Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BOOSTER”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,135 records · Page 63

Space shuttle phase B wind tunnel model and test information. Volume 2: Orbiter configuration

Archived wind tunnel test data are available for flyback booster or other alternate recoverable configurations as well as reusable orbiters studied during initial development (Phase B) of the Space Shuttle. Considerable wind tunnel data was acquired by the competing contractors and the NASA centers for an extensive variety of configurations with an array of wing and body planforms. All contractor and NASA wind tunnel test data acquiredin the Phase B development have been compiled into a database and are available for applying to current winged flyback or recoverable booster aerodynamic studies. The Space Shuttle Phase B Wind Tunnel Database is structured by vehicle component and configuration type. Basic components include the booster, the orbiter, and the launch vehicle. Booster configuration types include straight and delta wings, canard, cylindrical, retroglide, and twin body. Orbiter configuration types include straight and delta wings, lifting body, drop tanks, and double delta wings. Launch configration types include booster and orbiter components in various stacked and tandom combinations. The digital database consists of 220 files of data containing basic tunnel recorded data.

Glynn, J. L.↗

Space shuttle phase B wind tunnel model and test information. Volume 3: Launch configuration

Archived wind tunnel data are available for flyback booster or other alternative recoverable configurations as well as reusable orbiters studied during initial development (Phase B) of the Space Shuttle. Considerable wind tunnel data was acquired by the competing contractors and the NASA Centers for an extensive variety of configurations with an array of wing and body planforms. All contractor and NASA wind tunnel data acquired in the Phase B development have been compiled into a data base and are available for application to current winged flyback or recoverable booster aerodynamic studies. The Space Shuttle Phase B Wind Tunnel Database is structured by vehicle component and configuration type. Basic components include booster, orbiter and launch vehicle. Booster configuration types include straight and delta wings, canard, cylindrical, retroglide and twin body. Orbital configuration types include straight and delta wings, lifting body, drop tanks and double delta wings. This is Volume 3 (Part 2) of the report -- Launch Configuration -- which includes booster and orbiter components in various stacked and tandem combinations.

Glynn, J. L.↗

Space shuttle phase B wind tunnel model and test information. Volume 3: Launch configuration

Archived wind tunnel test data are available for flyback booster or other alternate recoverable configuration as well as reusable orbiters studied during initial development (Phase B) of the Space Shuttle, including contractor data for an extensive variety of configurations with an array of wing and body planforms. The test data have been compiled into a database and are available for application to current winged flyback or recoverable booster aerodynamic studies. The Space Shuttle Phase B Wind Tunnel Database is structured by vehicle component and configuration. Basic components include booster, orbiter, and launch vehicle. Booster configuration types include straight and delta wings, canard, cylindrical, retroglide and twin body. Orbiter configurations include straight and delta wings, lifting body, drop tanks and double delta wings. Launch configurations include booster and orbiter components in various stacked and tandem combinations. The digital database consists of 220 files containing basic tunnel data. Database structure is documented in a series of reports which include configuration sketches for the various planforms tested. This is Volume 3 -- launch configurations.

Glynn, J. L.↗

Finite element analysis of the Space Shuttle 2.5-inch frangible nut

Finite element analysis of the Space Shuttle 2.5-inch frangible nut was conducted to improve understanding of the current design and proposed design changes to this explosively-actuated nut. The 2.5-inch frangible nut is used in two places to attach the aft end of the Space Shuttle Orbiter to the External Tank. Both 2.5-inch frangible nuts must function to complete safe separation. The 2.5-inch frangible nut contains two explosive boosters containing RDX explosive each capable of splitting the nut in half, on command from the Orbiter computers. To ensure separation, the boosters are designed to be redundant. The detonation of one booster is sufficient to split the nut in half. However, beginning in 1987 some production lots of 2.5-inch frangible nuts have demonstrated an inability to separate using only a single booster. The cause of the failure has been attributed to differences in the material properties and response of the Inconel 718 from which the 2.5-inch frangible nut is manufactured. Subsequent tests have resulted in design modifications of the boosters and frangible nut. Model development and initial analysis was conducted by Sandia National Laboratories (SNL) under funding from NASA Lyndon B. Johnson Space Center (NASA-JSC) starting in 1992. Modeling codes previously developed by SNL were transferred to NASA-JSC for further analysis on this and other devices. An explosive bolt with NASA Standard Detonator (NSD) charge, a 3/4-inch frangible nut, and the Super*Zip linear separation system are being modeled by NASA-JSC.

