Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “hydropower”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,117 records · Page 62

TriFrame Mount Structural Performance - Period A

Long-Term TriFrame Monitoring System (LTTFMS) data collected during Period A (13 days - 10/22/20 - 11/4/20). The central component of the Verdant Power Free Flow System is a three-bladed horizontal-axis turbine. The turbine is equipped with a composite rotor with three fixed-pitch blades that rotate at a slow and regular rate (approx. 32 rpm), well below normal water vessel propeller speeds and conventional hydropower turbine blade speeds. The TriFrame mount is the structural mount that holds the three Verdant Power three-bladed horizontal-axis turbines.

16 TIDAL AND WAVE POWER↗

RITE Gen5 KHPS Performance - Period B

Includes Kinetic Hydropower System (KHPS) Turbine performance data from the RITE Gen5 KHPS turbine at the 5 meter size. This data was collected over 16 days in May 2021 during Period B operation. Along with performance data, the data includes setup data, project metadata, and characteristic data for RITE Gen5 KHPS (5m) turbine.

16 TIDAL AND WAVE POWER↗

Millinocket Stream, Maine Velocity and Bathymetry Measurements 2021

ORPC staff collected site characterization data on Millinocket Stream, downstream of the hydropower station at the former Great Northern Paper Mill site in Millinocket, Maine. Bathymetry was collected with a SonTek M9 using HydroSurveyor software package and velocity was collected using the SonTek M9 RiverSurveyor software package. Bathymetry only was collected on 9/30/21. Bathymetry and velocity were collected on 10/21/21.

16 TIDAL AND WAVE POWER↗

Energy Storage Cost and Performance Database

In support of the U.S. Department of Energy’s Energy Storage Grand Challenge, Pacific Northwest National Laboratory is applying its rich history of battery research and development to provide the U.S. Department of Energy (DOE) and industry with a guide to current energy storage costs and performance metrics for various technologies. Cost and performance metrics for individual technologies track the following to provide an overall cost of ownership for each technology: cost to procure, install, and connect an energy storage system; associated operational and maintenance costs; and end-of-life costs. These metrics are intended to support DOE and industry stakeholders in making sound decisions about future R&D directions and priorities that move the United States closer to its goal of energy independence. The technologies currently being evaluated are lithium-ion [lithium iron phosphate (LFP) and nickel manganese cobalt (NMC)] batteries, vanadium redox flow batteries, lead-acid batteries, zinc-based batteries, hydrogen energy storage, pumped storage hydropower, gravitational energy storage, compressed air energy storage, and thermal energy storage.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Effects of Reservoir Operations on Hatchery Coastal Rainbow Trout in Lake Roosevelt, Washington

Abstract It is suspected that reservoir operations limit the mitigation fishery for coastal rainbow trout Oncorhynchus mykiss irideus in Lake Roosevelt, Washington. Entrainment through Grand Coulee Dam has been suggested as the primary impact of reservoir operations. However, the causal mechanisms and effects of entrainment have been difficult to quantify. A logistic regression model was used to examine the effect of reservoir operations on the coastal rainbow trout tag return probability. Eight independent variables were studied: release location, presence–absence of a tag reward, minimum reservoir elevation (m above mean sea level (msl)) during a sample year, reservoir elevation on the fish release date, mean daily water retention time (d) 2 weeks postrelease, mean daily retention time 4 weeks postrelease, mean annual water retention time, and water year type (associated with shallow, average, or deep drawdown events). Models were selected on the basis of likelihood ratio tests, odds ratio confidence intervals (CIs), and predictive ability. Analyses indicated that the significant independent variables were release location, water year, release elevation, and mean water retention time at 4 weeks postrelease. Angler return of tagged fish was 1.86 times more likely after a shallow drawdown event than after a deep drawdown event (95% profile likelihood CI = 1.15–3.03). The effect of mean water retention time was dependent on reservoir elevation at the time of release. When release elevation was low (366–381 m above msl), increasing mean water retention time increased the probability of tag return. However, when release elevation was high (381–393 m above msl), increasing mean water retention time did not increase the probability of tag return. The logistic regression model can be used by fisheries managers to predict the impacts of hydropower operations on the coastal rainbow trout fishery in Lake Roosevelt, thereby allowing for annual adjustments to release strategies that would maximize harvest potential.

