Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Lander”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,135 records · Page 63

Current Status of NASA's Heavy Lift Plans

Numerous studies since the Apollo Program of the 1960s have highlighted the benefits of - and the need for - a national heavy lift launch capability to support human exploration, science, national security, and commercial development of space. NASA's most recent and most refined effort to develop that heavy lift capability is the Ares V. Ares V is a key element of NASA's Constellation Program. It s overall goal s part of approved national space policy is to retire the Space Shuttle and develop its successor, complete the International Space Station, and resume human exploration beyond low Earth orbit (LEO), beginning with exploration of the Moon as a step to other destinations in the Solar System. Ares V s first role is that of cargo vehicle to carry a lunar lander into Earth orbit, rendezvous with astronauts launched on the smaller Ares I crew launch vehicle, and perform the trans lunar injection (TLI) mission to send the mated crew and lander vehicles to the Moon. The design reference missions (DRMs) envisioned for it also include direct lunar cargo flights and a human Mars mission. Although NASA's priority from the start of the Constellation Program to the present has been development of the Ares I and Orion crew vehicle to replace the retiring Shuttle fleet, the Ares team has made significant progress in understanding the performance, design trades, technology needs, mission scenarios, ground and flight operations, cost, and other factors associated with heavy lift development. The current reference configuration was selected during the Lunar Capabilities Concept Review (LCCR) in fall 2008. That design has served since then as a point of departure for further refinements and trades among five participating NASA field centers. Ares V development to date has benefited from progress on the Ares I due to commonality between the vehicles. The Ares I first stage completed a successful firing of a 5-segment solid rocket motor. The Ares I-X launch Numerous studies since the Apollo Program of the 1960s have highlighted the benefits of and the need for - a national heavy lift launch capability to support human exploration, science, national security, and commercial development of space. NASA s most recent and most refined effort to develop that heavy lift capability is the Ares V. Ares V is a key element of NASA s Constellation Program. It s overall goal s part of approved national space policy is to retire the Space Shuttle and develop its successor, complete the International Space Station, and resume human exploration beyond low Earth orbit (LEO), beginning with exploration of the Moon as a step to other destinations in the Solar System. Ares V s first role is that of cargo vehicle to carry a lunar lander into Earth orbit, rendezvous with astronauts launched on the smaller Ares I crew launch vehicle, and perform the trans lunar injection (TLI) mission to send the mated crew and lander vehicles to the Moon. The design reference missions (DRMs) envisioned for it also include direct lunar cargo flights and a human Mars mission. Although NASA s priority from the start of the Constellation Program to the present has been development of the Ares I and Orion crew vehicle to replace the retiring Shuttle fleet, the Ares team has made significant progress in understanding the performance, design trades, technology needs, mission scenarios, ground and flight operations, cost, and other factors associated with heavy lift development. The current reference configuration was selected during the Lunar Capabilities Concept Review (LCCR) in fall 2008. That design has served since then as a point of departure for further refinements and trades among five participating NASA field centers. Ares V development to date has benefited from progress on the Ares I due to commonality between the vehicles. The Ares I first stage completed a successful firing of a 5-segment solid rocket motor. The Ares I-X launch successfully demonstrated in suborbital flighhe ability to assemble, prepare, launch, control and recover the Ares I configuration and compare performance to computer models. Component tests continue on the J-2X engine, which will put both the Ares I and Ares V upper stages into orbit. In addition, more than 100,000 parts have been manufactured or on the assembly line for the first J-2X powerpack and the first two development engines, with hot fire tests to begin in 2011. This paper will further detail the progress to date on the Ares V and planned activities for the remainder of 2010. In addition, the Ares V team has continued its outreach to potential user communities in science and national security. Through the Constellation Program, NASA has amassed an enormous knowledge base in the design, technologies, and operations of heavy lift launch vehicles that will be a national asset for any future launch vehicle decision. This early phase of the design presents the best opportunity to incorporate where possible the insights and needs of other users.

