Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “space launch”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,117 records · Page 62

Application of Fault Management Theory to the Quantitative Selection of a Launch Vehicle Abort Trigger Suite

This paper describes the quantitative application of the theory of System Health Management and its operational subset, Fault Management, to the selection of Abort Triggers for a human-rated launch vehicle, the United States' National Aeronautics and Space Administration's (NASA) Space Launch System (SLS). The results demonstrate the efficacy of the theory to assess the effectiveness of candidate failure detection and response mechanisms to protect humans from time-critical and severe hazards. The quantitative method was successfully used on the SLS to aid selection of its suite of Abort Triggers.

Lo, Yunnhon↗

Buckling Imperfection Sensitivity of Conical Sandwich Composite Structures for Launch-Vehicles

Structural stability can be an important consideration in the design of large composite shell structures and therefore it is important to understand the buckling response of such structures. It is well known that geometric imperfections can significantly influence the buckling response of such structures by causing the buckling loads to be significantly lower than the theoretical buckling load of a geometrically perfect shell structure. Results are presented of an analytical study on the buckling imperfection sensitivity of large-scale conical sandwich structures for launch vehicles. In particular, representative structures from the Space Launch System launch-vehicle development activities will be considered. The study considered composite sandwich conical structures with multiple sandwich core thicknesses and facesheet layups consisting of tape and fabric composite layups. The results of this analytical study indicate that there is conservatism in the NASA current buckling knockdown factor of 0.33 for conical shell structures. Therefore, it is suggested that the buckling response of composite sandwich cones be further investigated through buckling tests and analytical predictions to potentially revise the buckling design recommendations for conical composite structures.

Sleight, David W.↗

GOES-16 Magnetometers Anomaly Solar-Angle Based Characterization and Correction

GOES-R launched aboard an Atlas V 541 rocket from Space Launch Complex-41 at Cape Canaveral Air Force Station, Florida, on November 19, 2016. The first satellite in the series, GOES-R, was renamed GOES-16 upon reaching geostationary orbit GOES-16 at GOES-Checkout location (89.5 degrees West Longitude) during PLT (Post-Launch Testing). The GOES-16 magnetometer boom was deployed on December 7, 2016 and magnetometer checkout began. GOES-16 replaced GOES-13 as NOAA's operational GOES-East satellite on December 18, 2017. The GOES-16 satellite operational location (GOES-East) is at 75.2 degrees West Longitude.

Magnetometers↗

High-Resolution Launch Environment Simulations

After many years of harsh rocket launches, the Main Flame Deflector (MFD) at Kennedy Space Center has been upgraded in anticipation of flights of NASA’s next generation Space Launch System. The new MFD has a much easier to maintain shingled steel surface.

Launch↗

RL10 Engine Ability to Transition from Atlas to Shuttle/Centaur Program

A key launch vehicle design feature is the ability to take advantage of new technologies while minimizing expensive and time consuming development and test programs. With successful space launch experiences and the unique features of both the National Aeronautics and Space Administration (NASA) Space Transportation System (Space Shuttle) and Atlas/Centaur programs, it became attractive to leverage these capabilities. The Shuttle/Centaur Program was created to transition the existing Centaur vehicle to be launched from the Space Shuttle cargo bay. This provided the ability to launch heaver and larger payloads, and take advantage of new unique launch operational capabilities. A successful Shuttle/Centaur Program required the Centaur main propulsion system to quickly accommodate the new operating conditions for two new Shuttle/Centaur configurations and evolve to function in the human Space Shuttle environment. This paper describes the transition of the Atlas/Centaur RL10 engine to the Shuttle/Centaur configurations; shows the unique versatility and capability of the engine; and highlights the importance of ground testing. Propulsion testing outcomes emphasize the value added benefits of testing heritage hardware and the significant impact to existing and future programs.

