Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Data Qualification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,135 records · Page 63

New active asteroid 313P/Gibbs

We present initial observations of the newly discovered active asteroid 313P/Gibbs (formerly P/2014 S4), taken to characterize its nucleus and comet-like activity. The central object has a radius ∼0.5 km (geometric albedo 0.05 assumed). We find no evidence for secondary nuclei and set (with qualifications) an upper limit to the radii of such objects near 20 m, assuming the same albedo. Both aperture photometry and a morphological analysis of the ejected dust show that mass-loss is continuous at rates ∼0.2–0.4 kg s{sup −1}, inconsistent with an impact origin. Large dust particles, with radii ∼50–100 μm, dominate the optical appearance. At 2.4 AU from the Sun, the surface equilibrium temperatures are too low for thermal or desiccation stresses to be responsible for the ejection of dust. No gas is spectroscopically detected (limiting the gas mass-loss rate to <1.8 kg s{sup −1}). However, the protracted emission of dust seen in our data and the detection of another episode of dust release near perihelion, in archival observations from 2003, are highly suggestive of an origin by the sublimation of ice. Coincidentally, the orbit of 313P/Gibbs is similar to those of several active asteroids independently suspected to be ice sublimators, including P/2012 T1, 238P/Read, and 133P/Elst–Pizarro, suggesting that ice is abundant in the outer asteroid belt.

79 ASTRONOMY AND ASTROPHYSICS↗

Qualifications for Long-Term Analyses of Technological, Economic, and Other Obstacles Related to Alternative Electricity Supply Futures

Domestic wind power production is expanding dramatically, in support of U.S. Department of Energy (DOE) goals of supplying 20% of the nation’s electricity from the wind by 2030. While early progress is encouraging, meeting this goal will require not only installing many new wind turbines, but also making significant progress on many technological and scientific fronts involving both the extraction of power from the wind and its integration into the electricity grid. In 2008, a DOE-sponsored workshop consisting of industry, academia, and research laboratory representatives from around the world defined a set of research priorities to support increased wind-power production. The report prioritized (1) continued improvement of the many atmospheric models applied in wind power production, (2) coupling of different models to improve understanding of scale interactions involving various flow phenomena, and (3) the development of observational testbeds for collecting data focused on wind-energy related data gaps. LLNL possesses a broad base of tools and expertise to address each of these priorities, building on a long history of atmospheric boundary-layer simulation (ABL), global climate change research, and energy flow assessment.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Qualification of a Null Lens Using Image-Based Phase Retrieval

In measuring the figure error of an aspheric optic using a null lens, the wavefront contribution from the null lens must be independently and accurately characterized in order to isolate the optical performance of the aspheric optic alone. Various techniques can be used to characterize such a null lens, including interferometry, profilometry and image-based methods. Only image-based methods, such as phase retrieval, can measure the null-lens wavefront in situ - in single-pass, and at the same conjugates and in the same alignment state in which the null lens will ultimately be used - with no additional optical components. Due to the intended purpose of a Dull lens (e.g., to null a large aspheric wavefront with a near-equal-but-opposite spherical wavefront), characterizing a null-lens wavefront presents several challenges to image-based phase retrieval: Large wavefront slopes and high-dynamic-range data decrease the capture range of phase-retrieval algorithms, increase the requirements on the fidelity of the forward model of the optical system, and make it difficult to extract diagnostic information (e.g., the system F/#) from the image data. In this paper, we present a study of these effects on phase-retrieval algorithms in the context of a null lens used in component development for the Climate Absolute Radiance and Refractivity Observatory (CLARREO) mission. Approaches for mitigation are also discussed.