Creech, Steve↗

Pneumatic Proboscis Heat-Flow Probe

Heat flow is a fundamental property of a planet, and provides significant constraints on the abundance of radiogenic isotopes, the thermal evolution and differentiation history, and the mechanical properties of the lithosphere. Heat-flow measurements are also essential in achieving at least four of the goals set out by the National Research Council for future lunar exploration. The heat-flow probe therefore directly addresses the goal of the Lunar Geophysical Network, which is to understand the interior structure and composition of the Moon. A key challenge for heat flow measurement is to install thermal sensors to the depths approximately equal to 3 m that are not influenced by the diurnal, annual, and longer-term fluctuations of the surface thermal environment. In addition, once deployed, the heat flow probe should cause little disturbance to the thermal regime of the surrounding regolith. A heat-flow probe system was developed that has two novel features: (1) it utilizes a pneumatic (gas) approach, excavates a hole by lofting the lunar soil out of the hole, and (2) deploys the heat flow probe, which utilizes a coiled up tape as a thermal probe to reach greater than 3-meter depth. The system is a game-changer for small lunar landers as it exhibits extremely low mass, volume, and simple deployment. The pneumatic system takes advantage of the helium gas used for pressurizing liquid propellant of the lander. Normally, helium is vented once the lander is on the surface, but it can be utilized for powering pneumatic systems. Should sufficient helium not be available, a simple gas delivery system may be taken specifically for the heat flow probe. Either way, the pneumatic heat flow probe system would be much lighter than other systems that entirely rely on the electrical power of the lander.

Zacny, Kris↗

Sample Handling in Extreme Environments

Harsh environments, such as that on Venus, preclude the use of existing equipment for functions that involve interaction with the environment. The operating limitations of current high temperature electronics are well below the actual temperature and pressure found on Venus (460 deg C and 92 atm), so proposed lander configurations typically include a pressure vessel where the science instruments are kept at Earth-like temperature and pressure (25 deg C and 1 atm). The purpose of this project was to develop and demonstrate a method for sample transfer from an external drill to internal science instruments for a lander on Venus. The initial concepts were string and pneumatically driven systems; and the latter system was selected for its ability to deliver samples at very high speed. The pneumatic system was conceived to be driven by the pressure difference between the Venusian atmosphere and the inside of the lander. The pneumatic transfer of a small capsule was demonstrated, and velocity data was collected from the lab experiment. The sample transfer system was modeled using CAD software and prototyped using 3D printing. General structural and thermal analyses were performed to approximate the proposed system's mass and effects on the temperature and pressure inside of the lander. Additionally, a sampler breadboard for use on Titan was tested and functionality problems were resolved.

sample handling↗

Trajectory Design for MoonRise: A Proposed Lunar South Pole-Aitken Basin Sample Return Mission

This paper presents the mission design for the proposed MoonRise New Frontiers mission: a lunar far side lander and return vehicle, with an accompanying communication satellite. Both vehicles are launched together, but fly separate low-energy transfers to the Moon. The communication satellite enters lunar orbit immediately upon arrival at the Moon, whereas the lander enters a staging orbit about the lunar Lagrange points. The lander descends and touches down on the surface 17 days after the communication satellite enters orbit. The lander remains on the surface for nearly two weeks before lifting off and returning to Earth via a low-energy return.

NASA's New Frontie↗

ATHLETE: Lunar Cargo Handling for International Lunar Exploration

As part of the Human-Robot Systems Project within the NASA Exploration Technology Development Program, the Jet Propulsion Laboratory is developing a vehicle called ATHLETE: the All-Terrain Hex-Limbed Extra-Terrestrial Explorer. The basic idea of ATHLETE is to have six relatively small wheels on the ends of legs. The small wheels and associated drive actuators are much less massive than the larger wheels and gears needed for an "all terrain" vehicle that cannot "walk" out of extreme terrain. The mass savings for the wheels and wheel actuators is greater than the mass penalty of the legs, for a net mass savings. Starting in 2009, NASA became engaged in detailed architectural studies for international discussions with the European Space Agency (ESA), the Japanese Space Agency (JAXA), and the Canadian Space Agency (CSA) under the auspices of the International Architecture Working Group (IAWG). ATHLETE is considered in most of the campaign options considered, providing a way to offload cargo from large Altair-class landers (having a cargo deck 6+ meters above the surface) as well as offloading international landers launched on Ariane-5 or H-2 launch vehicles. These international landers would carry provisions as well as scientific instruments and/or small rovers that would be used by international astronauts as part of an international effort to explore the moon.Work described in this paper includes architectural studies in support of the international missions as well as field testing of a half-scale ATHLETE prototype performing cargo offloading from a lander mockup, along with multi-kilometer traverse, climbing over greater than 1 m rocks, tool use, etc.

