Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RECOMMENDATIONS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,117 records · Page 62

Coronal Polarimetry: Determining the Magnetic Origins of Coronal Mass Ejections

Synopsis: The mechanism for the release of stored magnetic energy in solar eruptions remains a major unsolved problem of Heliophysics. Choosing between triggers requires knowledge of pre-eruptive magnetic fields (B). Although linear polarization in visible/infrared (VIR) coronal emission lines reveals intriguing clues about coronal mass ejection (CME) precursor topology, small telescope apertures limit current capability for measuring vector field. Current coronal observations are insufficient to diagnose 3D coronal magnetic fields in CME precursors. Coronal cavities are the ideal candidates for CME precursor studies. BLOS in cavities is a direct measure of stored magnetic free energy, and the presence and location of topological X-points (reconnection locations) and O-points (circulation of B about axis) distinguish predictions of the flux rope-torus-instability and sheared-arcade-breakout CME models. - Finding: Coronal cavities are ubiquitous throughout the solar cycle, erupt as CMEs, and have coronal polarimetric signatures that distinguish between model predictions. - Recommendation: Coronal cavities should be targeted in a comprehensive multiwavelength study of CME precursors & associated eruption-driving mechanisms. Large ground-based VIR telescopes can measure both coronal magnetic field topology and strength through a combination of the saturated Hanle and BLOS -sensitive Zeeman effects. - Finding: The 4m Daniel K. Inouye Solar Telescope (DKIST) and proposed 1.5m Coronal Solar Magnetism Observatory Large Coronagraph (COSMO-LC) make a major leap forward in VIR coronal sensitivity, enabling measurement of vector B. - Recommendation: A dedicated coronal synoptic telescope with a large field-of-view (i.e., COSMO-LC) is needed to identify the dominant CME driving mechanisms, by measuring coronal magnetic fields from precursor state into eruption. In the UV, a new opportunity has arisen to make use of the strong H I Lyman-α coronal line, which obtains a measurement of B that is independent of the Zeeman effect. - Finding: Small-telescope spectropolarimetric capability in the unsaturated Hanle regime provides an independent and complementary coronal magnetic diagnostic to large ground-based telescope measurements. - Recommendation: The proposed 12-cm Coronal Lyman-α Resonance Observatory (CLARO) spectropolarimetric coronagraph demonstrates a path forward for space-based observations of the coronal magnetic field that should be incorporated into future missions away from the Sun-Earth line (e.g., COMPLETE).

magnetic energy↗

MPATH (Measuring Performance for Autonomy Teaming with Humans) Ground Control Station: Design Approach and Initial Usability Results

Envisioned future Advanced Air Mobility (AAM) operations will require a transition of aircraft command and control from onboard pilots to remote operators. The National Aeronautics and Space Administration (NASA) has developed a research ground control station (GCS) software called MPATH (Measuring Performance for Autonomy Teaming with Humans) to study the human factors of remote operators in a representative AAM environment, where small uncrewed aerial systems (sUAS; simulated or real) act as surrogates for larger AAM aircraft. A primary focus of the research being conducted with the MPATH GCS is scalability (i.e., one human managing multiple vehicles). MPATH has demonstrated to be a useful capability for human factors research and remote operations. Two initial usability studies and a multi-vehicle control assessment were recently conducted, and usability data and operator feedback were collected. Generally, participants rated MPATH high on usability and interface quality, whereas information quality was rated slightly lower. These results were supported by specific feedback. Several generalized GCS design recommendations are proposed based on the results and feedback from these flight activities. Future updates to MPATH will incorporate the proposed recommendations. In practice, these recommendations could be used by any GCS software designer or developer to promote usability and safety.

Advanced Air Mobility↗

Dissertation Defense: Three Papers on Organizational Decision-Making and Change at NASA Goddard Space Flight Center

This is a three-paper dissertation that responds to a call for empirical research on stakeholder influence in the implementation of evaluation recommendations. The literature is consistent but mostly theoretical: stakeholder participation should positively influence and increase the probability of implementation (see e.g., Christie, 2011; Cousins & Earl, 1992; Fetterman, 2004). In response, I use two Goddard Space Flight Center engineering technical training and development programs to build a causal argument supporting my proposition that stakeholder influence in the logic modeling process impacts organizational decision-making and change. I first introduce the logic modeling process as a tool to involve stakeholders in program and evaluation design (paper 1); then use the data collection process to implement the collaboratively constructed logic model outcomes (paper 2); and, finally, I triangulate the data using the Toal (2009) Evaluation Involvement Scale (paper 3). I do this to “increase the validity of the findings” (Noble & Heale, 2019, p. 67) and to garner potential mechanisms. I found that stakeholder participation in the logic modeling process positively influenced the use of data to inform recommendations which in turn positively influenced implementation of evaluation recommendations. I identified the process itself as the mechanism and the key decision points as links or influencers. Potential factors included power and interest (measured by role) and time-on-job.