McLellan, Holly J.↗

Injury and Mortality of Juvenile Salmon Entrained in a Submerged Jet Entering Still Water

Abstract Development of more eco-friendly hydroelectric facilities requires better understanding of the biological response of juvenile fish when they migrate through the turbines and other downstream passage facilities. Juvenile fall Chinook salmon Oncorhynchus tshawytscha were exposed to turbulent shear flows in a laboratory by using a fast-fish-to-slow-water mechanism in which test fish were carried by the fast-moving water of a submerged turbulent jet into the slow-moving water of a flume. Fish were released at six nozzle velocities: 6.1 (reference control), 12.2, 15.2, 18.3, 21.3, and 22.9 m/s. The onset of minor and major injuries occurred at 15.2 and 21.3 m/s, respectively. The acceleration magnitude threshold (m/s2) of major injury for the fast-fish-to-slow-water mechanism in this study was found to be significantly higher than that for a slow-fish-to-fast-water mechanism used in a previous study in which test fish were introduced into a turbulent jet from slow-moving water through an introduction tube placed just outside the edge of the jet. Fish responded differently and sustained different injuries when they were subjected to turbulent shear flows under the two exposure mechanisms. This information is applicable to the design and operation of turbines and spillways because these two tested mechanisms simulate the severe hydraulic events fish usually experience during passage at hydropower dams.

Deng, Zhiqun↗

Compound Flooding in Halmstad: Common Causes, Interannual Variability and the Effects of Climate Change

Compound flooding was investigated in Halmstad on the Swedish west coast. The highest sea level ever recorded in Sweden was recorded by the Halmstad tide gauge. Moreover, through the city runs Nissan, one of the largest hydropower-producing rivers in southern Sweden. Together these features make the city an interesting location to study compound flooding. Co-variability between different hazards are studied using a unique set of downscaled climate scenario projections produced using state-of-the-art regional atmosphere, ocean and hydrological models. River discharge and sea level annual maxima are found to be correlated with peak strength on interannual time scales. This co-variability is found to derive from a mutual dependence that these hazards have on the North Atlantic Oscillation (NAO). Precipitation also shares this dependence in winter months and acts as a driver, building up the fluvial river hazard, while potentially adding additional pluvial hazard. Trends are also assessed, and it was found that future changes in compound flooding will most likely be driven primarily by mean sea level rise and secondarily by increases in mean river discharge.

54 ENVIRONMENTAL SCIENCES↗

Investigation of Public Discourse Methods in Energy Policy Decision-Making: A Summary of What You Told Us and What We Learned

The ground is littered with projects that failed because of strong public opposition, including natural gas and coal power plants proposed in Idaho over the past several years. This joint project , of the Idaho National Laboratory, Boise State University, Idaho State University and University of Idaho has aimed to add to the tool box to reduce project risk through encouraging the public to engage in more critical thought and be more actively involved in public or social issues. Early in a project, project managers and decision-makers can talk with no one, pro and con stakeholder groups, or members of the public. Experience has shown that talking with no one outside of the project incurs high risk because opposition stakeholders have many means to stop most (if not all) energy projects. Talking with organized stakeholder groups provides some risk reduction from mutual learning, but organized groups tend not to change positions except under conditions of a negotiated settlement. Achieving a negotiated settlement may be impossible. Furthermore, opposition often arises outside pre-existing groups. Standard public polling provides some information but does not reveal underlying motivations, intensity of attitudes, etc. Improved methods are needed that probe deeper into stakeholder (organized groups and members of the public) values and beliefs (sometimes called /heuristics) to increase the potential for change of opinions and/or out-of-box solutions. The term “heuristics” refers to the mental short-cuts, underlying beliefs, and paradigms that everyone uses to filter and interpret information, to interpret what is around us, and to guide our actions and decisions. This document is the final report of a 3-year effort to test different public discourse methods in the subject area of energy policy decision-making. We analyzed 504 mail-in surveys and 80 participants in groups on the Boise State University campus for their preference, financial support, and evaluations of eight attributes for energy conservation and efficiency, fossil fuels, nuclear energy, hydropower, and renewable energy. All participants saw a 7-person diverse energy expert panel. Some participants attended deliberation sessions; some received a 35-page briefing document that included pros and cons of the different energy options.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Revised financial analysis of experimental releases conducted at Glen Canyon Dam during water years 1997 through 2005.

