Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “system planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,117 records · Page 62

Certification Considerations for Adaptive Systems

Advanced capabilities planned for the next generation of aircraft, including those that will operate within the Next Generation Air Transportation System (NextGen), will necessarily include complex new algorithms and non-traditional software elements. These aircraft will likely incorporate adaptive control algorithms that will provide enhanced safety, autonomy, and robustness during adverse conditions. Unmanned aircraft will operate alongside manned aircraft in the National Airspace (NAS), with intelligent software performing the high-level decision-making functions normally performed by human pilots. Even human-piloted aircraft will necessarily include more autonomy. However, there are serious barriers to the deployment of new capabilities, especially for those based upon software including adaptive control (AC) and artificial intelligence (AI) algorithms. Current civil aviation certification processes are based on the idea that the correct behavior of a system must be completely specified and verified prior to operation. This report by Rockwell Collins and SIFT documents our comprehensive study of the state of the art in intelligent and adaptive algorithms for the civil aviation domain, categorizing the approaches used and identifying gaps and challenges associated with certification of each approach.

Bhattacharyya, Siddhartha↗

Roman Space Telescope Optical System: Status and Test

A conference presentation providing an overview of the Roman Space Telescope optical system. Details on the optical system verification plan and Spacecraft Bus + Integrated Payload Assembly (SCIPA) thermal vacuum optical test program are provided.

space telescope↗

A CubeSat Asteroid Mission: Design Study and Trade-Offs

There is considerable interest in expanding the applicability of cubesat spacecraft into lightweight, low cost missions beyond Low Earth Orbit. A conceptual design was done for a 6-U cubesat for a technology demonstration to demonstrate use of electric propulsion systems on a small satellite platform. The candidate objective was a mission to be launched on the SLS test launch EM-1 to visit a Near-Earth asteroid. Both asteroid fly-by and asteroid rendezvous missions were analyzed. Propulsion systems analyzed included cold-gas thruster systems, Hall and ion thrusters, incorporating either Xenon or Iodine propellant, and an electrospray thruster. The mission takes advantage of the ability of the SLS launch to place it into an initial trajectory of C3=0. Targeting asteroids that fly close to earth minimizes the propulsion required for fly-by/rendezvous. Due to mass constraints, high specific impulse is required, and volume constraints mean the propellant density was also of great importance to the ability to achieve the required deltaV. This improves the relative usefulness of the electrospray salt, with higher propellant density. In order to minimize high pressure tanks and volatiles, the salt electrospray and iodine ion propulsion systems were the optimum designs for the fly-by and rendezvous missions respectively combined with a thruster gimbal and wheel system For the candidate fly-by mission, with a mission deltaV of about 400 m/s, the mission objectives could be accomplished with a 800s electrospray propulsion system, incorporating a propellant-less cathode and a bellows salt tank. This propulsion system is planned for demonstration on 2015 LEO and 2016 GEO DARPA flights. For the rendezvous mission, at a ΔV of 2000 m/s, the mission could be accomplished with a 50W miniature ion propulsion system running iodine propellant. This propulsion system is not yet demonstrated in space. The conceptual design shows that an asteroid mission is possible using a cubesat platform with high-efficiency electric propulsion.

cubesat↗

Soil mechanics surface sampler - Lunar surface test and results

After the success of Surveyor I in meeting the objectives of the engineering flight series, selection from among candidate experiments led to the inclusion of the Soil Mechanics Surface Sampler (SMSS) on the payload. Though originally planned for later Surveyors, the SMSS design was modified to fit the reduced telemetry and commanding capability of the earlier spacecraft. These modifications included removal of the strain-, acceleration-, and position-measuring systems originally planned, and incorporation of a means for measuring current drawn by the motors during operation. A description of the modified device, its performance on Surveyor III, and some conclusions regarding the lunar surface material drawn from the experiment are presented.

