Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technical management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,117 records · Page 62

The Advanced Exploration Systems Water Recovery Project: Innovation on 2 Fronts

As NASA looks forward to sending humans farther away from Earth, we will have to develop a transportation architecture that is highly reliable and that can sustain life for long durations without the benefit of Earth s proximity for continuous resupply or even operational guidance. NASA has consistently been challenged with performing great feats of innovation, but particularly in this time of economic stress, we are challenged to go farther with less. The Advanced Exploration Systems (AES) projects were implemented to address both of these needs by not only developing innovative technologies, but by incorporating innovative management styles and processes that foster the needed technical innovation given a small amount of resources. This presentation explains how the AES Water Recovery Project is exhibiting innovation on both fronts; technical and process. The AES Water Recovery Project (WRP) is actively engineering innovative technologies in order to maximize the efficiency of water recovery. The development of reliable, energy-efficient, and low-mass spacecraft systems to provide environmental control and life support (ECLS) is critical to enable long-duration human missions outside of low-Earth orbit. Recycling of life support consumables is necessary to reduce resupply mass and provide for vehicle autonomy. To address this, the WRP is working on a rotary distiller that has shown enhanced performance over the state-of-the-art (SOA). Additionally, the WRP is looking at innovative ways to address issues present in the state-of-the-art (SOA) systems pertaining to toxicity and calcium scale buildup. As an AES project, the WRP has a more streamlined Skunk Works like approach to technology development intended to reduce overhead but achieve a more refined end product. The project has incorporated key partnerships between NASA centers as well as between NASA and industry. A minimal project management style has been implemented such that risks are managed and milestones tracked without overburdening the team with reporting demands that take them away from their work. A lean Systems Engineering (SE) approach has been implemented where project objectives are defined and vetted early without overprescribing the process or limiting the ability to innovate. Finally, we are working with existing flight hardware support organizations like operations, safety, materials and others to impact the system design at the breadboard level. This type of early input is a key to ensuring that the technologies are developed on the right track to becoming space flight worthy.

Sarguisingh, Miriam M.↗

The design and implementation of the Technical Facilities Controller (TFC) for the Goldstone deep space communications complex

The Technical Facilities Controller is a microprocessor-based energy management system that is to be implemented in the Deep Space Network facilities. This system is used in conjunction with facilities equipment at each of the complexes in the operation and maintenance of air-conditioning equipment, power generation equipment, power distribution equipment, and other primary facilities equipment. The implementation of the Technical Facilities Controller was completed at the Goldstone Deep Space Communications Complex and is now operational. The installation completed at the Goldstone Complex is described and the utilization of the Technical Facilities Controller is evaluated. The findings will be used in the decision to implement a similar system at the overseas complexes at Canberra, Australia, and Madrid, Spain.

Killian, D. A.↗

Cryogenic Fluid Management: 2000-2004

This custom bibliography from the NASA Scientific and Technical Information Program lists a sampling of records found in the NASA Aeronautics and Space Database. The scope of this topic includes cooling technologies for precision astronomical sensors and advanced spacecraft, as well as propellant storage and transfer in space. This area of focus is one of the enabling technologies as defined by NASA's Report of the President's Commission on Implementation of United States Space Exploration Policy, published in June 2004.

Source record↗

Partial replacement of fossil fuels in a cement plant: Assessment of human health risks by metals, metalloids and PCDD/Fs

Highlights: • The environmental concentrations of metals and dioxins were not significantly modified. • Non-carcinogenic risks (metals and dioxins) were lower than the safety value (HQ• Carcinogenic risks were below the Spanish 10{sup −5} threshold. • The use of wastes as alternative fuels is being a good option for waste management. In 2009, a cement plant located in Alcanar (South Catalonia, Spain) started co-processing a special kind of refuse-derived fuel (RDF) called ENERFUEL™. In April 2014 and 2017, 5 and 8 years after RDF co-processing, the concentrations of metals and metalloids (As, Cd, Co, Cr, Cu, Hg, Mn, Ni, Pb, Sb, Tl, V and Zn) and PCDD/Fs were measured in samples of soils, herbage and air collected in the vicinity of the facility. The comparison of the current concentrations with those obtained in a baseline study (2008), when fossil fuels were used solely, has shown that the environmental concentrations of metals, metalloids and PCDD/Fs were not significantly modified. The concentrations of metals, metalloids and PCDD/Fs in soil, vegetation and air of Alcanar are in the low part of the ranges found around other cement plants in Catalonia (in general, below 50th percentile). Non-carcinogenic risks due to exposure to metals, metalloids and PCDD/Fs were lower than the safety value (HQ<1). In turn, carcinogenic risks were below the 10{sup −5} Spanish threshold. The present results corroborate that, from an environmental point of view, the use of wastes as alternative fuels (AF) in a cement plant, which is operating with suitable technical conditions, is a good option for waste management. It contributes towards overcoming challenges such as climate change and fossil fuel depletion, while utilizing principles of circular economy.

