Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SAFE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,117 records · Page 62

Integration of Automated Systems Test Campaign NC-IAS

NASA’s 2022 strategic plan included the goal to catalyze economic growth and drive innovation in the aviation industry, and to address challenges in air transportation and airspace management within the National Airspace System (NAS). The Aeronautics Research Mission Directorate (ARMD) specifically was tasked with leading aviation innovation to enable safe and sustainable air transportation through revolutionary vehicle advances and efficient flight operations. As a part of meeting these objectives and advancing air mobility concepts, NASA initiated the National Campaign (NC) in the Advanced Air Mobility (AAM) Project within the Airspace Operations and Safety Program (AOSP). The NC was designed to support operational demonstrations with industry as well as the research and development needed to support NASA-led research flight demonstrations. Within NC, the Integration of Automated Systems (IAS), an NC activity, tested and evaluated flight deck automation and airspace operations management functions needed to enable Urban Air Mobility (UAM) operations. This was accomplished through a partnership with Sikorsky Aircraft (specifically Sikorsky Innovations), a Lockheed Martin company, and DARPA (Defense Advanced Research Projects Agency), by leveraging two automation-enabled helicopters equipped with unique capabilities that enabled NASA to develop and test two-ship conflict encounters to demonstrate flight path management and hazard avoidance technologies. The enabler in this testing was NASA-developed “Middleware” (MW) software (also known as Expandable Variable Autonomy Architecture, or EVAA), which among other things allowed multiple algorithms to be incorporated into one software build that was hosted on the dissimilar-type Sikorsky helicopters. The IAS test campaign period of performance was from March 2022 through October 2023 and was structured as a phased, or spiral, approach that ultimately led to the first-ever demonstration of two-ship UAM/AAM operations designed to safely choreograph specific conflict encounters and mission scenarios to test the research algorithms for strategic and tactical aircraft deconfliction. Lessons learned are included in the body of the report. Data collected will be used to inform FAA and industry standards groups on the increasingly automated systems needed for future AAM operations. The test encounters developed for these flight tests were proven to be highly predictable, repeatable, and safely exercised flight path planning and Detect and Avoid (DAA) algorithms. These same test encounters should be leveraged by future flight test campaigns to verify that operational safety is not compromised as the AAM architecture matures. Next steps include repeating similar encounters using unmanned aircraft carrying DAA sensors in the National Airspace.

AAM↗

Separation Assurance in Urban Air Mobility Systems Using Shared Scheduling Protocols

Ensuring safe separation between aircraft is a critical challenge in air traffic management, particularly in urban air mobility (UAM) environments where high traffic density and low altitudes require precise control. In these environments, conflicts often arise at the intersections of flight corridors, posing significant risks. We propose a tactical separation approach leveraging shared scheduling protocols, originally designed for Ethernet networks and operating systems, to coordinate access to these intersections. Using a decentralized Markov decision process framework, the proposed approach enables aircraft to autonomously adjust their speed and timing as they navigate these critical areas, maintaining safe separation without a central controller. We evaluate the effectiveness of this approach in simulated UAM scenarios, demonstrating its ability to reduce separation violations to zero while acknowledging trade-offs in flight times as traffic density increases. Additionally, we explore the impact of non-compliant aircraft, showing that while shared scheduling protocols can no longer guarantee safe separation, they still provide significant improvements over systems without scheduling protocols.

Separation Assurance↗

Detangling Safety Knowledge with Contextualism

We have contradictory intuitions about knowing that things are safe: on the one hand, we claim to have knowledge that many systems (even complex ones) are safe in ordinary language. On the other hand, when challenged by an expert, we easily admit that we do not, in fact, possess very much safety knowledge at all. This Technical Memorandum (TM) attempts to reconcile these two competing intuitions using a philosophical view called epistemic contextualism. We can use epistemic contextualism to explain the importance of safety regulations and the goal in implementing them: first, to differentiate types of disagreement and establish a common basis upon which regulators and regulatees can know that a system is safe; second, to raise ordinary consumers’ standards for safety knowledge (given adequate knowledge of the comprehensiveness of the regulation). This TM also uses the contextualist framework of relevant alternatives to elucidate types of failure possibilities and explain complications in attempts to prevent common mode failures.