organizational decision-making↗

The Impact (Influence) of Stakeholder Participation in the Logic Modeling Process: A Case Study from NASA Goddard Space Flight Center

This is a three-paper dissertation that responds to a call for empirical research on stakeholder influence in the implementation of evaluation recommendations. The literature is consistent but mostly theoretical: stakeholder participation should positively influence and increase the probability of implementation (see e.g., Christie, 2011; Cousins and Earl, 1992); Fetterman, 2004). In response, I use two Goddard Space Flight Center engineering technical training and development programs to build a causal pathway argument supporting my proposition that stakeholder influence in the logic modeling process impacts organizational decision-making and change. I first introduce the logic modeling process as a tool to involve stakeholders in program and evaluation design (paper 1), then use the data collection process to implement the collaboratively constructed logic model outcomes (paper 2), and finally, I triangulate the data using the Toal (2009) Evaluation Involvement Scale (paper 3). I do this to “increase the validity of the findings” (Noble & Heale, 2019, p. 67) and to garner potential mechanisms. I found that stakeholder participation in the logic modeling process positively influenced the use of data to inform recommendations which in turn positively influenced implementation of evaluation recommendations. I identified the process itself as the mechanism and the key decision points as links or influencers. Potential factors included power and interest (measured by role) and time-on-job.

Organizational Decision-Making↗

IMPACTing Medical System Design with a Risk Analysis Tool [“IMPACT” sur la Conception du Système Médical avec un Outil d'Analyse des Risques]

Background: Following the success of Artemis I, NASA is preparing for human extended duration missions. Ongoing efforts are focused on mitigating mission-related risks, including those affecting crew health and performance. Communication latency, logistics of resupply and time frame of medical evacuation are barriers to provision of healthcare for these missions, especially with respect to constraints in mass, volume, and crew training. An in-depth assessment of medical risks, capabilities and resources for a specific mission design is necessary to determine an optimal balance that maximizes likelihood of mission success. Overview: IMPACT (Informed Mission Planning via Analysis of Complex Tradespaces) is a dynamic tool designed to estimate medical risk and outcomes for a specific mission design. In its current iteration, a list of medical conditions selected based on likelihood of occurrence and/or consequence was linked to a set of clinical capabilities and resources necessary for diagnosis and management. A probabilistic risk analysis tool was then used to identify and estimate the likelihood and consequence of risks through the following outcome metrics: loss of crew life (inflight mortality due to medical conditions), need for medical evacuation (return to definitive care), and crew disability (task time affected based on how medical conditions influence the ability to perform specific exploration mission crew tasks). Finally, the model’s optimization algorithm provides recommendations for medical capabilities that maximize risk mitigation relative to mass and volume constraints. In the Spring of 2023, IMPACT was utilized to estimate outcome metrics for a design reference mission that would be representative of an extended duration Artemis mission. Notional data generated were then used to determine a recommended set of medical capabilities and resources relative to user-defined mass and volume constraints. A multidisciplinary team has also been updating IMPACT to strengthen the model’s fidelity. Figure 1 shows how updates to outcome metric inputs for the conditions resulted in different capability and resource allocation recommendations. Discussion: This presentation will discuss the IMPACT tool and share the latest data generated for a representative extended duration Artemis mission. Efforts to improve the fidelity of data generated by the model’s algorithm will also be discussed.

K A Shair↗

IMPACTing Medical System Design with a Risk Analysis Tool

Background: Following the success of Artemis I, NASA is preparing for human extended duration missions. Ongoing efforts are focused on mitigating mission-related risks, including those affecting crew health and performance. Communication latency, logistics of resupply and time frame of medical evacuation are barriers to provision of healthcare for these missions, especially with respect to constraints in mass, volume, and crew training. An in-depth assessment of medical risks, capabilities and resources for a specific mission design is necessary to determine an optimal balance that maximizes likelihood of mission success. Overview: IMPACT (Informed Mission Planning via Analysis of Complex Tradespaces) is a dynamic tool designed to estimate medical risk and outcomes for a specific mission design. In its current iteration, a list of medical conditions selected based on likelihood of occurrence and/or consequence was linked to a set of clinical capabilities and resources necessary for diagnosis and management. A probabilistic risk analysis tool was then used to identify and estimate the likelihood and consequence of risks through the following outcome metrics: loss of crew life (inflight mortality due to medical conditions), need for medical evacuation (return to definitive care), and crew disability (task time affected based on how medical conditions influence the ability to perform specific exploration mission crew tasks). Finally, the model’s optimization algorithm provides recommendations for medical capabilities that maximize risk mitigation relative to mass and volume constraints. In the Spring of 2023, IMPACT was utilized to estimate outcome metrics for a design reference mission that would be representative of an extended duration Artemis mission. Notional data generated were then used to determine a recommended set of medical capabilities and resources relative to user-defined mass and volume constraints. A multidisciplinary team has also been updating IMPACT to strengthen the model’s fidelity. Figure 1 shows how updates to outcome metric inputs for the conditions resulted in different capability and resource allocation recommendations. Discussion: This presentation will discuss the IMPACT tool and share the latest data generated for a representative extended duration Artemis mission. Efforts to improve the fidelity of data generated by the model’s algorithm will also be discussed.