Launch Vehicle↗

RL10 Engine Ability to Transition from Atlas to Shuttle/Centaur Program

A key launch vehicle design feature is the ability to take advantage of new technologies while minimizing expensive and time consuming development and test programs. With successful space launch experiences and the unique features of both the National Aeronautics and Space Administration (NASA) Space Transportation System (Space Shuttle) and Atlas/Centaur programs, it became attractive to leverage these capabilities. The Shuttle/Centaur Program was created to transition the existing Centaur vehicle to be launched from the Space Shuttle cargo bay. This provided the ability to launch heaver and larger payloads, and take advantage of new unique launch operational capabilities. A successful Shuttle/Centaur Program required the Centaur main propulsion system to quickly accommodate the new operating conditions for two new Shuttle/Centaur configurations and evolve to function in the human Space Shuttle environment. This paper describes the transition of the Atlas/Centaur RL10 engine to the Shuttle/Centaur configurations; shows the unique versatility and capability of the engine; and highlights the importance of ground testing. Propulsion testing outcomes emphasize the value added benefits of testing heritage hardware and the significant impact to existing and future programs.

Propulsion Testing↗

Launch Vehicle Manual Steering with Adaptive Augmenting Control In-flight Evaluations of Adverse Interactions Using a Piloted Aircraft

An adaptive augmenting control algorithm for the Space Launch System has been developed at the Marshall Space Flight Center as part of the launch vehicles baseline flight control system. A prototype version of the SLS flight control software was hosted on a piloted aircraft at the Armstrong Flight Research Center to demonstrate the adaptive controller on a full-scale realistic application in a relevant flight environment. Concerns regarding adverse interactions between the adaptive controller and a proposed manual steering mode were investigated by giving the pilot trajectory deviation cues and pitch rate command authority. Two NASA research pilots flew a total of twenty five constant pitch-rate trajectories using a prototype manual steering mode with and without adaptive control.

manual steering mode↗

Anti-Criticality Methods for Nuclear Thermal Rocket Launches and Their Associated Assembly / Disassembly in Space

When launching a nuclear reactor into space for use in a nuclear thermal rocket (NTR), safety to the public is of the outmost importance. Ensuring that the reactor will not go critical in an accident scenario is the biggest risk that must be overcome to protect the public. Use of anti-criticality devices and methods, such as the use of poison materials in the core or loading a select portion of the fuel on orbit, can prevent the reactor from going critical in any accident scenario. However, both methods (unpoisoning / loading fuel into the reactor core on orbit) will likely require the use of In Space Assembly and Manufacturing (ISAM) technology to remove the safeguards and ensure the reactor is fully operational before use. This paper discusses the use of ISAMs to help with the unpackaging of anti-criticality devices on orbit along with ISAMs ability to help verify and preform maintenance and inspection checks of the reactor system before operation and in between engine burns.

nuclear thermal propulsion↗

Experimental measurements of the ground cloud growth during the 11 February 1974, Titan-Centaur launch at Kennedy Space Center

The Titan-Centaur was launched from Kennedy Space Center on February 11, 1974 at 0948 eastern daylight time. Ground level effluent measurements were obtained from the solid rocket motors for comparison with NASA diffusion models for predicting effluent ground level concentrations and cloud behavior. The results obtained provide a basis for an evaluation of such key model inputs such as cloud rise rate, stabilization altitude, crosswind growth, volume expansion, and cloud trajectory. Ground level effluent measurements were limited because of changing meteorological conditions, incorrect instrument location, and operational problems. Based on the measurement results, operational changes are defined. Photographs of the ground exhaust clouds are shown. The chemical composition of the exhaust gases was analyzed and is given.

Stewart, R. B.↗

Space Telescope - Design for orbital maintenance

Maintenance and repair of the Shuttle launched Space Telescope (ST) are examined, noting that except for the basic structure, mirrors, cables, and several noncritical items, the entire ST is replaceable or reparable on-orbit. EVA tasks have been designed to avoid contamination, and to provide a reduction in Orbital Replacement Units, a minimal number of doors and openings, and minimized structural weight associated with free-volume. All removable components have been provided with tool-compatible fittings and releases, and standardization of parts has been compromised with considerations of interface with crew handling. Replacement and repair equipment will be carried as an added parcel on Shuttle flights and are not part of the standard Shuttle components. The necessity of designing for crew-aid at ST workstations is suggested to provide sound data for the design of other space-based equipment.

