Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Status”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,117 records · Page 62

NASA Advanced Space Suit Pressure Garment System Status and Development Priorities 2022

This paper discusses the current focus of NASA’s Advanced Space Suit Pressure Garment Technology Development team’s efforts, the status of that work, and a summary of longer-term technology development priorities and activities. For the past two years, the team has focused on the development and detailed design of the Extra-vehicular Mobility Unit (xEMU) to support two parallel missions: A 2023 deadline for delivery of the xEMU International Space Station (ISS)Demonstration configuration, and a planetary walking suit configuration to support landing on the Moon in 2024. The baselined design of the xEMU will be reviewed. The results of Design Verification Testing (DVT) will be presented and its ability to provide confidence in the hardware’s ability to meet flight requirements will be discussed. To the extent possible, an impact assessment of the Exploration Extravehicular Activity Services (xEVAS) Contract will be provided. Finally, a brief review of longer-term pressure garment challenges and technology gaps will be presented to provide an understanding of the advanced pressure garment team’s technology investment priorities and needs for future exploration missions.

xEMU↗

The Status and Outlook of Cosmic Microwave Background Polarization Measurements

Abstract Measurements of the Cosmic Microwave Background (CMB) over the last 50+ years have yielded a wealth of information about the universe and LambdaCDM cosmology. Modern CMB instruments continue to search for the B-mode polarization signal from gravitational waves produced during the inflationary epoch. In this talk I will cover a brief history of measurements of the CMB and give a survey of the current status of the field. I will also talk about my work at Goddard Space Flight Center with the Cosmology Large Angular Scale Surveyor (CLASS) collaboration. CLASS is a ground-based series of telescopes in the Atacama desert in northern Chile, designed to measure the CMB and large angular scale B-mode polarization.

Kyle Helson↗

International Space Station as a Testbed for Exploration Environmental Control and Life Support Systems - 2022 Status

International Space Station as a Testbed for Exploration Environmental Control and Life Support Systems– 2022 StatusHuman exploration missions beyond low earth orbit, such as NASA’s Artemis Program, present significant challenges to spacecraft system design and supportability. A particularly challenging area is the Environmental Control and Life Support System (ECLSS) that maintains a habitable and life-sustaining environment for crewmembers. NASA is utilizing the experience gained from its current and prior spaceflight programs to mature life support technologies for exploration missions to deep space. The intent is to establish a portfolio of life support system capabilities with proven performance and reliability to enable human exploration missions and reduce risk to success of those missions. As a fully operational human-occupied platform in microgravity, the International Space Station (ISS) presents a unique opportunity to act as a testbed for exploration-class ECLSS, such that these systems may be tested, proven, and refined for eventual deployment on deep space human exploration missions. This paper will provide an updated status on the testbed development including hardware and ISS vehicle integration progress

Laura A Shaw↗

Status and Future of the FACT Network in the Northern Indian River Lagoon (Abstract for 2022 Indian River Lagoon Symposium)

Continued expansion of passive acoustic telemetry networks is allowing the movements of aquatic animals to be monitored over ever-larger distances and extended time periods. From modest beginnings in east-central Florida, the collaborative FACT Network has grown into one of the largest animal tracking networks in the world, with partners working throughout the southeastern US, Bahamas, and Caribbean. In the IRL region, tracking stations deployed across a continuum of habitats are revealing the behavior and habitat needs of our region’s most valuable sportfish, shark, and sea turtle species. This talk will summarize the status of the FACT Network as of 2022. Several ongoing and upcoming studies in the Canaveral region will be highlighted including those designed to understand the export of economically valuable sportfish from protected waters of Kennedy Space Center, inshore-offshore movements of spawning red drum, seasonal migrations of coastal sharks, and habitat use of juvenile IRL sea turtles.