Bolcar, Matthew R.↗

Towards in-situ certification of additively manufactured parts: the vital roles of physics-based and data-driven models

Certifying additively manufactured (AM) parts in-situ at the completion of a build is an enticing prospect, as it can help reduce the high costs associated with post-build testing and evaluation. However, achieving this goal presents significant challenges that may keep it aspirational for the foreseeable future. Nonetheless, incremental progress can pave the way forward. A critical aspect of in-situ certification involves continuous quality checking due to the random nature of the AM process and the difficulties in detecting defects or anomalies once layers are built over. While real-time in-situ monitoring strategies assisted by machine learning (ML) play a pivotal role in auditing part quality, they must ideally be supported by real-time (or near real-time) adaptive process control enabled by ML-assisted decision-making. By analyzing in-situ monitoring data in real-time (or near real- time) to dynamically adjust manufacturing parameters, such intervention can ensure AM parts are built to meet stringent certification standards. This can be achieved virtually by using high-fidelity performance models for the physical testing and evaluation tasks. In this short editorial, we discuss the key contributions made by data-driven and physics-based models in providing intelligence to the monitoring and process control tasks underpinning in-situ certification and in the simulation of the build’s performance under test and service conditions. While our focus lies in metal AM, the concepts discussed here are also relevant to other AM processes.

: In-situ monitoring↗

Comparison of Zirconium Redistribution in BISON EBR-II Models Using FIPD and IMIS Databases with Experimental Post Irradiation Examination

Metallic fuels have seen increased interest for future sodium fast reactors due to their material properties: high thermal conductivities and advantageous neutronic properties allow for greater fission densities. One drawback to typical metallic fuels is zirconium redistribution, which impacts this advantageous material and its neutronic properties. Unfortunately, the processes behind zirconium migration behavior are understood using first principles, so before these fuels are implemented in future fast reactors, characterization and fuel qualification regimes must be completed. These activities can be supported through the use of robust modeling using the most accurate empirical models currently available to fuel researchers around the world. The tool that allows researchers to model this complex coupled thermo-mechanical behavior and nuclear properties is BISON. Additionally, BISON model parameters need to be compared against PIE measurements. The current work utilizes two fuel pins from EBR-II experiment X441 to optimize various model parameters, including porosity correction factor, thermal conductivity, phase transition temperature, and diffusion coefficient multipliers, before implementing the final model for seven fuel pins with differing characteristics. To properly evaluate the BISON simulations, the results are compared to PIE metallography data for each fuel pin, to ensure the zirconium redistribution is properly reflected in the simulation results. Six out of seven analyzed fuel pins demonstrate good agreement between the metallography images and BISON results, showing alignment of the Zr-rich, Zr-depleted, and moderately Zr-enriched zones at various axial heights along the fuel pins. Further work is needed to refine the model parameters for general pin use.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Evaluation of Commercial-Off-The-Shelf (COTS) Electronics for Extreme Cold Environments

Deep space and Icy Moon missions (Titan, Enceladus, Ceres, Europa, & Ganymede) will need qualified extreme environment capable components for electronic systems located in extremities of their rovers and spacecraft. Commercial off the shelf (COTS) components would be advantageous to use for some aspects of such projects, given that they are easier to procure and offer a broad range of functionalities. Furthermore, theoretical and experimental data suggest that many COTS parts are capable of operation, and not just storage, at temperatures well beyond the manufacturer specified temperature limits. To help address the challenges presented at near cryogenic temperatures, a COTS selection knowledge base is being developed to estimate the performance of COTS components within cold environments. The knowledge base captures queries from a range of information sources such as cold functionality test results for part types and families, theoretical and experimental literature reviews and key findings are summarized here. In addition, a selection of components are planned to be examined for their performance to near cryogenic temperatures to generate a methodology for identification and verification of the COTS candidates. As the qualification of COTS parts for extreme environments can be very costly, this knowledge base can serve to reduce qualification time and cost by pre-selecting and limiting candidates.