Fisher, H. T.↗

Launch Vehicle Debris Models and Crew Vehicle Ascent Abort Risk

For manned space launch systems, a reliable abort system is required to reduce the risks associated with a launch vehicle failure during ascent. Understanding the risks associated with failure environments can be achieved through the use of physics-based models of these environments. Debris fields due to destruction of the launch vehicle is one such environment. To better analyze the risk posed by debris, a physics-based model for generating launch vehicle debris catalogs has been developed. The model predicts the mass distribution of the debris field based on formulae developed from analysis of explosions. Imparted velocity distributions are computed using a shock-physics code to model the explosions within the launch vehicle. A comparison of the debris catalog with an existing catalog for the Shuttle external tank show good comparison in the debris characteristics and the predicted debris strike probability. The model is used to analyze the effects of number of debris pieces and velocity distributions on the strike probability and risk.

Gee, Ken↗

Mitigation of Electrostatic Hazards on Spacecraft

Spacecraft are complex systems operating in challenging environments that require customized testing procedures designed to mitigate the unique hazards of a space launch environment. As an example of those testing procedures, we describe the test methodology and recommendations developed to mitigate electrostatic discharges that could have triggered an explosion of the Space Shuttle during launch, return to launch site, abort after one orbit, or during normal landing.

Calle, C. I.↗

Next Generation Heavy-Lift Launch Vehicle: Large Diameter, Hydrocarbon-Fueled Concepts

With the passage of the 2010 NASA Authorization Act, NASA was directed to begin the development of the Space Launch System (SLS) as a follow-on to the Space Shuttle Program. The SLS is envisioned as a heavy lift launch vehicle that will provide the foundation for future large-scale, beyond low Earth orbit (LEO) missions. Supporting the Mission Concept Review (MCR) milestone, several teams were formed to conduct an initial Requirements Analysis Cycle (RAC). These teams identified several vehicle concept candidates capable of meeting the preliminary system requirements. One such team, dubbed RAC Team 2, was tasked with identifying launch vehicles that are based on large stage diameters (up to the Saturn V S-IC and S-II stage diameters of 33 ft) and utilize high-thrust liquid oxygen (LOX)/RP engines as a First Stage propulsion system. While the trade space for this class of LOX/RP vehicles is relatively large, recent NASA activities (namely the Heavy Lift Launch Vehicle Study in late 2009 and the Heavy Lift Propulsion Technology Study of 2010) examined specific families within this trade space. Although the findings from these studies were incorporated in the Team 2 activity, additional branches of the trade space were examined and alternative approaches to vehicle development were considered. Furthermore, Team 2 set out to define a highly functional, flexible, and cost-effective launch vehicle concept. Utilizing this approach, a versatile two-stage launch vehicle concept was chosen as a preferred option. The preferred vehicle option has the capability to fly in several different configurations (e.g. engine arrangements) that gives this concept an inherent operational flexibility which allows the vehicle to meet a wide range of performance requirements without the need for costly block upgrades. Even still, this concept preserves the option for evolvability should the need arise in future mission scenarios. The foundation of this conceptual design is a focus on low cost and effectiveness rather than efficiency or cutting-edge technology. This paper details the approach and process, as well as the trade space analysis, leading to the preferred vehicle concept.

Holliday, Jon↗

Analyzing the Impacts of Natural Environments on Launch and Landing Availability for NASA's Exploration Systems Development Programs

The National Aeronautics and Space Administration (NASA) is developing new capabilities for human and scientific exploration beyond Earth orbit. Natural environments information is an important asset for NASA's development of the next generation space transportation system as part of the Exploration Systems Development (ESD) Programs, which includes the Space Launch System (SLS) and Multi-Purpose Crew Vehicle (MPCV) Programs. Natural terrestrial environment conditions - such as wind, lightning and sea states - can affect vehicle safety and performance during multiple mission phases ranging from pre-launch ground processing to landing and recovery operations, including all potential abort scenarios. Space vehicles are particularly sensitive to these environments during the launch/ascent and the entry/landing phases of mission operations. The Marshall Space Flight Center (MSFC) Natural Environments Branch provides engineering design support for NASA space vehicle projects and programs by providing design engineers and mission planners with natural environments definitions as well as performing custom analyses to help characterize the impacts the natural environment may have on vehicle performance. One such analysis involves assessing the impact of natural environments to operational availability. Climatological time series of operational surface weather observations are used to calculate probabilities of meeting/exceeding various sets of hypothetical vehicle-specific parametric constraint thresholds. Outputs are tabulated by month and hour of day to show both seasonal and diurnal variation. This paper will discuss how climate analyses are performed by the MSFC Natural Environments Branch to support the ESD Launch Availability (LA) Technical Performance Measure (TPM), the SLS Launch Availability due to Natural Environments TPM, and several MPCV (Orion) launch and landing availability analyses - including the 2014 Orion Exploration Flight Test 1 (EFT-1) mission.