K A Shair↗

A Minority Report Submitted as an Addendum to the Report of the Mars 2020 Organic Contamination Panel

This Minority Report (MR) presents seven findings in addition to or contrary to the main OCP report: 1. Contamination control for the Mars 2020 cache must be strict. Mars’ surface is known to be organics-poor from laboratory studies, Mars meteorite analyses, and from four previous NASA missions. It is imperative that contamination control measures are enacted that enable reliable and robust detection of potential biomarker compounds at the ppb level. 2. Since Mars 2020 is a sample return mission and analyses of samples in the returnable cache are expected to occur after return to Earth, positive controls are not recommended for flight on Mars 2020 unless a compelling case can be made for their use. 3. The findings of previous panels dedicated to organic compound analysis in Martian samples (OCSSG, ND-SAG, SDT) recommend TOC limits between 10-40 ppb. The MR finds that the lower limit of 10 ppb is recommended and that insufficient justification is given by the OCP Panel Report (PR) to raise the TOC limit to 40 ppb. 4. Analytical capability is sufficiently advanced that analytical capability is an irrelevant consideration with respect to differentiating between 10 and 40 ppb TOC. 5. Perceived contamination control challenges are an irrelevant consideration for raising the TOC contamination limit from 10 to 40 ppb since those challenges, and the procedures to ameliorate them, will exist regardless of whether the limit is 10 or 40 ppb. 6. The “dilution cleaning” method has not been adequately proven for utilization on the Mars 2020 mission. Shortcomings have been identified in terms of peer review, method verification, analytical and testing approach, application to space flight hardware, and performance under Martian conditions. The method should be revisited and independently tested using statistically and analytically robust methods, and scrutinized in a rigorous peer review process. 7. The Mars 2020 mission claims considerable heritage from the Mars Science Laboratory (MSL) mission, but MSL contamination control efforts contain significant errors and implementation discrepancies that would imperil the Mars 2020 caching mission were they repeated. A standing contamination control panel should be formed to provide independent oversight for the Mars 2020 mission.

Mars Sample Return↗

Wilson Corners, Solid Waste Management Unit 001(SWMU 01) 2023 Annual Long-Term Monitoring Report

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2023 at Wilson Corners, Solid Waste Management Unit 001, at Kennedy Space Center (KSC), Florida. Annual LTM of groundwater is being conducted at the site. Based on results from groundwater sampling activities performed during the 2019 through 2020 LTM reporting period and the 2020 and 2021 DPT groundwater sampling, it was determined that the LTM sampling plan was no longer meeting the goal of LTM because delineation was not verified and the installation of an air sparge (AS) system to treat the area of the High Concentration Plume was recommended. The AS System was installed in late 2022 and early 2023. System start-up activities were initiated in April 2023. Following system startup, several site wells required retrofitting to equip wellheads for withstanding the air pressure released from air sparge wells during system operation. Some site wells also required repair or abandonment, and replacement. Survey of location and top-of-casing of newly installed monitoring wells was combined with scheduled AS system survey activities and was completed in January 2024. The activities presented in this report include the February and April 2023 LTM monitoring well installations; March and April 2023 LTM and performance monitoring well water level gauging and sampling; November 2023 LTM well retrofits and repairs; a summary of December 2023 LTM well abandonments and installations (complete site well abandonment activities will be presented under a separate cover); and January 2024 LTM well survey. During the March and April 2023 sampling events, the low-flow sampling method was used, and samples were analyzed for a select list of volatile organic compounds. In March 2023, groundwater flow for the site was generally to the west was generally consistent with historical observations at the site. The Low Concentration Plume (LCP) continues to extend both horizontally and vertically beyond the terminal depth of the current monitoring well network. Data, inclusive of the 2023 LTM and baseline performance monitoring sampling events, indicate that the LCP encompasses an estimated 19.5 acres, compared to the 2021 LCP footprint, inclusive of the 2020 and 2021 DPT sampling events of 20.7 acres. The vertical extent of VOCs was historically delineated by monitoring wells screened greater than 48 feet below land surface (bls). The results from the three vertical extent monitoring wells screened below 48 feet bls that were sampled during the 2023 LTM indicate that groundwater vinyl chloride concentrations in these three wells are greater than the GCTL. As presented in the 2021 Long-Term Monitoring Report (NASA 2022), the KSCRT agreed to delay deeper investigations in this area to prevent the creation of additional pathways for vertical migration. Based on groundwater sampling activities performed in 2023, recommendations are to perform the next annual LTM sampling event, scheduled for April 2024 and to conduct quarterly performance monitoring of the AS System. The current selection of monitoring wells in the recommended 2024 LTM plan will provide an adequate data set for monitoring groundwater plume behavior; however, the LTM monitoring well network will be evaluated and refined based on 2024 LTM and year one performance monitoring data.

