Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,117 records · Page 62

Quiet Supersonic Flights 2018 (QSF18) Test: Galveston, Texas Risk Reduction for Future Community Testing with a Low-Boom Flight Demonstration Vehicle

The Quiet Supersonic Flights 2018 (QSF18) Program was designed to develop tools and methods for demonstration of overland supersonic flight with an acceptable sonic boom, and collect a large dataset of responses from a representative sample of the population. Phase 1 provided the basis for a low amplitude sonic boom testing in six different climate regions that will enable international regulatory agencies to draft a noise-based standard for certifying civilian supersonic overland flight. Phase 2 successfully executed a large scale test in Galveston, Texas, developed well documented data sets, calculated dose response relationships, yielded lessons, and identified future risk reduction activities.

Galveston↗

Development of the Advanced Regolith Ground Operations (ARGO) Test Bed– A Robotic Construction Test Facility with Simulated Lunar Environments

NASA’s Artemis Program is working towards developing a sustained presence on the Moon and eventually Mars. To achieve this goal, robotic excavation, site preparation and construction technologies are under development to establish the capability to construct infrastructure such as launch/landing pads and radiation protection shelters. Technologies must be proven in simulated Lunar conditions prior surface demonstration missions. To that end, the Relevant Additive Construction Technology (REACT) Announcement of Collaboration Opportunities (ACO) project with AI Space Factory and the NASA Kennedy Space Center’s (KSC) Granular Mechanics and Regolith Operations Laboratory (a.k.a. Swamp Works) has developed the Advanced Regolith Ground Operations (ARGO) Test Bed. ARGO includes a ~1.5m x 1.5m x 1.2m (~5x5x4ft) vacuum chamber, cryogenically cooled thermal shroud, a 3-axis robotic positioning system, and a regolith bin. For the REACT project, a pellet extruder and feed hopper have been installed on ARGO to advance the Technology Readiness Level (TRL) of regolith-polymer composite Fused Deposition Modeling (FDM) additive construction systems, processes, and materials. This paper will focus on the design and operational characteristics of the ARGO Test Bed with pellet extruder.

Moon↗

Design and Testing of a Device for Homogeneous Moon Dust Deposition on Test Articles/Systems

During this decade, NASA is charged to return humans to the surface of the Moon. One of the most challenging aspects to operating on the lunar surface is the regolith present, which is pervasive and damaging. To support systems design and validation for this environment, the handling and application of lunar simulants onto test articles or systems becomes important, albeit difficult. A device to apply the same amount of dust uniformly was developed in a previous study (Hollingsworth et al., 2006) but was only utilized with Mars dust simulant during that previous project. The current work provides evaluation of this device with multiple lunar simulants, each representing different composition as found at various locations on the Moon’s surface. Enhancements to the design and operation of the dust distributor are also described, along with a new digital imaging technique to calculate the percent surface coverage of the dust after deposition. The results support the use of the distributor and improved techniques to provide a uniform coating of dust on test articles and systems.

lunar↗

Development of the Advanced Regolith Ground Operations (ARGO) Test Bed – A Robotic Excavation and Construction Test Facility with Simulated Lunar Environments

NASA’s Artemis Program is working towards developing a sustained presence on the Moon and eventually Mars. To achieve this goal, robotic excavation, site preparation and construction technologies are under development to establish the capability to construct infrastructure such as launch/landing pads and radiation protection shelters. Technologies must be proven in simulated Lunar conditions prior to surface demonstration missions. To that end, the Relevant Additive Construction Technology (REACT) Announcement of Collaboration Opportunities (ACO) project with AI Space Factory and the NASA Kennedy Space Center’s (KSC) Granular Mechanics and Regolith Operations Laboratory (a.k.a. Swamp Works) has developed the Advanced Regolith Ground Operations (ARGO) Test Bed. ARGO includes a ~1.5m x 1.5m x 1.2m (~5x5x4ft) vacuum chamber, cryogenically cooled thermal shroud, 3-axis robotic positioning system, and regolith bin. For the REACT project, a pellet extruder, feed hopper, and heated 600mm x 600mm (23.6x23.6in) build plate have been installed on ARGO to advance the Technology Readiness Level (TRL) of regolith-polymer composite Fused Deposition Modeling (FDM) additive construction systems, processes, and materials. This paper will focus on the design and operational characteristics of the ARGO Test Bed with pellet extruder.