International Collaboration in Space↗

Integrated Pressure-Fed Liquid Oxygen / Methane Propulsion Systems - Morpheus Experience, MARE, and Future Applications

An integrated liquid oxygen (LOx) and methane propulsion system where common propellants are fed to the reaction control system and main engines offers advantages in performance, simplicity, reliability, and reusability. LOx/Methane provides new capabilities to use propellants that are manufactured on the Mars surface for ascent return and to integrate with power and life support systems. The clean burning, non-toxic, high vapor pressure propellants provide significant advantages for reliable ignition in a space vacuum, and for reliable safing or purging of a space-based vehicle. The NASA Advanced Exploration Systems (AES) Morpheus lander demonstrated many of these key attributes as it completed over 65 tests including 15 flights through 2014. Morpheus is a prototype of LOx/Methane propellant lander vehicle with a fully integrated propulsion system. The Morpheus lander flight demonstrations led to the proposal to use LOx/Methane for a Discovery class mission, named Moon Aging Regolith Experiment (MARE) to land an in-situ science payload for Southwest Research Institute on the Lunar surface. Lox/Methane is extensible to human spacecraft for many transportation elements of a Mars architecture. This paper discusses LOx/Methane propulsion systems in regards to trade studies, the Morpheus project experience, the MARE NAVIS (NASA Autonomous Vehicle for In-situ Science) lander, and future possible applications. The paper also discusses technology research and development needs for Lox/Methane propulsion systems.

Hurlbert, Eric↗

Solar vs. Fission Surface Power for Mars

A multi-discipline team of experts from the National Aeronautics and Space Administration (NASA) developed Mars surface power system point design solutions for two conceptual missions. The primary goal of this study was to compare the relative merits of solar- versus fission-powered versions of each surface mission. First, the team compared three different solar power options against a fission power system concept for a sub-scale, uncrewed demonstration mission. The 4.5 meter (m) diameter pathfinder lander's primary mission would be to demonstrate Mars entry, descent, and landing techniques. Once on the Martian surface, the lander's In Situ Resource Utilization (ISRU) payload would demonstrate liquid oxygen propellant production using atmospheric resources. For the purpose of this exercise, location was assumed to be at the Martian equator. The three solar concepts considered included a system that only operated during daylight hours (at roughly half the daily propellant production rate of a round-the-clock fission design), a battery-augmented system that operated through the night (matching the fission concept's propellant production rate), and a system that operated only during daylight, but at a higher rate (again, matching the fission concept's propellant production rate). Including 30% mass growth allowance, total payload masses for the three solar concepts ranged from 1,116 to 2,396 kg, versus the 2,686 kg fission power scheme. However, solar power masses are expected to approach or exceed the fission payload mass at landing sites further from the equator, making landing site selection a key driver in the final power system decision. The team also noted that detailed reliability analysis should be performed on daytime-only solar power schemes to assess potential issues with frequent ISRU system on/off cycling. Next, the team developed a solar-powered point design solution for a conceptual four-crew, 500-day surface mission consisting of up to four landers per crewed expedition mission. Unlike the demonstration mission, a lengthy power outage due to the global dust storms that are known to occur on Mars would pose a safety hazard to a crewed mission. A similar fission versus solar power trade study performed by NASA in 2007 concluded that fission power was more reliable-with a much lower mass penalty-than solar power for this application. However, recent advances in solar cell and energy storage technologies and changes in operational assumptions prompted NASA to revisit the analysis. For the purpose of this exercise a particular landing site at Jezero Crater, located at 18o north latitude, was assumed. A fission power system consisting of four each 10 kW Kilopower fission reactors was compared to a distributed network of Orion-derived Ultraflex solar arrays and Lithium ion batteries mounted on every lander. The team found that a solar power system mass of about 9,800 kg would provide the 22 kilowatts (kW) keep-alive power needed to survive a dust storm lasting up to 120-days at average optical depth of 5, and 35 kW peak power for normal operations under clear skies. Although this is less than half the mass estimated during the 2007 work (which assumed latitudes up to 30o) it is still more than the 7,000 kg mass of the fission system which provides full power regardless of dust storm conditions.