language↗

Separation Assurance in Urban Air Mobility Systems Using Shared Scheduling Protocols

Ensuring safe separation between aircraft is a critical challenge in air traffic management, particularly in urban air mobility (UAM) environments where high traffic density and low altitudes require precise control. In these environments, conflicts often arise at the intersections of flight corridors, posing significant risks. We propose a tactical separation approach leveraging shared scheduling protocols, originally designed for Ethernet networks and operating systems, to coordinate access to these intersections. Using a decentralized Markov decision process framework, the proposed approach enables aircraft to autonomously adjust their speed and timing as they navigate these critical areas, maintaining safe separation without a central controller. We evaluate the effectiveness of this approach in simulated UAM scenarios, demonstrating its ability to reduce separation violations to zero while acknowledging trade-offs in flight times as traffic density increases. Additionally, we explore the impact of non-compliant aircraft, showing that while shared scheduling protocols can no longer guarantee safe separation, they still provide significant improvements over systems without scheduling protocols.

system safety↗

Wireless Power Transfer

Wireless Power Transfer is an innovative approach using magnetic resonance coupling of air core transformers designed for today's growing plug-in electric vehicle market. This technology can provide a convenient, safe and flexible means to charge electric vehicles under stationary and dynamic conditions. Plug-in Electric Vehicles (PEV) are burdened by the need for cable and plug charger, galvanic isolation of the on-board electronics, bulk and cost of this charger and the large energy storage system (ESS) packs needed. With a system where you have to physically plug in there are a number of occasions where the owner could very well forget to charge the vehicle. For stationary applications (like charging of a PHEV at home), ORNL's innovative wireless power transfer technology adds a convenience factor compared to actually plugging in which will mean that the vehicle will have a full charge every morning. Electric vehicle charging must be safe, compact and efficient in order to be convenient for customers. By reconfiguring the transformer and altering the resonance frequency, energy is transferred to the battery with lower energy losses and with fewer demands on the primary circuit by the rest of the transformer system. The ORNL discovery shows that sufficient power for the battery can be transferred from the primary to secondary circuits without significant energy losses if the operating frequency is set at 50% to 95% of the resonance frequency of the circuit. The electrical power is then transmitted to the chargeable battery, which is electrically coupled to the secondary circuit through the air core transformer. Some advantages include: Reduced energy losses during transfer of energy to the battery; A charge potential that is relatively unaffected by up to 25% misalignment of vehicle; and Other receiving components draw less power from the primary circuit. These advantages allow wireless power technology applications to expand at the workplace and beyond as the demand for EV rises. For vehicles that operate over a fixed route such as busses and shuttle vehicles, Wireless Power Transfer (WPT) means that a smaller battery pack can be used. In the traditional system, the battery pack is designed to accommodate the needs of the entire route or shift. With WPT the battery can be downsized because it can be charged when the vehicle stops on its route (a rental car shuttle bus, for example, can charge when it waits in the terminal and again when it waits at the rental car place. Thus the battery only needs enough charge to get to the next stop. This decrease in battery size means significant cost savings to electrify the vehicle. This technology enables efficient "opportunity charging stations" for predefined routes and planned stops reducing down time. Charging can occur in minutes. This improvement also eliminates the harmful emissions that occur in garages while buses are at idle during charging. In larger cities, dynamic charging offers an even greater impact utilizing existing infrastructure. As vehicles travel along busy freeways and interstate systems, wireless charging can occur while the vehicle is in motion. With this technology a vehicle essentially has unlimited electric range while using a relatively small battery pack. In-motion charging stations use vehicle sensors to alert the driver. Traveling at normal speeds, sensors establish in-motion charging. WPT transmit pads sequentially energize to the negotiated power level based on vehicle speed and its requested charging energy. Lower power when vehicle speed is slow and much higher power for faster moving vehicles. Vehicle to Infrastructure communications (V2I) coordinates WPT charging level according to on-board battery pack state-of-charge. V2I activates the roadway transmit pads placing them in standby mode and negotiates charging fee based on prevailing grid rate and vehicle energy demand. Dynamic charging would allow electricity to supply a very large fraction of the energy for the transportation sector and reduce greatly petroleum consumption. Previously worrisome traffic delays now provide longer periods of charge while passing over in-motion chargers. Inclement weather such as rain and snow do not affect the charging capability. At ORNL, we are working to develop the robust nature of wireless power technology to provide a convenient, safe and flexible means to charge electric vehicles under stationary and dynamic conditions.