54 ENVIRONMENTAL SCIENCES↗

A DDS-Based Energy Management Framework for Small Microgrid Operation and Control

The smart grid is seen as a power system with realtime communication and control capabilities between the consumer and the utility. This modern platform facilitates the optimization in energy usage based on several factors including environmental, price preferences, and system technical issues. In this paper a real-time energy management system (EMS) for microgrids or nanogrids was developed. The developed system involves an online optimization scheme to adapt its parameters based on previous, current, and forecasted future system states. The communication requirements for all EMS modules were analyzed and are all integrated over a data distribution service (DDS) Ethernet network with appropriate quality of service (QoS) profiles. In conclusion, the developed EMS was emulated with actual residential energy consumption and irradiance data from Miami, Florida and proved its effectiveness in reducing consumers’ bills and achieving flat peak load profiles.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Extrahepatic Pseudoaneurysms and Ruptures of the Hepatic Artery in Liver Transplant Recipients: Endovascular Management and a New Iatrogenic Etiology

To characterize extrahepatic pseudoaneurysm regarding incidence and etiology and determine the effectiveness of endovascular management. A retrospective audit of 1,857 liver transplants in two institutions was performed (1996-2009). Recipients' demographics, clinical presentation, transplant type, biliary anastomosis, and presence of biliary endoprostheses were noted. Pseudoaneurysms were classified into iatrogenic (associated with biliary endoprosthesis or angioplasty) or spontaneous extrahepatic pseudoaneurysms. Spontaneous and iatrogenic pseudoaneurysms were compared for time from transplant, presenting symptoms, location in the arterial anatomy, and 3-month graft survival. Arterial patency and 6-month graft survival were calculated. Twenty pseudoaneurysms were found (1.1 %, 20/1,857): 9 (0.5 % of transplants, 9/1,857) were spontaneous and 11 (0.6 % of transplants, 11/1,857) were 'iatrogenic' (due to minimally invasive procedures: 4 angioplasty and 7 biliary endoprostheses). Sixty percent (12/20) underwent endovascular management (4 coil embolization and 8 stent-grafts). Technical success was 83 % (10/12) with a mean arterial patency of 70 % (follow-up mean, 4.9; range, 0-18 months). The 1-, 3-, and 6-month graft survival was 70, 40, and 35 %, respectively. Due to minimally invasive procedures, posttransplant extrahepatic pseudoaneurysms are no longer an exclusive complication of the transplant surgery itself. Endovascular management is effective to stabilize patients but has not improved historic postsurgical graft survival.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

2021 NIRT Mini Drill (After Action Report)

During the summer and fall of 2021, several functional area drills were held that focused on exercising Consequence Management’s (CM) ability to extract and use data from RadResponder for the purpose of answering intermediate-phase questions presented as technical inject requests for information (RFI) in Sandia National Laboratories (SNL) Consequence Management Operational System (COSMOS) software. The scenario chosen was that of Northern Lights 2016 (NL16) which was a large-scale nuclear power plant (NPP) release exercise in the state of Minnesota. The NL16 data was extracted from the Radiological Assessment and Monitoring System (RAMS) event where it was created and was reformatted for implanting to a new RadResponder event. Next, the beta-version of a laboratory sample data simulator was used to generate more sample data that was injected to the event. Five “mini-drills” were devised with each prompt defined by a data-based need. For each drill, a team of assessment and NARAC scientists worked the problem using the drill prompt and the available data in RadResponder. The teams held a kickoff meeting, had several days to work the problem, and then reported their results as well as observations in a hotwash. Several areas for improvement in both the software and process were identified during the course of these drills. This report will document the process of addressing each RFI and the discovered gaps in both software capability and methodology so that they can be considered for future development and investment by the CM and NIRT programs.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Full-Scale Vessel Testing for the Hanford Waste Treatment and Immobilization Plant - 18333