King Linnea↗

Launch Complex 39B, SWMU 009, 2023 Performance Monitoring and Air Sparge Expansion Construction Completion Report, Kennedy Space Center, Florida

The 2023 Performance Monitoring and Construction Completion Report (PM-CCR) presents the findings, observations, and results for Air Sparging (AS) operations and expansion activities, as well as sitewide groundwater monitoring for Launch Complex 39B (LC39B), Solid Waste Management Unit (SWMU) 009, at Kennedy Space Center (KSC), Florida. The reporting period for activities covered under this PM-CCR is from January 1, 2023, to December 31, 2023. At LC39B, AS operations began in 2017 in the area west of the launch pad, in the liquid oxygen (LOX) tank area located northwest of the launch pad, and in an area outside of the perimeter fence to protect nearby Outstanding Florida Waters (OFW). The LC39B AS system was installed with 279 AS wells to depths ranging from 23 to 60 feet below land surface (bls), including the sump, correlating to top of screen depths ranging from 20 to 57 feet bls. In December 2022, a total of 22 AS wells were abandoned to support launch pad crane operations, and in November 2023, the system was expanded with five additional AS wells installed to 13 or 17 feet bls near the LOX tank. The remedial objective of the LC39B AS Interim Measure (IM) is to actively decrease concentrations of contaminants of concern (COCs) in groundwater, specifically trichloroethene (TCE), cis-1,2-Dichloroethene (cDCE), and vinyl chloride (VC), to less than their respective Natural Attenuation Default Concentrations (NADCs), so LC39B can transition into a Long-Term Monitoring (LTM) program. This PM-CCR presents the following information for LC39B: • AS system operations and maintenance (O&M) (Year 7 of operation) from January 2023 to December 2023, to include AS trailer relocation in March 2023 and subsequent replacement and re-start in June 2023. • Construction completion details for AS system expansion, which included installation of five new AS wells and one new monitoring well in November 2023. As part of expansion activities, soil samples were also collected for petroleum analysis; no exceedances were identified, and no further investigation for petroleum is warranted. • Performance monitoring results for groundwater sampling events conducted in May/June 2023 (30 wells) and November 2023 (31 wells) in the AS IM area and in the Low Concentration Plume (LCP) areas located north and east of the launch pad for volatile organic compound (VOC) analysis. • Sampling results for one monitoring well, LOX-IW0012S, which is sampled for aluminum on an annual basis (May/June 2023). This well was resampled in November 2023 for both total and dissolved aluminum. Due to a communication error with the laboratory, the May/June 2023 sample was analyzed for total aluminum only. • Groundwater sampling results for per- and polyfluoroalkyl substances (PFAS) collected from seven monitoring wells during the May/June 2023 event to further investigate the Former Sewage Treatment Plant #6 and Percolation Pond area, west of the launch pad. O&M and performance monitoring results show that the AS system at LC39B is operating as designed and meeting performance criteria. Overall runtime was 45 percent (%) during the reporting period (January to December), but the operational runtime was 78% during the timeframe when the system could run (June to December). The most significant downtime contributor was post-launch crane operations following the Artemis launch on November 16, 2022, which lasted until June 2023. During that timeframe, the AS trailer at LC39B was relocated to another KSC remediation site (Wilson Corners) and was subsequently replaced with the AS trailer from the Paint & Oil Locker (POL) remediation site at KSC to resume AS system operations. Performance monitoring results in the AS IM and LCP areas continue to show reduction in COC concentrations over time when compared to baseline levels. In 2023, only one monitoring well (MW0048) detected a COC exceeding its NADC (VC at 740 micrograms per liter [µg/L]), which marks the baseline result for this new well installed during system expansion. Across the rest of the site, VC concentrations have declined or remained stable during the 2023 sampling events. Excluding MW0048, the highest VC result in 2023 was during the May/June sampling event with a concentration of 63 µg/L at MW0032, which is located near MW0048 and the AS expansion area by the LOX tank. TCE was detected in select monitoring wells in the IM area in 2023, but only two locations exceeded the State of Florida Groundwater Cleanup Target Level (GCTL): MW0032 (21 µg/L in May/June 2023 and 9.1 µg/L in November 2023) and MW0036 (5.0 µg/L in November 2023). MW0036 is also located near the LOX tank, on the north side, where the AS system is still operational (Zone Z4). cDCE and trans-1,2-dichloroethene concentrations were less than laboratory method detection limits or their respective GCTLs in all wells sampled in 2023. Near the OFW located northwest of the launch complex, all COC concentrations were less than laboratory method detection limits from monitoring wells (MW0039, MW0040, and LOXTA0002S) sampled in 2023. Aluminum results from LOX-IW0012S, which has been sampled routinely since 2006, detected a total aluminum concentration of 3,900 µg/L during the May/June 2023 sampling event. Results from the November 2023 event detected 5,700 µg/L for total aluminum and 5,500 µg/L for dissolved aluminum. These concentrations slightly decreased from the previous year but remain relatively consistent with historical detections. Aluminum will continue to be sampled on an annual basis at this well as results still exceed the GCTL of 200 µg/L and the Upper Limit of the KSC Background Concentration of 280 µg/L. PFAS results detected nine different PFAS compounds (out of 32 analyzed) from seven wells sampled. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA), currently have FDEP Provisional GCTLs of 70 nanograms per liter (ng/L). All seven samples collected resulted in concentrations less than the FDEP Provisional GCTLs for both PFAS compounds; no exceedances were observed. PFOS and PFOA also have assigned United States Environmental Protection Agency (USEPA) Maximum Contaminant Levels (MCLs) of 4 nanograms per liter (ng/L). None of the PFOS results exceeded the USEPA MCLs. PFOA was detected in two samples above the USEPA MCL at concentrations of 5.8 ng/L (ECS-IW0009I) and 5.5 ng/L (ECS-IW0009S). Three other PFAS compounds, perfluorohexanesulfonic acid (PFHxS), perfluoro-n-nonanoic acid (PFNA), and hexafluoropropylene oxide dimer acid (GenX), currently have USEPA MCLs of 10 ng/L. PFHxS, PFNA, and GenX were not detected at concentrations greater than their respective USEPA MCLs in any of the seven wells. PFAS compounds without FDEP Provisional GCTLs or USEPA MCLs were screened against USEPA RSLs. No other detections exceeded their respective USEPA RSLs. Additional PFAS sampling will be conducted as part of a future PFAS Site Assessment. Based on O&M activities and performance monitoring, the following is recommended for LC39B: • Continue with Year 8 AS system operation within Zone Z4, which includes the AS expansion area. Zone Z3, which has been off since 2018, should remain off as no rebound has been observed. Zones Z1 and Z2, which were turned off at the end of 2022, will remain shut down as monitoring well results have consistently been below GCTLs or have low-level detections with stable or decreasing trends (Meeting Minute 2402-M10, Decision 2402-D30). • Continue with performance monitoring in 2024 with the same monitoring well network as 2023, except with the addition of MW0048 in both semi-annual events. Baseline concentrations for this well were collected during the November 2023 performance monitoring event. Semi-annual sampling should be planned for the May 2024 and November 2024 timeframes (Meeting Minute 2402-M10, Decision 2402-D31). • Continue sampling monitoring well, LOX-IW0012S, for aluminum (total and dissolved) on an annual basis in May 2024. It is also recommended to re-develop this well prior to the next sampling event (Meeting Minute 2402-M10, Decision 2402-D32). The above recommendations for LC39B were presented at the February 2024 KSCRT Meeting, with Team consensus reached on the path forward. The contents of this PM-CCR were also presented at this meeting.