Mojarradi, Mohammad↗

AST Launch Vehicle Acoustics

The liftoff phase induces acoustic loading over a broad frequency range for a launch vehicle. These external acoustic environments are then used in the prediction of internal vibration responses of the vehicle and components which result in the qualification levels. Thus, predicting these liftoff acoustic (LOA) environments is critical to the design requirements of any launch vehicle. If there is a significant amount of uncertainty in the predictions or if acoustic mitigation options must be implemented, a subscale acoustic test is a feasible pre-launch test option to verify the LOA environments. The NASA Space Launch System (SLS) program initiated the Scale Model Acoustic Test (SMAT) to verify the predicted SLS LOA environments and to determine the acoustic reduction with an above deck water sound suppression system. The SMAT was conducted at Marshall Space Flight Center and the test article included a 5% scale SLS vehicle model, tower and Mobile Launcher. Acoustic and pressure data were measured by approximately 250 instruments. The SMAT liftoff acoustic results are presented, findings are discussed and a comparison is shown to the Ares I Scale Model Acoustic Test (ASMAT) results.

Houston, Janice↗

The Mission and Technology of a Gas Dynamic Trap Neutron Source for Fusion Material and Component Testing and Qualification

The successful operation (with {beta} {le} 60%, classical ions and electrons with Te = 250 eV) of the Gas Dynamic Trap (GDT) device at the Budker Institute of Nuclear Physics (BINP) in Novosibirsk, Russia, extrapolates to a 2 MW/m{sup 2} Dynamic Trap Neutron Source (DTNS), which burns only {approx}100 g of tritium per full power year. The DTNS has no serious physics, engineering, or technology obstacles; the extension of neutral beam lines to steady state can use demonstrated engineering; and it supports near-term tokamaks and volume neutron sources. The DTNS provides a neutron spectrum similar to that of ITER and satisfies the missions specified by the materials community to test fusion materials (listed as one of the top grand challenges for engineering in the 21st century by the U.S. National Academy of Engineering) and subcomponents (including tritium-breeding blankets) needed to construct DEMO. The DTNS could serve as the first Fusion Nuclear Science Facility (FNSF), called for by ReNeW, and could provide the data necessary for licensing subsequent FSNFs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Electric Six Degree of Freedom Installation Timelapse (Six Degree of Freedom Dynamic Test System)

The Six-degree-of-freedom Dynamic Test System (SDTS) is a short-range real-time motion based testing platform. Its primary use at NASA/JSC has been for development and qualification testing of docking systems, robotic assisted berthing mechanisms, and dynamic attachment systems. The SDTS is a closed-loop force feedback system that can simulate on-orbit contact dynamics between two vehicles utilizing the actual mechanical interfaces for testing. The facility is controlled by interconnected computers running real-time simulation software that takes measured contact forces, integrates the equations of motion in real time, and provide those states back into the motion table. This infrastructure can also be used for non-mating applications such as relative position sensor testing/evaluations. The SDTS facility provides a superstructure for mounting test articles, multiple test sensors, an intercom network for voice communications, and a synchronized timing system for data acquisition that includes HD video. This time-lapse video shows the buildup and testing of a modern electric actuation system created by Mikrolar, Inc. at the Johnson Space Center. This motion base will replace the current hydraulic actuator system, which is been in use since the 1970s, for all-future NASA testing. Once the system goes through customization to provide JSC’s unique closed-loop environment, the facility will help certify docking system and attach mechanisms on the ground before we send the first woman and the next man to the lunar surface

hexapod↗

Technology Implementation Plan: Irradiation Testing and Qualification for Nuclear Thermal Propulsion Fuel

This document is a notional technology implementation plan (TIP) for the development, testing, and qualification of a prototypic fuel element to support design and construction of a nuclear thermal propulsion (NTP) engine, specifically its pre-flight ground test. This TIP outlines a generic methodology for the progression from non-nuclear out-of-pile (OOP) testing through nuclear in-pile (IP) testing, at operational temperatures, flows, and specific powers, of an NTP fuel element in an existing test reactor. Subsequent post-irradiation examination (PIE) will occur in existing radiological facilities. Further, the methodology is intended to be nonspecific with respect to fuel types and irradiation or examination facilities. The goals of OOP and IP testing are to provide confidence in the operational performance of fuel system concepts and provide data to program leadership for system optimization and fuel down-selection. The test methodology, parameters, collected data, and analytical results from OOP, IP, and PIE will be documented for reference by the NTP operator and the appropriate regulatory and oversight authorities. Final full-scale integrated testing would be performed separately by the reactor operator as part of the preflight ground test.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