Concerns over the mixing performance of the planned pulse jet mixed (PJM) vessels for high-solids applications in the Hanford Waste Treatment and Immobilization Plant (WTP) Pretreatment (PT) Facility, led to the development of a standard high-solids vessel (SHSV) design and full-scale vessel testing program. The SHSV is intended as a potential replacement for several high-level waste feed receipt and lag storage vessels (High-Level Waste Facility lag storage and feed blending process), ultrafiltration feed preparation vessels (ultrafiltration process system), and plant wash vessels (plant wash and disposal system). The SHSV concept uses multiple smaller vessels (60 500 L - 79 500 L nominal batch size) to replace larger vessels, providing redundancy, improved mixing (PJM design and spargers), monitoring (multi-level bubblers), reduced material at risk, and improved structural features. The SHSV also requires qualification of a single vessel design for high solids Newtonian and non-Newtonian slurry processing, rather than having to qualify earlier multiple vessel designs. An Integrated Technical Team consisting of the U.S. Department of Energy, Bechtel National, Inc., and independent experts was established to accelerate and provide oversight and direction of the test program and SHSV qualification. Qualification of the SHSV for mixing has now been achieved through a comprehensive full-scale vessel testing program conducted in 2017 with a prototypic SHSV under a set of most adverse design conditions, in conjunction with additional engineering analyses. This paper will present an overview of the SHSV, results from the three-phase full-scale vessel test and qualification program completed in September 2017, and the management program to achieve resolution of the PJM mixing technical issue. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The French Geological Repository Project Cigeo - 12023

The French Agency for Radioactive Waste Management, ANDRA, was launched by law in 1991 to perform and develop the research programme for managing high level and intermediate level long-lived radioactive waste generated by the French nuclear fleet. After a 15-year intensive research programme, including the study of alternative solutions, an overall review and assessment of the results was organized, including a national public debate. As a result, the Parliament passed a Planning Act on radioactive waste management in 2006. Commissioning of a geological repository by 2025 was one of the most important decisions taken at that time. To reach this goal, a license application must be submitted and reviewed by the competent authorities by 2015. A detailed review and consultation process is, as well, defined in the Planning Act. Beside the legal framework the project needs to progress on two fronts. The first one is on siting. A significant milestone was reached in 2009 with the definition of a defined area to locate the underground repository facilities. This area was approved in March 2010 by the Government, after having collected the opinions and positions of all the interested parties, at both National and local levels. A new phase of dialogue with local players began to refine the implementation scenarios of surface facilities. The final site selection will be approved after a public debate planned for 2013. The second one is the industrial organization, planning and costing. The industrial project of this geological repository was called Cigeo (Centre Industriel de Stockage Geologique). Given the amount of work to be done to comply with the given time framework, a detailed organization with well-defined milestones must be set-up. Cigeo will be a specific nuclear facility, built and operated underground for over a hundred years. The consequence of this long duration is that the development of the repository facilities will take place in successive operational phases. The characteristics of the first waste packages received will determine the work and the corresponding investments by 2025 on the repository site. One of the main challenges will be to accommodate both activities of mining and nuclear operations at the same time and at the same location. From the technical standpoint, ventilation and fire risk cannot be managed through a simple transposition from current nuclear industry practices. The reversibility demand also leads to concrete proposals with regard to repository management flexibility and waste package retrievability. These proposals contribute to the dialogue with stakeholders to prepare for the public debate and a future law which will determine the reversibility conditions. New design developments are expected to be introduced in the application from the current studies conducted until 2014. The possibility of optimization beyond 2015 will be kept open taking into account the one hundred years operating time as well as the capability to integrate feedback gained from the first construction and operation works. The industrial committed work aims to reach the application stage by 2015. The license application procedure was defined by the 2006 Act. Subject to authorization, the construction might begin in 2017. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Updated Waste Management System Analysis Tool Requirements and Enhancements

