Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “AmP”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,135 records · Page 63

Energy Transmission and Infrastructure Northern Ohio (OH)

The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: • improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; • identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); • analyze the potential within the district to utilize farm wastes to produce biofuels; • enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; • identify the policy, regulatory, and financial barriers impeding development of a new energy system; and • improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the College’s yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energy-delivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Initial Experiences with the NEAMS Early User Program

In FY 2012, the NEAMS program initiated an Early User Program to get the modeling and simulation codes being developed by the program into the hands of “friendly” users outside the development team. The primary purpose of this activity was to provide the development teams with independent feedback as to the scientific and computational performance of the codes, their usability and other factors. It also serves to provide the stakeholders of the NEAMS program with visibility into the progress and capability of the codes prior to their anticipated first full official release in 2018. Seven teams were supported under the FY 2012 Early User program, working with the BISON/MOOSE and AMP fuel performance codes, and the Nek5000 computational fluid dynamics code for reactor modeling, primarily in validation studies. The program was considered successful and useful by the Product Line Leads, and worked largely as expected. However we have noted a number of areas in which the program could be adjusted and improved in the future. The most significant have to do with ensuring Early Users get training on the applications as early as possible, and finding ways to reduce some of the constraints imposed by the NEAMS financial schedule and the effects of Continuing Resolutions.

Baird, Mark L.↗

Advanced Battery Manufacturing (VA)

LiFeBATT has concentrated its recent testing and evaluation on the safety of its batteries. There appears to be a good margin of safety with respect to overheating of the cells and the cases being utilized for the batteries are specifically designed to dissipate any heat built up during charging. This aspect of LiFeBATT’s products will be even more fully investigated, and assuming ongoing positive results, it will become a major component of marketing efforts for the batteries. LiFeBATT has continued to receive prismatic 20 Amp hour cells from Taiwan. Further testing continues to indicate significant advantages over the previously available 15 Ah cells. Battery packs are being assembled with battery management systems in the Danville facility. Comprehensive tests are underway at Sandia National Laboratory to provide further documentation of the advantages of these 20 Ah cells. The company is pursuing its work with Hybrid Vehicles of Danville to critically evaluate the 20 Ah cells in a hybrid, armored vehicle being developed for military and security applications. Results have been even more encouraging than they were initially. LiFeBATT is expanding its work with several OEM customers to build a worldwide distribution network. These customers include a major automotive consulting group in the U.K., an Australian maker of luxury off-road campers, and a number of makers of E-bikes and scooters. LiFeBATT continues to explore the possibility of working with nations that are woefully short of infrastructure. Negotiations are underway with Siemens to jointly develop a system for using photovoltaic generation and battery storage to supply electricity to communities that are not currently served adequately. The IDA has continued to monitor the progress of LiFeBATT’s work to ensure that all funds are being expended wisely and that matching funds will be generated as promised. The company has also remained current on all obligations for repayment of an IDA loan and lease payments for space to the IDA. A commercial venture is being formed to utilize the LiFeBATT product for consumer use in enabling photovoltaic powered boat lifts. Field tests of the system have proven to be very effective and commercially promising. This venture is expected to result in significant sales within the next six months.

25 ENERGY STORAGE↗

Managing Aging Effects on Dry Cask Storage Systems for Extended Long-Term Storage and Transportation of Used Fuel – Revision 1

Because there is currently no designated disposal site for used nuclear fuel in the United States, the nation faces the prospect of extended long-term storage (i.e., >120 years) and deferred transportation of used fuel at operating and decommissioned nuclear power plant sites. Under U.S. federal regulations contained in Title 10 of the Code of Federal Regulations (CFR) 72.42, the initial license term for an Independent Spent Fuel Storage Installation (ISFSI) must not exceed 40 years from the date of issuance. Licenses may be renewed by the U.S. Nuclear Regulatory Commission (NRC) at the expiration of the license term upon application by the licensee for a period not to exceed 40 years. Applications for ISFSI license renewals must include the following: 1. Time-limited aging analyses (TLAAs) that demonstrate that structures, systems, and components (SSCs) important to safety will continue to perform their intended function for the requested period of extended operation, and 2. A description of the aging management program (AMP) for management of issues associated with aging that could adversely affect SSCs important to safety. In addition, the application must include design basis information as documented in the most recently updated final safety analysis report, as required by 10 CFR 72.70. Information contained in previous applications, statements, or reports filed with the Commission under the license may be incorporated by reference, provided that these references are clear and specific.