33 ADVANCED PROPULSION SYSTEMS↗

Supporting the future nuclear workforce with computer-based procedures

Here we see that computer-based tools have dramatically increased ease and efficiency of everyday tasks. Gone are the days of paging through a paper catalog, transcribing product numbers, and calculating totals. Today, a consumer can find a product online with a simple search engine, and then purchase it in a matter of a few clicks. Paper catalogs have their place, but it is hard to imagine life without on-line shopping sites. All tasks conducted in a nuclear power plant are guided by procedures, which helps ensure safe and reliable operation of the plants. One prominent goal of the nuclear industry is to minimize the risk of human errors. To achieve this goal one has to ensure tasks are correctly and consistently executed. This is partly achieved by training and by a structured approach to task execution, which is provided by procedures and work instructions. Procedures are used in the nuclear industry to direct workers' actions in a proper sequence. The governing idea is to minimize the reliance on memory and choices made in the field. However, the procedure document may not contain sufficient information to successfully complete the task. Therefore, the worker might have to carry additional documents such as turnover sheets, operation experience, drawings, and other procedures to the work site. The nuclear industry is operated with paper procedures like paper catalogs of the past. A field worker may carry a large stack of documents needed to complete a task to the field. Even though the paper process has helped keep the industry safe for decades, there are limitations to using paper. Paper procedures are static (i.e., the content does not change after the document is printed), difficult to search, and rely heavily on the field worker’s situational awareness and ability to consistently meet the high expectation of human performance excellence. With computer-based procedures (CBPs) that stack of papers may be reduced to the size of a small tablet or even a smart phone. Instead of manually matching equipment identification numbers listed in the procedure with the number on the physical equipment the field worker can simply scan a barcode to ensure the correct valve is opened while simultaneously creating a record. Instead of navigating through a maze of cross-references, CBPs enable intelligent work path navigation which accounts for past decisions and observation, thereby enabling more efficient and safe task completion.

47 OTHER INSTRUMENTATION↗

2018 Accomplishments Report

Nuclear energy is an important part of supplying our nation’s electricity safely, dependably, and economically, with reduced carbon dioxide emissions, through the long-term safe and economical operation of current nuclear power plants. The United States (U.S.) Department of Energy-Office of Nuclear Energy (DOE-NE) supports a strong and viable domestic nuclear industry and preserves the ability of that industry to participate in nuclear projects here and abroad. In collaboration with industry programs, the LWRS Program provides the technical basis for extended safe, reliable, and economical operations of the existing commercial fleet of nuclear power plants.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Stakeholder Engagement Review Meeting Summary Report

Sustainability in the context of the Light Water Reactor Sustainability (LWRS) Program is the ability to maintain the safe and economic operation of the existing fleet of nuclear power plants now and in the future. It has two objectives with respect to long-term operations: (1) to provide science and technology-based solutions to industry to safely enhance the economical operation of power reactors; and (2) to manage the aging of systems, structures, and components (SSCs) so that nuclear power plants can continue to operate safely and cost-effectively.