Deborah M Wilson↗

Flight Deck Design of a Hybrid Turbine/Electric Aircraft

The SUbsonic Single Aft eNgine (SUSAN) program is being developed as a sustainable subsonic regional aircraft. NASA is conducting trade studies for this future hybrid single aisle passenger aircraft. The goal of reducing emission levels by 50% will be enabled through an advanced design. An aft mounted single turbine engine provides thrust and electric power to drive 16 wing mounted electric engines. Using the 16 counter-rotating electric fans will create an efficient, very high bypass ratio, engine. Electric engines allow for distributed thrust, reducing control surfaces and provide a greater dynamic response. Batteries provide boost for takeoff and climb, allowing a smaller, more efficient, turbine engine. As part of the SUSAN effort, two pilot-in-the-loop studies were conducted at NASA Langley Research Center in Virginia to explore flight deck design issues. In particular: how many throttles are required/desired for a 17-engine aircraft, does the hybrid electric design change the answer, what are the requirements for electric engine displays, what system pages are required, and what information is required to monitor the batteries. Objective and subjective data were collected after each scenario and at the end of the day with a guided set of questionnaires from sixteen crews paired by airline. Data along with pilot comments were used to improve the throttle and engine displays between the studies and used to make the final recommendations on flight deck configurations. This paper provides final design recommendations for the SUSAN flight deck and justification for each recommendation.

