Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operator decision support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,117 records · Page 62

The Second Wind Forecast Improvement Project (WFIP 2): General Overview

In 2015 the U.S. Department of Energy initiated a four-year study, the second Wind Forecast Improvement Project (WFIP 2), to improve the representation of boundary-layer physics and related processes in mesoscale models for better wind and wind power forecasts. This goal challenges numerical weather prediction models in complex terrain due to inherent assumptions underlying their boundary-layer parameterizations. The WFIP 2 effort involved the wind industry, universities, NOAA, and DOE's national laboratories in an integrated observational and modeling study. Observations spanned 18-months to assure a full annual cycle of continuously recorded observations from remote-sensing and in situ measurement systems. The study area comprised the Columbia Basin of eastern Washington and Oregon, containing more than 4 GW of installed wind capacity; nests of observational systems captured important atmospheric scales from mesoscale to NWP sub-grid scale. Model improvements targeted NOAA's High-Resolution Rapid Refresh (HRRR) model to facilitate transfer of improvements to NWS operational forecast models. This paper describes the general WFIP 2 scope and objectives, the particular scientific challenges of improving wind forecasts in complex terrain, early successes of the project, and an integrated approach to archiving observations and model output. It provides an introduction for a set of more detailed BAMS papers addressing WFIP 2 observational science, modeling challenges and solutions, practical transfer of boundary layer advances to industry use, and advances in coupling improved mesoscale models to microscale models that can represent interactions between wind plants and the atmosphere.

WFIP2, boundary layer, complex terrain, forecastin↗

Tracking Aging in Nuclear Electrical Cable Polymers

The electrical cable network is the nerve center of a nuclear plant, providing power, instrumentation and control of critical systems during operation, planned outage, and during design basis, unplanned outage events. It is therefore important to manage cable system health through awareness of local environments adverse to cable longevity, monitoring of cable condition, and predictive understanding of cable degradation [1-3]. Nondestructive methods can be used to assess the condition of the full length of installed cables and of localized cable regions to support cable repair and replacement planning decisions [4-5]. Informed knowledge of the effects of environment on cable performance over time combined with cable state assessment data can minimize costs associated with cable management by both avoiding outages and ramifications from unexpected cable failure and by avoiding premature replacement of functional cables. In this work, the aging behavior of commonly found nuclear cable insulation and jacketing materials is investigated along with established and emerging methods for locating and quantifying cable degradation. Ethylene-propylene rubber (EPR) and chlorinated polyethylene (CPE), examples of prevalent insulation and jacket materials used in nuclear power plants (NPPs), are thermally aged at elevated temperature to induced material changes similar to those experienced by cable material under long term service conditions. Destructive and nondestructive laboratory tests are used to follow changes in the materials with aging toward establishing predictive capabilities to help extend the life of installed nuclear cables and reduce cable management operational costs.

Cable aging, EPR, CPE, NDE, nuclear↗

Management of Operations under Visual Flight Rules in UTM for Disaster Response Missions

The disaster response domain has experienced an increased focus in recent years due to the rise in number and scale of events, lessons learned from past experience, and emerging technologies that make possible a more coordinated and effective response. As part of this focus, JAXA and NASA have been collaborating on the integration of manned and unmanned aircraft in support of disaster response operations through integrated testing of their respective mission planning and optimization system (Disaster Relief Aircraft Information Sharing Network, or D-NET) and an automated UAS traffic management system (e.g., UTM). In 2018, JAXA and NASA jointly participated in a large-scale disaster drill in Japan where the integration of systems was successfully demonstrated through real-time data exchanges, visualization, and decision making as part of the coordinated airspace management of a manned helicopter in VFR conditions and unmanned small UAS operating in common areas. This work details a flight test consisting of two flights that were conducted December 2019 near the Chofu Aerodrome in Tokyo, which focused on the evaluation of pilots operating under Visual Flight Rules (VFR) communicating through D-NET and sharing intent and position information within UTM. This work contributes to defining the necessary requirements for digital coordination between manned and unmanned operations. UTM requires the use of operation volumes, which are spatial and temporal volumes that encompass UAS flight trajectories and account for technical performance errors and deviations due to disturbances (e.g., wind). A series of flights, representing different missions, used landmark-based operation volumes and conformance of the aircraft to those operation volumes were tracked within UTM. Experienced disaster response helicopter pilots provided insight on the development of the operation plans and their usability during disaster response operations. Results from the flight test supported the suggested benefits of using landmarks for planning and positional awareness and highlighted the need for future research in advanced visualization capabilities to support operations that consider both system constraints and flight deck/airspace management interaction.

