Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “deployable”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,117 records · Page 62

Is the Distribution Grid Ready to Accept Large Scale Photovoltaic Deployment? - State of the Art, Progress and Future Prospects

The installed capacity of photovoltaic systems has recently increased at a much faster rate than the development of grid codes to effectively and efficiently manage high penetrations of PV within the distribution system. In a number of countries, PV penetrations in some regions are now raising growing concerns regarding integration. Management strategies vary considerably by country - some still have an approach that photovoltaic systems should behave as passive as possible while others demand an active participation in grid control. This variety of grid codes also causes challenges in learning from 'best practice'. This paper provides a review of current grid codes in some countries with high PV penetrations. In addition, the paper presents a number of country-specific case studies on different approaches for improved integration of photovoltaic systems in the distribution grid. In particular, we consider integration approaches using active and reactive power control that can reduce or defer expensive grid reinforcement while supporting higher PV penetrations.

14 SOLAR ENERGY↗

Measuring the Benefits of Public Chargers and Improving Infrastructure Deployments Using Advanced Simulation Tools: Preprint

With support from the U.S. Department of Energy's Vehicle Technologies Office, the National Renewable Energy Laboratory developed BLAST-V -- the Battery Lifetime Analysis and Simulation Tool for Vehicles. The addition of high-resolution spatial-temporal travel histories enables BLAST-V to investigate user-defined infrastructure rollouts of publically accessible charging infrastructure, as well as quantify impacts on vehicle and station owners in terms of improved vehicle utility and station throughput. This paper presents simulation outputs from BLAST-V that quantify the utility improvements of multiple distinct rollouts of publically available Level 2 electric vehicle supply equipment (EVSE) in the Seattle, Washington, metropolitan area. Publically available data on existing Level 2 EVSE are also used as an input to BLAST-V. The resulting vehicle utility is compared to a number of mock rollout scenarios. Discussion focuses on the estimated number of Level 2 stations necessary to substantially increase vehicle utility and how stations can be strategically sited to maximize their potential benefit to prospective electric vehicle owners.

25 ENERGY STORAGE↗

ReEDS™ 2.0 Model (Regional Energy Deployment System Model) Version 2.0 [SWR-20-36 and SWR-09-14]

ReEDS™ is a capacity planning and dispatch model for the U.S. electricity system. As the National Laboratory of the Rockies (NLR's) flagship long-term power sector model, ReEDS has served as the primary analytic tool for many studies of electricity sector research questions. Example model results are available in the Scenario Viewer here: https://scenarioviewer.nlr.gov/. Quick-start guide The ReEDS model is written in Python, GAMS, and Julia. Python and Julia are free, open-source languages; GAMS requires a software license from the vendor. A step-by-step guide for getting started with ReEDS is available here: https://pages.github.nrel.gov/ReEDS/ReEDS-2.0/setup.html.

Short, Walter↗

ARM TBS and TigerShark deployment data in 2021

In 2021, observational data collected using ARM platforms, including seven TigerShark UAS flights and 133 tethered balloon system (TBS) flights, were archived by the ARM Data Center and made publicly available to the user community.

54 ENVIRONMENTAL SCIENCES↗

SORCER TEST UTQIAĠVIK DEPLOYMENT FOR IONOGRAMS (STUDI) 2021-2024

The Air Force Research Laboratory (AFRL) has developed a passive broadband radio frequency (RF) receiver, called a Sounder Receiver (SoRcer), as an ionospheric diagnostic instrument. These systems can produce ionospheric specifications to characterize the local ionosphere. The specifications from the SoRcers can then be used to inform data-assimilation models; monitor diurnal, seasonal, or other cyclical changes; and detect irregularities or abnormalities in the ionosphere, such as traveling ionospheric disturbances (TIDs), sporadic E, and spread F.

frequency↗

Bridging Control and Deployment: A Cross-Layer Analysis of Scalable Building Cluster Control

Building cluster control has emerged as a promising approach for enabling flexible and coordinated operation of distributed building systems, yet its transition from pilot demonstrations to routine grid-interactive operation remains limited. This paper argues that this gap cannot be explained by control algorithms alone. Instead, it arises from interacting barriers in communication infrastructure, data and semantic interoperability, uncertainty management, stakeholder participation, market design, and policy support. Accordingly, the paper reviews both technical and non-technical barriers to building cluster control. Technical challenges include heterogeneous devices and protocols, communication latency and reliability, distributed decision-making, and uncertainty propagation across aggregated loads. Non-technical barriers include user participation, stakeholder coordination, incentive allocation, and data governance. Existing solution approaches are synthesized, including semantic interoperability frameworks, edge and hierarchical communication architectures, distributed and transactive control strategies, uncertainty-aware optimization, policy mechanisms, and market reforms. Based on this analysis, two research directions are identified: testing infrastructures that can evaluate control performance under realistic multi-building conditions, and abstraction methods that allow building clusters to interact with other energy sectors through standardized flexibility representations. Overall, the paper provides a structured review of how building cluster control can move from isolated demonstrations toward reproducible, market-compatible, and grid-relevant implementation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

OVERVIEW OF IMPACTS OF TECHNOLOGY DEPLOYMENT ON THE MISSION OF THE DEPARTMENT OF ENERGY OFFICE OF ENVIRONMENTAL MANAGEMENT

The Environmental Management (EM) mission is to complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons development and government-sponsored nuclear energy research. The EM program has embraced a mission completion philosophy based on reducing risk and environmental liability over a 40-50 year lifecycle. The Department has made great progress toward safely disposing of its legacy nuclear waste. EM Research and Development (R&D) program management strategies have driven numerous technology and engineering innovations to reduce risk, minimize cleanup costs, and reduce schedules. Engineering and technology investments have provided the engineering foundation, technical assistance, approaches, and technologies that have contributed to moving the cleanup effort forward. These successes include start-up and operation of several waste treatment facilities and processes at the sites.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Automated Commissioning for Lower-cost, Widely Deployed Building Commissioning of the Future

This chapter takes a brief look at the benefits of commissioning and describes a vision of the future where most of the objectives of commissioning will be accomplished automatically by capabilities built into the building systems themselves. Commissioning will become an activity that is performed continuously rather than periodically, and only repairs requiring replacement or overhaul of equipment will require manual intervention. This chapter then identifies some of the technologies that will be needed to realize this vision and ends with a call for all involved in the enterprise of building commissioning and automation to embrace and dedicate themselves to a future of automated commissioning.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