regolith↗

Development of the Advanced Regolith Ground Operations (ARGO) Test Bed: A Robotic Excavation and Construction Test Facility with Simulated Lunar Environments

NASA’s Artemis Program is working towards developing a sustained presence on the Moon and eventually Mars. To achieve this goal, robotic excavation, site preparation and construction technologies are under development to establish the capability to construct infrastructure such as launch/landing pads and radiation protection shelters. Technologies must be proven in simulated Lunar conditions prior to surface demonstration missions. To that end, the Relevant Additive Construction Technology (REACT) Announcement of Collaboration Opportunities (ACO) project with AI Space Factory and the NASA Kennedy Space Center’s (KSC) Granular Mechanics and Regolith Operations Laboratory (a.k.a. Swamp Works) has developed the Advanced Regolith Ground Operations (ARGO) Test Bed. ARGO includes a ~1.5m x 1.5m x 1.2m (~5x5x4ft) vacuum chamber, cryogenically cooled thermal shroud, 3-axis robotic positioning system, and regolith bin. For the REACT project, a pellet extruder, feed hopper, and heated 600mm x 600mm (23.6x23.6in) build plate have been installed on ARGO to advance the Technology Readiness Level (TRL) of regolith-polymer composite Fused Deposition Modeling (FDM) additive construction systems, processes, and materials. This paper will focus on the design and operational characteristics of the ARGO Test Bed with pellet extruder.

regolith↗

Design and Testing of a Device for Moon Dust Deposition on Test Articles/Systems

During this decade, NASA is charged to return humans to the surface of the Moon. One of the most challenging aspects to operating on the lunar surface is the regolith present, which is pervasive and damaging. To support systems design and validation for this environment, the handling and application of lunar simulants onto test articles or systems becomes important, albeit difficult. A device to apply the same amount of dust uniformly was developed in a previous study but was only utilized with Mars dust simulant during that previous project. The current work provides evaluation of this device with multiple lunar simulants, each representing different composition as found at various locations on the Moon’s surface. Enhancements to the design and operation of the dust distributor are also described, along with a new digital imaging technique to calculate the percent surface coverage of the dust after deposition. The results support the use of the distributor and improved techniques to provide a uniform coating of dust on test articles and systems.

Kathryn M Hurlbert↗

Micro/nano-mechanical test system employing tensile test holder with push-to-pull transformer

A micromachined or microelectromechanical system (MEMS) based push-to-pull mechanical transformer for tensile testing of micro-to-nanometer scale material samples including a first structure and a second structure. The second structure is coupled to the first structure by at least one flexible element that enables the second structure to be moveable relative to the first structure, wherein the second structure is disposed relative to the first structure so as to form a pulling gap between the first and second structures such that when an external pushing force is applied to and pushes the second structure in a tensile extension direction a width of the pulling gap increases so as to apply a tensile force to a test sample mounted across the pulling gap between a first sample mounting area on the first structure and a second sample mounting area on the second structure.

42 ENGINEERING↗

Beam Tests of the PIP-II Injector Test Radio Frequency Quadrupole

In modern high intensity ion-particle accelerators, a Radio Frequency Quadrupole (RFQ) is utilized to prepare a high-quality beam for injection to the main accelerating section. Since an RFQ governs the initial beam parameters, characterization of the beam coming out from the RFQ is foremost step toward commissioning of an accelerator facili-ty. It allows validating the RFQ design as well as attaining a better understanding of charged-particle beams. This pa-per describes the beam-performance of the Proton Improvement Plan-II Injector Test (PIP2IT) Continuous Wave (CW) four vane-type RFQ. It is designed to operate at a frequency of 162.5 MHz and accelerate a nominal H- beam of 5 mA from 30 keV to 2.1 MeV. The paper details beam tests performed to validate the RFQ design specifications for trans-mission, beam kinetic energy and, RMS emittances. The paper also presents beam profile measurements and implica-tion of the beam-jitters on the effective beam emittance at the RFQ exit.