Indian River Lagoon↗

Pathfinder Technology Demonstrator (PTD) Status

This paper will provide the status of the NASA Small Spacecraft Technology (SST) program’s Pathfinder Technology Demonstrator (PTD) series. Details on the development, launch, and operations of the recently completed PTD-1, as well as the planned operations of the upcoming PTD-3 and PTD-4 flights will be presented. Significant advances in the capabilities of nano-spacecraft over the past 15 years, coupled with improved access to space for CubeSats, have created new opportunities for scientific exploration using these high-value platforms. Continued development and demonstration of key technologies are improving the performance of the 1-unit (U) and 3U class CubeSats while expanding the reach of nano-spacecraft technologies into larger platforms, such as the 12-kilogram class “6U” buses. NASA’s PTD series is demonstrating a variety of new technologies on-orbit, providing proof of the maturity of these significant new technologies, and enhancing the performance of future CubeSats. Each of the four PTD flights consists of one 6U CubeSat weighing approximately 12 kilograms and measuring approximately 36 centimeters x 25 centimeters x 10 centimeters. Each flight is planned to characterize its payload within 90 days of insertion into low-Earth orbit. The PTD flights will demonstrate key technologies such as novel nano-spacecraft compatible propulsion systems, which enable deep space and maneuverable CubeSat flights; optical communications systems to facilitate high data rate collection and communications; and highly integrated systems that combine power and communication system elements to enable high power generation and novel integrated communication systems. The first PTD spacecraft, PTD-1, was placed in orbit by a SpaceX Falcon 9 launch in January of 2021 and demonstrated the functionality of the HYDROS propulsion system, developed by Tethers Unlimited of Bothell, Washington, over a period of six months. The PTD-3 flight, scheduled for launch in summer 2022, will demonstrate the TeraByte InfraRed Delivery, or TBIRD, optical communications payload developed by Massachusetts Institute of Technology Lincoln Laboratory in Lexington. The PTD-4 flight will demonstrate the Lightweight Integrated Solar Array and anTenna, or LISA-T, a payload that consists of an integrated solar array and transceiver developed by NASA’s Marshall Spaceflight Center in Huntsville, Alabama. The PTD spacecraft bus, integration and test, and flight operations services are provided by Tyvak Nano-Satellite Systems, Inc. (“Tyvak”) of Irvine, California. NASA’s SST program within the agency’s Space Technology Mission Directorate funds the PTD demonstration flights. The SST program rapidly develops and demonstrates capabilities for small spacecraft applicable to exploration, science, and the commercial sector. The program is based at NASA’s Ames Research Center.

Small Spacecraft↗

Impact, a Tool Suite for Crew Health and Performance System Trade Analyses and Decision Support - Status of Development

Mission planners, systems engineers, and clinicians that support crew health and performance face very difficult choices on upcoming exploration missions. Given that there will be a heavily constrained mass and volume allocation for a medical system on these missions, what medical capability should be manifested to minimize both medical risk and mission risk? Given that not all promising research and technology proposals can be funded, how can proposals be prioritized so that those funded research investments produce the maximum benefit in reducing overall medical risk? The Informing Mission Planning via Analysis of Complex Tradespaces (IMPACT) project seeks to answer these kinds of questions and others to support upcoming exploration missions. IMPACT enables risk-informed and evidence-based trade space analysis for future space vehicles, missions, and systems. This presentation will discuss the long-term HRP and ExMC vision for the larger ecosystem of tools, which include an updated medical database (consisting of an Evidence Library for medical conditions and a medical item database (MedID) for medical resources), dynamic Probabilistic Risk Assessment (PRA) capabilities, System Modeling Language (SysML) models, and contextual data visualizations of output data. IMPACT is the result of a multi-center collaborative effort. The trade space analyses performed by IMPACT can directly inform mission, vehicle, and habitat development by quantifying medical risk, given a design reference mission, crew attributes and a set of medical capabilities. This presentation will update the audience on the development status of the tool suite, its constituent parts and the plans for when it will deploy as an operational product, currently scheduled for the end of FY22. Recent development successes on the IMPACT project include the ability to cluster medical resources into medical capabilities and mutually-dependent bundles, the ability to perform trade analyses on different medical sets, different DRMs, and different crew complements, and the ability to specify mission segments as periods of time assigned to one or more members of the crew during which unique mission events occur (e.g., extravehicular activities, surface operations, gravity well adaptations, etc.). IMPACT is gearing up for its verification and validation phase to compile the data package necessary for a successful Transition to Operations (TtO), per the guidance in NPR 8900.1B .

IMPACT↗

Current Status and Perspectives to Detect Natural Hazards Using GNSS-Based Ionospheric Measurements

We discuss current status and new directions in detection of natural hazards generated ionospheric signatures using GNSS-based ionospheric measurements. By studying the propagation properties of ionospheric perturbations generated by natural hazards, and applying sophisticated physics-based modeling, we are on track to develop new techniques for detection of natural hazards that can greatly reduce damage to human lives and property. It is also expected that real-time ionospheric monitoring of TEC perturbations might become an integral part of existing natural hazards warning systems.