Ground test↗

Opportunities and Strategies for Testing and Infusion of ISRU in the Evolvable Mars Campaign

HE Evolvable Mars Campaign (EMC) is developing the plans and systems needed for a robust, evolutionary strategy to explore cis-lunar space, the Mars sphere of influence (including the moons of Mars), and the surface of Mars. Recently, the emphasis of NASA's plans has changed to focus on the prolonged pioneering of space, rather than focusing on a single crewed mission as the ultimate goal. A sustainable, pioneering vision of space would include in-situ resource utilization (ISRU) in multiple forms and at multiple destinations: atmospheric capture of Mars CO2 and/or volatiles for consumables and propellants, regolith for bulk and refined materials, and in-situ manufacturing at the Moon, Mars, and other bodies. These resources would enable a reduction in the logistical needs from Earth for future missions, thus preparing the way for a sustained presence on Mars. Although the EMC initially relies only on propellant production for the Mars ascent vehicle via ISRU, one of its primary objectives is to prospect at every EMC destination to understand the potential for ISRU; this will permit true pioneering to be enabled after the first crew arrives at Mars. Recent and ongoing analysis has considered the possible prospecting measurements that can be performed at the asteroid returned to cis-lunar space by the Asteroid Robotic Redirect Mission (ARRM), at the lunar surface, at Phobos and Deimos, and on the surface of Mars to identify available resources for future use. These opportunities will be available on missions currently in the Evolvable Mars Campaign construct, and will also facilitate the testing and demonstration of resource acquisition, processing, storage, and useage technologies that can play a role in later missions. This analysis has also led to the identification of several objectives that should be targeted during the missions building up to and including the initial crewed missions. These objectives are mapped to strategies for incorporating ISRU to support resource cycle closure and reduce mass requirements from Earth. This analysis has yielded engineering constraints, based on ISRU, that impact the evaluation of landing sites for missions to the surface of Mars. The terrain of a particular site must be sufficiently flat to permit ISRU systems, as well as ancillary systems such as power and propellant storage tanks, to be landed, moved into position, set up, and operated. Water must be accessible in a form that can be acquired via ISRU, in quantities that align with demands. The chosen method of acquiring and processing water should align with the available resources at a particular site, and that site must have sufficient quantities to meet the requirements (based on crew consumables and propellant demands). Lower altitude landing sites are preferred, as the increase in density can facilitate carbon dioxide acquisition from the atmosphere. Another preference is for sites with a greater ability to move regolith for civil engineering purposes; for example, this would be conducive to both bulk regolith uses (such as the manufacture of berms), and processed regolith uses (such as microwave sintering).

Evolvable Mars Campaign↗

Advanced Communications Technology Satellite (ACTS) Used for Inclined Orbit Operations

The Advanced Communications Technology Satellite (ACTS) is operated by the NASA Glenn Research Center at Lewis Field 24 hours a day, 7 days a week. ACTS, which was launched in September 1993, is in its 7th year of operations, far exceeding the system s planned 2 years of operations and 4 years of designed mission life. After 5 successful years of operating as a geostationary satellite, the spacecraft s North-South stationkeeping was discontinued in August 1998. The system is now operating in an inclined orbit that increases at a rate of 0.8 /yr. With only scarce fuel remaining, operating in this mode extends the usage of the still totally functional payload. Although tracking systems are now needed on the experimenter Earth stations, experiment operations have continued with very little disruption. This is the only known geosynchronous Ka-band (30/20 GHz) spot-beam satellite operating in an inclined orbit. The project began its transition from geostationary operations to inclined operations in August 1998. This did not interrupt operations and was transparent to the experimenters on the system. For the space segment, new daily procedures were implemented to maintain the pointing of the system s narrow 0.3 spot beams while the spacecraft drifts in the North-South direction. For the ground segment, modifications were designed, developed, and fielded for the three classes of experimenter Earth stations. With the next generation of commercial satellite systems still being developed, ACTS remains the only operational testbed for Ka-band geosynchronous satellite communications over the Western hemisphere. Since inclined orbit operations began, the ACTS experiments program has supported 43 investigations by industry, Government, and academic organizations, as well as four demonstrations. The project s goals for inclined-orbit operations now reflect a narrower focus in the types of experiments that will be done. In these days of "faster, better, cheaper," NASA is seeking to gain greater relevance to the agency s mission from these experiments. One area that is of much interest both to NASA and the commercial world is the investigation of protocol issues related to the interoperability of satellites with terrestrial networks, such as Transmission Control Protocol/Internet Protocol (TCP/IP) and Asynchronous Transfer Mode (ATM) over wideband satellites. Other experiment areas of interest are supporting the U.S. Government and NASA as they begin using commercial space assets to meet their communications needs, evaluating issues related to operating a spot-beam satellite in inclined orbit, and evaluating new Ka-band hardware that requires a satellite link. ACTS is now in its last year of operations. Operations are planned through June 2000, when after 81 months of operations, this very successful spacecraft will be superorbited and made inert.