Darin N. McKinnis↗

Launch Architecture Impact on Ascent Abort and Crew Survival

A study was performed to assess the effect of booster configuration on the ascent abort process. A generic abort event sequence was created and booster related risk drivers were identified. Three model boosters were considered in light of the risk drivers: a solid rocket motor configuration, a side mount combination solid and liquid configuration, and a stacked liquid configuration. The primary risk drivers included explosive fireball, overpressure, and fragment effects and booster-crew module re-contact. Risk drivers that were not specifically booster dependent were not addressed. The solid rocket configuration had the most benign influence on an abort while the side mount architecture provided the most challenging abort environment.

Mathias, Donovan L.↗

Wind Tunnel Investigation of the Supersonic Stage Separation Aerodynamics of a Generic 0.0175-Scale Bimese Two-Stage-to-Orbit Reusable Launch Vehicle Configuration

A wind tunnel investigation was conducted of the supersonic stage separation aerodynamics of a generic two-stage-to-orbit bimese wingbody configuration in the NASA Langley Research Center Unitary Plan Wind Tunnel. Proximity and isolated model testing was conducted at Mach numbers of 2.3, 3.0, and 4.5 and a unit Reynolds number of 2.0 million per foot using 0.0175-scale models of the Langley Glide-Back Booster concept designated as the orbiter and booster in belly-to-belly and back-to-belly configurations. Longitudinal forces and moments were obtained on both models and surface static pressure measurements were obtained on the orbiter model at 328 relative proximity locations and at relative angles of attack of 0 degrees and 5 degrees. The test results supported a larger effort to develop and validate experimental and computational tools applicable to the design and simulation of stage separation and abort procedures for reusable launch vehicles composed of multiple bodies, including winged bodies. An initial proof-of-concept experiment featuring low-cost uninstrumented models was conducted to verify an emerging automated model control system and new support system hardware, and to identify potential model and support system blockage and unsteady aerodynamics/model dynamics prior to committing to higher-fidelity instrumented models. This investigation led to upgrades in the facility stage separation hardware, calibration and testing techniques and capabilities, and data analysis and documentation methodologies that have been extended to the more recent NASA Constellation and Space Launch System crew and cargo launch vehicle programs. A virtual diagnostics interface methodology was used to facilitate the design of the stage separation support hardware, to position the models in the test section, and to define the experimental test space. Advances in the facility automated model positioning system established a foundation for the development of a continuous-sweep data acquisition technique that is responsible for significant productivity improvements to the current NASA Space Launch System test program. The automated model positioning capability was leveraged to conduct a companion statistically-designed stage separation experiment requiring randomization of the relative proximity positions of the orbiter and booster models. The respective zones of influence and interference effects of the orbiter and booster were identified from three-dimensional scatter plots, contour and influence maps, and two-dimensional plotting methods. The highly-nonlinear, shock-dominated aerodynamic characteristics of the orbiter and booster in the Unitary Plan Wind Tunnel exhibited good agreement with independent test data obtained in a NASA Marshall Space Flight Center wind tunnel and with computational fluid dynamics predictions using a compressible, three-dimensional flow solver and an inviscid, unstructured Cartesian method.

Erickson, Gary E.↗

NSLS-II injector commissioning and initial operation

The injector for the National Synchrotron Light Source II (NSLS-II) storage ring consists of a 3 GeV booster synchrotron and a 200 MeV S-band linac. The linac was designed to produce either a single bunch with a charge of 0.5 nC of electrons or a train of bunches up to 300 ns long containing a total charge of 15 nC. The booster was designed to accelerate up to 15 nC each cycle in a train of bunches up to 300 ns long. Linac commissioning was completed in April 2012. Booster commissioning was started in November 2013 and completed in March 2014. All of the significant design goals were satisfied including beam emittance, energy spread, and transport efficiency. While the maximum booster charge accelerated was only 10 nC, this has proven to be more than sufficient for storage ring commissioning and operation. The injector has operated reliably during storage ring operation since then. Results will be presented showing measurements of linac and booster operating parameters achieved during commissioning and initial operation. Operating experience and reliability during the first year of NSLS-II operation will be discussed.