RESULTS OF TESTS TO DEMONSTRATE A SIX-INCH DIAMETER COATER FOR PRODUCTION OF TRISO-COATED PARTICLES FOR ADVANCED GAS REACTOR EXPERIMENTS

The Next Generation Nuclear Plant (NGNP)/Advanced Gas Reactor (AGR) Fuel Development and Qualification Program includes a series of irradiation experiments in Idaho National Laboratory's (INL's) Advanced Test Reactor. TRISOcoated particles for the first AGR experiment, AGR-1, were produced at Oak Ridge National Laboratory (ORNL) in a twoinch diameter coater. A requirement of the NGNP/AGR Program is to produce coated particles for later experiments in coaters more representative of industrial scale. Toward this end, tests have been performed by Babcock and Wilcox (B&W) in a six-inch diameter coater. These tests are expected to lead to successful fabrication of particles for the second AGR experiment, AGR-2. While a thorough study of how coating parameters affect particle properties was not the goal of these tests, the test data obtained provides insight into process parameter/coated particle property relationships. Most relationships for the six-inch diameter coater followed trends found with the ORNL two-inch coater, in spite of differences in coater design and bed hydrodynamics. For example the key coating parameters affecting pyrocarbon anisotropy were coater temperature, coating gas fraction, total gas flow rate and kernel charge size. Anisotropy of the outer pyrolytic carbon (OPyC) layer also strongly correlates with coater differential pressure. In an effort to reduce the total particle fabrication run time, silicon carbide (SiC) was deposited with methyltrichlorosilane (MTS) concentrations up to 3 mol %. Using only hydrogen as the fluidizing gas, the high concentration MTS tests resulted in particles with lower than desired SiC densities. However when hydrogen was partially replaced with argon, high SiC densities were achieved with the high MTS gas fraction.

08 HYDROGEN↗

Backscatter Ultraviolet (BUV) Instrument

This final project report covers the design, development, construction, testing and qualification of the NIMBUS D BUV (Backscatter Ultraviolet) instrument. The instrument was designed and constructed in accordance with GSFC specification S-623-P-l and amendments. The design phase consisted of activity in three areas of technology: (1) Optical, (2) Mechanical, and (3) Electrical. Beckman Instruments, Inc. performed the tasks concerned with optical and mechanical design while Analog Technology Corporation was the electronics subcontractor. Initial studies resulted in the development of a breadboard model of the BUV instrument. Following extensive testing, additional mathematical analyses, and required modifications, preliminary and critical design reviews were performed. The results of these activities were the construction of an engineering model, used for extensive testing and demonstration of the final design features. Final design data resulted in the construction of two flight-rated instruments, serial numbers P103 and Fl04. On April 8, 1970, the P103 instrument was successfully launched into orbit on NIMBUS D and is presently fully operational.

Source record↗

RESULTS OF TESTS TO DEMONSTRATE A SIX-INCH-DIAMETER COATER FOR PRODUCTION OF TRISO-COATED PARTICLES FOR ADVANCED GAS REACTOR EXPERIMENTS