Because of concerns about the impact that Glen Canyon Dam (GCD) operations were having on downstream ecosystems and endangered species, the Bureau of Reclamation (Reclamation) conducted an Environmental Impact Statement (EIS) on dam operations (DOE 1996). New operating rules and management goals for GCD that had been specified in the Record of Decision (ROD) (Reclamation 1996) were adopted in February 1997. In addition to issuing new operating criteria, the ROD mandated experimental releases for the purpose of conducting scientific studies. This paper examines the financial implications of the experimental flows that were conducted at the GCD from 1997 to 2005. An experimental release may have either a positive or negative impact on the financial value of energy production. This study estimates the financial costs of experimental releases, identifies the main factors that contribute to these costs, and compares the interdependencies among these factors. An integrated set of tools was used to compute the financial impacts of the experimental releases by simulating the operation of the GCD under two scenarios, namely, (1) a baseline scenario that assumes operations comply with the ROD operating criteria and experimental releases that actually took place during the study period, and (2) a 'without experiments' scenario that is identical to the baseline scenario of operations that comply with the GCD ROD, except it assumes that experimental releases did not occur. The Generation and Transmission Maximization (GTMax) model was the main simulation tool used to dispatch GCD and other hydropower plants that comprise the Salt Lake City Area Integrated Projects (SLCA/IP). Extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and Western Area Power Administration's (Western's) power purchase prices were used for the simulation. In addition to estimating the financial impact of experimental releases, the GTMax model was also used to gain insights into the interplay among ROD operating criteria, exceptions that were made to criteria to accommodate the experimental releases, and Western operating practices. Experimental releases in some water years resulted in financial benefits to Western whileothers resulted in financial costs. During the study period, the total financial costs of all experimental releases were more than $23 million.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Tethys: The Marine and Hydrokinetic Technology Environmental Impacts Knowledge Management System -- Requirements Specification -- Version 1.0

The marine and hydrokinetic (MHK) environmental impacts knowledge management system (KMS), dubbed Tethys after the mythical Greek goddess of the seas, is being developed for the U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy Wind and Hydropower Technologies Program (WHTP) by Pacific Northwest National Laboratory (PNNL). This requirements specification establishes the essential capabilities required of Tethys and clarifies for WHTP and the Tethys development team the results that must be achieved by the system.

54 ENVIRONMENTAL SCIENCES↗

Financial analysis of experimental releases conducted at Glen Canyon Dam during water years 2006 through 2010.

Because of concerns about the impact that Glen Canyon Dam (GCD) operations were having on downstream ecosystems and endangered species, the Bureau of Reclamation (Reclamation) conducted an Environmental Impact Statement (EIS) on dam operations (DOE 1996). New operating rules and management goals for GCD that had been specified in the Record of Decision (ROD) (Reclamation 1996) were adopted in February 1997. In addition to issuing new operating criteria, the ROD mandated experimental releases for the purpose of conducting scientific studies. A report released in January 2011 examined the financial implications of the experimental flows that were conducted at the GCD from 1997 to 2005. This report continues the analysis and examines the financial implications of the experimental flows conducted at the GCD from 2006 to 2010. An experimental release may have either a positive or negative impact on the financial value of energy production. This study estimates the financial costs of experimental releases, identifies the main factors that contribute to these costs, and compares the interdependencies among these factors. An integrated set of tools was used to compute the financial impacts of the experimental releases by simulating the operation of the GCD under two scenarios, namely, (1) a baseline scenario that assumes both that operations comply with the ROD operating criteria and the experimental releases that actually took place during the study period, and (2) a 'without experiments' scenario that is identical to the baseline scenario of operations that comply with the GCD ROD, except it assumes that experimental releases did not occur. The Generation and Transmission Maximization (GTMax) model was the main simulation tool used to dispatch GCD and other hydropower plants that comprise the Salt Lake City Area Integrated Projects (SLCA/IP). Extensive data sets and historical information on SLCA/IP powerplant characteristics, hydrologic conditions, and Western Area Power Administration's (Western's) power purchase prices were used for the simulation. In addition to estimating the financial impact of experimental releases, the GTMax model was also used to gain insights into the interplay among ROD operating criteria, exceptions that were made to criteria to accommodate the experimental releases, and Western operating practices. Experimental releases in some water years resulted in financial benefits to Western while others resulted in financial costs. During the study period, the total financial costs of all experimental releases were more than $4.8 million.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Laboratory Studies of the Effects of Static and Variable Magnetic Fields on Freshwater Fish

