Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “system planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,117 records · Page 62

Systems special investigation group overview

The Systems Special Investigation Group (SIG) has undertaken investigations in the four major engineering disciplines represented in the Long Duration Exposure Facility (LDEF) hardware: electrical, mechanical, thermal, and optical systems. Testing was planned for the highest possible level of assembly, and top level system tests for nearly all systems were performed at this time. To date, testing was performed on a mix of LDEF and individual experimenter systems. No electrical or mechanical system level failures attributed to the spaceflight environment have yet been detected. Some low cost electrical components were used successfully, although relays were a continuing problem. Mechanical galling was observed unexpectedly, but no evidence of cold welding was identified yet. A working index of observed systems anomalies was created and will be used to support the tracking and resolution of these effects. The LDEF hardware currently available to the Systems SIG includes most of the LDEF systems hardware, and some significant experimenter hardware as well. A series of work packages was developed for each of several subsystem types where further testing is of critical interest. The System SIG is distributing a regular newsletter to the greater LDEF community in order to maintain coherence in an investigation which is widely scattered both in subject matter and in geography. Circulation of this informal document has quadrupled in its first year.

Mason, James B.↗

Systems special investigation group overview

The Systems Special Investigation Group (SIG) has undertaken investigations in the four major engineering disciplines represented by LDEF hardware: electrical, mechanical, thermal, and optical systems. Testing was planned for the highest possible level of assembly, and top level system tests for nearly all systems were performed at this time. Testing to date was performed on a mix of LDEF and individual experimenter systems. No electrical or mechanical system level failures attributed to the spaceflight environment were detected by the Systems SIG. Some low cost electrical components were used successfully, although relays were a continuing problem. Extensive mechanical galling was observed, but no evidence of coldwelding was identified. A working index of observed systems anomalies was created and will be used to support the tracking and resolution of these effects. LDEF hardware currently available to the Systems SIG includes most of the LDEF facility systems hardware, and some significant experimenter hardware as well. A series of work packages was developed for each of several subsystem types where further testing is of critical interest. The Systems SIG is distributing a regular newsletter to the greater LDEF community in order to maintain coherence in an investigation which is widely scattered both in subject matter and in geography. Circulation of this informal document has quadrupled in its first year.

James B Mason↗

Improving System Engineering Excellence at NASA's Marshall Space Flight Center

NASA's Marshall Space Flight Center (MSFC) management feels that sound system engineering practices are essential for successful project management, NASA studies have concluded that recent project failures could be attributed in part to inadequate systems engineering. A recent survey of MSFC project managers and system engineers' resulted in the recognition of a need for training in Systems Engineering Practices, particularly as they relate to MSFC projects. In response to this survey, an internal pilot short-course was developed to reinforce accepted practices for system engineering at MSFC. The desire of the MSFC management is to begin with in-house training and offer additional educational opportunities to reinforce sound system engineering principles to the more than 800 professionals who are involved with system engineering and project management. A Systems Engineering Development Plan (SEDP) has been developed to address the longer-term systems engineering development needs of MSFC. This paper describes the survey conducted and the training course that was developed in response to that survey.

Takada, Pamela Wallace↗

Max Launch Abort System (MLAS) Landing Parachute Demonstrator (LPD) Drop Test

The Landing Parachute Demonstrator (LPD) was conceived as a low-cost, rapidly-developed means of providing soft landing for the Max Launch Abort System (MLAS) crew module (CM). Its experimental main parachute cluster deployment technique and off-the-shelf hardware necessitated a full-scale drop test prior to the MLAS mission in order to reduce overall mission risk. This test was successfully conducted at Wallops Flight Facility on March 6, 2009, with all vehicle and parachute systems functioning as planned. The results of the drop test successfully qualified the LPD system for the MLAS flight test. This document captures the design, concept of operations and results of the drop test.