disaster response↗

What to expect when you're expecting engagement: Delivering procedural justice in large-scale solar energy deployment

Community engagement in the planning process to build large-scale solar (LSS) projects can win local support and advance procedural justice. However, an understanding of community engagement in current LSS development is lacking. Using responses from a U.S. nationwide survey (n = 979) of residential neighbors living within 3 miles (4.8 km) of completed LSS projects (i.e. “solar neighbors”) and project details from the U.S. Large-Scale Solar Photovoltaic Database (USPVDB), this study seeks to answer the following questions: How are solar neighbors' perceptions of community engagement associated with their attitudes toward their LSS projects? How do solar neighbors' perceptions of community engagement compare to their expectations? And, how do neighbors explain what they perceived about the planning process? We answer these questions using mixed methods, including regression modeling, a new gap analysis technique, and qualitative coding. We find that higher perceived engagement is associated with more positive attitudes toward the project, even when controlling for respondents who acted in opposition. Supporters and opponents alike expect more engagement than they perceived and information about projects both before construction and after operation is lacking. Awareness and engagement expectations increase at certain project size and proximity thresholds. However, most neighbors expect the public to offer input during engagement, but not make decisions. We contextualize these findings with explanatory comments from respondents.

14 SOLAR ENERGY↗

Power System Resilience Metrics Augmentation for Critical Load Prioritization

One of the major goals of new grid operation regimes, such as transactive energy systems (TESs), is to make the power grid more resilient to withstand natural or man-made disasters and potential reliability events, and to continue to serve the maximum number of its customers. But it is a well-known fact to system operators that not all customers are the same. This implies that any discussion of TESs’ impacts on the resilience of the power system should consider the needs of its critical customers (such as the power system operation centers, fire and police stations, and hospitals) over those of other customers. When evaluating the resilience of the system, bonus points must be awarded to any system that could maintain its power supply to critical customers during a disturbance that may cause an outage. This report discusses critical infrastructure (CI) as found in the literature and then categorizes it based on the field to which the operations belong (such as human life/safety-related, operations management, necessary city operation, industrial customers, etc.). Each of these CI categories is further divided into types of critical customers (e.g., the human life/safety-related category has different types of customers like hospitals, fire and police stations, etc.). The entire demand of each of the critical customer types is not categorized as critical load (CL); instead, only a portion of the total load of these critical customers is characterized as critical load. This is done based on the categories of equipment, the function of which is crucial in the operation of the overall facility. CL categorization is performed to provide the ratio of the critical load portion to the overall load , so that it can serve as a parameter in the resilience evaluation of the grid through a metrics-based approach. Such categorization is important as it helps to augment the existing quantifiable resilience metrics with CL categorization. The metrics for a power system need to not only consider how well a system performed during a disturbance event, but also how it reduced strain and supplied power to its CLs. The first step in this process is characterize CLs in the system. After CL characterization, the next step is the inclusion of these loads in the resilience metrics. To that end, in this report weight-based augmentation of resilience metrics is proposed, where certain customers (the ones that are categorized as critical) are assigned higher weights than others. Though an overview of assigning weights to customers is discussed, there is no one-size-fits-all approach for every power system. The decisions made about assigning such weights to customers vary greatly from one operator to another, based on their unique systems and the current and predicted states of critical customers. This decision-making can include the type of disturbance event, which might only affect certain parts of the system. In general, analyzing critical customers before an event helps understand system vulnerabilities. It also helps in planning and conducting operations during the event, evaluating system performance after the event, and supporting better planning for future events. An alternative to the current practices of managing the grid for outages is an innovative TES, which has the potential to provide a platform for including distributed energy resources for managing CLs. This report also describes how TES qualities can help (1) to maintain power supply to critical customers for uninterrupted operations and (2) to restore lost power supply to the critical customers rapidly.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Simulation & Computing FY09-FY10 Implementation Plan Volume 2, Rev. 0