Rucker, Michelle A.↗

NIAC Phase 1 Final Study Report on Titan Aerial Daughtercraft

Saturns giant moon Titan has become one of the most fascinating bodies in the Solar System. Even though it is a billion miles from Earth, data from the Cassini mission reveals that Titan has a very diverse, Earth-like surface, with mountains, fluvial channels, lakes, evaporite basins, plains, dunes, and seas [Lopes 2010] (Figure 1). But unlike Earth, Titans surface likely is composed of organic chemistry products derived from complex atmospheric photochemistry [Lorenz 2008]. In addition, Titan has an active meteorological system with observed storms and precipitation-induced surface darkening suggesting a hydrocarbon cycle analogous to Earths water cycle [Turtle 2011].Titan is the richest laboratory in the solar system for studying prebiotic chemistry, which makes studying its chemistry from the surface and in the atmosphere one of the most important objectives in planetary science [Decadal 2011]. The diversity of surface features on Titan related to organic solids and liquids makes long-range mobility with surface access important [Decadal 2011]. This has not been possible to date, because mission concepts have had either no mobility (landers), no surface access (balloons and airplanes), or low maturity, high risk, and/or high development costs for this environment (e,g. large, self-sufficient, long-duration helicopters). Enabling in situ mobility could revolutionize Titan exploration, similarly to the way rovers revolutionized Mars exploration. Recent progress on several fronts has suggested that small-scale rotorcraft deployed as daughtercraft from a lander or balloon mothercraft may be an effective, affordable approach to expanding Titan surface access. This includes rapid progress on autonomous navigation capabilities of such aircraft for terrestrial applications and on miniaturization, driven by the consumer mobile electronics market, of high performance of sensors, processors, and other avionics components needed for such aircraft. Chemical analysis, for example with a mass spectrometer, will be important to any Titan surface mission. Anticipating that it may be more practical to host chemical analysis instruments on a mothership than a daughtercraft, we defined system and mission concepts that deploy a small rotorcraft, termed a Titan Aerial Daughtercraft (TAD), from a lander or balloon to perform high-resolution imaging and mapping, potentially land to acquire microscopic images or other in situ measurements, and acquire samples to return to analytical instruments on the mothership. In principle, the ability to recharge batteries in TAD from a radioisotope or other long-lived power source on the mothership could enable multiple sorties. For a lander-based mission, a variety of landing sites is conceivable, including near lake margins, in dry lake beds, or in regions of plains, dunes, or putative cryovolanic or impact melt features. Such missions may require landing with greater precision than in previous missions (Huygens) and mission studies; this could also enhance the ability of TAD to reach interesting terrain from the landing site. Precision descent may also benefit balloon missions, with or without a daughtercraft, by increasing the probability that the balloon will drift over desired terrain early in its mission. Given these potential benefits, the overall concept studied here includes brief consideration of precision descent for landing or balloon deployment, followed by one or more sorties by a rotorcraft deployed from the mothership, with the ability to return to the mothership.