43 PARTICLE ACCELERATORS↗

Proton Beam Intensity Upgrades for the Neutrino Program at Fermilab

Fermilab is committed to upgrading its accelerator complex towards the intensity frontier to pursue HEP research in the neutrino sector and beyond. The upgrade has two steps: 1) the Proton Improvement Plan (PIP), which is underway, has its primary goal to start providing 700 kW beam power on NOvA target by the end of 2017 and 2) the foreseen PIP–II will replace the existing LINAC, a 400 MeV injector to the Booster, by an 800 MeV superconducting LINAC by the middle of next decade, with output beam intensity from the Booster increased significantly and the beam power on the NOvA target increased to <1.2 MW. In any case, the Fermilab Booster is going to play a very significant role for the next two decades. In this context, we have recently developed and commissioned an innovative beam injection scheme for the Booster called "early injection scheme". This scheme is already in operation and has a potential to increase the Booster beam intensity from the PIP design goal by a considerable amount with a reduced beam emittance and beam loss. In this paper, we will present results from our experience from the new scheme in operation, current status and future plans.

43 PARTICLE ACCELERATORS↗

Beam Transport and Diagnostics for the NSLS-II Injection System

The NSLS-II is a state of the art 3 GeV synchrotron light source being developed at BNL. The injection system will consist of a 200 MeV linac, 3 GeV booster synchrotron, and associated transfer lines. The transport lines between the linac and booster (LtB) and the booster and storage ring (BSR) must satisfy a number of requirements. In addition to transporting the beam while maintaining the beam emittance, these lines must allow for commissioning, provide appropriate diagnostics, allow for the appropriate safety devices and in the case of the BSR line, provide a stable beam for top off injection. Appropriate diagnostics are also necessary in the linac and booster to complement the measurements in the transfer lines and to allow for fast commissioning. In this paper we discuss the design of the transfer lines for the NSLSII along with the incorporated diagnostics and safety systems. Necessary diagnostics in the linac and booster are also discussed.

43 PARTICLE ACCELERATORS↗

Boosted Fast Flux Loop Final Report

The Boosted Fast Flux Loop (BFFL) project was initiated to determine basic feasibility of designing, constructing, and installing in a host irradiation facility, an experimental vehicle that can replicate with reasonable fidelity the fast-flux test environment needed for fuels and materials irradiation testing for advanced reactor concepts. Originally called the Gas Test Loop (GTL) project, the activity included (1) determination of requirements that must be met for the GTL to be responsive to potential users, (2) a survey of nuclear facilities that may successfully host the GTL, (3) conceptualizing designs for hardware that can support the needed environments for neutron flux intensity and energy spectrum, atmosphere, flow, etc. needed by the experimenters, and (4) examining other aspects of such a system, such as waste generation and disposal, environmental concerns, needs for additional infrastructure, and requirements for interfacing with the host facility. A revised project plan included requesting an interim decision, termed CD-1A, that had objectives of' establishing the site for the project at the Advanced Test Reactor (ATR) at the Idaho National Laboratory (INL), deferring the CD 1 application, and authorizing a research program that would resolve the most pressing technical questions regarding GTL feasibility, including issues relating to the use of booster fuel in the ATR. Major research tasks were (1) hydraulic testing to establish flow conditions through the booster fuel, (2) mini-plate irradiation tests and post-irradiation examination to alleviate concerns over corrosion at the high heat fluxes planned, (3) development and demonstration of booster fuel fabrication techniques, and (4) a review of the impact of the GTL on the ATR safety basis. A revised cooling concept for the apparatus was conceptualized, which resulted in renaming the project to the BFFL. Before the subsequent CD-1 approval request could be made, a decision was made in April 2006 that further funding for the project would be suspended. Remaining funds have been used to prepare and irradiate mini-plates of the proposed booster fuel. The current baseline design is for a set of three test positions inside an in-pile tube with a thermal neutron absorber and heat sink made of aluminum mixed with hafnium. Operating the ATR at power levels needed to achieve the required fast flux will result in an estimated increase in ATR fuel consumption between 15 and 20% above present rates and a reduction in the time between fuel replacements. Preliminary safety analyses conducted have indicted safe operation of the ATR with the GTL under normal, abnormal, and postulated accident conditions. More comprehensive analyses are needed.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Preservation and control of the proton and deuteron polarizations in the proposed electron-ion collider at Jefferson Lab

We propose a scheme of preserving the proton and deuteron beam polarizations during acceleration and storage in the proposed electron-ion collider at Jefferson Lab. This scheme allows one to provide both the longitudinal and transverse polarization orientations of the proton and deuteron beams at the interaction points of the figure-8 ion collider ring. We discuss questions of matching the polarization direction at all stages of the beam transport including the pre-booster, large booster and ion collider ring.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