The Stockpile Stewardship Program (SSP) is a single, highly integrated technical program for maintaining the safety and reliability of the U.S. nuclear stockpile. The SSP uses past nuclear test data along with current and future nonnuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. It includes stockpile surveillance, experimental research, development and engineering programs, and an appropriately scaled production capability to support stockpile requirements. This integrated national program requires the continued use of current facilities and programs along with new experimental facilities and computational enhancements to support these programs. The Advanced Simulation and Computing Program (ASC)1 is a cornerstone of the SSP, providing simulation capabilities and computational resources to support the annual stockpile assessment and certification, to study advanced nuclear-weapons design and manufacturing processes, to analyze accident scenarios and weapons aging, and to provide the tools to enable Stockpile Life Extension Programs (SLEPs) and the resolution of Significant Finding Investigations (SFIs). This requires a balanced resource, including technical staff, hardware, simulation software, and computer science solutions. In its first decade, the ASC strategy focused on demonstrating simulation capabilities of unprecedented scale in three spatial dimensions. In its second decade, ASC is focused on increasing its predictive capabilities in a three-dimensional simulation environment while maintaining the support to the SSP. The program continues to improve its unique tools for solving progressively more difficult stockpile problems (focused on sufficient resolution, dimensionality and scientific details); to quantify critical margins and uncertainties (QMU); and to resolve increasingly difficult analyses needed for the SSP. Moreover, ASC has restructured its business model from one that was very successful in delivering an initial capability to one that is integrated and focused on requirements-driven products that address long-standing technical questions related to enhanced predictive capability in the simulation tools. ASC must continue to meet three objectives: Objective 1. Robust Tools--Develop robust models, codes, and computational techniques to support stockpile needs such as refurbishments, SFIs, LEPs, annual assessments, and evolving future requirements. Objective 2--Prediction through Simulation. Deliver validated physics and engineering tools to enable simulations of nuclear-weapons performances in a variety of operational environments and physical regimes and to enable risk-informed decisions about the performance, safety, and reliability of the stockpile. Objective 3--Balanced Operational Infrastructure. Implement a balanced computing platform acquisition strategy and operational infrastructure to meet Directed Stockpile Work (DSW) and SSP needs for capacity and high-end simulation capabilities.

99 GENERAL AND MISCELLANEOUS↗

Gulf of Mexico Helicopter Offshore System Technologies Engineering Needs Assessment

The National Aeronautics and Space Administration (NASA), in partnership with the Federal Aviation Administration (FAA), is conducting a research and development program to modernize the National Airspace System (NAS). The mission of NASA's Advanced Air Transportation Technologies (AATT) project is to develop advanced Air Traffic Management (ATM) concepts and decision support tools for eventual deployment and implementation by the FAA and the private sector. One major objective of the NASA AATT project is to understand and promote the needs of all user classes. The Gulf of Mexico (GoMex) airspace has unique needs. A large number of helicopters operate in this area with only limited surveillance and sometimes-severe environmental conditions. Thunderstorms are the most frequent weather hazard during the spring, summer, and fall. In winter, reduced hours of daylight, low ceilings, strong winds, and icing conditions may restrict operations. Hurricanes impose the most severe weather hazard. The hurricane season, from June through October, normally requires at least one mass evacuation of all offshore platforms.

