aviation safety but that have shown promise for such use. In the future, we plan to incorporate such data into ML algorithms to use with data that we have used before and determine the additional benefit that is actually achieved under different contexts from the inclusion of these non-traditional data sources.

Nikunj C. Oza↗

NASA's Biomass Production Chamber: a testbed for bioregenerative life support studies

The Biomass Production Chamber (BPC) located at Kennedy Space Center, FL, USA provides a large (20 m2 area, 113 m3 vol.), closed environment for crop growth tests for NASA's Controlled Ecological Life Support System (CELSS) program. Since the summer of 1988, the chamber has operated on a near-continuous basis (over 1200 days) without any major failures (excluding temporary power losses). During this time, five crops of wheat (64-86 days each), three crops of soybean (90 to 97 days), five crops of lettuce (28-30 days), and four crops of potato (90 to 105 days were grown, producing 481 kg of dry plant biomass, 196 kg edible biomass, 540 kg of oxygen, 94,700 kg of condensed water, and fixing 739 kg of carbon dioxide. Results indicate that total biomass yields were close to expected values for the given light input, but edible biomass yields and harvest indices were slightly lower than expected. Stand photosynthesis, respiration, transpiration, and nutrient uptake rates were monitored throughout growth and development of the different crops, along with the build-up of ethylene and other volatile organic compounds in the atmosphere. Data were also gathered on system hardware maintenance and repair, as well as person-hours required for chamber operation. Future tests will include long-term crop production studies, tests in which nutrients from waste treatment systems will be used to grow new crops, and multi-species tests.

NASA Center KSC↗

SPOT4 Operational Control Center (CMP)

CNES(F) is responsible for the development of a new generation of Operational Control Center (CMP) which will operate the new heliosynchronous remote sensing satellite (SPOT4). This Operational Control Center takes large benefit from the experience of the first generation of control center and from the recent advances in computer technology and standards. The CMP is designed for operating two satellites all the same time with a reduced pool of controllers. The architecture of this CMP is simple, robust, and flexible, since it is based on powerful distributed workstations interconnected through an Ethernet LAN. The application software uses modern and formal software engineering methods, in order to improve quality and reliability, and facilitate maintenance. This software is table driven so it can be easily adapted to other operational needs. Operation tasks are automated to the maximum extent, so that it could be possible to operate the CMP automatically with very limited human interference for supervision and decision making. This paper provides an overview of the SPOTS mission and associated ground segment. It also details the CMP, its functions, and its software and hardware architecture.

Zaouche, G.↗

Design study of RL10 derivatives. Volume 3, part 2: Operational and flight support plan

Transportation requirements are considered during the engine design layout reviews and maintenance engineering analyses. Where designs cannot be influenced to avoid transportation problems, the transportation representative is advised of the problems permitting remedies early in the program. The transportation representative will monitor and be involved in the shipment of development engine and GSE hardware between FRDC and vehicle manufacturing plant and thereby will be provided an early evaluation of the transportation plans, methods and procedures to be used in the space tug support program. Unanticipated problems discovered in the shipment of development hardware will be known early enough to permit changes in packaging designs and transportation plans before the start of production hardware and engine shipments. All conventional transport media can be used for the movement of space tug engines. However, truck transport is recommended for ready availability, variety of routes, short transit time, and low cost.

Shubert, W. C.↗

Data management applications

Kennedy Space Center's primary institutional computer is a 4 megabyte IBM 4341 with 3.175 billion characters of IBM 3350 disc storage. This system utilizes the Software AG product known as ADABAS with the on line user oriented features of NATURAL and COMPLETE as a Data Base Management System (DBMS). It is operational under the OS/VSI and is currently supporting batch/on line applications such as Personnel, Training, Physical Space Management, Procurement, Office Equipment Maintenance, and Equipment Visibility. A third and by far the largest DBMS application is known as the Shuttle Inventory Management System (SIMS) which is operational on a Honeywell 6660 (dedicated) computer system utilizing Honeywell Integrated Data Storage I (IDSI) as the DBMS. The SIMS application is designed to provide central supply system acquisition, inventory control, receipt, storage, and issue of spares, supplies, and materials.

Source record↗

Evaluation of the benefits and feasibility of on-orbit repair by comparison with operations in an analogous environment - How is the Freedom Space Station like an oceanographic expedition?

Equipment maintenance and logistics strategies followed on the R/S Thompson, an oceanographic research vessel, are described, and parallels are drawn between the problems and solutions of an oceanographic expedition and those of a space station mission. Presumably oceanic expeditions, which have been conducted for over 150 years, have developed effective methods of equipment maintenance. Similarities are found in relative budget and equipment maintenance problems, but few similarities are found in solutions to these problems. It is speculated that the high relative cost of on-orbit work is responsible, and that development of significantly more effective component level fault diagnosis equipment and repair equipment could enable application of oceanographic equipment maintenance strategies, enhancing safety and speeding laboratory work while giving significant cost reduction.

Lewis, William C.↗