Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test procedure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,117 records · Page 62

The development and flight test of an electronic integrated propulsion control system

Advanced technical features of the electronic integrated propulsion control system (IPCS) and flight evaluation tests of IPCS (F-111E with TF30-P-9 engines as test vehicle) are described. Nine baseline flight tests and 15 IPCS flight tests were conducted. Instrumentation, data acquisition and data processing systems, software maintenance procedures, flight test procedures, flight safety criteria, flight test results, and ground and flight testing of the aircraft system are described. Advantages conferred by IPCS include: faster accelerations (both gas generator and afterburner performance), better thrust and flight control, reduced flight idle thrust, reduced engine ground trim, extended service ceiling, automatic stall detection, and stall recovery detection.

Johnson, H. J.↗

[EC5-Space Suit Assembly Team- Internship]

There were three main projects in this internship. The first pertained to the Bearing Dust Cycle Test, in particular automating the test to allow for easier administration. The second concerned modifying the communication system setup in the Z2 suit, where speakers and mics were adjusted to allow for more space in the helmet. And finally, the last project concerned the tensile strength testing of fabrics deemed as candidates for space suit materials and desired to be sent off for radiation testing. The major duties here are split up between the major projects detailed above. For the Bearing Dust Cycle Test, the first objective was to find a way to automate administration of the test, as the previous version was long and tedious to perform. In order to do this, it was necessary to introduce additional electronics and perform programming to control the automation. Once this was done, it would be necessary to update documents concerning the test setup, procedure, and potential hazards. Finally, I was tasked with running tests using the new system to confirm system performance. For the Z2 communication system modifications, it was necessary to investigate alternative speakers and microphones which may have better performance than those currently used in the suit. Further, new speaker and microphone positions needed to be identified to keep them out of the way of the suit user. Once this was done, appropriate hardware (such as speaker or microphone cases and holders) could be prototyped and fabricated. For the suit material strength testing, the first task was to gather and document various test fabrics to identify the best suit material candidates. Then, it was needed to prepare samples for testing to establish baseline measurements and specify a testing procedure. Once the data was fully collected, additional test samples would be prepared and sent off-site to undergo irradiation before being tested again to observe changes in strength performance. For the Bearing Dust Cycle Test, automation was achieved through use of a servo motor and code written in LabVIEW. With this a small electrical servo controller was constructed and added to the system. For the Z2 communication modifications speaker cases were developed and printed, and new speakers and mics were selected. This allowed us to move the speakers and mics to locations to remain out of the suit users way. For the suit material strength testing, five material candidates were identified and test samples were created. These samples underwent testing, and baseline test results were gathered, though these results are currently being investigated for accuracy. The main process efficiency developed during the course of this internship comes from automation of the Bearing Dust Cycle Test. In particular, many hours of human involvement and precise operation are replaced with a simple motor setup. Thus it is no longer required to man the test, saving valuable employee time. This internship has confirmed a few things for me, namely that I both want to work as an engineer for an aerospace firm and that in particular I want to work for the Johnson Space Center. I am also confirmed in my desire to work with electronics, though I was surprised to enjoy prototyping 3D CAD design as much as I did. Therefore, I will make an effort to build my skills in this area so that I can continue to design mechanical models. In fact, I found the process of hands-on prototyping to be perhaps the most fun aspect of my time working here. This internship has also furthered my excitement for continual education, and I will hopefully be pursuing a masters in my field in the near future.

Maicke, Andrew↗

Software verification and testing

General procedures for software verification and validation are provided as a guide for managers, programmers, and analysts involved in software development. The verification and validation procedures described are based primarily on testing techniques. Testing refers to the execution of all or part of a software system for the purpose of detecting errors. Planning, execution, and analysis of tests are outlined in this document. Code reading and static analysis techniques for software verification are also described.

Source record↗

M-52 spray booth qualification test

The procedures, performance, and results obtained from the M-52 spray booth qualification test are documented. The test was conducted at Thiokol Corporation, Space Operations, M-52 Inert Parts Preparation facility. The purpose of this testing sequence was to ensure the spray booth would produce flight qualified hardware. The testing sequence was conducted in two series. The first series was conducted under CTP-0142, Revision 1. The second series was conducted in accordance with CTP-0142, Revision 2. The test sequence started with CTP-0142, Revision 1. The series consisted of the contamination removal test and the performance test. The contamination removal test was used to assess the Teflon level in the spray booth. The performance test consisted of painting and Chemloking a forward dome inside the spray booth per flight procedures. During the performance test, two sets of witness panels (case/insulation and steel/epoxy/steel) were prepared and pull tested. The CTP-0142, Revision 2, series of testing consisted of re-testing the steel/epoxy/steel witness panels. The pull tests analysis indicates the results of the tensile tests were comparable to the systems tunnel witness panel database. The exposed panel set and the control panel set average tensile values were above the 1-basis lower limits established on the systems tunnel witness panel database. It is recommended that the M-52 spray booth be qualified for producing flight hardware.