Edmund J. Koenke↗

Development of a Weather Capability for the Urban Air Mobility Airspace Research Roadmap

Traditionally, the transportation system’s resiliency to the impacts of weather is an area where neglected or incorrect assumptions can lead to difficulties later in the research and development lifecycle. To mitigate this, NASA has ongoing efforts to develop a set of research roadmaps for organizing, integrating, and communicating research into new aviation infrastructure and transportation modalities, within which weather is being addressed early on. An effort has been undertaken to add weather assumptions and requirements to an already-existing roadmap for the Urban Air Mobility (UAM) airspace, seeking to integrate weather requirements early in the system design. This effort addresses the way in which state-of-the art and evolving weather science and technology can enable safe and efficient travel with increasing tempo of UAM operations over time. This paper describes the addition of weather as one of 10 capabilities into the UAM Airspace research roadmap, laying out the anticipated weather technology and information requirements needed to facilitate operations at various UAM Maturity Levels. The process developed and exercised by MIT Lincoln Laboratory researchers produced 41 unique requirements to be satisfied by a Weather capability for the UAM ecosystem, with more than 300 dependencies identified across the system. These requirements cover measurement, analysis, modeling, forecasting, decision support, dissemination, and overarching policy, and are provided with an overview of weather challenges for UAM. The requirements were mainly defined based on subject matter expert review of existing UAM Airspace system requirements, and refined based on iterative feedback with various stakeholders including regulators, academia, and industry. Going forward, this roadmap will help researchers and developers align to a common vision in ensuring that weather is appropriately considered in the UAM ecosystem.

Timothy Bonin↗

Development of a Weather Capability for the Urban Air Mobility Airspace Research Roadmap

Traditionally, the transportation system’s resiliency to the impacts of weather is an area where neglected or incorrect assumptions can lead to difficulties later in the research and development lifecycle. To mitigate this, NASA has ongoing efforts to develop a set of research roadmaps for organizing, integrating, and communicating research into new aviation infrastructure and transportation modalities, within which weather is being addressed early on. An effort has been undertaken to add weather assumptions and requirements to an already-existing roadmap for the Urban Air Mobility (UAM) airspace, seeking to integrate weather requirements early in the system design. This effort addresses the way in which state-of-the art and evolving weather science and technology can enable safe and efficient travel with increasing tempo of UAM operations over time. This paper describes the addition of weather as one of 10 capabilities into the UAM Airspace research roadmap, laying out the anticipated weather technology and information requirements needed to facilitate operations at various UAM Maturity Levels. The process developed and exercised by MIT Lincoln Laboratory researchers produced 41 unique requirements to be satisfied by a Weather capability for the UAM ecosystem, with more than 300 dependencies identified across the system. These requirements cover measurement, analysis, modeling, forecasting, decision support, dissemination, and overarching policy, and are provided with an overview of weather challenges for UAM. The requirements were mainly defined based on subject matter expert review of existing UAM Airspace system requirements, and refined based on iterative feedback with various stakeholders including regulators, academia, and industry. Going forward, this roadmap will help researchers and developers align to a common vision in ensuring that weather is appropriately considered in the UAM ecosystem.

research roadmap↗

Updates to a Preliminary Probabilistic Performance Assessment Model for Radiological and Chemical Contamination at the West Valley Site, New York - 20420