Draft presentation for presentation to Nuclear Waste Technical Review Board Winter/Spring Meeting March 2nd NOTE: FYI this presentation is almost the same as the presentation that will be uploaded soon entitled 'Next Generation System Analysis Model: Recently Added Features and Future Plans' for the Waste Management 2022 conference.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Summary of Investigations on Technical Feasibility of Direct Disposal of Dual-Purpose Canisters

This study has evaluated the technical feasibility of direct disposal in a geologic repository, of commercial spent nuclear fuel (SNF) in dual-purpose canisters (DPCs) of existing designs. The authors, representing several national laboratories, considered waste isolation safety, engineering feasibility, thermal management, and postclosure criticality control. The 3-year study concludes that direct disposal is technically feasible for most DPCs, depending on the repository host geology. Postclosure criticality control, and thermal management strategies that allow permanent disposal within 150 years, are two of the most challenging aspects. This document summarizes technical results from a series of previous reports, and describes additional studies that can be done especially if site-specific information becomes available from one or more prospective repository sites.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Resource Management (PRM) Implementation and Effects within Safety Review Panel Settings and Dynamics

While technical training and advanced degree's assure proficiency at specific tasks within engineering disciplines, they fail to address the potential for communication breakdown and decision making errors familiar to multicultural environments where language barriers, intimidating personalities and interdisciplinary misconceptions exist. In an effort to minimize these pitfalls to effective panel review, NASA's lead safety engineers to the ISS Safety Review Panel (SRP), and Payload Safety Review Panel (PSRP) initiated training with their engineers, in conjunction with the panel chairs, and began a Panel Resource Management (PRM) program. The intent of this program focuses on the ability to reduce the barriers inhibiting effective participation from all panel attendees by bolstering participants confidence levels through increased communication skills, situational awareness, debriefing, and a better technical understanding of requirements and systems.

Taylor, Robert W.↗

Fuel Cycle Research & Development, Technical Monthly - February 2012

Topics discussed in this monthly report are: (1) MPACT Campaign management and integration; (2) Accounting and control technologies - microcalorimetry, electrochemical sensor, fast neutron multiplicity analysis, lead slowing down spectrometer; (3) MPACT analysis tools - modeling and simulation for analysis of safeguards performance (electrochemical), material control including process monitoring (pattern recognition, sensors), sensor for measuring density and depth of molten electrolyte, MPACT system integration and technical support.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Savannah River Site Eastern Transportation Hub: A Concept For a DOE Eastern Packaging, Staging and Maintenance Center - 13143

The Department of Energy (DOE) is working to de-inventory sites and consolidate hazardous materials for processing and disposal. The DOE administers a wide range of certified shipping packages for the transport of hazardous materials to include Special Nuclear Material (SNM), radioactive materials, sealed sources and radioactive wastes. A critical element to successful and safe transportation of these materials is the availability of certified shipping packages. There are over seven thousand certified packagings (i.e., Type B/Type AF) utilized within the DOE for current missions. The synergistic effects of consolidated maintenance, refurbishment, testing, certification, and costing of these services would allow for efficient management of the packagings inventory and to support anticipated future in-commerce shipping needs. The Savannah River Site (SRS) receives and ships radioactive materials (including SNM) and waste on a regular basis for critical missions such as consolidated storage, stabilization, purification, or disposition using H-Canyon and HB-Line. The Savannah River National Laboratory (SRNL) has the technical capability and equipment for all aspects of packaging management. SRS has the only active material processing facility in the DOE complex and is one of the sites of choice for nuclear material consolidation. SRS is a logical location to perform maintenance and periodic testing of the DOE fleet of certified packagings. This initiative envisions a DOE Eastern Packaging Staging and Maintenance Center (PSMC) at the SRS and a western hub at the Nevada National Security Site (NNSS), an active DOE Regional Disposal Site. The PSMC's would be the first place DOE would go to meet their radioactive packaging needs and the primary locations projects would go to disposition excess packaging for beneficial reuse. These two hubs would provide the centralized management of a packaging fleet rather than the current approach to design, procure, maintain and dispose of packagings on a project-by-project basis. This initiative provides significant savings in packaging costs and acceleration of project schedules. In addition to certified packaging, the PSMC would be well suited for select designs of 7A Type A packaging and Industrial Packaging. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing Low-Level Waste at Dounreay - 16269