Shreves, Christopher M.↗

Automation of Hubble Space Telescope Mission Operations

On June 13, 2011, after more than 21 years, 115 thousand orbits, and nearly 1 million exposures taken, the operation of the Hubble Space Telescope successfully transitioned from 24x7x365 staffing to 815 staffing. This required the automation of routine mission operations including telemetry and forward link acquisition, data dumping and solid-state recorder management, stored command loading, and health and safety monitoring of both the observatory and the HST Ground System. These changes were driven by budget reductions, and required ground system and onboard spacecraft enhancements across the entire operations spectrum, from planning and scheduling systems to payload flight software. Changes in personnel and staffing were required in order to adapt to the new roles and responsibilities required in the new automated operations era. This paper will provide a high level overview of the obstacles to automating nominal HST mission operations, both technical and cultural, and how those obstacles were overcome.

Burley, Richard↗

Aerial Data Acquisition Platform for Firefront Monitoring

Over the past century, wildfires have grown in their destructive tendencies, and have become a threat to civilian lives, infrastructure, and emergency officials. The 2021 NASA Academy at Langley Research Center was tasked with utilizing NASA technology to increase situational awareness and communication amongst both incident officials and the public. With this mission in mind, the Data Acquisition sub-team chose to develop an outline for a small unmanned aircraft system (UAS) package including required specifications, a payload layout, and mission planning. The proposed system would be capable of mapping firelines at a speed of about 9.8 m/s for periods of up to 3.6 hours. The system would also be able to gather near real time data at a lower cost than currently utilized systems.

Firefront monitoring↗

Test oracle automation for V&V of an autonomous spacecraft's planner

We built automation to assist the software testing efforts associated with the Remote Agent experiment. In particular, our focus was upon introducing test oracles into the testing of the planning and scheduling system component. This summary is intended to provide an overview of the work.

testing test oracles verification validation analy↗

Ground Systems Development Environment (GSDE) interface requirements and prototyping plan

This report describes the data collection and requirements analysis effort of the Ground System Development Environment (GSDE) Interface Requirements study. It identifies potential problems in the interfaces among applications and processors in the heterogeneous systems that comprises the GSDE. It describes possible strategies for addressing those problems. It also identifies areas for further research and prototyping to demonstrate the capabilities and feasibility of those strategies and defines a plan for building the necessary software prototypes.

Church, Victor E.↗

EOS distributed planning and scheduling prototype

Some of the more significant lessons learned during the development of the Earth Observing System (EOS) Distributed Planning and Scheduling Prototype are presented. The need for a central scheduler is not demonstrated. A mapping of scheduling and conflict-resolution responsibility across the nodes of the EOS distributed scheduling system is developed and shown to be both feasible and appropriate. Complex instrument scheduling is mostly accomplished at the ICC/IST (instrument control center/instrumental support terminal) with 'slidable' flexibility for slews and some kinds of calibrations resolved at the EOS Operations Center (EOC). All nodes have full visibility interinstrument contention for resource and environmental rights, e.g., vibration, thermal, and electromagnetic. The EOC assigns, by activity, initial action responsibility for conflict resolution to a node which is party to the conflict. Most interinstrument conflicts are resolved by the ICCs and ISTs during an intermediate scheduling phase while the EOC is negotiating a TDRS schedule with the NCC.

Hull, Larry G.↗

Survey of current correlators and applications

With this summary an attempt is made to contact as many users as possible so as to provide summary data on correlation systems, both in use and as planned. Data on currently available very large scale integration (VLSI) chips and complete systems are included. Also, several planned correlator systems are described and summarized in tabular form. Finally, a description is given of the work being done in the Communications Systems Research Section on VLSI correlator chips and complete correlator systems.

Lahmeyer, C. R.↗

Solar radiation for Mars power systems

Detailed information about the solar radiation characteristics on Mars are necessary for effective design of future planned solar energy systems operating on the surface of Mars. A procedure and solar radiation related data from which the diurnally and daily variation of the global, direct (or beam), and diffuse insolation on Mars are calculated, are presented. The radiation data are based on measured optical depth of the Martian atmosphere derived from images taken of the Sun with a special diode on the Viking Lander cameras; and computation based on multiple wavelength and multiple scattering of the solar radiation.