PAI↗

Components Refurbishment and Chemical Analysis Facility, SWMU #041 - Per- and Polyfluoroalkyl Substances Site Assessment Report Kennedy Space Center, Florida

This PFAS Site Assessment (SA) Report presents the activities and results associated with PFAS investigations at the Components Refurbishment and Chemical Analysis (CRCA) facility located at Kennedy Space Center (KSC), Florida. In 2022, CRCA was identified as an Area of Potential Concern because the facility stores several potential PFAS-containing chemicals. A groundwater sample collected from an onsite monitoring well detected PFOA and PFOS at concentrations greater than State of Florida provisional Groundwater Cleanup Target Levels (pGCTLs). PFAS SA activities were conducted between March 2022 and February 2024. During this timeframe, a total of 16 direct-push technology (DPT) locations and 82 discrete samples were collected from these locations, along with 90 monitoring well samples. The analytical data screening process focused on State of Florida pGCTLs and United States Environmental Protection Agency (USEPA) Regional Screening Level (RSLs) from November 2023 to evaluate the data. Analytical results identified PFOS, PFOA, and PFBA at concentrations exceeding their respective RSLs at each depth interval (shallow, intermediate, and deep). PFOS and PFOA had the largest footprint of RSL exceedances in each depth interval, but pGCTL exceedances were only observed at limited locations in the shallow and intermediate intervals. PFBA had the highest detections of any PFAS compound, with concentrations exceeding 180,000 nanograms per liter (ng/L), which is 100-times the RSL of 1,800 ng/L in the shallow and intermediate intervals and 10-times the RSL in the deep interval. The maximum PFBA detection was 841,000 ng/L at shallow monitoring well, MW0006. The PFAS SA also included samples collected from the onsite hydraulic containment system (HCS) which was installed to control and treat the onsite chlorinated volatile organic compound (CVOC) plume. Influent and effluent aqueous samples were collected monthly from the system. PFAS concentrations were relatively the same for both influent and effluent samples, indicating that while the HCS has been effective for CVOC treatment, it does not provide any additional treatment for PFAS compounds. Since the HCS has achieved its objectives, the system was shut down in December 2024. PFAS data gaps still exist, to include surface water and soil, which were not sampled during this SA. Soil sampling near the Chemical Process Area is recommended. Surface water and soil sampling at select stormwater outfalls is also recommended. Additionally, further groundwater sampling is recommended (DPT and monitoring well) in all depth intervals to delineate the extent of PFAS impacts at CRCA.

K Alex Murphy↗

NICS (NASA Instrument Capabilities Study) Instrument Schedule and Cost Study

This paper summarizes work performed on the Flight Projects Directorate Planetary Science Projects Division (PSPD, Code 430) NICS (NASA Instrument Capabilities study) instrument schedule and cost study. Included are a short summary of the original NICS (NASA, 2008), and the design and approach, data collection, analysis, preliminary findings and recommendations from select areas of the current study. The NICS (2008) was chartered by then NASA Chief Engineer Michael Ryschkewitsch and chaired by Goddard Space Flight Center (GSFC) engineer, John Leon. The focus was to identify problem areas in instrument development and, if possible, to offer solutions. In the area of instrument developments, the NICS (2008) identified a lack of resources and authority to successfully manage to instrument cost and schedule requirements; and a lack of critical skills, expertise, and leadership to successfully implement unique (one-of-a-kind) high technology developments (NASA, 2008, pp. 51, 52). Additionally, the NICS (2008) found problems in requirements formulation, reviews and management; unrealistic caps and overly optimistic estimates; and externally directed changes which increased the likelihood of overrunning cost and schedule (NASA, 2008, pp.53, 54). It is noteworthy that NICS findings are consistent with previous studies at the mission level (Robbins, Schmidt & White, 2020). Five years later in 2013, the Instrument Projects Division (IPD) was established to implement and manage instrument projects greater than $20M. The IPD was known as Code 490. Its structure incorporated several of the NICS (2008) recommendations. To see if these incorporated recommendations made a difference, and to identify other potential challenges in instrument developments, two parallel studies were initiated. Originally led by the IPD, now led by the PSPD, and the Instrument and Payload Systems Engineering Branch (IPSE, Code 592), respectively, the instrument schedule and cost study and the instrument technical complexity study began in 2017. Data collection was initiated in 2020 and is on-going. This paper is limited to the IPD/PSPD study. Among other findings, preliminary data indicate IPD/PSPD project management support positively influenced instrument development as related to providing a dedicated level of support staff, including a deputy Instrument Project Manager (dIPM), reducing IPM leadership changes, and providing other project support. Next steps include continued data collection and analysis, and mapping to technical complexity data.