Saturn↗

Atmospheric Mining in the Outer Solar System: Outer Planet Resource Processing, Moon Base Propulsion,and Vehicle Design Issues

Atmospheric mining in the outer solar system has been investigated as a means of fuel production for high energy propulsion and power. Fusion fuels such as Helium 3 (3He) and deuterium can be wrested from the atmospheres of Uranus and Neptune and either returned to Earth or used in-situ for energy production. Helium 3 and deuterium were the primary gases of interest with hydrogen being the primary propellant for nuclear thermal solid core and gas core rocket-based atmospheric flight. A series of analyses were undertaken to investigate resource capturing aspects of atmospheric mining in the outer solar system. This included the gas capturing rate, storage options, and different methods of direct use of the captured gases. While capturing 3He, large amounts of hydrogen and 4He are produced. Analyses of orbital transfer vehicles (OTVs), landers, and in-situ resource utilization (ISRU) mining factories are included. Preliminary observations are presented on near-optimal selections of moon base orbital locations, OTV power levels, and OTV and lander rendezvous points. Based on earlier propulsion investigations, the analyses of round trip OTV flights from Uranus and Neptune to their major moons with a 10- Megawatt electric (MWe) OTV power level and a 200 metric ton (MT) lander payload were selected. The OTV power level was based on delivering a relatively short OTV trip time and minimization of the number of lander flights. Moon base sites at Uranus and Neptune and the OTV requirements to support them will also be addressed. These analyses will include all of the major moons of Uranus and Neptune. In addition, the total masses and mass delivery schedules needed for atmospheric mining are presented.

nuclear propulsion↗

Recent Efforts Enabling Martian Rotorcraft Missions

The Mars Helicopter (MH), launching as a part of the Mars 2020 mission, will begin a new era of planetary exploration. Mars research has historically been conducted through landers, rovers, and satellites. As both government and private industries prepare for human exploration of the Martian surface within two decades, more in depth knowledge of what awaits on the surface is critical. Planetary aerial vehicles increase the range of terrain that can be examined, compared to traditional landers and rovers and have more near surface capability than orbiters. The Jet Propulsion Laboratory (JPL) and NASA Ames are currently exploring possibilities for a Mars Science Helicopter (MSH), a second-generation Mars rotorcraft with the capability of conducting science investigations independently of a lander or rover (although this type of vehicle could also be used assist rovers or landers in future missions). Preliminary designs of coaxial-helicopter and hexacopter configurations have targeted the minimum capability of lifting a payload in the range of two to three kilograms with an overall vehicle mass of approximately twenty kilograms. These MSH designs’ sizes are constrained by the aeroshell dimensions(currently focused on employing legacy Pathfinder or MSL aeroshells), rather than vehicle structural or aeroperformance limitations. Feasibility of the MSH configurations has been investigated considering packaging/deployment, rotor aerodynamics, and structural analysis studies. Initial findings suggest not only the overall feasibility of MSH configurations but also indicate that improvements up to 11.1 times increase in range or 1.3 times increase in hover time might be achievable, even with an additional science payload, compared to the current design of the MH.

Withrow-Maser, Shannah↗

Mars Science Helicopter Conceptual Design

Robotic planetary aerial vehicles increase the range of terrain that can be examined, compared to traditional landers and rovers, and have more near-surface capability than orbiters. Aerial mobility is a promising possibility for planetary exploration as it reduces the challenges that difficult obstacles pose to ground vehicles. The first use of a rotorcraft for a planetary mission will be in 2021, when the Mars Helicopter technology demonstrator will be deployed from the Mars 2020 rover. The Jet Propulsion Laboratory and NASA Ames Research Center are exploring possibilities for a Mars Science Helicopter, a second-generation Mars rotorcraft with the capability of conducting science investigations independently of a lander or rover (although this type of vehicle could also be used assist rovers or landers in future missions). This report describes the conceptual design of Mars Science Helicopters. The design process began with coaxial-helicopter and hexacopter configurations, with a payload in the range of two to three kg and an overall vehicle mass of approximately twenty kg. Initial estimates of weight and performance were based on the capabilities of the Mars Helicopter. Rotorcraft designs for Mars are constrained by the dimensions of the aeroshell and lander for the trip to the planet, requiring attention to the aircraft packaging in order to maximize the rotor dimensions and hence overall performance potential. Aerodynamic performance optimization was conducted, particularly through airfoils designed specifically for the low Reynolds number and high Mach number inherent to operation on Mars. Rotor structural designs were developed that met blade frequency and weight targets, subject to material stress limits. The final designs show a substantial capability for science operations on Mars: a 31 kg hexacopter that fits within a 2.5 m diameter aeroshell could carry a 5 kg payload for 10 min of hover time or over a range of 5 km.