Altino, Karen M.↗

Space Shuttle standard launch window

To maximize the efficiency of the Space Transportation System as a shared cargo launch system and to enhance the mixability and launch opportunities for payloads carried on the Space Shuttle, the National Aeronautics and Space Administration has developed a shared cargo standard launch window. The launch window is based on the transfer orbit sun angle requirements of an established, common class of geosynchronous communications satellites. This standard window is applicable to mixed cargoes launched from the John F. Kennedy Space Center into 28.5 deg inclination orbits. The window consists of two time periods, each 2 hrs long and centered at 0023 and 1223 Greenwich mean time; it extends unchanged throughout the year.

Deatkine, David D.↗

Launch Vehicle Control Center Architectures

This analysis is a survey of control center architectures of the NASA Space Launch System (SLS), United Launch Alliance (ULA) Atlas V and Delta IV, and the European Space Agency (ESA) Ariane 5. Each of these control center architectures have similarities in basic structure, and differences in functional distribution of responsibilities for the phases of operations: (a) Launch vehicles in the international community vary greatly in configuration and process; (b) Each launch site has a unique processing flow based on the specific configurations; (c) Launch and flight operations are managed through a set of control centers associated with each launch site, however the flight operations may be a different control center than the launch center; and (d) The engineering support centers are primarily located at the design center with a small engineering support team at the launch site.

Watson, Michael D.↗

Spitzer Pre Launch Mission Operations System - The Road to Launch

Spitzer Space Telescope was launched on 25 August 2003 into an Earth-trailing solar orbit to acquire infrared observations from space. Development of the Mission Operations System (MOS) portion prior to launch was very different from planetary missions from the stand point that the MOS teams and Ground Data System had to be ready to support all aspects of the mission at launch (i.e., no cruise period for finalizing the implementation). For Spitzer, all mission-critical events post launch happen in hours or days rather than months or years, as is traditional with deep space missions. At the end of 2000 the Project was dealt a major blow when the Mission Operations System (MOS) had an unsuccessful Critical Design Review (CDR). The project made major changes at the beginning of 2001 in an effort to get the MOS (and Project) back on track. The result for the Spitzer Space Telescope was a successful launch of the observatory followed by an extremely successful In Orbit Checkout (IOC) and operations phase. This paper describes how the project was able to recover the MOS to a successful Delta (CDR) by mid 2001, and what changes in philosophies, experiences, and lessons learned followed. It describes how projects must invest early or else invest heavily later in the development phase to achieve a successful operations phase.

observatory↗

Launch Vehicle Manual Steering with Adaptive Augmenting Control:In-Flight Evaluations of Adverse Interactions Using a Piloted Aircraft

An Adaptive Augmenting Control (AAC) algorithm for the Space Launch System (SLS) has been developed at the Marshall Space Flight Center (MSFC) as part of the launch vehicle's baseline flight control system. A prototype version of the SLS flight control software was hosted on a piloted aircraft at the Armstrong Flight Research Center to demonstrate the adaptive controller on a full-scale realistic application in a relevant flight environment. Concerns regarding adverse interactions between the adaptive controller and a potential manual steering mode were also investigated by giving the pilot trajectory deviation cues and pitch rate command authority, which is the subject of this paper. Two NASA research pilots flew a total of 25 constant pitch rate trajectories using a prototype manual steering mode with and without adaptive control, evaluating six different nominal and off-nominal test case scenarios. Pilot comments and PIO ratings were given following each trajectory and correlated with aircraft state data and internal controller signals post-flight.

adaptive control↗