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351-ha site located approximately 48 km south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States at the WNYNSC. NFS built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg (640 metric tons) of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations halted in 1972 and never restarted, leaving behind radioactive and chemical wastes. The U.S. Department of Energy (DOE) was required to complete certain waste management activities under the West Valley Demonstration Project (WVDP) Act of 1980 including decommissioning of WVDP facilities. As collaborating agencies, NYSERDA and the DOE are tasked with making decisions about decommissioning and risk reduction for the West Valley Site. Neptune and Company, Inc. (Neptune) was contracted to develop a probabilistic performance assessment (PPA) model to assist the agencies in their decision making process for decommissioning the WVDP and WNYNSC. One important tool that is needed in order to inform the decision-making process is a science-based model of the West Valley Site that evaluates potential future consequences for human health and the environment. This forms the core of the spatial domain of the West Valley PPA Model. The PPA Model, developed using the GoldSim system modeling software, is a tool intended to provide support for decision making that evaluates uncertainty, in a manner that is transparent, defensible, and robust. The PPA Model includes contaminant transport and health effects components, and is organized around geographically-grouped contaminated facilities. These include the waste disposal areas licensed by the U.S. Nuclear Regulatory Commission and the State of New York, a waste tank farm for storage of high level radioactive waste resulting from reprocessing operations, and several areas contaminated with radioactive and chemical constituents. The PPA Model evaluates contaminant transport from these sources to points of exposure across the site and into receiving surface waters and sediments. Hypothetical people and wildlife could be exposed to contamination at these locations, and the effects of these exposures are evaluated. Contaminant transport processes to be evaluated in the PPA Model include groundwater and surface water transport, contaminant translocation by plants and animals, diffusion, and erosion. The evaluation of exposures to people in this preliminary model is limited to a resident farmer scenario, and ecological assessment is performed at the level of a screening analysis. The results of these preliminary evaluations inform future model developments. PPA Model results are subjected to sensitivity analysis in order to determine those pathways and parameters that are most significant in influencing the results. This information allows analysts and decision makers to focus on those aspects of Site behavior and processes. With this information, the decision makers can drive informed, defensible decisions regarding decommissioning of the Site. This paper includes an update of the information presented at WM2019 [1]. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A New Consolidated Storage Facility for Used Nuclear Fuel in Andrews County, Texas - 16418

On February 6, 2015, Waste Control Specialists LLC (WCS) announced its plan to file a license application with the U.S. Nuclear Regulatory Commission (NRC) to construct and operate a Consolidated Interim Storage Facility (CISF). Upon issuance of the license, WCS would be authorized to receive Used Nuclear Fuel (UNF) and reactor related Greater Than Class C Low Level Radioactive Waste (referred hence forth as UNF) at the CISF in late 2020. WCS based its decision to license a CISF based on strong support from the State of Texas and the local community's willingness to host such a facility in Andrews County, Texas. WCS' decision to license a CISF in a supportive community is consistent with the consent-based licensing approach recommended by the Blue Ribbon Commission on America's Nuclear Future. WCS intends to use existing technology developed by AREVA and NAC International that have already been approved by the NRC to transport UNF from existing commercial nuclear reactors across the nation for interim storage at its 14,000 acre site in Andrew County, Texas. In the pre-application licensing meetings held with the NRC, WCS underscored that UNF would be removed first from the shutdown decommissioned reactor sites and transported to the CISF. Approximately eighty percent of the UNF currently residing at the shutdown decommissioned reactor sites can be safely placed into the storage systems developed by AREVA and NAC International that are currently licensed by the NRC. WCS plans to store up to 40,000 Metric Tons of Heavy Metal (MTHM) at the CISF that would be constructed in eight phases over the next 20 years. WCS intends to submit its license application for the CISF to the NRC by April 2016. The license application will request authorization to possess up to 5,000 MTHM of UNF for Phase One which can accommodate storing the fuel located at over ten shutdown decommissioned reactor sites. As discussed with the NRC, the license application will be developed following NRC regulatory guidance to comply with the technical requirements specified in Title 10 of the Code of Federal Regulations (CFR) Part 72, Licensing Requirements for the Independent Storage of Spent Nuclear Fuel, High-Level Radioactive Waste, and Reactor-Related Greater Than Class C Waste. In addition, to filing the license application, WCS is also seeking legislative changes to the Nuclear Waste Policy Act of 1982 requiring the U.S. Department of Energy (DOE) to take title of the UNF at the commercial nuclear reactor sites. Under such legislative changes, the DOE would also be responsible for the transport of UNF to the CISF. In addition to preparing the CISF License Application, WCS and its partners AREVA and NAC International are prepared to work with DOE to facilitate the development of the UNF transportation infrastructure in the timeframe needed to support CISF operations. The WCS site and technical approach give it several advantages which uniquely position it to become the first successful commercial CISF in the U.S. These advantages include: broad consent-based support at the local, state, and Congressional level; an operating waste disposal site with an existing transportation infrastructure; and the use of already licensed systems to address 80% of the UNF currently in dry storage at shutdown sites in the U.S. WCS firmly believes this initiative will provide an economically viable option for consolidated interim storage of UNF until a permanent geologic repository becomes available. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Neural-based time series forecasting of loss of coolant accidents in nuclear power plants