Chopra, O. K.↗

Managing Aging Effects on Dry Cask Storage Systems for Extended Long-Term Storage and Transportation of Used Fuel (Rev. 2)

At present, the United States does not have a designated disposal site for used nuclear fuel — the nation therefore faces the prospect of extended long‐term storage (i.e., >60 years) and deferred transportation of used fuel at operating and decommissioned nuclear power plant sites. Under current U.S. federal regulations contained in Title 10 of the Code of Federal Regulations (CFR) 72.42, the initial license term for an Independent Spent Fuel Storage Installation (ISFSI) must not exceed 40 years from the date of issuance (20 years before the rule change in 2010 that became effective in 2011). The U.S. Nuclear Regulatory Commission (NRC) may renew licenses at the expiration of the license term upon application by the licensee for a period not to exceed 40 years. Applications for ISFSI license renewals must include the following: 1. Time‐limited aging analyses (TLAAs) that demonstrate that structures, systems, and components (SSCs) important to safety will continue to perform their intended function for the requested period of extended operation and 2. A description of the aging management program (AMP) for the management of issues associated with aging that could adversely affect SSCs important to safety. In addition, the application must include design basis information as documented in the most recently updated final safety analysis report, as required by 10 CFR 72.70. Information contained in previous applications, statements, or reports filed with the Commission under the license may be incorporated by reference, provided that these references are clear and specific. The NRC has issued the “Standard Review Plan for Renewal of Spent Fuel Dry Cask Storage System Licenses and Certificates of Compliance,” NUREG‐1927, under which NRC may renew a specific license or a Certificate of Compliance (CoC) for a term not to exceed 40 years. Both the license and the CoC renewal applications must contain revised technical requirements and operating conditions (fuel storage, surveillance and maintenance, and other requirements) for the ISFSI and dry cask storage system (DCSS) that address aging effects that could affect the safe storage of the used fuel. The information contained in the license and CoC renewal applications will require NRC review to verify that the aging effects on the SSCs in DCSSs/ISFSIs are adequately managed for the requested period of extended operation. To date, all of the ISFSIs across the United States with more than 1,500 dry casks loaded with used fuel have initial license terms of 20 years — three ISFSIs (Surry, H.B. Robinson, and Oconee) have received their renewed licenses for 40 years, and two other ISFSIs (Calvert Cliffs and Prairie Island) have applied for license renewal for 40 years. In addition, renewal of the CoC for the VSC‐24 system is pending approval from NRC.

Chopra, O. K.↗

Preshot Calculations for a Small-Scale HE Experiment. Overview and Results for Symmetric Configurations

Explosively-driven magnetic flux compression generators create substantial currents (10’s of mega-amps) by compressing magnetic fields initially created by injected seed currents. In a Ranchero generator it is the field between two cylinders of aluminum that is compressed when the inner cylinder (armature) is driven across the magnetized gap toward the second cylinder (stator). All Rancheros to date have used the explosive PBXN-110, but future devices are expected to use PBX-9501 because of several advantages of the latter over the former. For Ranchero applications, though, a potentially important disadvantage stems from the requirement that the large PBX-9501 charges (15 to 50 kg) must built up from smaller machined pieces rather than cast into the appropriate shape as with PBXN-110. Calculations and related experiments raise the possibility that jetting may occur at gaps between machined pieces of PBX-9501 and lead to localized failure of the soft aluminum armature causing premature contact of the armature with the stator or, in the most extreme case, a severing of the armature into separate pieces and a subsequent loss of current. A set of small-scale experiments has been designed to provide Ranchero designers and users insight into the effects of gaps and also to provide useful data for the validation of Ranchero calculations. These experiments should be executed in early May 2015. The code Rage was used to model the small-scale experiment and this paper presents the results. The emphasis here is on the calculations and the experimental details are limited, so the interested reader is referred to reference 5 for a fuller description of the experimental configuration and diagnostics. Less-interested readers may be interested in only a summary of results and are directed to the “Summary of key results” section later in this paper.