NICS implementation↗

Reducing Airborne Infectious Aerosol Exposure

Since beginning its work in late March 2020, the ASHRAE Epidemic Task Force (ETF) has produced a large set of guidance documents totaling hundreds of pages, all of which can be found at the ASHRAE COVID-19 resources web pages (www.ashrae.org/COVID19). This guidance has evolved as scientific understanding has increased and circumstances have changed, necessitating several updates. The initial, one-page “Core Recommendations” document, approved in January 2021, was written to provide a concise summary of the most current task force recommendations for the benefit of the public and to promote consistency between guidance documents developed by different ETF teams. This column includes the Core Recommendations (in bold) with added commentary to provide the rationale for each.

60 APPLIED LIFE SCIENCES↗

U.S. Commercial Building Stock Analysis of COVID-19 Mitigation Strategies: Preprint

The COVID-19 pandemic highlights the importance of improving building indoor air quality to reduce occupants’ chances of contracting airborne illness. The ASHRAE Epidemic Task Force (ASHRAE-ETF) released several COVID-19 mitigation strategies at the onset of the pandemic. This study explores four of those recommendations for reducing transmission of COVID-19 inside buildings: (1) 100% outdoor air ventilation, (2) MERV-13 or better filters, (3) demand control ventilation removal, and (4) HVAC flushing mode. These recommendations were simulated and assessed using ComStock, a model of the U.S. commercial building stock. The study showed the 100% outdoor air ventilation recommendation had the largest impact on energy consumption, noncoincident peak demand, and thermostat violations. Removing demand control ventilation had the smallest national aggregate impact, installing MERV-13 filters led to slight increases in energy use and peak demand, and HVAC outdoor air flushing led to modest energy use and peak demand increases.

building energy modelling↗

Assessment of the Corrosion Risks to a Double Shell Tank During the Selective Removal of a Cesium-rich Supernate Layer - 20227

The Direct Feed Low Activity Waste (DF-LAW) activity will provide the initial feed to the Waste Treatment and Immobilization Plant at the Hanford Tank Farm facility. Feed preparation for DF-LAW will be carried out in multiple double shell waste tanks (DST) utilizing the Tank Side Cesium Removal (TSCR) process. Tank AP-106 will be an integral part of the TSCR process and hence key to the DFLAW activity. Prior to being utilized for this purpose, the Cs-137 concentration levels in the AP-106 supernate must be reduced significantly. The AP-106 re-purposing process manages normal waste tank addition procedures such that waste acceptance criteria objectives for Cs-137 removal are achieved. As this process was being developed, several concerns regarding tank integrity during and after repurposing of Tank AP-106, and the associated tanks (i.e., AP-102, AN-101, and AP-108), were addressed. The potential corrosion degradation mechanisms identified based on process knowledge included: general and pitting corrosion, caustic stress corrosion cracking, concentration cell corrosion, and microbiologically induced corrosion (MIC). A systematic approach was undertaken to assess the risk of corrosion during the AP-106 re-purposing process. The assessment considered the initial and present condition of the tank, the service history of the tank, the environmental conditions created in each tank during each stage of the process, process timing, and corrosion testing and modeling that approximated tank conditions. Based on this information, recommendations were provided to minimize the exposure of the tank to corrosive conditions. These recommendations included time limits for each stage of the process, staging of corrosion inhibitor solutions should process delays occur, and waste sampling with potential chemistry adjustments at defined steps in the process. Additionally, recommendations for post-process supernate chemistry adjustments and tank inspections were put forth. The greatest risk for this process occurs during the manipulation of large quantities of Columbia River water (i.e., greater than 450,000 gallons) within AP-106, the associated tanks and the supporting infrastructure (i.e., transfer line piping). This risk becomes more pronounced if there is a process upset and the tank walls remain exposed to a corrosive condition longer than intended. As long as the river water is blended into the supernate in a timely fashion, and the waste is adjusted appropriately with corrosion inhibitors, corrosion may be minimized and the final condition of the supernate in AP-106 and the associated tanks is expected to be in compliance with corrosion chemistry requirements. Contingency plans will be made to minimize the impact of a process upset. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Efficient Parallelization of Irregular Applications on GPU Architectures