During the last few years, deep learning in neural networks has demonstrated impressive successes in the areas of computer vision, speech and image recognition, text generation, and many others. However, sensitive engineering areas such as nuclear engineering benefited less from these efficient techniques. In this work, deep learning expert systems are utilized to model and predict time series progression of a design-basis nuclear accident, featuring a loss of coolant accident. Two major findings are accomplished in this work. First, the ability to train expert systems with high accuracy, which could help nuclear power plant operators to figure out plant responses during the accident. Second, building fast, efficient, and accurate deep models to simulate nuclear phenomena, which could be valuable to nuclear computational science. In this work, large amount of time series data is obtained from simulation tools by simulating different conditions of the base-case/nominal accident scenario. Four critical outputs/responses are monitored during the accident (e.g. temperature, pressure, break flow rate, water level). Two approaches are adopted in this work. The first approach is to use feedforward deep neural networks (DNN) to fit all time steps and outputs in a single model. The second approach is to use long short-term memory (LSTM) to fit all time steps together for each reactor response separately. Both DNN and LSTM demonstrate very good performance in predicting the test and base-case scenarios, with accuracy as low as 92% and as high as 99%, where these test scenarios are unknown to the expert systems and are not included in the model training. In addition, both approaches demonstrate a significant reduction in computational costs, as the deep expert system is able to accurately predict the accident 100,000 times faster than the original simulation tool. Given sufficient data, the methodology adopted in this study demonstrates that DNN/LSTM expert systems can be used as a decision support system to model advanced time series phenomena within nuclear power plants with high accuracy and negligible computational costs.