Komjathy, Attila↗

Cathode & Electromagnet Qualification Status and Power Processing Unit Development Update for the Ascendant Sub-kW Transcelestial Electric Propulsion System

A review of the component-level flight qualification efforts and power processing unit development status of the Ascendant Sub-kW Transcelestial Electric Propulsion System (ASTRAEUS) program is presented. Component-level qualification efforts were undertaken for the system’s ultra-compact heaterless LaB6 hollow cathode and electromagnets, both of which employ designs bespoke to ASTRAEUS, as they represent the highest failure risks for the thruster. Through parallel long-duration wear and ignition tests, the ASTRAEUS cathode demonstrated invariant discharge performance over more than 5000 h of operation at its maximum operating current of 4 A and demonstrated more than 25,000 ignition cycles. The ASTRAEUS electromagnets completed their environmental qualification through a demonstration of more than 1200 deep thermal cycles with no indication of coil degradation (the test articles previously completed qualification-level vibration and shock testing). ASTRAEUS’s prototype power processing unit has demonstrated more than 92% total power conversion efficiency and class-leading power density & specific power density of 4.5 W/cm3 & 1670 W/kg, respectively. The various power converters found in the ASTRAEUS power processing unit are reviewed with a focus on the methods by which such high performance was achieved.

Conversano, Ryan W.↗

Electric Propulsion for the Psyche Mission: Development Activities and Status

NASA’s Psyche mission will launch in 2022 and begin a 3.6-year cruise to the metallic asteroid Psyche, where it will examine this unique body. The baseline spacecraft design is a hybrid of JPL’s deep-space heritage subsystems with commercial partner Maxar’s electric propulsion, power, and structure subsystems. All primary propulsion will be done with SPT-140 thrusters, which will be the first use of Hall thrusters for a NASA mission. The electric propulsion subsystem and its implementation for the Psyche mission are described here. Major testing activities have included the successful completion of subsystem integrated testing with the design modifications required for Psyche, and a series of low-power thrust repeatability tests that were performed in support of navigation analyses. Thruster performance models have been further validated with new SPT-140 flight data, and new analyses of thruster swirl torque have been performed that result in much higher values than previously estimated. Analysis of recent Maxar flight data has also provided a new understanding of in-flight propellant usage uncertainties. Subsystem integration and test activities are now underway and the status and plans are discussed.

Johnson, Ian↗

International Space Station as a Testbed for Exploration Environmental Control and Life Support Systems - 2022 Status

Human exploration missions beyond low earth orbit, such as NASA’s Artemis Program, present significant challenges to spacecraft system design and supportability. A particularly challenging area is the Environmental Control and Life Support System (ECLSS) that maintains a habitable and life-sustaining environment for crewmembers. NASA is utilizing the experience gained from its current and prior spaceflight programs to mature life support technologies for exploration missions to deep space. The intent is to establish a portfolio of life support system capabilities with proven performance and reliability to enable human exploration missions and reduce risk to success of those missions. As a fully operational human-occupied platform in microgravity, the International Space Station (ISS) presents a unique opportunity to act as a testbed for exploration-class ECLSS, such that these systems may be tested, proven, and refined for eventual deployment on deep space human exploration missions. This paper will provide an updated status on the testbed development including hardware and ISS vehicle integration progress to date as well as future plans for efforts to design, select, build, test and fly Exploration ECLSS on the ISS.

ECLSS↗

Update and Status of the Mars Climate Modeling Center at NASA Ames Research Center

NASA Ames Research Center has a long-established history in the study and numerical modeling of Mars’ atmosphere and climate. Such studies began with the late Jim Pollack and have continued under the leaderships of Bob Haberle, Jeff Hollingsworth, and now Melinda Kahre. Our group has grown to more than 10 members, including civil servants, research scientists, postdocs, and students. While we still prioritize science and the model development that supports it, we have recently enhanced efforts to make our codes and output publicly available and boost community engagement through the hosting of modeling tutorials, etc. Here our goal is to present the status of the Ames Mars GCM, our ongoing science projects, the tools we have recently made publicly available, and our plans for releases and continued community engagement.

M. A. Kahre↗

Status of ISS Water Management and Recovery

Water management on ISS is responsible for the provision of water to the crew for drinking water, food preparation, and hygiene, to the Oxygen Generation System (OGS) for oxygen production via electrolysis, to the Waste & Hygiene Compartment (WHC) for flush water, and for experiments on ISS. This paper summarizes water management activities on the ISS US Segment as of March 2022 and provides a status of the performance and issues related to the operation of the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA).