42 ENGINEERING↗

EPA and Idaho National Laboratory create first of its scale

Advancing the science and engineering of decontaminating water distribution systems and safely disposing of high-volumes of contaminated water are high priorities for the EPA. To help address these science gaps, EPA homeland security researchers have developed the first-of-its-scale Water Security Test Bed (WSTB). Water is an important component of everyday life. We rely on safe, clean water for our health and the health of the environment. Protecting this vital resource is critical to living safely and securely. The U.S. Environmental Protection Agency is responsible for working with water utilities to protect water systems from contamination and to clean up systems that become contaminated. Purposeful or inadvertent distribution system contamination can result in large amounts of infrastructure and water that must be cleaned. Water distribution systems contamination can be caused by, for example, natural disasters such as Superstorm Sandy or by individuals hoping to cause harm. The WSTB, constructed at the Department of Energy’s (DOE) Idaho National Laboratory, replicates a section of a typical municipal drinking water system including a piping system with roughly 445 feet of pipe and two fire hydrants laid out in an “L” shape using 40-year-old, eight-inch cement mortar lined, ductile iron pipes, excavated after twenty years of use for water conveyance. Researchers built the WSTB above ground for easy access during experiments, and to facilitate fast leak detection. Over the next several years, EPA and partner researchers will conduct experiments using simulants of various biological, chemical, and radioactive materials that simulate high toxic versions of these agents. At this “full” sized system, researchers will demonstrate approaches to contamination detection, sensor and model testing, infrastructure decontamination, water treatment and cyber testing developed at lab and pilot scale. Researchers are also able to verify if laboratory results that were effective in controlled conditions are as effective in full-scale testing. Having the ability to conduct bench scale studies in a real world setting can help address specific research gaps, and help water researchers understand conditions in which real world drinking water systems operate.

54 ENVIRONMENTAL SCIENCES↗

Using Qualified On-Site Nuclear Power Plant Simulators in Human Factors Validations of Control Room Upgrades

Existing commercial nuclear power plants (NPPs) are valuable assets in the infrastructure portfolio of the United States (U.S.) because they safely and reliably generate about 1/5th of all the electricity used. The instrumentation and control (I&C) systems in commercial NPPs are the ‘eyes and ears' of the operator, allowing operators to maintain situation awareness, thereby allowing the plant to operate safely and efficiently for all phases of operation. Because the I&C systems in NPPs are still mostly based on analog technologies, which are reliable but not especially cost-effective, upgrading the existing I&C in com-mercial NPPs to new digital I&C is very important. Furthermore, simulators and simulation are critical human factors engineering tools for this I&C modernization work. NPP control room simulators are essential test beds to simulate normal, abnormal, and emergency operations that allow human factors researchers to safely and realistically evaluate early design phase prototypes of the upgraded digital I&C, and validate final as-built digital I&C systems that have been modernized deployed in NPPs. This paper describes research performed using qualified on-site NPP simulators to perform human factors validations of digital I&C control room upgrades.

99 GENERAL AND MISCELLANEOUS↗

Transuranic Waste Processing Center (TWPC) Legacy Tank RH-TRU Sludge Processing and Compliance Strategy - 13255