The Next Generation Nuclear Plant (NGNP)/Advanced Gas Reactor (AGR) Fuel Development and Qualification Program includes a series of irradiation experiments in Idaho National Laboratory’s (INL’s) Advanced Test Reactor. TRISOcoated particles for the first AGR experiment, AGR-1, were produced at Oak Ridge National Laboratory (ORNL) in a two inch diameter coater. A requirement of the NGNP/AGR Program is to produce coated particles for later experiments in coaters more representative of industrial scale. Toward this end, tests have been performed by Babcock and Wilcox (B&W) in a six-inch diameter coater. These tests are expected to lead to successful fabrication of particles for the second AGR experiment, AGR-2. While a thorough study of how coating parameters affect particle properties was not the goal of these tests, the test data obtained provides insight into process parameter/coated particle property relationships. Most relationships for the six-inch diameter coater followed trends found with the ORNL two-inch coater, in spite of differences in coater design and bed hydrodynamics. For example the key coating parameters affecting pyrocarbon anisotropy were coater temperature, coating gas fraction, total gas flow rate and kernel charge size. Anisotropy of the outer pyrolytic carbon (OPyC) layer also strongly correlates with coater differential pressure. In an effort to reduce the total particle fabrication run time, silicon carbide (SiC) was deposited with methyltrichlorosilane (MTS) concentrations up to 3 mol %. Using only hydrogen as the fluidizing gas, the high concentration MTS tests resulted in particles with lower than desired SiC densities. However when hydrogen was partially replaced with argon, high SiC densities were achieved with the high MTS gas fraction.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Consideration of Thermal Embrittlement in Alloy 316H for Advanced Non-Light Water Reactor Applications

To construct advanced non-light water reactors (ANLWRs) operating in the temperature range above that for the traditional light water reactors (LWRs), Alloy 316H is one of the candidate materials because of its inexpensiveness, significant service experience, and qualification for nuclear applications by the American Society of Mechanical Engineers (ASME). However, during the life span at temperatures expected for the ANLWRs, the alloy is likely to experience thermal embrittlement that has not been a concern for the traditional LWRs. To prepare for the development, the possibility of adverse thermal embrittlement effects on Alloy 316H performance in the ANLWRs must be evaluated and a technical basis regarding thermal embrittlement, if necessary, must be established for structural integrity analysis to provide reasonable assurance of adequate nuclear safety protection.In this paper, current technical basis for nuclear applications of Alloy 316H deterioration from thermal aging is briefly introduced. The likelihood of adverse thermal embrittlement effects on Alloy 316H performance is evaluated through historical data on microstructural and mechanical property evolution. Characterization of thermal embrittlement is then discussed, followed by a review of predictive models and trend curves for alloy embrittlement. Based on the review and evaluation, technical gaps for addressing thermal embrittlement issues are identified and gap-filling actions are recommended for establishing a technical basis to enable adequate consideration of thermal embrittlement in Alloy 316H applications to the ANLWRs.

Ren, Weiju↗

Characterization of Pinhole Collimators for High-Resolution Gamma Imaging of Irradiated Fuel

Post-irradiation examination (PIE) of nuclear fuels requires imaging tools capable of resolving isotopic and spatial features with high throughput. This project contributes to a proof-of-concept effort aimed at advancing gamma emission tomography (GET) by evaluating novel fine-aperture pinhole collimators. Two Rose’s metal collimators, 100 µm (20° acceptance angle) and 350 µm (30° acceptance angle), were prototyped and characterized for their effectiveness in transporting gamma rays through the pinhole aperture. To support data collection, a Python-based data acquisition system was developed to coordinate a rotation stage, linear stage, and CZT detector, reducing latency in high-rate gamma event logging to one second per acquisition. Queue-based file writing enabled seamless real-time data capture for count rates up to 35,000 counts per second (cps). List-mode parsing algorithms were implemented to differentiate single and simultaneous gamma interactions for future tomographic reconstruction. Detector response was evaluated in both spectroscopy and list mode acquisition methods across varying source distances to confirm absolute and collimator efficiencies. Preliminary efficiency figures suggest effective collimation of gamma-rays with energies below 700 keV, with ~4% residual intensity through the aperture for Cs-137. The impact of collimator geometry on image quality is currently being evaluated. This groundwork supports the ongoing development of a sub mm resolution cone-beam CT system for imaging fuel phantoms, an essential step toward improving GET efficiency and accelerating nuclear fuel qualification efforts.