PIP-II 800 MeV Proton Linac Beam Pattern Generator

The PIP2 IT Beam Pattern Generator is the system that synchronizes beam injection and the RF systems between the PIP2 LINAC to the Booster. The RF frequencies of these two accelerator systems are not harmonically related. Synchronization is accomplished by controlling two MEBT Beam Choppers, which select 162.5MHz beam bunches from the LEBT and RFQ to produce an appropriate reduced beam bunch pattern that enables bucket-to-bucket transfer to the Booster RF at 46.46MHz (84th harmonic). This chopping pattern also reduces the beam current to an average of 2mA over the Booster injection, matching the Linac nominal beam current. The BPG also generates the RF frequency/phase reference which the Booster will phase lock to during injection. The BPG is fully programmable, allowing for arbitrary beam patterns with adjustable timing parameters, having a fine adjustment resolution of 38ps. The latter is accomplished using digital signal processing techniques. This paper discusses the design of the BPG, its construction, test results, and operational experience after being integrated into the PIP2 IT test accelerator and concludes with a discussion of the system’s performance and future plans.

43 PARTICLE ACCELERATORS↗

Experimental longitudinal emittance manipulation using laser-based photoionization in the Fermilab Linac

A series of simulations and beam studies were conducted at Fermilab’s linear accelerator to evaluate the effectiveness of longitudinal emittance control via laser-induced photoionization. While similar laser techniques have been employed at Fermilab to enhance injection and extraction efficiency into the Booster, the work presented here focuses on extending these methods to bunch-by-bunch manipulation. This approach utilizes fine-scale correction of the H- bunches’ longitudinal spatial distribution. In theory, loosely confined particles in longitudinal phase space contribute to emittance growth during acceleration. By selectively removing these outlying particles through laser scraping (H- + γ → H + e-), this growth can be reduced. This report presents experimental results from both symmetric and asymmetric longitudinal scraping of H⁻ bunches in the Fermilab linac, which were subsequently injected into Booster, and evaluates the broader applicability of this method for future high-intensity accelerator operations.

Landon, Parker [Boston U.; Fermilab]↗

Adiabatic Capture and Debunching

In the study of beam preparation for the g-2 experiment, adiabatic debunching and adiabatic capture are revisited. The voltage programs for these adiabbatic processes are derived and their properties discussed. Comparison is made with some other form of adiabatic capture program. The muon g-2 experiment at Fermilab calls for intense proton bunches for the creation of muons. A booster batch of 84 bunches is injected into the Recycler Ring, where it is debunched and captured into 4 intense bunches with the 2.5-MHz rf. The experiment requires short bunches with total width less than 100 ns. The transport line from the Recycler to the muon-production target has a low momentum aperture of ~ ±22 MeV. Thus each of the 4 intense proton bunches required to have an emittance less than ~ 3.46 eVs. The incoming booster bunches have total emittance ~ 8.4 eVs, or each one with an emittance ~ 0.1 eVs. However, there is always emittance increase when the 84 booster bunches are debunched. There will be even larger emittance increase during adiabatic capture into the buckets of the 2.5-MHz rf. In addition, the incoming booster bunches may have emittances larger than 0.1 eVs. In this article, we will concentrate on the analysis of the adiabatic capture process with the intention of preserving the beam emittance as much as possible. At this moment, beam preparation experiment is being performed at the Main Injector. Since the Main Injector and the Recycler Ring have roughly the same lattice properties, we are referring to adiabatic capture in the Main Injector instead in our discussions.

43 PARTICLE ACCELERATORS↗

A Comparison of High Intensity Proton Efficiencies for Rf Harmonics 1 and 2

There have been many changes to the Booster setup over the past seven years, but the most fundamental physical change is probably the change from an Rf harmonic of 2 to 1. By looking at the intensity data over this period it is possible to compare the running efficiencies in each case. The harmonic change occurred at the beginning of the 1998 run. Another fundamental, though administrative, change that occurred after the 1998 run was the advent of ALARA alarms that limit the amount of beam loss that is allowed to occur during different parts of the cycle. These ALARA alarm limits also depend on the AGS repetition period since it is the amount of beam energy lost per unit time that is used as the criterion for these alarms. The 1998 h=1 run did not have an ALARA constraint, but subsequent h=1 runs did have that constraint. The highest Booster proton intensity was obtained in the h=2 mode (about 23 Tp). At best, the h=1 mode only yielded about 20 Tp per cycle. Is it because the h=2 setup can produce higher intensity than the h=1 setup that the h=2 intensity was higher, or is it because other factors are responsible? This note seeks to shed some light on this question. In order to compare the two setups (h=1 vs. h=2) intensity scaler data was taken from the setup books over the past seven years. In general, this data was taken when the Booster was in an optimized state. What ‘optimized’ means is not so clearly defined, but would typically mean that the Booster configuration was ‘optimized’ so that it yields the highest intensity late in the AGS given physical and other constraints.