There is considerable interest in the development of marine and hydrokinetic energy projects in rivers, estuaries, and coastal ocean waters of the United States. Hydrokinetic (HK) technologies convert the energy of moving water in river or tidal currents into electricity, without the impacts of dams and impoundments associated with conventional hydropower or the extraction and combustion of fossil fuels. The Federal Energy Regulatory Commission (FERC) maintains a database that displays the geographical distribution of proposed HK projects in inland and tidal waters (FERC 2012). As of March 2012, 77 preliminary permits had been issued to private developers to study HK projects in inland waters, the development of which would total over 8,000 MW. Most of these projects are proposed for the lower Mississippi River. In addition, the issuance of another 27 preliminary permits for HK projects in inland waters, and 3 preliminary permits for HK tidal projects (totaling over 3,100 MW) were under consideration by FERC. Although numerous HK designs are under development (see DOE 2009 for a description of the technologies and their potential environmental effects), the most commonly proposed projects entail arrays of rotating devices, much like submerged wind turbines, that are positioned in the high-velocity (high energy) river channels. The many diverse HK designs imply a diversity of environmental impacts, but a potential impact common to most is the effect on aquatic organisms of electromagnetic fields (EMF) created by the projects. The submerged electrical generator will emit an EMF into the surrounding water, as will underwater cables used to transmit electricity from the generator to the shore, between individual units in an array (inter-turbine cables), and between the array and a submerged step-up transformer. The electric current moving through these cables will induce magnetic fields in the immediate vicinity, which may affect the behavior or viability of fish and benthic invertebrates (Gill et al. 2005, 2009). It is known that numerous marine and freshwater organisms are sensitive to electrical and magnetic fields, often depending on them for such diverse activities as prey location and navigation (DOE 2009; Normandeau et al. 2011). Despite the wide range of aquatic organisms that are sensitive to EMF and the increasing numbers of underwater electrical transmitting cables being installed in rivers and coastal waters, little information is available to assess whether animals will be attracted, repelled, or unaffected by these new sources of EMF. This knowledge gap is especially significant for freshwater systems, where electrosensitive organisms such as paddlefish and sturgeon may interact with electrical transmission cables. We carried out a series of laboratory experiments to test the sensitivity of freshwater fish and invertebrates to the levels of EMF that are expected to be produced by HK projects in rivers. In this context, EM fields are likely to be emitted primarily by generators in the water column and by transmission cables on or buried in the substrate. The HK units will be located in areas of high-velocity waters that are used as only temporary habitats for most riverine species, so long-term exposure of fish and benthic invertebrates to EMF is unlikely. Rather, most aquatic organisms will be briefly exposed to the fields as they drift downstream or migrate upstream. Because the exposure of most aquatic organisms to EMF in a river would be relatively brief and non-lethal, we focused our investigations on detecting behavioral effects. For example, attraction to the EM fields could result in prolonged exposures to the fields or the HK rotor. On the other hand, avoidance reactions might hinder upstream migrations of fish. The experiments reported here are a continuation of studies begun in FY 2010, which focused on the potential effects of static magnetic fields on snails, clams, and fathead minnows (Cada et al. 2011). Those experiments found little indication that the behaviors of these freshwater species were altered by the static magnetic fields that would be created by submerged, direct current (DC)-transmitting electrical cables expected to be used by the HK developers. Laboratory experiments in FY 2011 examined the responses of additional fish species (sunfish, striped bass, and channel catfish) to the static magnetic fields. In addition, the effects of variable magnetic fields (that would be created by the HK generators and AC-transmitting cables) on swimming behavior of two electrosensitive fish species (paddlefish and lake sturgeon) were studied.

13 HYDRO ENERGY↗

Hydroacoustic Evaluation of Overwintering Summer Steelhead Fallback and Kelt Passage at The Dalles Dam Turbines, Early Spring 2011

This report presents the results of an evaluation of overwintering summer steelhead (Oncorhynchus mykiss) fallback and early out-migrating steelhead kelts downstream passage at The Dalles Dam turbines during early spring 2011. The study was conducted by Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers, Portland District (USACE) to investigate whether adult steelhead are passing through turbines during early spring before annual sluiceway operations typically begin. The sluiceway surface flow outlet is the optimal non-turbine route for adult steelhead, although operating the sluiceway reduces hydropower production. This is a follow-up study to similar studies of adult steelhead passage at the sluiceway and turbines we conducted in the fall/winter 2008, early spring 2009, fall/winter 2009, and early spring 2010. The goal of the 2011 study was to characterize adult steelhead passage rates at the turbines while the sluiceway was closed so fisheries managers would have additional information to use in decision-making relative to sluiceway operations. Sluiceway operations were not scheduled to begin until April 10, 2011. However, based on a management decision in late February, sluiceway operations commenced on March 1, 2011. Therefore, this study provided estimates of fish passage rates through the turbines, and not the sluiceway, while the sluiceway was open. The study period was March 1 through April 10, 2011 (41 days total). The study objective was to estimate the number and distribution of adult steelhead and kelt-sized targets passing into turbine units. We obtained fish passage data using fixed-location hydroacoustics with transducers deployed at all 22 main turbine units at The Dalles Dam. Adult steelhead passage through the turbines occurred on 9 days during the study (March 9, 12, 30, and 31 and April 2, 3, 5, 7, and 9). We estimated a total of 215 ± 98 (95% confidence interval) adult steelhead targets passed through the turbines between March 1 and April 10, 2011. Horizontal distribution data indicated Main Unit 18 passed the majority of fish. Fish passage occurred throughout the day. We conclude that adult steelhead passed through turbines during early spring 2011 at The Dalles Dam.