Source record↗

The application of digital computers to near-real-time processing of flutter test data

Procedures used in monitoring, analyzing, and displaying flight and ground flutter test data are presented. These procedures include three digital computer programs developed to process structural response data in near real time. Qualitative and quantitative modal stability data are derived from time history response data resulting from rapid sinusoidal frequency sweep forcing functions, tuned-mode quick stops, and pilot induced control pulses. The techniques have been applied to both fixed and rotary wing aircraft, during flight, whirl tower rotor systems tests, and wind tunnel flutter model tests. An hydraulically driven oscillatory aerodynamic vane excitation system utilized during the flight flutter test programs accomplished during Lockheed L-1011 and S-3A development is described.

Hurley, S. R.↗

Single-Bar SMT Creep-Fatigue Testing on Alloy 617 with Software Controls on elastic Follow-Up Feedback in Support of New Creep-Fatigue Design Methodology

The Simplified Model Test (SMT) is one of the alternative ways to calculate the creep-fatigue damage of elevated temperature components. The SMT approach unifies the creep and fatigue damage, simplifying the damage calculation process with improved accuracy. Traditionally, SMT tests has have been conducted through the two bars: first is the driver bar and second is the test bar. The driver bar stays elastic and imposes the confinement to the second bar. This experimental procedure requires two test frames and a large test specimen, which limits the test parameter range and accessibility of this testing procedures. Hence, a single-bar SMT (SB-SMT) tests has been developed to simplify complexity in SMT experiment setup. The software-controlled SB-SMT test process has been introduced which completely replaces the driver bar. This paper discusses the single-bar SMT (SB-SMT) test procedure with software controls. The challenges and critical parameters in the software-controlled SB-SMT procedure are addresses addressed and recommendations are provided. A scoping test with a set of wider strain range, elastic follow-ups and dwell time validated the proposed test procedure.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SWI 1.10 Testing Process

This procedure establishes a system for performing testing in the Six-Degree-Of-Freedom Dynamic Test System (SDTS). Testing includes development and verification testing of customer supplied Test Articles (TAs) and other testing requirements, as requested. This procedure applies to all SDTS testing operations and equipment. The procedure provides an overview of testing performed in the SDTS including test identification requirements, test planning and procedure development, test and performance inspection, test data analysis, and test report generation.

Stokes, LeBarian↗

Radiation Hardened Foam Cold Test Plan – Phase-I: Foam Adhesion, Contamination Fixation, Moisture Stresses, Pipe Cutting, and Thermal Profile Testing

This document outlines the Phase-I test objectives and implementation plan for a down-selective foam fixative technology intended to facilitate activities in support of the Savannah River Site (SRS) F/H labs deactivation and decommissioning (D&D) efforts. It is a collaborative effort between Savannah River National Laboratory (SRNL), Florida International University (FIU), and the SRS F/H labs team intended to test and evaluate the potential of an intumescent, fire-retardant foam in mitigating the release of contamination during dismantling operations on radioactively contaminated piping in legacy facilities. The cold test plan addresses specific requirements highlighted by site and safety personnel and will be executed in FIU’s Outdoor Test and Evaluation Facility using a mock-up that replicates the operational conditions at the proposed hot test location at F/H labs. Results from the cold test plan will inform the hot test at F/H labs, which will use the foam fixative to confine and/or isolate residual contamination within a 3-dimensional void space of Hastelloy C-22 piping designated for removal from the site and transported to a proper disposal facility. Phase-I testing will address eight test objectives: (1) evaluation of the adhesion and bonding properties of foam fixative in piping, (2) evaluation of the adhesion of the foam fixative in piping under varying moisture conditions, (3) determination of the heat profile of the foam fixative during curing, (4) determination of the relationship between pipe diameter and foam fixative quantity, (5) determination of the internal pipe pressure after foam deployment and curing, (6) development of a leak test standard operating procedure to test for the effectiveness of the foam plug, (7) initiation of a literature review to determine if using a hot tap is a viable method to deliver foam into piping, and (8) initiation of a 10-foot mock up test that will be used in Phase-II cold testing. The cold test will be conducted at FIU and all testing activities will comply with SRNL Conduct of R&D Protocols (SRNL-IM-2020-00019).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Granta:MI Record Review Procedure for Materials Testing Projects