46 - INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AN↗

Safety Testing of AGR-2 UCO Compacts 5-2-2, 2-2-2, and 5-4-1

Post-irradiation examination (PIE) is being performed on tristructural-isotropic (TRISO) coated-particle fuel compacts from the Advanced Gas Reactor (AGR) Fuel Development and Qualification Program second irradiation experiment (AGR-2). This effort builds upon the understanding acquired throughout the AGR-1 PIE campaign, and is establishing a database for the different AGR-2 fuel designs. The AGR-2 irradiation experiment included TRISO fuel particles coated at BWX Technologies (BWXT) with a 150-mm-diameter engineering-scale coater. Two coating batches were tested in the AGR-2 irradiation experiment. Batch 93085 had 508-μm-diameter uranium dioxide (UO 2 ) kernels. Batch 93073 had 427-μm-diameter UCO kernels, which is a kernel design where some of the uranium oxide is converted to uranium carbide during fabrication to provide a getter for oxygen liberated during fission and limit CO production. Fabrication and property data for the AGR-2 coating batches have been compiled and compared to those for AGR-1. The AGR-2 TRISO coatings were most like the AGR-1 Variant 3 TRISO deposited in the 50-mm-diameter ORNL lab-scale coater. In both cases argon-dilution of the hydrogen and methyltrichlorosilane coating gas mixture employed to deposit the SiC was used to produce a finer-grain, more equiaxed SiC microstructure. In addition to the fact that AGR-1 fuel had smaller, 350-μm-diameter UCO kernels, notable differences in the TRISO particle properties included the pyrocarbon anisotropy, which was slightly higher in the particles coated in the engineering-scale coater, and the exposed kernel defect fraction, which was higher for AGR-2 fuel due to the detected presence of particles with impact damage introduced during TRISO particle handling.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Structural Health Monitoring: Using an Autoencoder to Identify Damage in a Bolted Joint [Capstone Project]

Los Alamos National Laboratory (LANL) is an important fixture in the United States Department of Energy’s (DOE) National Nuclear Security Agency (NNSA) complex. LANL is one of the largest national laboratories in the country, and the laboratory’s primary mission is to support the nation’s nuclear stockpile. The lab functions as a design agencies for the NNSA and performs extensive testing on weapons as part of that mission. The shock and vibration test team at LANL utilizes electrodynamic shaker systems for important qualification testing in support of the laboratory’s mission. Modern engineering relies heavily on bolted joints to connect two objects. During these shaker tests, engineers depend on bolted joints to secure the test article to a fixture and the fixture to the table. The test article may be hazardous and contain high explosives which could create a safety issue if a bolted joint failed. A loss of preload in a bolt will affect the way energy is input to the system and may introduce nonlinearities as the joint opens and closes. The loss of preload can create challenges controlling the test and make acquired signals useless. Being able to monitor preload within bolted joints during testing can improve the quality of the data and keep workers safe.

42 ENGINEERING↗

Obtaining cryogenic molecular transport data for analysis

The James Webb Space Telescope (JWST) has a primary mirror, made of 18 segments, and a secondary mirror (SM) that are used to direct the light of desired targets. While on orbit, the secondary mirror assembly (SMA) was stowed for approximately 10 days and was subject to molecular contamination outgassing from the cavity of the secondary mirror support structure (SMSS) in-board hinge (IBH) which contains cables, motors, resolvers, and coatings. The main concern during this period before SMA deployment is the accumulation of ice due to the lack of a heater on the SMA. The temperature differentials between the IBH surfaces and SMA could cause redistribution of contaminants. To address this concern, single layer insulation (SLI) was used to create adequate venting and path redirection of outgassing from the IBH. Two separate thermal vacuum tests were performed to quantify this contamination: one Z307 ASTM E 1559 materials test of the radiator paint used on the motor of the IBH and a separate test on a primary mirror backplane assembly (PMBA) qualification engineering test unit (ETU) of the IBH. These tests approximately followed the predicted SMA pre-deployment thermal environment. To quantify source rates in case of a leak, the motor and resolver sides were separated and quartz crystal microbalances (QCM) were used to measure the deposition of water. The SLI redesign and implementation and outgassing measurements to understand leak effects from the IBH were essential to mitigate the deposition of contamination on the SMA.

James Webb Space Telescope, contamination, cleanro↗