The U.S. Department of Energy (DOE) needs to safely and efficiently treat its 'legacy' transuranic (TRU) waste and mixed low-level waste (LLW) from past research and defense activities at the Oak Ridge National Laboratory (ORNL) so that the waste is prepared for safe and secure disposal. The TWPC operates an Environmental Management (EM) waste processing facility on the Oak Ridge Reservation (ORR). The TWPC is classified as a Hazard Category 2, non-reactor nuclear facility. This facility receives, treats, and packages low-level waste and TRU waste stored at various facilities on the ORR for eventual off-site disposal at various DOE sites and commercial facilities. The Remote Handled TRU Waste Sludge held in the Melton Valley Storage Tanks (MVSTs) was produced as a result of the collection, treatment, and storage of liquid radioactive waste originating from the ORNL radiochemical processing and radioisotope production programs. The MVSTs contain most of the associated waste from the Gunite and Associated Tanks (GAAT) in the ORNL's Tank Farms in Bethel Valley and the sludge (SL) and associated waste from the Old Hydro-fracture Facility tanks and other Federal Facility Agreement (FFA) tanks. The SL Processing Facility Build-outs (SL-PFB) Project is integral to the EM cleanup mission at ORNL and is being accelerated by DOE to meet updated regulatory commitments in the Site Treatment Plan. To meet these commitments a Baseline (BL) Change Proposal (BCP) is being submitted to provide continued spending authority as the project re-initiation extends across fiscal year 2012 (FY2012) into fiscal year 2013. Future waste from the ORNL Building 3019 U-233 Disposition project, in the form of U-233 dissolved in nitric acid and water, down-blended with depleted uranyl nitrate solution is also expected to be transferred to the 7856 MVST Annex Facility (formally the Capacity Increase Project (CIP) Tanks) for co-processing with the SL. The SL-PFB project will construct and install the necessary integrated systems to process the accumulated MVST Facilities SL inventory at the TWPC thus enabling safe and effective disposal of the waste. This BCP does not include work to support current MVST Facility Surveillance and Maintenance programs or the ORNL Building 3019 U-233 Disposition project, since they are not currently part of the TWPC prime contract. The purpose of the environmental compliance strategy is to identify the environmental permits and other required regulatory documents necessary for the construction and operation of the SL- PFB at the TWPC, Oak Ridge, TN. The permits and other regulatory documents identified are necessary to comply with the environmental laws and regulations of DOE Orders, and other requirements documented in the SL-PFB, Safety Design Strategy (SDS), SL-A-AD-002, R0 draft, and the Systems, Function and Requirements Document (SFRD), SL-X-AD-002, R1 draft. This compliance strategy is considered a 'living strategy' and it is anticipated that it will be revised as design progresses and more detail is known. The design basis on which this environmental permitting and compliance strategy is based is the Wastren Advantage, Inc., (WAI), TWPC, SL-PFB (WAI-BL-B.01.06) baseline. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preparation for the Recovery of Spent Nuclear Fuel (SNF) at Andreeva Bay, North West Russia - 13309

Andreeva Bay is located near Murmansk in the Russian Federation close to the Norwegian border. The ex-naval site was used to de-fuel nuclear-powered submarines and icebreakers during the Cold War. Approximately 22,000 fuel assemblies remain in three Dry Storage Units (DSUs) which means that Andreeva Bay has one of the largest stockpiles of highly enriched spent nuclear fuel (SNF) in the world. The high contamination and deteriorating condition of the SNF canisters has made improvements to the management of the SNF a high priority for the international community for safety, security and environmental reasons. International Donors have, since 2002, provided support to projects at Andreeva concerned with improving the management of the SNF. This long-term programme of work has been coordinated between the International Donors and responsible bodies within the Russian Federation. Options for the safe and secure management of SNF at Andreeva Bay were considered in 2004 and developed by a number of Russian Institutes with international participation. This consisted of site investigations, surveys and studies to understand the technical challenges. A principal agreement was reached that the SNF would be removed from the site altogether and transported to Russia's reprocessing facility at Mayak in the Urals. The analytical studies provided the information necessary to develop the construction plan for the site. Following design and regulatory processes, stakeholders endorsed the technical solution in April 2007. This detailed the processes, facilities and equipment required to safely remove the SNF and identified other site services and support facilities required on the site. Implementation of this strategy is now well underway with the facilities in various states of construction. Physical works have been performed to address the most urgent tasks including weather protection over one of the DSUs, installation of shielding over the cells, provision of radiation protection infrastructure and general preparation of the site for construction of the facilities for the removal of the SNF. This paper describes the development and implementation of the strategy and work to improve the safe and secure management of SNF, preparing it for retrieval and removal from Andreeva Bay. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Maximizing Operational Efficiencies in Waste Management on the Hanford Plateau Remediation Contract in a Down-turned Market - 13484