Dounreay Site Restoration Limited (DSRL) is the site licence company responsible for the clean-up and demolition of Britain's former centre of fast reactor research and development. The Dounreay site requires facilities to dispose of up to 175,000 cubic metres of low level waste (LLW) that has been and will continue to be generated during the decommissioning and restoration of the site. In May 2014, construction of two new vaults for the disposal of LLW at Dounreay was completed, including the necessary roads, infrastructures and services, followed by an encapsulation plant in September 2014. The vaults are located immediately to the northeast of the Dounreay licensed site, on NDA-owned land. The facilities are for disposal of the solid LLW generated at Dounreay and the adjacent Vulcan site only. In 2004, following consultation with stakeholders and members of the public, Dounreay issued the 'Best Practicable Environmental Option (BPEO) Report' on the management of Dounreay LLW. This report assessed potential management options for LLW against a range of criteria, including technical, environmental, cost, health and safety issues. The study was conducted in line with best practice and involved consultation with a range of people, including the local community and organisations with an interest in radioactive waste management. The recommendations and conclusions from the study provided the basis for the 'Dounreay Solid LLW Overall Strategy', which was published in March 2005. A fundamental component of this strategy was the development of new below-ground disposal vaults for LLW at Dounreay. Siting the vaults on land at Dounreay avoids any need to transport the LLW away from Dounreay on public roads. Disposal at Dounreay therefore satisfies the proximity principle of managing the waste at source. Disposal at Dounreay is also consistent with UK Government Policy on LLW management, the Scottish Government's Radioactive Waste Management Policy and the Nuclear Decommissioning Authority's (NDA's) strategy on management of LLW from the UK nuclear industry. A planning application was initially lodged with the Highland Council in June 2006. The period for the determination of this application was extended to allow the Scottish Environment Protection Agency (SEPA) sufficient time to assess fully the supporting Environmental Safety Case (ESC). The planning application was re-activated in May 2008, and planning permission was granted by Highland Council in April 2009. The planning permission included 26 conditions on DSRL, covering a wide range of environmental issues such as construction noise/dust, traffic, visual impact and also a condition to develop a community fund aimed at socio-economic development of the area around the Dounreay site. After undertaking the necessary detailed design work, construction of the phase one vaults commenced in November 2011 by principal contractor, Graham Construction. Work was undertaken on both vaults simultaneously, excavating around 243,000 m{sup 3} of rock. When excavation was complete, steel reinforcement was placed and concrete poured to construct the floor slabs. This was followed by the construction of the reinforced walls and then the installation of the steel support structure and materials that form the roof. Mechanical and electrical installation then followed, in parallel with the construction of the vault apron, ramps and access roads. A pumping system and control building was also constructed to remove groundwater from around the vaults to allow the vaults to be kept dry while they are being filled with waste. A layer of excavated material, approximately 3 m thick, was placed across the existing ground surface between the vaults and the coast, to ensure the water table lies well below the new ground surface after closure of the vaults, and that any future trace contaminated groundwater flows out to the sea rather than to the soil zone. This layer is referred to in project documents as the 'enhanced geosphere'. After disposals are completed and the vaults are closed, this layer will be joined to the capping over the vaults so that the ensemble merges visually with the surrounding landscape. The original vegetation and soil mix will be returned as far as is practicable. An encapsulation plant has been constructed to fill the LLW containers with grout prior to disposal in the vault, similar to the process used at the national Low-Level Waste Repository facility (LLWR), near Drigg in Cumbria. The plant has the capacity to grout up to four containers per day. The grout fills voids in the container and helps provide chemical conditions in the vault that limit the release of radionuclides in the far future, after the vault has been penetrated by groundwater. On April 24 2015, active commissioning began at the Encapsulation Plant and LLW Vaults. Half-height ISO containers packed with low level waste are currently being filled with grout and disposed of in the LLW Vault. Also packaged Demolition Low Level Waste (DLLW) is being processed and disposed of in the Demolition Low Level Waste Vault. To date over 2500 packages of DLLW and 70 containers LLW have been disposed of. Completion of construction and the start of operating the Phase One vaults and encapsulation plant are fundamental to the successful and efficient decommissioning of the Dounreay site, upon which many millions of pounds of investment and hundreds of jobs rely.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Monitoring Plan for the Idaho National Laboratory Remote Handled Low Level Waste Disposal Facility