Wayne Johnson↗

In-Situ Surface Construction of Infrastructure

In situ resources offer an opportunity to reduce the amount of items brought from Earth when exploring moons and planets. Utilizing those resources requires energy that comes with a cost. In the case of human missions to Mars, trading surface power for launch mass is beneficial for propellant and consumables required to sustain human pioneering and settlement on the planet’s surface. However, In Situ Resource Utilization (ISRU) can mean far more than propellant production and consumables replacement for missions beyond Low Earth Orbit. NASA’s Systems Capability Leader-ship Team (SCLT) for ISRU created a work break-down structure based on functions identified in roadmaps pertaining to human exploration. That WBS includes Prospecting, Extraction, Processing, Construction, Manufacturing, and Energy. Over the years, NASA has developed some capabilities and technologies for prospecting, extraction, and processing carbon dioxide and water on Mars into propellants and life support consumables. However, that is a small subset of the ISRU needs that are coming to light with NASA’s push to return to the Moon for extended periods of time. For instance, astronauts require shielding from Ga-lactic Cosmic Rays and nuclear radiation and protection from the low temperatures and pressures in Space. Surface assets including crew, landers, and ascent modules can be damaged by surface ejecta during landing and launch operations on the Moon and Mars. Creating shielding, berms, and pads requires movement of large volumes and stabilization of regolith in the context of a civil engineering construction project. Because of the multi-disciplinary nature of the aerospace systems needed for human exploration, SCLT on ISRU created an ISRU Construction Integrated Steering Group that combines expertise among several NASA Principal Technologists and Capabilities Leaders for exploring options, assessing opportunities, and developing requirements for construction and manufacturing on the Moon and Mars NASA’s new program to develop Lunar landers for small, mid, and large payload deliveries to the Lunar surface leading to human missions by 2025 spawned an investigation into plume surface interactions caused by the lander during descent and ascent. The trade space to resolve this issue includes regolith stabilization via landing pad construction techniques and lander nozzles characteristics due to vehicle systems design. Some data exists from the Apollo missions but more is required for the missions ahead. The purpose of this paper [1] is to outline an approach for developing requirements that can guide systems designs while taking advantage of flight opportunities in NASA’s plans to return to the Moon.

In-Situ↗

MIP: the First ISRU Flight Experiment

The Mars ISPP Precursor, “MIP”, was a flight experiment on the 2001 Mars Surveyor Lander that was designed to demonstrate In-situ Propellant Production-- ISPP-- for the first time on Mars. The experiment was designed to show that it was possible to produce oxygen from the carbon dioxide atmosphere, and to demonstrate the individual technology components that would go into a full-scale production plant. The aimpoint of the oxygen production was to showcase the possibility of producing oxygen for use as rocket fuel, ultimately as an enabling technology for a future human expedition to Mars. The MIP team built and qualified flight hardware for the experiment to fly on the Surveyor-2001 lander, but following the failure of the 1999 Mars Polar Lander spacecraft, the Surveyor-2001 lander mission was cancelled, and the MIP experiment was never flown. The experience in building and testing the hardware did show that the carbon dioxide electrolysis process was feasible, and led to incorporation of in-situ propellant production into the NASA reference plans for human Mars missions. Twenty years later, the technology is flying to Mars in the form of the MOXIE experiment on the Perseverance rover.