Recent changes in DOE priorities and funding have pressed DOE and its contractors to look for innovative methods to sustain critical operations at sites across the Complex. At the Hanford Site, DOE Richland Operations and its prime contractor, CH2M Hill Plateau Remediation Company (CHPRC), have completed in-depth assessments of the Plateau Remediation Contract (PRC) operations that compared available funding to mission and operational objectives in an effort to maintain requisite safety and compliance margins while realizing cost savings that meet funding profiles. These assessments included confirmation of current baseline activities, identification of potential efficiencies, barriers to implementation, and potential increased risks associated with implementation. Six operating PRC waste management facilities were evaluated against three possible end-states: complete facility closure, maintaining base operations, and performing minimum safe surveillance and maintenance activities. The costs to completely close evaluated facilities were determined to be prohibitively high and this end-state was quickly dropped from consideration. A summary of the analysis of remaining options by facility, efficiencies identified, impact to risk profiles, and expected cost savings is provided in Table I. The expected cost savings are a result of: - right-sizing and cross-training work crews to address maintenance activities across facilities; - combining and sequencing 'like-moded' operational processes; - cross-cutting emergency planning and preparedness staffing; - resource redistribution and optimization; - reducing areas requiring routine surveillance and inspection. For the efficiencies identified, there are corresponding increases in risk, including a loss of breadth and depth of available resources; lengthened response time to emergent issues; inability to invest in opportunities for improvement (OFIs); potential single-point failures or non-compliancies due to resource scarcity; limited cross-training capability; and reduced capability to respond to changes in DOE priorities. Finally, there are many challenges to achieving these cost savings. With a workforce nearing retirement effective succession planning becomes critical to success and requires establishing a balance between the cost of hiring and training and cost-saving activities. With six active waste management facilities spread across nearly 15 square miles, scheduling and deploying cross-trained surveillance and maintenance teams is a logistical challenge, particularly as the loss of funding has not diminished emphasis by regulatory agencies placed on the safe and compliant performance of DOE and its contractors. As reflected in Table I, efficiencies are currently being implemented on the Hanford Plateau Remediation Contract (PRC) that deliver cost savings that align with the current site budget while maintaining critical capabilities. It is currently estimated that these efficiencies will result in a cost savings of approximately $9 million for FY13 in base and minimum safe operations on the PRC - a cost reduction of more than 13 percent over FY12 and nearly 30 percent over FY09 levels. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned in the Design and Use of IP1 / IP2 Flexible Packaging - 13621

For many years in the USA, Low Level Radioactive Waste (LLW), contaminated soils and construction debris, have been transported, interim stored, and disposed of, using IP1 / IP2 metal containers. The performance of these containers has been more than adequate, with few safety occurrences. The containers are used under the regulatory oversight of the US Department of Transportation (DOT), 49 Code of Federal Regulations (CFR). In the late 90's the introduction of flexible packaging for the transport, storage, and disposal of low level contaminated soils and construction debris was introduced. The development of flexible packaging came out of a need for a more cost effective package, for the large volumes of waste generated by the decommissioning of many of the US Department of Energy (DOE) legacy sites across the US. Flexible packaging had to be designed to handle a wide array of waste streams, including soil, gravel, construction debris, and fine particulate dust migration. The design also had to meet all of the IP1 requirements under 49CFR 173.410, and be robust enough to pass the IP2 testing 49 CFR 173.465 required for many LLW shipments. Tens of thousands of flexible packages have been safely deployed and used across the US nuclear industry as well as for hazardous non-radioactive applications, with no recorded release of radioactive materials. To ensure that flexible packages are designed properly, the manufacturer must use lessons learned over the years, and the tests performed to provide evidence that these packages are suitable for transporting low level radioactive wastes. The design and testing of flexible packaging for LLW, VLLW and other hazardous waste streams must be as strict and stringent as the design and testing of metal containers. The design should take into consideration the materials being loaded into the package, and should incorporate the right materials, and manufacturing methods, to provide a quality, safe product. Flexible packaging can be shown to meet the criteria for safe and fit for purpose packaging, by meeting the US DOT regulations, and the IAEA Standards for IP-1 and IP-2 including leak tightness. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Light Water Reactor Sustainability Program: Integrated Program Plan

Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 60%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to grow by about 24% from 2013 to 2040 . At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license, for a total of 60 years of operation (the oldest commercial plants in the United States reached their 40th anniversary in 2009). Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity for 40- and 60-year license periods. If current operating nuclear power plants do not operate beyond 60 years (and new nuclear plants are not built quickly enough to replace them), the total fraction of generated electrical energy from nuclear power will rapidly decline. That decline will be accelerated if plants are shut down before 60 years of operation. Decisions on extended operation ultimately rely on economic factors; however, economics can often be improved through technical advancements. The U.S. Department of Energy Office of Nuclear Energy's 2010 Research and Development Roadmap (2010 Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: 1. Develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; 2. Develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration's energy security and climate change goals; 3. Develop sustainable nuclear fuel cycles; and 4. Understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program's plans. For the LWRS Program, sustainability is defined as the ability to maintain safe and economic operation of the existing fleet of nuclear power plants for a longer-than-initially-licensed lifetime. It has two facets with respect to long-term operations: (1) manage the aging of plant systems, structures, and components so that nuclear power plant lifetimes can be extended and the plants can continue to operate safely, efficiently, and economically; and (2) provide science-based solutions to the industry to implement technology to exceed the performance of the current labor-intensive business model.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Creating and sustaining a safety conscious work environment - 15240

Organizational Culture, Safety Culture, and a Safety Conscious Work Environment (SCWE) are psychological constructs that describe behaviors of organizations, especially with respect to behaviors needed to ensure safe, highly reliable work. These attributes of culture are often singled out in surveys, root cause analyses and management expectations as the basis for being safe or as the cause of an incident. Organizations that wish to improve culture often do not have a framework to measure and act upon tasks or projects that will promote a positive safety culture (and thus a positive SCWE). Combining the work of organizational behavior pioneers with the 'blue collar' approaches to continuous improvement offers framework organizations may use to improve safety culture while devoting efforts to improving conditions that are meaningful and tangible to floor level employees. The framework consists of the use of Safety Culture and SCWE surveys and focus groups to complement each other and offer topical areas that need improvement or study in the organization. A Safety Culture Improvement Panel will then direct specific improvement projects based on these topic areas and relate these projects to causal variables that effect incremental changes in culture. By applying principles of process improvement to the improvement of culture, the framework is formed to have employees work 'day-today' issues while effectively addressing the often vague or abstract notion of improving culture. A case study of the use of these principles is given by following the SCWE Assessment conducted by the Transuranic Waste Processing Center (TWPC) and subsequent improvements derived from data found in the assessment. The attributes of a SCWE and an effective safety culture accomplish much more than just having a safe place to work. These characteristics result in a high performance, continuously improving organization. The experience of commercial nuclear power, the aviation industry, and other high performing endeavors bear this out. Achieving an effective SCWE is not easy, and sustaining it is even more difficult, but the results are surely worth the effort. The techniques discussed in this presentation are effective, available, and cost-effective; they are easily adaptable for use in other organizations to create, sustain and improve a SCWE. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mega salt-stone Disposal Units at the Savannah River site - 15322