This monitoring plan for Idaho National Laboratory’s Remote-Handled Low Level Waste Disposal Facility was developed to meet the requirements for monitoring low-level waste disposal facilities according to the U.S. Department of Energy (DOE) Order 435.1, “Radioactive Waste Management,” and the guidance provided in the associated technical standard “Disposal Authorization Statement and Tank Closure Documentation” (DOE-STD-5002-2017). The purpose of this monitoring plan is to document a monitoring strategy that includes (1) compliance monitoring activities to demonstrate compliance with regulatory standards/limits and (2) performance monitoring to build confidence the facility is performing as demonstrated in the facility performance assessment (PA) (DOE-ID 2018a), composite analysis (CA) (DOE ID 2012), and CA addendum (DOE-ID 2018b). The de minimus impact to the aquifer predicted by the PA suggests that aquifer compliance monitoring should be augmented with performance monitoring of the drainage course materials and sedimentary interbeds in the vadose zone beneath the facility to provide a more effective means of identifying performance deviations. The monitoring approach delineated in this document was informed by the systems evaluation of natural and engineered facility features presented in the PA, an assessment of aquifer baseline conditions (INL 2017d), the dose analysis conducted in support of the PA and CA, and monitoring data collected during the first four years of facility operations (baseline monitoring phase) (INL 2023b). This plan provides monitoring locations, sampling frequencies, and sampling methods; recommendations for data evaluation; and a description of the monitoring plan implementation. Collected data will be used to demonstrate facility compliance and to identify conditions that are not consistent with the key assumptions made by the PA and CA.

12 - MGMT OF RADIOACTIVE AND NON-RADIOACTIVE WASTE↗

Proactive Management of Materials Degradation - A Review of Principles and Programs

The U.S. Nuclear Regulatory Commission (NRC) has undertaken a program to lay the technical foundation for defining proactive actions so that future degradation of materials in light water reactors (LWRs) is limited and, thereby, does not diminish either the integrity of important LWR components or the safety of operating plants. This technical letter report was prepared by staff at Pacific Northwest National Laboratory in support of the NRC Proactive Management of Materials Degradation (PMMD) program and relies heavily on work that was completed by Dr. Joseph Muscara and documented in NUREG/CR-6923. This report concisely explains the basic principles of PMMD and its relationship to prognostics, provides a review of programs related to PMMD being conducted worldwide, and provides an assessment of the technical gaps in PMMD and prognostics that need to be addressed. This technical letter report is timely because the majority of the U.S. reactor fleet is applying for license renewal, and many plants are also applying for increases in power rating. Both of these changes could increase the likelihood of materials degradation and underline, therefore, the interest in proactive management in the future.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Underground Test Area October 1, 2015, to December 31, 2016 Quality Assurance Report Nevada National Security Site, Nevada

This report is required by the Underground Test Area (UGTA) Activity Quality Assurance Plan (QAP) (NNSA/NFO, 2015) and identifies the UGTA quality assurance (QA) activities from October 1, 2015, through December 31, 2016 (hereafter, called “the reporting period”). This expanded reporting period allows this report to be converted to a calendar-year (CY) reporting cycle. This change is being made to better align this report with the annual UGTA sampling and the Nevada National Security Site (NNSS) environmental reports. All UGTA organizations—U.S. Department of Energy (DOE) Office of Environmental Management (EM) Nevada Program; Desert Research Institute (DRI); Lawrence Livermore National Laboratory (LLNL); Los Alamos National Laboratory (LANL); National Security Technologies, LLC (NSTec); Navarro Research and Engineering, Inc. (Navarro); and the U.S. Geological Survey (USGS)—conducted QA activities in the reporting period. The activities included conducting oversight assessments for QAP compliance, identifying findings and completing corrective actions, evaluating laboratory performance, reviewing technical work, and publishing documents.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