This document is intended to serve as a guide for the review of records in LANL’s Weapons Materials Database. Specifically, this guide provides step-by-step instructions for the review of records associated with a materials testing project. This is the type of dataset that testing organizations such as MST-7 & MST-8 at LANL commonly produce for the weapons complex and want to archive in Granta:MI.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

EVSE Characterization, A Next-Gen Profiles Project Report

As part of the U.S. DOE EVs@Scale consortium Next-Generation Profiles project, results and analysis from the characterization of high-power conductive and wireless charging infrastructure are presented. This characterization was conducted over a wide range of DC output current and DC voltage charging for nominal test conditions and off-nominal test conditions. Test plans and procedures were developed to define the test configurations and requirements, measurement parameters, and test procedures used throughout testing. Results from a 2023 study conducted on electric vehicle supply equipment (EVSE) characterization by Idaho National Laboratory (INL) and Oak Ridge National Laboratory (ORNL) include one 350 kW capable EVSE using a liquid-cooled combined charging system-1 (CCS-1, North American version) cable and connector and an ORNL-developed 100-kW polyphase wireless charger. Characterization results during nominal operation show the AC-to-DC power transfer efficiency for the 350kW conductive EVSE is 95.1% peak and is >92% when the AC power is at least 50 kW. The power quality of the 350 kW conductive EVSE is also measured during nominal conditions. The power factor is >0.91 for power transfer above 50 kW AC input during nominal conditions with a maximum power factor of 0.975. The AC current harmonics produced by the EVSE as measured at the AC input connection to the EVSE is <25% harmonics for power transfer greater than 50 kW and <10% harmonics for power transfer greater than 180 kW.

25 ENERGY STORAGE↗

EVSE Characterization: V2G EVSE Comparison

As part of the U.S. Department of Energy EVs@Scale consortium Next-Generation Profiles project, results and analysis from the characterization of high-power conductive and wireless charging infrastructure are presented. This characterization is conducted over a wide range of direct current (DC) current and DC voltage operation for nominal test conditions and off-nominal test conditions. Test plans and procedures were developed to define the test configurations and requirements, measurement parameters, and test procedures used throughout testing. Results from a 2024 study conducted on electric vehicle supply equipment (EVSE) characterization by the Idaho National Laboratory (INL) include two bi-directional vehicle-to-grid (V2G) capable EVSEs. These EVSE are referred to as V2G-EVSE9 and V2G-EVSE10. Laboratory testing is conducted at nominal test conditions to characterize the power transfer capabilities, efficiency, power factor, and other power quality metrics of the two DC EVSEs capable of V2G bi-directional power transfer. Results from testing show the performance is consistent for V2G-EVSE9 and V2G-EVSE10 when comparing charging to discharging performance, except for V2G-EVSE10 for power transfer when operating above 70% of the rated DC current. V2G-EVSE10 efficiency is >98% while charging and <91% while discharging at the same operating conditions, near maximum-rated current, at 300VDC. In contrast, V2G-EVSE9 results are consistent for charging and discharging. This EVSE is nearly 96% efficient while charging or discharging when operating over 50% of rated AC power. V2G EVSE performance is also characterized during off-nominal AC grid conditions involving AC voltage deviation (426 VAC to 518 VAC), AC frequency deviation of +2% (58.8 Hz to 61.2 Hz), and AC voltage harmonics injection. Many test conditions have little-to-no impact on performance characteristics of the two EVSEs; however, there are a few notable findings with significant power transfer capability impacts. AC voltage harmonics injection resulted in negative impacts on power quality attributes for both EVSEs, but with no impact on power transfer capability. Off-nominal AC voltage and frequency conditions resulted in unstable or lack of power transfer capability for both EVSEs. V2G-EVSE9 is unable to transfer power when AC voltage is >300V L-N. V2G-EVSE10 is unable to transfer power when AC frequency deviation exceeds +0.8%. V2G energy management system transient response and latency are quantified during laboratory testing. V2G-EVSE9 and V2G-EVSE10 utilize cloud-based V2G energy management systems that command the power transfer level between the EVSE and EV. The latency and response characteristics of the entire systems (web-based user interface, V2G energy management system, cellular communications, and EVSE response) are quantified through laboratory testing for V2G-EVSE9 and V2G-EVSE10. V2G-EVSE9 latency ranges from 0.8 to 1.8 seconds, whereas V2G-EVSE10 latency ranges from 3.4 to 8.8 seconds. The ramp rate to a change in power transfer request also differs between the two EVSEs. V2G-EVSE10 ramp rate ranges from 50% to -250% of rated AC power per second, whereas V2G-EVSE9 rate ranges from 95% to -95% of rated AC power per second. At the highest rate of change in power transfer, V2G-EVSE10 can change from full charge power to full discharge power in less than one second. The V2G EVSE characterization presented in this report provides valuable insights and results for use by numerous entities. This includes modeling and simulation organizations, decision makers, fleet planning, industry stakeholders, and many others involved with the development and deployment of electrified transportation technologies. Additional high-power DC chargers, bidirectional chargers, and inductive power transfer EVSE characterization results are anticipated from additional EVSE brands and models, which will be detailed in future publications in support of the U.S. Department of Energy EVs@Scale consortium Next-Gen Profiles project.