The Liquid Waste (LW) System at Savannah River Site (SRS) is a highly integrated operation involving safely storing radioactive liquid waste in underground storage tanks; vitrifying the higher activity waste; and storing the vitrified waste in stainless steel canisters until permanent disposition is provided; and removing, treating, and dispositioning the low-level waste (LLW) fraction in concrete with final disposition being the salt-stone Disposal Units (SDUs) at the SRS salt-stone Disposal Facility (SDF). Treatment and disposition of salt waste is the critical path to completion of the SRS Liquid Waste (LW) Disposition Program. Successful and timely salt waste removal and disposal is integral to efforts by SRS to proceed with all aspects of tank cleanup and removal from service. The construction and implementation of the first-of-a-kind Mega SDU (MSDU) is underway to provide the most environmentally safe and cost-effective solution for salt processing and long term storage of the LLW at SRS. The MSDU design is a duplicate of the Water Treatment Tanks located in Syracuse, New York. This commercial design, developed by an affiliate of Savannah River Remediation LLC (SRR), was slightly modified to meet the requirements of the nuclear industry. The MSDU is a critical link in salt disposition. In comparison to the current SDU design, approximately 46 meters (150 feet) in diameter and 7 meters (22 feet) tall with a capacity of approximately 11,000 m{sup 3} (3.0 million gallons), the MSDU is 114 meters (375 feet) in diameter and 13 meters (43 feet) tall which will provide a capacity of approximately 121,000 m{sup 3} (32.0 million gallons) to receive the LLW fraction embedded in a grout-like form. The MSDU will provide the taxpayers an estimated $300 M in life cycle savings at SRS by reducing the number of SDUs from the estimated 72 smaller vessels to 7 of the new larger vessels. Additionally, based on the reduced number of SDUs, the environmental footprint is significantly reduced as well. Due to the similarities between the existing SDU design and the MSDU design, efforts to integrate the MSDU into the LW system are minimal. Required infrastructure modifications will consist of tying into the existing grout and drain lines, as well as the installation of new electrical and instrumentation services for the MSDU. Grout flow testing has been successfully completed, with results showing the MSDU will be a safe and cost-effective replacement for the existing SDUs. The MSDU design is complete, Critical Decision (CD)-3 was approved on June 17, 2014, and the first MSDU, salt-stone Disposal Unit n.6 (SDU 6), is being constructed in the existing LW SDF operated by SRR as a Capital Line Item project. As an added benefit, once constructed, lessons learned will be available for future MSDUs at SRS and throughout the complex as necessary. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Success in commissioning a key U.S. radioactive waste burial site through the technical support of Dufrane Nuclear Shielding Incorporated (DNSI) - 15476

With the -phase out- of the South Carolina based Barnwell Radioactive Waste Burial Site, and the stockpile and storage of radioactive waste and irradiated components throughout the U.S. Nuclear Industry for decades, the opening of the Texas Low-Level Radioactive Waste Disposal Compact Facility by Waste Control Specialists (WCS), is a game changer in solving this industry-wide issue. For the first time in decades, generators now have the opportunity to send their waste to a site specifically designed to permanently sequester the waste in a licensed facility that will protect public health and the environment, better than any built to date. As history has shown through the many decades of the U.S. Commercial and Federal Nuclear Industry, site operators and management have relied heavily on contractors and vendors with exceptional expertise and decades of experience to achieve success and meet their goals. The commissioning of WCS was no exception as DNSI was contracted to design, develop, build and deploy a major component required for the opening and successful operation of the WCS site. This component, being the Modular Concrete Canister (MCC), is the -work horse- of the site. With its enormous size, weight and strength, it provides many functions that meet and comply with the site performance assessment (PA) under 10 CFR Part 61, the site WAC, and Texas Low-Level Radioactive Waste Disposal Authority. Offsite contracting the production and delivery of this critical component was a major step toward success in meeting schedule and cost for the much needed opening of the Texas Compact and Federal site. In selecting a shielding vendor, WCS partnered with a U.S. Nuclear Service company with over 30 years of experience which spans the entire U.S. Commercial, Federal, and Nuclear Industry. The task given DNSI was not a simple one, it involved every aspect from start to finish of the design, production and delivery of rectangular, cylindrical and -irradiated hardware- (IH) MCCs, that could accept waste up to 100 Sv /Hr contact dose rates. The enormity of this project was quite clear and required extensive quality control, construction of batch plants, purchase of huge quantities of raw materials, setting up a production site in a neighboring city, relocation of personnel from company headquarters, and safely transporting 8,000 Tons of MCC components 75 miles one-way on West Texas highways daily. Most important of all, this was accomplished safely with no incidents, no component failures or rejects, and on schedule. The start of receipt, of -in-compact waste- and -out-of-compact waste- was conducted virtually in a 3 month period time span. To help guarantee success and quality of product, all forms had surfaces machined, heavy duty elastomer coatings were applied to concrete surfaces, only galvanized anchors were used, and the batch plant was run to strict ASME standards thus testing every 50 cubic yards of concrete poured. With significant teamwork and success from Vendors such as DNSI, WCS and the Texas Compact has evolved as one of the leading radioactive waste sites in the U.S. and the world, providing safe, secure and compliant permanent waste disposal services by using technical expertise and innovation of the highest standards. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