Water Recovery System↗

The James Webb Space Telescope Mission Status

The James Webb Space Telescope (Webb) is a large, infrared space telescope that recently completed its on-orbit commissioning activities and will now embark on the first year of approved science. Its architecture includes many first-of-its-kind innovations for space, including a segmented primary mirror that is 6.6 m in diameter and a 5-layer sunshield used to passively cool the telescope and its four science instruments. Although Webb had an extensive test program, the system-level performance often relied on predictions based on integrated modeling, using conservative factors for the model uncertainties and primarily focusing on evaluating the performance requirements at end of life. A set of commissioning activities were designed for a system-level characterization of the performance. This proceeding will provide the status of the mission, including a discussion of the major events, on-orbit system performance, and early science highlights.

Michael McElwain↗

The First Year of KOKEE12M-WETTZ13S VGOS Intensive Scheduling: Status and Efforts Towards Improvement

The KOKEE12M-WETTZ13S (K2-Ws) Intensive series began on January 4, 2021. Evaluation of the first year of schedules has shown that the series is performing reasonably weel, but the schedules could be improved. For example, the number of scheduled observations in a typical 2021 K2-Ws session is approximately half that of the first few MACGO12M-WETTZ13S Intensive sessions, and scheduling fewer observations negatively impats UT1 results. Also, preliminary analysis of the scheduled and achieve SNRs of the K2-Ws observations and the SNRs' ratios shows examples where the achieved SNRs are either too high, indicating long observations that could have been replaced by a greater number of shorter observations, or too low, indicating a lack of robustness that could lead to observation loss. In this poster, we describe key aspects of how the K2-Ws Intensives have been scheduled in 2021. Then we discuss the areas of concern and the status of efforts to make improvements in these areas.

Karen Baver↗

Development Status of Powered Descent for High-Mass Mars Entry, Descent, and Landing Systems

Retropropulsion, initiated at supersonic conditions, provides both deceleration and control authority as an enabling capability for the delivery of human-scale payloads to the surface of Mars. There are no other presently viable approaches to the descent phase of flight for vehicles of such scales. NASA continues to dedicate investment in the maturation of powered descent in atmospheric environments, for the express application to large-scale entry, descent, and landing systems. Efforts focus on parametric, subscale, inert gas ground testing, rigorous validation of computational modeling approaches against these data, and the implementation of highly efficient, scalable simulation tools. This paper summarizes the current maturity of retropropulsion in a free-flight, atmospheric environment for vehicles with significant aerodynamic surface area, as well as the current status of efforts within NASA for ground testing, computational simulation, and flight testing.

Mars↗

Development and Qualification Status of the Electric Propulsion Systems for the NASA PPE Mission and Gateway Program

NASA is charged with landing the first American woman and next American man on the South Pole of the Moon and establishing sustainable lunar exploration by the end of the decade. To meet this challenge, NASA’s Gateway will develop and deploy critical infrastructure required for operations on the lunar surface and that enables a sustained presence on and around the moon. NASA’s Power and Propulsion Element (PPE), the first planned element of NASA’s cis-lunar Gateway, leverages prior and ongoing NASA and U.S. industry investments in high-power, long-life solar electric propulsion technology investments. NASA awarded a PPE contract to Maxar Technologies to provide a 50 kW-class SEP spacecraft that meets Gateway’s needs, aligns with industry’s heritage spacecraft buses, and allows extensibility for NASA’s Mars exploration goals. Maxar’s PPE concept design, is based on their high heritage, modular, and highly reliable 1300-series bus architecture. The electric propulsion system features three 12 kW Advanced Electric Propulsion (AEPS) thrusters from Aerojet Rocketdyne and four BHT-6000 thrusters from Busek. Maxar-provided power electronics and xenon flow controllers from Moog are utilized in both the 12kW and 6kW electric propulsion strings on the spacecraft. The paper will present overviews of NASA’s Gateway and the PPE Project, status of the development and qualification activities for the two electric propulsion system, and the planned implementation of PPE electric propulsion system as keystone of NASA’s Gateway. The PPE spacecraft is currently heading into the Critical Design Review, with the qualification and flight electric propulsion hardware fabrication already initiated and significant progress being made toward planned qualifications in support of the planned PPE spacecraft co-manifest launch in 2024.

Electric Propulsion↗