25 ENERGY STORAGE↗

Wavelengths and levels of the Na I isoelectronic sequence from K IX through Mn XV

The seven spectra K IX through Mn XV have been analyzed and the series limits determined. We present the adopted wavelengths and the derived energy levels and term splittings. The highly ionized atoms were produced in a spark source and recorded mainly on a 3 m grazing incidence spectrograph. Many new lines have been identified and many previously given wavelengths have been revised. All wavelengths have been examined for consistency by least-squares-fitting procedures and other tests. These procedures indicated misidentified lines and incorrect wavelengths which we corrected when possible. A discussion of the errors is given.

Cohen, L.↗

High-Flux, High-Temperature Thermal Vacuum Qualification Testing of a Solar Receiver Aperture Shield

As part of the International Space Station (ISS) Phase 1 program, NASA Lewis Research Center (LERC) and the Russian Space Agency (RSA) teamed together to design, build and flight test the world's first orbital Solar Dynamic Power System (SDPS) on the Russian space station Mir. The Solar Dynamic Flight Demonstration (SDFD) program was to operate a nominal 2 kWe SDPS on Mir for a period up to 1-year starting in late 1997. Unfortunately, the SDFD mission was demanifested from the ISS phase 1 shuttle program in early 1996. However, substantial flight hardware and prototypical flight hardware was built including a heat receiver and aperture shield. The aperture shield comprises the front face of the cylindrical cavity heat receiver and is located at the focal plane of the solar concentrator. It is constructed of a stainless steel plate with a 1-m outside diameter, a 0.24-m inside diameter and covered with high-temperature, refractory metal Multi-Foil Insulation (MFI). The aperture shield must minimize heat loss from the receiver cavity, provide a stiff, high strength structure to accommodate shuttle launch loads and protect receiver structures from highly concentrated solar fluxes during concentrator off-pointing events. To satisfy Mir operational safety protocols, the aperture shield was required to accommodate direct impingement of the intensely concentrated solar image for a 1-hour period. To verify thermal-structural durability under the anticipated high-flux, high-temperature loading, an aperture shield test article was constructed and underwent a series of two tests in a large thermal vacuum chamber configured with a reflective, point-focus solar concentrator and a solar simulator. The test article was positioned near the focal plane and exposed to concentrated solar flux for a period of 1-hour. In the first test, a near equilibrium temperature of 1862 K was attained in the center of the shield hot spot. In the second test, with increased incident flux, a near equilibrium temperature of 2072 K was achieved. The aperture shield sustained no visible damage as a result of the exposures. This paper describes the aperture shield thermal-vacuum qualification test program including the test article, test facility, procedures, data collection, test success criteria, results and conclusions.

Kerslake, Thomas W.↗

Numerical Modeling, Thermomechanical Testing, and NDE Procedures for Prediction of Microcracking Induced Permeability of Cryogenic Composites

Reusable Space Vehicles will include light cryogenic composite fuel tanks that must not leak excessively even after multiple launches. Damage in cryogenic composite fuel tanks induced during manufacturing and advanced by thermomechanical cycling can accelerate leakage of the propellant. Whether the leakage exceeds tolerable levels depends on many factors, including pressure gradients, microcrack density, other damage such as delamination, connectivity of the cracks, residual stresses from manufacture, service-induced stresses from thermal and mechanical loads, and composite lay-up. Although it is critical to experimentally characterize permeability during various thermal and mechanical load histories, optimal design depends on having analytical models that can predict the effect of various parameters on performance. Our broad goal is to develop such models that are experimentally validated by destructive and non-destructive evaluation means.

Noh, Jae↗