43 PARTICLE ACCELERATORS↗

At-power subcritical multiplication in the Advanced Test Reactor during nuclear requalification testing

Power division information during nuclear requalification of the Advanced Test Reactor (ATR) is of considerable interest as an importance function for observed changes to core reactivity. The degree to which a given physical subdivision of a critical reactor acts as a neutron source for other lobes is not analytically characterized for general application. When ATR operates at power, individual power-producing lobes rely on each other as neutron sources in order to maintain constant power, which in general requires either exactly critical multiplication within a reactor or an external neutron source. Here, this work shows that fuel element and lobe powers in ATR can be related with subcritical multiplication theory. Subcritical multiplication factors are computed with a physically validated analytical method based on actual at-power operation, quantifying for each lobe its dependence on other lobes as an external neutron source. This explanation is significant for ATR due to the desire to irradiate a large variety of experiments simultaneously, each having its impact on the core neutron population. For any physical subdivision of any other critical reactor, it is likewise true that the subdivision undergoes only subcritical multiplication.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Results of the AGR-5/6/7 UCO TRISO fuel irradiation test in the Advanced Test Reactor

AGR-5/6/7 was the last in a series of irradiation experiments sponsored by the U.S. Department of Energy in support of the development and qualification of TRISO coated particle fuel for use in a high-temperature gas-cooled reactor. This experiment was conducted to verify the performance of the reference-design TRISO-coated low-enriched UCO fuel for modular high-temperature gas-cooled reactor normal operating conditions and to explore fuel performance at temperatures substantially beyond those typical of normal operation. A total of 194 UCO fuel compacts in five capsules were irradiated in the Advanced Test Reactor for 360.9 effective full-power days, achieving final burnup ranging from 5.66% to 15.26% fissions per initial heavy metal atom and fast neutron fluence ranging from 1.62 × 10 25 to 5.55 × 10 25 n/m 2 (E > 0.18 MeV). Calculated time-averaged fuel temperatures ranged from 467 °C to 1432 °C, with a peak fuel temperature of 1536 °C. During the first five irradiation cycles (∼180 effective full-power days), 85m Kr fission gas release-rate-to-birth-rate ratios were 10 −7 –10 −6 , indicating no particle failures. Near the end of the sixth cycle, a substantial number of in-pile particle failures occurred in Capsule 1. The fission gas release from this capsule impacted the readings from the other four capsules and led to unreliable fission gas release measurements for all capsules during the last four cycles. A preliminary post-irradiation examination of Capsule 1 fuel and internal components revealed the in-pile particle failures resulted from operational issues with the capsule, not subpar performance of the fuel particles.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Runaway of energetic test ions in a toroidal plasma

Ion runaway in the presence of a large-scale, reconnection-driven electric field has been conclusively measured in the Madison Symmetric Torus reversed-field pinch (RFP). Measurements of the acceleration of a beam of fast ions agree well with test particle and Fokker-Planck modeling of the runaway process. However, the runaway mechanism does not explain all measured ion heating in the RFP, particularly previous measurements of strong perpendicular heating. It is likely that multiple energization mechanisms occur simultaneously and with differing significance for magnetically coupled thermal ions and magnetically decoupled tail and beam ions.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

High Throughput, High Precision Hot Testing Tool for HBLED Wafer Level Testing

The Socrates research effort developed an in depth understanding and demonstrated in a prototype tool new precise methods for teh characterization of color characteristics and flux from individual LEDs for the production of uniform quality lighting. This effort was focused on improving the color quality and consistency of solid state lighting and potentially reducing characterization costs for all LED product types. The patented laser hot testing method was demonstrated to be far more accurate than all current state of the art color and flux characterization methods in use by the solid state lighting industry today. A seperately patented LED grouping method (statistical binning) was demonstrated to be a useful approach to improving utilization of entire lots of large color and flux distributions of manufactured LEDs for high quality color solid-state lighting. At the conclusion of the research in late 2015 the solid-state lighting industry was however generally satisfied with its existing production methods for high quality color products for the small segment of customers that demand it, albeit with added costs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