43 PARTICLE ACCELERATORS↗

Search for Electron Neutrino Anomalies with the MicroBooNE Detector

The Micro Booster Neutrino Experiment (MicroBooNE) is a Liquid Argon Time Projection Chamber (LArTPC) located in the Booster Neutrino Beam at Fermi National Accelerator Laboratory. The experiment was devised to investigate a series of observed anomalies concerning short-baseline neutrino oscillation physics. The LArTPC technology enables the experiment to study neutrino-argon scattering with unprecedented detail.This thesis presents a cosmic-ray characterisation and rate measurement. The understanding of cosmic activity in the detector - MicroBooNE's dominant background - is then used to develop cosmic rejection tools. A flavour-agnostic neutrino selection is constructed, which forms the cornerstone of this and further analyses. Inclusive muon and electron charged-current neutrino interaction selections with unprecedented purity and efficiency are presented.The first fully-automated characterisation of electron neutrinos in a muon neutrino beam with the LArTPC detector technology is performed. The Booster Neutrino Beam has an energy peaking around 1GeV and an intrinsic electron content of approximately 0.5%. The analysis investigates electrons produced in charged-current electron neutrino interactions. The kinematics of the electrons are measured along with comparisons to simulation. Most of the systematic uncertainties are constrained using a data-driven sample of charged-current muon neutrino events. The measurement of electron neutrinos originating from the Booster Neutrino Beam is a crucial component towards understanding the nature of the observed excess of low-energy electromagnetic-like events at its predecessor, MiniBooNE.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Mechanical Design and Vacuum Pressure Impregnation of Combined Function Electromagnets

There are 96 combined function magnets, 48 focusing and 48 defocusing, that have been in operation in the Fermi NAL Booster without a critical failure requiring replacement for over 50 years. The Proton Improvement Plan-II (PIP-II) poses risk to these magnets and Fermilab does not currently have the tooling or knowledge of process to fabricate spares. Two new variants of these magnets are needed to reduce beam loss by having a larger aperture (Booster Gradient Defocusing Wide, or BGDS) and create space for a new injection system (Booster Gradient Defocusing Short, or BGDS). Risk of failure and need for spares will increase substantially with the implementation of PIP-II in consequence of a frequency increase from 15 Hz to 20 Hz and a 30 percent increase in peak to ground voltage. The BGDS and BGDW magnets will be fabricated in the same way as the current booster magnets so that future combined function magnet spares can be produced using learned processes.

Szabo, B. [Fermilab]↗

Estimation of the Required Dipole Corrector Magnetic Field for PIP-II Injection Based on Beam Studies

The Fermilab Booster will accept a 600 µs beam pulse from the new superconducting Linac for PIP-II operations. The Booster is a rapid-cycling synchrotron that uses a resonant magnet circuit ramping at 15 Hz. For PIP-II, the cycle rate will increase to 20 Hz, and the injection pulse length will expand from 40 µs to 600 µs due to the lower output current from the new Linac. Because the Booste main bending field follows a sinusoidal waveform, the magnetic field is not constant during the extended injection window. The longer pulse length and higher repetition rate modify the beam orbit and can lead to increased beam losses. The Booster contains 48 dipole-corrector packages distributed across its 24 periods. Each package includes horizontal and vertical dipoles, quadrupole, sextupole, skew-quadrupole, and skew-sextupole elements. By driving the dipole correctors with an appropriately shaped sinusoidal waveform during injection, we can compensate the changing main field and create an effectively flat bending field—referred to as flat injection. Over the past several years, machine studies have been performed to characterize the required correction fields and to determine the corresponding power-supply specifications needed for PIP-II operation. In this presentation, we will summarize the study results and discuss the estimated magnetic field requirements and power supply parameters for achieving flat injection in the Booster.

Seiya, K. [Fermilab] (ORCID:0000000250576943)↗