42 ENGINEERING↗

Climate Information Needs for Financial Decision Making

Climate Information Needs for Financial Decision Making (Final Report) This Department of Energy workshop award (grant #DE-SC0008480) provided primary support for the American Meteorological Society’s study on climate information needs for financial decision making. The goal of this study was to help advance societal decision making by examining the implications of climate variability and change on near-term financial investments. We explored four key topics: 1) the conditions and criteria that influence returns on investment of major financial decisions, 2) the climate sensitivity of financial decisions, 3) climate information needs of financial decision makers, and 4) potential new mechanisms to promote collaboration between scientists and financial decision makers. Better understanding of these four topics will help scientists provide the most useful information and enable financial decision makers to use scientific information most effectively. As a result, this study will enable leaders in business and government to make well-informed choices that help maximize long-term economic success and social wellbeing in the United States The outcomes of the study include a workshop, which brought together leaders from the scientific and financial decision making communities, a publication of the study report, and a public briefing of the results to the policy community. In addition, we will present the results to the scientific community at the AMS Annual Meeting in February, 2014. The study results were covered well by the media including Bloomberg News and E&E News. Upon request, we also briefed the Office of Science Technology Policy (OSTP) and the Council on Environmental Quality (CEQ) on the outcomes. We presented the results to the policy community through a public briefing in December on Capitol Hill. The full report is publicly available at www.ametsoc.org/cin. Summary of Key Findings The United States invests roughly $1.5 trillion U.S. dollars (USD) in capital assets each year across the public and private sectors (Orszag 2008; United States Census Bureau 2013). Extreme weather events create and exacerbate risks to these financial investments by contributing to: • Direct physical impacts on the investments themselves • Degradation of critical supporting infrastructure • Changes in the availability of key natural resources • Changes to workforce availability or capacity • Changes in the customer base • Supply chain disruptions • Legal liability • Shifts in the regulatory environment • Reductions in credit ratings Even small changes in weather can impact operations in critical economic sectors. As a result, maximizing returns on financial investments depends on accurately understanding and effectively accounting for these risks. Climate variability and change can either exacerbate existing risks or cause new sources of risk to emerge. Managing these risks most effectively will depend on scientific advances and increases in the capacity of financial decision makers to use the scientific knowledge that results. Barriers to using climate information must also be overcome. This study proposes three predefined levels of certainty for communicating about weather and climate risks: 1) possible (i.e., unknown likelihood or less than 50% chance of occurrence), 2) probable (greater than 50% chance of occurrence), and 3) effectively certain (at least 95% chance of occurrence). For example, it is effectively certain that a change in climate will alter weather patterns. It is probable that climate warming will cause increases in the intensity of some extreme events. It is possible that climate change will cause major and widespread disruptions to key planetary life-support services. Key recommendations of this study: 1) Identify climate-related risks and opportunities for financial decision making. 2) Create a framework to translate scientific information in clear and actionable terms for financial decision makers. 3) Analyze existing climate assessments and translate projected impacts into possible, probable, and effectively certain impacts. 4) Improve climate projections with respect to precipitation (timing, amount, and intensity), extreme events, and tails of probability distributions (i.e., low-probability but high-consequence events). 5) Increase spatial resolution of climate projections in order to provide climate information at the scale most relevant to financial investments. 6) Improve projections of the societal consequences of climate impacts through integrated assessments of physical, natural, and social sciences. 7) Create a user-friendly information repository and portal that provides easy access to information relevant to financial decision making. 8) Create and maintain opportunities to bring together financial decision makers, scientists, and service providers. Near-term financial decisions have long-term implications for the United States’ social and economic well-being that depend, in part, on climate variability and change. Investments will be most successful, and will advance the interests of society most effectively, if they are grounded in the best available knowledge & understanding.

54 ENVIRONMENTAL SCIENCES↗

Operating Experience Data Analysis for Digital Instrumentation and Control System Reliability and Risk Assessment in Nuclear Power Plants

The implementation of advanced digital instrumentation and control (DI&C) systems in U.S. nuclear power plants (NPPs) can bring significant advancements in reliability, monitoring, and control capabilities. However, these systems also introduce new challenges, particularly in assessing risks such as common-cause failures (CCFs) and establishing robust reliability estimates for DI&C components. Addressing these challenges is critical for ensuring the safe and efficient operation of NPPs. Recently, Idaho National Laboratory was tasked by the U.S. Nuclear Regulatory Commission (NRC) to conduct a DI&C reliability study using operating experience data from the nuclear industry. The two operating experience data sources for the study are the Institute of Nuclear Power Operations’ Industry Reporting and Information System (IRIS) and the NRC’s Licensee Event Report database which is hosted at Idaho National Laboratory at https://lersearch.inl.gov/LERSearchCriteria.aspx. This report provides a comprehensive examination of DI&C systems, including their architecture, operational advantages, and associated challenges. It reviews existing industry DI&C studies and failure mode taxonomies, along with reliability data from various industries. Through a detailed analysis of these databases, the study provides insights into DI&C system performance. Considerations should be given to incorporate DI&C failure data into the NRC's Integrated Data Collection and Coding System and updating the Reliability and Availability Data System to support ongoing DI&C reliability studies. Recommendations are also provided for modeling DI&C reliability and CCF in probabilistic risk assessment, thereby supporting risk-informed decision-making and enhancing the reliability and safety of NPPs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