Geoffrey A Landis↗

Mars Science Helicopter: Conceptual Design of the Next Generation of Mars Rotorcraft

Robotic planetary aerial vehicles increase the range of terrain that can be examined, compared to traditional landers and rovers, and have more near-surface capability than orbiters. Aerial mobility is a promising possibility for planetary exploration as it reduces the challenges that difficult obstacles pose to ground vehicles. The first use of a rotorcraft for a planetary mission will be in 2021, when the Ingenuity Mars helicopter technology demonstrator will be deployed via the Perseverance rover. NASA’s Jet Propulsion Laboratory and NASA Ames Research Center are exploring possibilities for a Mars Science Helicopter, a second-generation Mars rotorcraft with the capability of conducting science investigations independently of a lander or rover (although this type of vehicle could also be used to assist rovers or landers in future missions). Two, large rotorcraft configurations are described: a hexacopter and a co-axial helicopter with a payload in the range of two to three kilograms and an overall vehicle mass of approximately twenty kilograms. Additionally, advancements in technology over the course of the study are applied to a rotorcraft of the same size and form as Ingenuity. Initial estimates of weight and performance were based on the capabilities of Ingenuity. Rotorcraft designs for Mars are constrained by the dimensions of the aeroshell and lander for the trip to the planet, constraining maximum rotor dimensions and, hence, overall performance potential. The effects of airfoils designed specifically for the low Reynolds number and high Mach number inherent to operation on Mars were studied. Rotor structural designs were developed that met blade frequency and weight targets, subject to material stress limits. The final designs are representative of the vehicle configurations required for a large range of future missions and will require relatively minor adaptations once science tasks are chosen. These designs will be compared to Ingenuity to demonstrate technology advancements developed during the study.

Mars Science Helicopter↗

Mars Sample Return Conceptual Mission Overview

This talk will provide an overview of an overall Mars Sample Return campaign architecture, and the current concepts and options for the architecture and design of a Mars Sample Retrieval Lander (called Sample Retrieval Lander, SRL). The overall SRL mission concept and key mission objectives will be described, including the mission’s concept of operations and a notional timeline from launch to entry, through surface operations, to delivery of the samples to Mars orbit. The overall lander vehicle concept will be described, including current options being evaluated. Key lander element options will be discussed, including a Mars Ascent Vehicle (MAV), Fetch Rover, Orbiting Sample container (OS), and tube transfer robotics systems. Details of the notional Fetch Rover functions, constraints and operations will be discussed. Specific challenges and approaches for addressing those challenges will be discussed, including key technical margins and planetary protection. Major trade studies and implementation approaches and a proposed schedule will also be discussed. The information provided about possible Mars sample return architectures and concepts is for planning and discussion purposes only. NASA and ESA have made no official decisions to implement Mars Sample Return.

Beyer, Friederike↗

Mars Sample Return Conceptual Mission Overview

This talk will provide an overview of an overall Mars Sample Return campaign architecture, and the current concepts and options for the architecture and design of a Mars Sample Retrieval Lander (called Sample Retrieval Lander, SRL). The overall SRL mission concept and key mission objectives will be described, including the mission’s concept of operations and a notional timeline from launch to entry, through surface operations, to delivery of the samples to Mars orbit. The overall lander vehicle concept will be described, including current options being evaluated. Key lander element options will be discussed, including a Mars Ascent Vehicle (MAV), Fetch Rover, Orbiting Sample container (OS), and tube transfer robotics systems. Details of the notional Fetch Rover functions, constraints and operations will be discussed. Specific challenges and approaches for addressing those challenges will be discussed, including key technical margins and planetary protection. Major trade studies and implementation approaches and a proposed schedule will also be discussed. The information provided about possible Mars sample return architectures and concepts is for planning and discussion purposes only. NASA and ESA have made no official decisions to implement Mars Sample Return.