36 MATERIALS SCIENCE↗

Experimental Comparison of PV-Smoothing Controllers using Distributed Generators

The power output variability of photovoltaic systems can affect local electrical grids in locations with high renewable energy penetrations or weak distribution or transmission systems. In those rare cases, quick controllable generators (e.g., energy storage systems) or loads can counteract the destabilizing effects by compensating for the power fluctuations. Previously, control algorithms for coordinated and uncoordinated operation of a small natural gas engine-generator (genset) and a battery for smoothing PV plant output were optimized using MATLAB/Simulink simulations. The simulations demonstrated that a traditional generation resource such as a natural gas genset in combination with a battery would smooth the photovoltaic output while using a smaller battery state of charge (SOC) range and extending the life of the battery. This paper reports on the experimental implementation of the coordinated and uncoordinated controllers to verify the simulations and determine the differences in the controllers. The experiments were performed with the PNM PV and energy storage Prosperity site and a gas engine-generator located at the Aperture Center at Mesa Del Sol in Albuquerque, New Mexico. Two field demonstrations were performed to compare the different PV smoothing control algorithms: (1) implementing the coordinated and uncoordinated controls while switching off a subsection of the PV array at precise times on successive clear days, and (2) comparing the results of the battery and genset outputs for the coordinated control on a high variability day with simulations of the coordinated and uncoordinated controls. It was found that for certain PV power profiles the SOC range of the battery may be larger with the coordinated control, but the total amp-hours through the battery-which approximates battery wear-will always be smaller with the coordinated control.

14 SOLAR ENERGY↗

Testing of TAMU3: a Nb 3 Sn Block–Coil Dipole with Stress Management

The Accelerator Research Lab (ARL) at Texas A&M has recently concluded the construction and testing of a superconducting block-coil dipole TAMU3. TAMU3 reached 85% of the resistive-onset short sample critical current (0.1 μV/cm criterion) that was measured on extracted strands at the National High Magnetic Field Lab. Peak magnet current was 6603 amps, and all with quenches originated in the vicinity of the hard-way chicane near the exit lead of the TAMU3c inner winding. Leading up to the testing we discovered that we had made two grievous mistakes in the fabrication (we mistakenly used the wrong superconducting wire for the cables of the inner windings) and the heat treatment (we used a heat treatment that was too hot and too long). We extracted strands from the leads of the inner and outer windings, and colleagues at NHMFL performed short-sample measurements upon them. The NHMFL measurements indicated RRR ~ 2-5, which gives very little stability against microquenches. The short-sample tests of the extracted strands exhibited a long resistive transition, in which there was a current I sc (B) beyond which it became resistive, then a higher current In(B) at which it went fully normal. Using the I sc (B) data we predicted a short-sample limit for the revised load line of TAMU3 of 7700 A (9 T) – a disappointing reduction from the 14 T objective. On those unhappy notes we undertook the testing of the dipole. The first quench occurred at 5695 A, and the dipole trained thereafter to a maximum quench current of 6600 A (7.6 T), 85% of the compromised short-sample limit. All quenches occurred at a single location, in the region of the S-bend transition and outer lead of one inner winding. Data was collected from stress transducers on the outer windings to evaluate stress management, and on the coil ends to evaluate capture of axial forces by staticfriction lock. The low field reached prevented us from extending those tests to the stress levels where they would have become most interesting, but the designed stress management appeared to be working at the level tested.

43 PARTICLE ACCELERATORS↗

Light Water Reactor Sustainability Program: Evaluation of Localized Cable Test Methods for Nuclear Power Plant Cable Aging Management Programs

This Pacific Northwest National Laboratory (PNNL) milestone report describes progress to date on the investigation of nondestructive test (NDE) methods focusing particularly on local measurements that provide key indicators of cable aging and damage. The work includes a review of relevant literature as well as hands-on experimental verification of inspection capabilities. As NPPs consider applying for second, or subsequent, license renewal (SLR) to extend their operating period from 60 years to 80 years, it important to understand how the materials installed in plant systems and components will age during that time and develop aging management programs (AMPs) to assure continued safe operation under normal and design basis events (DBE). Normal component and system tests typically confirm the cables can perform their normal operational function. The focus of the cable test program is directed toward the more demanding challenge of assuring the cable function under accident or DBE. Most utilities already have a program associated with their first life extension from 40 to 60 years. Regrettably, there is neither a clear guideline nor a single NDE that can assure cable function and integrity for all cables. Thankfully, however, practical implementation of a broad range of tests allows utilities to develop a practical program that assures cable function to a high degree. The industry has adopted 50% elongation at break (EAB) relative to the un-aged cable condition as the acceptability standard. All tests are benchmarked against the cable EAB test. EAB is a destructive test so the test programs must apply an array of other NDE tests to assure or infer the overall set of cable’s system integrity. These cable NDE programs vary in rigor and methodology. As the industry gains experience with the efficacy of these programs, it is expected that implementation practice will converge to a more common approach. This report addresses the range of local NDE cable tests that are or could be practically implemented in a field test situation. These tests include: visual, infrared thermography, interdigital capacitance, indenter, relaxation time indenter, dynamic mechanical analyzer, infrared/near-infrared spectrometry, ultrasound, and distributed fiber optic temperature measurement.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Thermal FEA for Front End Fixed Mask (SST)