ISS Operations Cost Reductions Through Automation of Real-Time Planning Tasks

In 2007 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organizations to find ways to reduce the cost of operations for supporting the International Space Station (ISS) in the Mission Control Center (MCC). Each MOD organization was asked to define and execute projects that would help them attain cost reductions by 2012. The MOD Operations Division Flight Planning Branch responded to this challenge by launching several software automation projects that would allow them to greatly improve console operations and reduce ISS console staffing and intern reduce operating costs. These tasks ranged from improving the management and integration mission plan changes, to automating the uploading and downloading of information to and from the ISS and the associated ground complex tasks that required multiple decision points. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture; as well as engaging a previously TRL 4-5 technology developed by Ames Research Center (ARC) that utilized an intelligent agent-based system to manage and automate file traffic flow, archive data, and generate console logs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the goal of eliminating a second full time ISS console support position by 2012. The team will also reduce one long range planning console position by 2014. When complete, these Flight Planning Branch projects will account for the elimination of 3 console positions and a reduction in staffing of 11 engineering personnel (EP) for ISS.

Hall, Timothy A.↗

The Technical Resilience Navigator: Risk-Informed Decision Making to Support Resilience Planning

The Technical Resilience Navigator (TRN) helps organizations manage the risk to critical functions at a site from disruptions in energy and water services. Developed in partnership by the Pacific Northwest National Laboratory and the National Renewable Energy Laboratory, under direction and funding from the Department of Energy’s Federal Energy Management Program, the TRN helps organizations enhance their resilience to a variety of disruptive events, both natural and human-caused, that could interrupt normal operations for an unknown period of time. This report provides an overview of the TRN’s risk-informed approach to resilience planning and formally describes how it uses a streamlined risk model to identify effective strategies for improving resilience.

99 GENERAL AND MISCELLANEOUS↗

City of Largo Clear Sky Assessment Process: Prioritizing Solar + Storage for Resilient Facilities & Communities

The Clear Sky Tampa Bay project was a 15-month collaborative research effort to support solar + storage deployment for community resilience in Florida. The Clear Sky Decision Support Toolkit is a collection of resources designed to support users in conducting solar + storage prioritization and feasibility screening assessments at critical facilities. The Tampa Bay Regional Planning Council worked with four local governments in the region to test and apply the Toolkit. This case study series describes how each partner government used the Toolkit and highlights key insights and lessons learned that other users could follow to replicate the process. The City of Largo used the Clear Sky Decision Support Toolkit to advance community solar + storage resilience goals by collaborating with staff across departments and disciplines and engaging with utility stakeholders. The City of Largo conducted an analysis of its Wastewater Treatment Facility (WWTF), which processes an average of 43 million gallons of wastewater daily. Water treatment operations are both critical and energy intensive, requiring sustained energy throughout the day.

14 SOLAR ENERGY↗

ARM FY2026 Radar Plan

The U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) User Facility maintains a suite of advanced atmospheric radar systems that serve as critical tools in ARM’s mission to provide continuous, high-quality observations for advancing the understanding and modeling of atmospheric processes. These radar systems enable detailed characterization of clouds, precipitation, and dynamic structures in the atmosphere, supporting a broad range of scientific applications. The number of deployed systems exceeds what current staffing levels can fully support for continuous 24/7/365 operation. As such, it is essential to have a clearly defined and community-informed plan that prioritizes radar operations and communicates ARM’s strategy for sustaining and evolving these observational assets. This FY2026 Radar Plan outlines ARM’s approach to managing its radar portfolio—balancing scientific impact, operational feasibility, and long-term sustainability. It reflects ARM’s continued commitment to delivering calibrated, well-documented radar data products that enable process-level studies and support the development and evaluation of weather and climate models. Through this plan, ARM aims to ensure transparency in decision-making, alignment with user needs, and support for innovative science across the facility’s fixed and mobile observatories. Given uncertainties around the Fiscal Year (FY) 2026 budget, this plan was developed to assume business as usual and will be updated as budgets and plans may change. It should be noted that, given the limited timeframe involved, this plan will be more succinct than previous plans.

47 OTHER INSTRUMENTATION↗