Beyer, Friederike↗

Large Vehicle Lunar Landing Surface Interaction and In-Situ Resource Based Risk Mitigation: Landing & Launch Pads

A key capability required for the exploration of planetary bodies is the ability to land on the surface. Previous work performed by NASA and other institutions has primarily focused on landing small spacecraft on planetary surfaces and the associated small-to-medium thrusters required for the soft landing. In the case of human exploration—particularly the establishment of long duration exploration and habitation outposts—the ability to land large landers, such as the SpaceX Starship, is necessary. These larger landing systems require the use of more powerful engines, with higher engine exhaust temperatures and higher landing loads. Understanding the excavation of material by the engines, as well as the potential for the landing legs to sink into the subsurface, is key in ensuring reliable and safe landings. A further improvement in landing reliability can be achieved by constructing landing / launch pads, especially with in-situ resources. Some material excavation by the plume is inevitable, leaving at least a portion of the surface scoured and uneven under the lander and ejecting regolith particles and rocks at very high velocities. One possible solution would be to robotically build landing / launch pads (ideally autonomously) at the destination using in-situ materials. In this case, the first one or few landers will need to land on unimproved surfaces at higher risk; however, they would bring the required equipment to build the landing pads with mostly local resources, thus increasing the reliability of safe landing for subsequent larger landers. A number of methods to build in-situ landing and launch pads have already been developed. These methods include no, or some, addition of required binder additives to the local regolith material, different processing approaches and result in varying landing pad strengths. A sub-scale rocket engine plume, was used to simulate some of the conditions of a landing on the Moon to assess the effectiveness of various materials for an in-situ built landing pad, The GO2/GCH4rocket engine fired on a 1m2area coupons of representative pad materials. The results will allow continued development towards materials that satisfy the landing pad properties required for the effective risk reduction and increased reliability for landing people and equipment on the lunar surface. This work contained two parts: (1) computer modeling of a large rocket engine plume interacting with regolith on the Moon, using the Granular Gas Flow Solver (GGFS) provided by CFD Research Corporation as well as other computational fluid dynamics codes (CFD) such as Loci/CHEM. (2) Developing landing/launch pad materials that could be used for in-situ construction on the lunar surface in the future, to mitigate the calculated effects of a large vehicle rocket engine landing and launching on the Moon.

Lunar↗

Neighbors on the Red Planet: Mars Science Laboratory Relay Coordination Post InSight Arrival

The Mars Science Laboratory (MSL) strategic communications planning toolset selects orbiter relay opportunities that the rover will use for transmitting data back to Earth. The toolset was extensively reworked in preparation for the Interior Exploration using Seismic Investigations, Geodesy and Heat Transport's (InSight) arrival at Mars in November 2018 and the regular use of Mars Atmosphere and Volatile Evolution (MAVEN) and Trace Gas Orbiter (TGO) orbiters as relay assets in addition to Mars Reconnaissance Orbiter (MRO) and 2001 Mars Odyssey (ODY). Overflight selection criteria was automated in the new toolset to take into account overflight deconfliction and down-selection as well as tactical timeline planning impacts and total data return. This was done while remaining flexible and configurable for changing mission priorities. As the Curiosity rover ages, the MSL planning team must overcome issues such as reduced budgets, memory bank anomalies, and reduced power availability. These are some examples of factors that affect the strategic communications planning toolset. In addition to adapting to evolving internal mission needs, the toolset must also be flexible to changes in the relay planning interface with other landers. The concept of shared relay or “split passes” was introduced when InSight began operating on Mars just 600 kilometers away and at the same longitude as MSL. This proximity meant that orbiters could now communicate with two landers during the same relay session. Over time, this new operational use-case became common practice as InSight and MSL settled into relay planning negotiations. Today, many TGO relay sessions are shared between MSL and InSight. As more orbiters pursue integrating this capability into nominal relay operations, and more landers arrive on Mars, the strategic communications process and toolsets increases in complexity. Development of a single tool that schedules relay sessions for all orbiters and landers simultaneously may become necessary as the number of Martian spacecraft increases. Examples of how toolset selection criteria and capabilities have helped or hindered MSL planning will be presented. Ongoing improvements to MSL toolsets and processes, as well as to shared relay tools such as Mars Relay Operations Service (MaROS) and General Telecom Predictor (GTP) are also discussed in this paper. Examples of how toolset selection criteria and capabilities have helped or hindered MSL planning will be presented. Ongoing improvements to MSL toolsets and processes, as well as to shared relay tools such as Mars Relay Operations Service (MaROS) and General Telecom Predictor (GTP) are also discussed in this paper.

Vandermey, Nancy↗