The purpose of this study was to determine the temperature of the Fixed Mask using heat loads of the U42 Undulator. Finite Element Analysis was conducted on the fixed mask, to determine the temperature distribution on it, for 500 milli-amp current for NSLS-II. The Fixed mask has the sine wave surface profile.

36 MATERIALS SCIENCE↗

Prediction of Circuit Response to an Electromagnetic Environment (ASC IC FY2020 Milestone 7179)

This report covers the work performed in support of the ASC Integrated Codes FY20 Milestone 7179. For the Milestone, Sandia's Xyce analog circuit simulator was enhanced to enable a loose coupling to Sandia's EIGER electromagnetic (EM) simulation tool. A device was added to Xyce that takes as its input network parameters (representing the impedance response) and short-circuit current induced in a wire or other element, as calculated by an EM simulator such as EIGER. Simulations were performed in EIGER and in Xyce (using Harmonic Balance analysis) for a variety of linear and nonlinear circuit problems, including various op amp circuits. Results of those simulations are presented and future work is also discussed.

42 ENGINEERING↗

New High-Energy & Safe Battery Technology with Extreme Fast Charging Capability for Automotive Applications (Final Technical Report)

Being able to refill a cars gas tank when low on fuel is incredibly convenient and is a lacking feature for battery elective vehicles. New High-Energy & Safe Battery Technology with Extreme Fast Charging Capability for Automotive Applications was a research project designed to help correct this lacking feature by developing automotive sized Li-ion battery cells and demonstrating their ability to charge in under 10-minutes. To address the technical challenges Microvast, a cell manufacturer, was joined by Argonne National Labs, battery technology innovator, and BMW, a renown OEM, worked together to define and validate materials and cells for this project. By projects end, Microvast had successfully built and demonstrated a 240 Wh/kg, 35 Ah pouch cell that was capable of over 800 10-minute charge, full discharge cycles. From the outset of the project the plan was to use large amp-hour cells (ie automotive relevant sizes) to ensure the project findings and outcomes were most relevant for electric vehicle applications. The manufacture of cells was done using test manufacturing lines at Microvast and BMW that closely resemble the procedures of a Li-ion battery cell factory.

25 ENERGY STORAGE↗

Development of a New Neutron Electric Dipole Moment Experiment at LANL [Slides]

Conclusion: New timing filter amps and power supplies for the PMTs have been procured. The second switcher is built and will be tested with UCN soon. The second simultaneous spin analyzer is being built at Indiana University and will be tested this year. We plan to start taking production data from next year

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Characterization of CST Post-Processing AP-105 Hanford Tank Waste

The primary goal of the Tank Side Cesium Removal (TSCR) system, under development by Washington River Protection Solutions, LLC (WRPS), is to remove entrained solids and 137 Cs from the Hanford tank waste supernate to expedite production of low-activity waste. Ion exchange (IX) testing of 10.9 L of waste from Hanford tank 241-AP-105 (AP-105), performed by Pacific Northwest National Laboratory, used a lead-lag-polish column format, with a bed volume of 10 mL per column, to decontaminate tank waste supernate using crystalline silicotitanate (CST) as the IX media. The AP-105 Cs IX processing test, discussed elsewhere, resulted in a shorter transition zone (i.e., steeper load curve) than those defined by wastes from tanks 241-AP-107 and 241-AW-102.1 The shorter transition zone was indicative of a matrix effect retarding Cs capacity. Therefore, aliquots of spent CST from the lead, lag, and polish columns were subjected to a digestion protocol to quantify analytes retained by the CST and extrapolate the impact on Cs capacity. The spent CST was digested using a combination of 5 M HNO 3 and H 2 O 2 with vigorous heating and stirring. Due to the radiation dose accompanying the 137 Cs on the CST columns, a secondary Cs separation by ammonium molybdophosphate embedded in polyacrylonitrile (AMP-PAN) was performed to separate the 137 Cs from the CST so the samples could be contact-handled for analysis outside of a shielded facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