13 HYDRO ENERGY↗

Financial analysis of experimental releases conducted at Glen Canyon Dam during water year 2011

This report examines the financial implications of experimental flows conducted at the Glen Canyon Dam (GCD) in water year 2011. It is the third report in a series examining financial implications of experimental flows conducted since the Record of Decision (ROD) was adopted in February 1997 (Reclamation 1996). A report released in January 2011 examined water years 1997 to 2005 (Veselka et al. 2011), and a report released in August 2011 examined water years 2006 to 2010 (Poch et al. 2011). An experimental release may have either a positive or negative impact on the financial value of energy production. This study estimates the financial costs of experimental releases, identifies the main factors that contribute to these costs, and compares the interdependencies among these factors. An integrated set of tools was used to compute the financial impacts of the experimental releases by simulating the operation of the GCD under two scenarios, namely, (1) a baseline scenario that assumes both that operations comply with the ROD operating criteria and the experimental releases that actually took place during the study period, and (2) a 'without experiments' scenario that is identical to the baseline scenario of operations that comply with the GCD ROD, except it assumes that experimental releases did not occur. The Generation and Transmission Maximization (GTMax) model was the main simulation tool used to dispatch GCD and other hydropower plants that comprise the Salt Lake City Area Integrated Projects (SLCA/IP). Extensive data sets and historical information on SLCA/IP powerplant characteristics, hydrologic conditions, and Western Area Power Administration's (Western's) power purchase prices were used for the simulation. In addition to estimating the financial impact of experimental releases, the GTMax model was also used to gain insights into the interplay among ROD operating criteria, exceptions that were made to criteria to accommodate the experimental releases, and Western operating practices. Experimental releases conducted in water year 2011 resulted only in financial costs; the total cost of all experimental releases was about $\$$622,000.

13 HYDRO ENERGY↗

Outlook and Challenges for Chinese Coal

China has been, is, and will continue to be a coal-powered economy. The rapid growth of coal demand since 2001 has created deepening strains and bottlenecks that raise questions about supply security. Although China's coal is 'plentiful,' published academic and policy analyses indicate that peak production will likely occur between 2016 and 2029. Given the current economic growth trajectory, domestic production constraints will lead to a coal gap that is not likely to be filled with imports. Urbanization, heavy industry growth, and increasing per-capita consumption are the primary drivers of rising coal usage. In 2006, the power sector, iron and steel, and cement accounted for 71% of coal consumption. Power generation is becoming more efficient, but even extensive roll-out of the highest efficiency units could save only 14% of projected 2025 coal demand. If China follows Japan, steel production would peak by 2015; cement is likely to follow a similar trajectory. A fourth wedge of future coal consumption is likely to come from the burgeoning coal-liquefaction and chemicals industries. New demand from coal-to-liquids and coal-to-chemicals may add 450 million tonnes of coal demand by 2025. Efficient growth among these drivers indicates that China's annual coal demand will reach 4.2 to 4.7 billion tonnes by 2025. Central government support for nuclear and renewable energy has not been able to reduce China's growing dependence on coal for primary energy. Few substitution options exist: offsetting one year of recent coal demand growth would require over 107 billion cubic meters of natural gas, 48 GW of nuclear, or 86 GW of hydropower capacity. While these alternatives will continue to grow, the scale of development using existing technologies will be insufficient to substitute significant coal demand before 2025. The central role of heavy industry in GDP growth and the difficulty of substituting other fuels suggest that coal consumption is inextricably entwined with China's economy in its current mode of growth. Ongoing dependence on coal reduces China's ability to mitigate carbon dioxide emissions growth. If coal demand remains on its current growth path, carbon dioxide emissions from coal combustion alone would exceed total US energy-related carbon emissions by 2010. Broadening awareness of the environmental costs of coal mining, transport, and combustion is raising the pressure on Chinese policy makers to find alternative energy sources. Within China's coal-dominated energy system, domestic transportation has emerged as the largest bottleneck for coal industry growth and is likely to remain a constraint to further expansion. China is short of high-quality reserves, but is producing its best coal first. Declining quality will further strain production and transport. Transporting coal to users has overloaded the train system and dramatically increased truck use, raising transport oil demand. Growing international imports have helped to offset domestic transport bottlenecks. In the long term, import demand is likely to exceed 200 mt by 2025, significantly impacting regional markets. The looming coal gap threatens to derail China's growth path, possibly undermining political, economic, and social stability. High coal prices and domestic shortages will have regional and global effects. Regarding China's role as a global manufacturing center, a domestic coal gap will increase prices and constrain growth. Within the Asia-Pacific region, China's coal gap is likely to bring about increased competition with other coal-importing countries including Japan, South Korea, Taiwan, and India. As with petroleum, China may respond with a government-supported 'going-out' strategy of resource acquisition and vertical integration. Given its population and growing resource constraints, China may favor energy security, competitiveness, and local environmental protection over global climate change mitigation. The possibility of a large coal gap suggests that Chinese and international policy makers should maximize institutional and financial support to moderate demand and improve energy efficiency.