Bauer, Robert A.↗

Review of Marine Renewable Energy in Integrated Resource Plans

As part of a literature review of reference material for grid applications of marine hydrokinetic energy capture technologies, Pacific Northwest National Laboratory (PNNL) surveyed U.S. electric utility integrated resource plans for the mention or treatment of marine renewable energy technologies, principally wave energy, tidal energy, and offshore wind energy. This review offers a window into utility decision-making and data utilization with regard to these generating technologies. The report also offers perspectives on the relationship between traditional and emerging resource planning paradigms and metrics.

16 TIDAL AND WAVE POWER↗

U.S. Solar System Decommissioning Policies

In the United States, cumulative installed utility-scale solar photovoltaic (PV) capacity reached more than 60 gigawatts (GW)dc at the end of 2020. Federal and state renewable energy and net-zero emissions policies will continue to drive solar development in the United States with installed utility-scale PV projected to quadruple (240 GWdc) by 2030. Although more than 75% of all U.S. installed utility-scale PV came online in the last 5 years, federal, state, and local governments are planning for system decommissioning. Our research found that as of April 2021, one federal agency, the Bureau of Land Management (BLM), and 15 U.S. states have solar decommissioning policies in place. North Carolina is also in the process of drafting solar decommissioning regulations, and at least 4 states (Maine, Pennsylvania, West Virginia, Texas) proposed solar decommissioning bills in the 2021 legislative session. This presentation looks at U.S. federal and state solar decommissioning policies who they apply to, when they apply, the requirements/responsibilities, and what the impacts are.

circular economy↗

Feasibility study of using satellites for a disaster warning system

The development of requirements for the Disaster Warning System (DWS) was investigated in relation to the National Weather Service. Conceptual communication traffic flow patterns for the future of the NWS are studied to determine the impact of the DWS on the MWS. The planned warning systems, and satellite communications are discussed along with data collection, and communication services.

Source record↗

The use of database management systems and artificial intelligence in automating the planning of optical navigation pictures

The use of database management systems (DBMS) and AI to minimize human involvement in the planning of optical navigation pictures for interplanetary space probes is discussed, with application to the Galileo mission. Parameters characterizing the desirability of candidate pictures, and the program generating them, are described. How these parameters automatically build picture records in a database, and the definition of the database structure, are then discussed. The various rules, priorities, and constraints used in selecting pictures are also described. An example is provided of an expert system, written in Prolog, for automatically performing the selection process.

Davis, Robert P.↗

Interference Analysis Status and Plans for Aeronautical Mobile Airport Communications System (AeroMACS)

Interference issues related to the operation of an aeronautical mobile airport communications system (AeroMACS) in the C-Band (specifically 5091-5150 MHz) is being investigated. The issue of primary interest is co-channel interference from AeroMACS into mobile-satellite system (MSS) feeder uplinks. The effort is focusing on establishing practical limits on AeroMACS transmissions from airports so that the threshold of interference into MSS is not exceeded. The analyses are being performed with the software package Visualyse Professional, developed by Transfinite Systems Limited. Results with omni-directional antennas and plans to extend the models to represent AeroMACS more accurately will be presented. These models should enable realistic analyses of emerging AeroMACS designs to be developed from NASA Test Bed, RTCA 223, and European results.

Kerczewski, Robert J.↗

Current Practices in Distribution Utility Resilience Planning for Winter Storms

This report is part of a series of hazard-focused case studies examining common practices in electric utility resilience planning. We use standard terminology defining resilience as the ability to anticipate, withstand, absorb, and recover from hazards that cause long duration outages. We distinguish between reliability and resilience using Institute of Electrical and Electronics Engineers (IEEE) 1366-2022, which defines major events as an event that exceeds reasonable design and/or operational limits of the electric power system. Resilience planning is focused on major event days and reliability planning is focused on nonmajor event days. Utility resilience plans are assessed according to common resilience components identified in existing resilience frameworks. The focus of this report is on winter storms in which the primary hazards are heavy snowfall, freezing rain, ice, extreme cold, severe wind, and flooding. These hazards can also contribute to generation shortages, resulting in bulk power system impacts that have consequences for the distribution system, such as load shedding. Stand-alone reports focusing on wildfires and nonwinter storms have been published in parallel with this report. This report can be used as a starting point for understanding potential investment prioritization processes and investment options. This report is intended to improve utility resilience planning by supporting constructive dialogue among utilities, regulators, and other stakeholders.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Putting ROSE to Work: A Proposed Application of a Request-Oriented Scheduling Engine for Space Station Operations