Appelbaum, Joseph↗

Coupled Reactor Multiphysics and Mass Scalability Assessment for Crewed Megawatt-Class NEP System Architectures

Nuclear Electric Propulsion (NEP) is an in-space propulsion technology capable of enabling opposition and conjunction class crewed Mars missions. NEP subsystems include the reactor for heat generation, a power conversion system (PCS), power management and distribution, electric propulsion system, and heat rejection system. Specific mass, or α (kg/kWe), is a key performance parameter (KPP) of the propulsion system which is directly scalable with the performance and mass predictions for each individual component. To inform technology maturation planning activities, full system and component level parametric modeling is ongoing to explore the design trade space and illustrate the effect of subsystem design choices on the system KPPs. In this study, scaling of high-assay, low-enriched uranium reactor designs is assessed through coupled reactor physics and thermal hydraulics analyses. Scaling analyses evaluate the impact of system performance parameters (power level, interface temperatures) on mass for direct gas cooled, pumped liquid metal, and passively-cooled heat pipe reactor concepts. Each concept requires specific geometries, fluids, and power conversion interface conditions (temperature, pressure, flow rate) to meet desired performance and mass. The reactor assembly includes the active core (fuel, moderator, cladding, working fluid), axial and radial neutron reflectors, control drums, structural support / pressure vessel, and external radiation shielding. Each of these components are parametrically sized based on performance parameters for a megawatt-class power cycle. Results of this scaling analysis increase NEP propulsion system modeling fidelity and ultimately aim to support concept down-selection along with related technology development planning. The reactor and shield α are a function of several PCS and heat rejection system design choices, and reactor scaling with these parameters must be considered to enable an informed decision on an optimal reactor geometry and working fluid combination.

Nuclear Electric Propulsion↗

Planning Coverage Campaigns for Mission Design and Analysis: Clasp for the Proposed DESDynI Mission

Mission design and analysis present challenges in that almost all variables are in constant flux, yet the goal is to achieve an acceptable level of performance against a concept of operations, which might also be in flux. To increase responsiveness, our approach is to use automated planning tools that allow for the continual modification of spacecraft, ground system, staffing, and concept of operations while returning metrics that are important to mission evaluation, such as area covered, peak memory usage, and peak data throughput. We have applied this approach to DESDynI (Deformation, Ecosystem Structure, and Dynamics of Ice) mission design concept using the CLASP (Compressed Large-scale Activity Scheduler/Planner) planning system [7], but since this adaptation many techniques have changed under the hood for CLASP and the DESDynI mission concept has undergone drastic changes, including that it has been renamed the Earth Radar Mission. Over the past two years, we have run more than fifty simulations with the CLASP-DESDynI adaptation, simulating different mission scenarios with changing parameters including targets, swaths, instrument modes, and data and downlink rates. We describe the evolution of simulations through the DESDynI MCR (Mission Concept Review) and afterwards.

DESDynI (Deformation, Ecosystem Structure, and Dyn↗

DSN test and training system

Key characteristics of the Deep Space Network Test and Training System were presented. Completion of the Mark III-75 system implementation is reported. Plans are summarized for upgrading the system to a Mark III-77 configuration to support Deep Space Network preparations for the Mariner Jupiter/Saturn 1977 and Pioneer Venus 1978 missions. A general description of the Deep Space Station, Ground Communications Facility, and Network Operations Control Center functions that comprise the Deep Space Network Test and Training System is also presented.

H. C. Thorman↗

Delta VLBI spacecraft tracking system demonstration. Part 1: Design and planning

The current status of planned delta very long base interferometry (VLBI) navigation during Voyager Jupiter encounters is discussed. It is indicated that angular accuracies of 0.05 microrads are possible and that near real time data transmission can be achieved with minimal station hardware and software modifications. A software correlator and phase tracking program, operating on the SFOF IBM 360, used for data processing is described.

Brunn, D. L.↗