With the enlarging computation capacity of general Graphics Processing Units (GPUs), leveraging GPUs to accelerate parallel applications has become a critical topic in academia and industry. However, a wide range of irregular applications with the computation-/memory-intensive nature cannot easily achieve high GPU utilization. The challenges mainly involve the following aspects: first, data dependence leads to coarse-grained kernel and inefficient parallelism; second, heavy GPU memory usage may cause frequent memory evictions and extra overhead of I/O; third, specific computation patterns produce memory redundancies; last, workload balance and data reusability conjunctly benefit the overall performance, but there may exist a dynamic trade-off between them. Targeting these challenges, this dissertation proposes multiple optimizations to accelerate two real-world applications: many-body correlation functions to simulate nuclear physics in a large-scale scientific system; the other is the eALS-based matrix factorization recommendation system. To accelerate the calculations of many-body correlation functions, this dissertation presents three frameworks in GPU memory management and multi-GPU scheduling. Firstly, an optimized systematic GPU memory management framework, MemHC, utilizes a series of new memory reduction designs in GPU memory allocation, CPU/GPU communications, and GPU memory oversubscription. Secondly, an enhanced multi-GPU scheduling framework, MICCO, particularly by taking both data dimension (e.g., data reuse and data eviction) and computation dimension into account. MICCO designs a heuristic scheduling algorithm and a machine learning-based regression model to generate the optimal settings of a proposed new concept to manage the trade-off. Thirdly, a locality-aware multi-GPU scheduling framework. This scheduler leverages pipeline batch generation with a looking-ahead strategy by building local dependency graphs for memory transfer reduction and better data reuse, achieving up to 79.92% memory cost reduction and 1.67x speedup. To parallelize the eALS-based recommendation system, this dissertation proposes an efficient CPU/GPU heterogeneous recommendation system, HEALS. HEALS employs newly designed architecture-adaptive data formats to achieve load balance and good data locality on CPU and GPU. To mitigate the data dependence, HEALS presents a CPU/GPU collaboration model for both task parallelism and data parallelism with multiple kernel computation optimizations. In summary, this dissertation efficiently accelerates two typical irregular applications on GPUs by building four frameworks, including CPU/GPU collaboration, GPU memory management, and multi-GPU scheduling.

Wang, Qihan↗

Developing a Supply Chain Security Program

Amid growing concerns over foreign manufacturing for components and devices deployed in critical energy infrastructure, this research from the national labs will highlight best practices for developing and maintaining a supply chain security program. Tools for asset inventory, tips for developing and maintaining software- and hardware-bills-of-materials (SBOMs and HBOMs), recommended contractual language for vendor agreements, and identification of responsibilities will be shared. We discuss the one-time requirements to enable a successful supply chain security program and the best ways to operationalize this program for maximum impact, including development of robust practices for vulnerability tracking, patch management, and workarounds, with understanding of the reliability and uptime requirements for utilities. The recommendations shared are based on a cyber-informed engineering approach to identification of high-consequence impacts and the engineering controls related to supply chain management that can best mitigate these impacts. This approach allows for prioritization of resources. Additionally, we highlight relative up-front and ongoing costs associated with recommended controls. Viewers will leave with an understanding what a supply chain security program is, and what steps, prioritized for resource-constrained organizations, can build a robust program.

14 SOLAR ENERGY↗

Assessment of ROI for Workforce Development Efforts National & Homeland Security

The IDEAL Professional Engagement project at Idaho National Laboratory (INL) aims to enhance the laboratory's workforce diversity and inclusivity efforts, focusing on the U.S. National and Homeland Security mission areas. This project involves researching and evaluating opportunities for INL to engage in various professional events, particularly cyber conferences, to support recruitment and professional development. The project involved several key tasks: compiling comprehensive information on national laboratories and their mission statements, developing a deep understanding of INL’s role and efforts in national and homeland security, and identifying and engaging key stakeholders. Interviews were conducted with a set of targeted questions, and the findings were analyzed to identify common themes, insights, and actionable recommendations. Additionally, relevant upcoming cyber conferences were identified, various sponsorship levels and their associated benefits were evaluated, and the recruitment potential of these conferences was assessed. A detailed cost analysis was performed, including registration fees and travel expenses, and a cost-benefit analysis was conducted to evaluate the financial viability and potential return on investment (ROI) of conference participation and sponsorship. Based on the research and analysis, actionable recommendations for conference participation and sponsorship were formulated, ensuring alignment with INL’s mission and diversity goals. Preliminary results include a comprehensive list of relevant cyber conferences, a detailed cost analysis, and a set of actionable recommendations for future conference participation and sponsorship. The analysis highlights the financial requirements and geographical distribution of these conferences, providing valuable insights for INL's engagement strategies. This project underscores the importance of strategic engagement in professional events to attract and develop a diverse and skilled workforce, ultimately supporting INL’s mission areas in U.S. National and Homeland Security.

99 GENERAL AND MISCELLANEOUS↗