01 COAL, LIGNITE, AND PEAT↗

Puget Sound Tidal Energy In-Water Testing and Development Project (Final Technical Report)

Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy's Wind and Hydropower Technologies Program's goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step toward potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.

16 TIDAL AND WAVE POWER↗

Small Hydro Reference Model Project (Final Project Report)

Small hydropower has long been developed in the United States, but still thousands of small hydro sites remain untapped. Most of them are technically and environmentally feasible but may not be cost-effective to develop at the current level of technology and carbon and fuel markets. This report aims to identify the cost drivers for small hydro generation through cost analyses, and to improve understanding of the pathways for cost reduction and the strategies for accelerating small hydro development in the United States. Reference to the empirical cost equations in literature, an initial capital cost (ICC) equation for nonpowered dam (NPD) and conduit projects has been preliminarily developed using limited project cost data collected from the Federal Energy Regulatory Commission (FERC) e-library and directly from industrial contacts. The regression analysis shows a correlation between the project ICC and plant capacity and head. The electro-mechanical equipment costs for Francis, axial flow, Kaplan, and propeller turbines are derived from the historical budget prices of a small hydro turbine manufacturer. These cost curves show the turbine-generator cost is also associated with the plant capacity and net head. In addition, the initial cost breakdowns are analyzed based on project cost data from literature and industry. It was found that the turbine-generator and the powerhouse are often the major cost components for low-head projects, whereas water conveyance is likely to be the key cost driver for high-head projects. The ICC variations for different site features, such as new greenfield sites vs. non-powered dams, are also discussed.

Zhang, Qin Fen (Katherine)↗

Iowa: Iowa's Clean Energy Resources and Economy [Brochure]

By harnessing its vast natural resources, Iowa has become a leader in renewable energy production. Iowa was the largest producer of ethanol in the United States in 2011—accounting for more than a quarter of the nation’s fuel ethanol production. Iowa, home to nine wind industry manufacturing facilities in 2010, ranks second in the country in installed wind capacity, with 4,322 megawatts installed at the end of 2011. This installed wind capacity is estimated, in an average year, to supply approximately 20% of Iowa’s entire in-state electricity generation. Iowa’s high utilization of wind power has propelled the state to third in the nation for total installed renewable electricity capacity. Additionally, Iowa’s potential for using biopower produced from solid materials is second in the country, behind only Illinois. Iowa owes part of its success to its early policy support for renewable energy. The first capacity target in Iowa’s Alternative Energy Law, passed in 1983, was met in 1997. This early success led to former Iowa Governor Vilsack’s 2003 call for Iowa to deploy 1,000 MW of renewable energy—a goal that was met in 2006. Although Iowa’s renewable energy capacity requirements are met mostly by wind, other eligible resources include solar, waste management, resource recovery, refuse-derived fuel, agricultural crops or residues, wood-burning facilities, and small hydropower facilities. The state has also made a strong commitment to energy efficiency. Iowa’s investor-owned utilities more than doubled the budgets of their efficiency programs from 2002 to 2007, passing the $\$$100 million mark in 2006.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