IC Report for project “Developing nonlinear laser-plasma instability models for high-fidelity, multi-physics simulation capability for ICF/HED” [Slides]

We’ve achieved our technical goals: (1) Perform large-scale kinetic simulations of SRS and CBET a range of plasma and laser conditions; (2) Develop a new $\delta f$-Gaussian-mixture algorithm to represent non-Maxwellian distribution functions from particle trapping and time-dependent plasma response; (3) Develop physics-based preliminary nonlinear LPI models for coupling to LRT/ Mazinisin and AMP; and (4) Begin implementation of LPI sub-grid models into Mazinisin.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Laser Welder Startup Capacitor Failure Analysis & Suggested Potential Mitigation Factors [Slides]

On the morning of the failure (Mon 2/23/2023 5 AM), an unclassified Yttrium Aluminum Garnet Laser Welder system was working within operational parameters. However, when another part was positioned for drilling and it was activated, the coolant compressor was heard shutting off by everyone working on the laser. The coolant pump reportedly failed due to blown 5-amp fuses. Since the coolant pump was offline, the laser was automatically placed into an inoperable state. Failure of the coolant pump was due to a failed capacitor in the startup circuit for the pump.

42 ENGINEERING↗

Dual Triggered Beam Extraction Kicker (Rev. 1)

A Blumlein modulator is a relatively inexpensive pulsed power device that can deliver highly repeatable pulses that can be used to change the path of beam pulses. The modulator is primarily built with transmission line cable which is relatively inexpensive. Due to the highly repeatable nature of a Blumlein modulator it is a great tool for kicking beam pulses while producing very little spill or losses in beam current. One of the challenges with a Blumlein kicker is that the length of the kicking pulse output by the modulator is determined by the length of the cables. Cable lengths are set prior to implementation for the desired kicking pulse width. The Blumlein modulator at LANSCE uses a single thyratron which can deliver two 50-kilovolt 1,000-amp pulses of opposite polarity to kicking plates at the same time. This method makes for a very strong kick that is highly repeatable. A method that has been discussed, to deliver a different pulse width, is to add a second trigger that would be fired, once the desired pulse width has been delivered, cutting out the remaining pulse. The second trigger would offer a lot of variability with the pulse width of the kicker. This method has only ever been attempted using low current and relatively low voltages compared to the scale needed to properly kick a beam pulse. This in turn allows for the use of power supplies with a higher repetition rate. The advancement of this standard kicker technology in the accelerator facilities would attract attention within the scientific and engineering communities. The project detailed within will investigate the capabilities of different triggering topologies and design a prototype dual triggered Blumlein kicker modulator capable of variable kicking pulse width.

43 PARTICLE ACCELERATORS↗

Design and Prototyping of a Novel Toroid Magnet System for the MOLLER Experiment at Jefferson Lab

The Thomas Jefferson National Accelerator Facility (JLab) has designed a unique spectrometer system to measure the weak interaction between electrons. The experiment ?Measurement of Lepton-Lepton Electroweak Reaction? (MOLLER) requires leveraging the recent 12 GeV electron beam upgrade and will run in JLab for 3 years. Focusing the signal for the MOLLER experiment requires five water-cooled toroidal magnets, each with unique geometry and with 7-fold symmetry. This system of magnets provides the magnetic field required to separate the incident beam electrons scattered from the target electrons (Møller scattering) and protons (elastic e-p scattering) in a liquid hydrogen target. The conceptual design was developed by the MOLLER collaboration and was given to JLab in the form of amp turns and physical location, with additional physics requirements. This paper presents prototyping of the coils and magnet support system and discusses the lessons learned during the process along with the plans for full magnet testing and installation. The JLab Magnet Group along with the MOLLER collaboration developed the specification document that includes keep out zones to design the set of magnets. JLab contracted the design of the first toroid magnet in the magnet (TM0) to Massachusetts Institute of Technology. The other four toroid magnets (TM1 through TM4) have been designed by JLab and are in the process of fabrication and assembly. Prototype coils of TM1-TM4 have been fabricated by Everson-Tesla Incorporated, PA (USA). The manuscript presents the unique challenges of the design, alignment, high current density, operating range, high radiation dose, and vacuum environment.

Kashy, David↗