Scheduling engines are found at the core of software systems that plan and schedule activities and resources. A Request-Oriented Scheduling Engine (ROSE) is one that processes a single request (adding a task to a timeline) and then waits for another request. For the International Space Station, a robust ROSE-based system would support multiple, simultaneous users, each formulating requests (defining scheduling requirements), submitting these requests via the internet to a single scheduling engine operating on a single timeline, and immediately viewing the resulting timeline. ROSE is significantly different from the engine currently used to schedule Space Station operations. The current engine supports essentially one person at a time, with a pre-defined set of requirements from many payloads, working in either a "batch" scheduling mode or an interactive/manual scheduling mode. A planning and scheduling process that takes advantage of the features of ROSE could produce greater customer satisfaction at reduced cost and reduced flow time. This paper describes a possible ROSE-based scheduling process and identifies the additional software component required to support it. Resulting changes to the management and control of the process are also discussed.

Jaap, John↗

Design of a modular digital computer system, CDRL no. D001, final design plan

The engineering breadboard implementation for the CDRL no. D001 modular digital computer system developed during design of the logic system was documented. This effort followed the architecture study completed and documented previously, and was intended to verify the concepts of a fault tolerant, automatically reconfigurable, modular version of the computer system conceived during the architecture study. The system has a microprogrammed 32 bit word length, general register architecture and an instruction set consisting of a subset of the IBM System 360 instruction set plus additional fault tolerance firmware. The following areas were covered: breadboard packaging, central control element, central processing element, memory, input/output processor, and maintenance/status panel and electronics.

Easton, R. A.↗

Milestone 4: Test plan for Reusable Hydrogen Composite Tank System (RHCTS). Task 3: Composite tank materials

This document is the detailed test plan for the series of tests enumerated in the preceding section. The purpose of this plan is to present the test objectives, test parameters and procedures, expected performance and data analysis plans, criteria for success, test schedules, and related safety provisions and to describe the test articles, test instrumentation, and test facility requirements. Initial testing will be performed to screen four composite materials for suitability for SSTO LH2 tank loads and environmental conditions. The laminates for this testing will be fabricated by fiber placement, which is the manufacturing approach identified as baseline for the tank wall. Even though hand layup will be involved in fabricating many of the internal structural members of the tank, no hand-layup laminates will be evaluated in the screening or subsequent characterization testing. This decision is based on the understanding that mechanical properties measured for hand-layup material should be at least equivalent to properties measured for fiber-placed material, so that the latter should provide no less than a conservative approximation of the former. A single material will be downselected from these screening tests. This material will be subsequently characterized for impact-damage tolerance and durability under conditions of mechanical and thermal cycling, and to establish a preliminary design database to support ongoing analysis. Next, testing will be performed on critical structural elements fabricated from the selected material. Finally, the 8-foot diameter tank article, containing the critical structural features of the full-scale tank, will be fabricated by fiber placement and tested to verify its structural integrity and LH2 containment.

Greenberg, H. S.↗

Technical development for Australia's MOBILESAT system

With the planned introduction in Australia of the mobile satellite service in mid-1992, MOBILESAT will be the first domestic mobile satellite system with full voice and data capability to be in operation worldwide. This paper describes the technical features which have been adopted by MOBILESAT in providing a unique system optimized for land mobile operation and the technical activities which have been carried out by AUSSAT in the past three years in supporting the development of the system.

Dinh, Kim↗

Evolutionary growth for Space Station Freedom electrical power system

Over an operational lifetime of at least 30 yr, Space Station Freedom will encounter increased space station user requirements and advancing technologies. The space station electrical power system is designed with the flexibility to accommodate these emerging technologies and expert systems and is being designed with the necessary software hooks and hardware scars to accommodate increased growth demand. The electrical power system is planned to grow from the initial 75 kW up to 300 kW. The Phase 1 station will utilize photovoltaic arrays to produce the electrical power; however, for growth to 300 kW, solar dynamic power modules will be utilized. Pairs of 25 kW solar dynamic power modules will be added to the station to reach the power growth level. The addition of solar dynamic power in the growth phase places constraints in the initial space station systems such as guidance navigation and control, external thermal, truss structural stiffness, computational capabilities and storage which must be planned-in in order to facilitate the addition of the solar dynamic modules.

Marshall, Matthew F.↗