Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Protection & Control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,117 records · Page 62

Of the final end state for decommissioning of reactors at SRS: collaboration between stakeholders, regulators, and the Federal Government - 15279

The Savannah River Site (SRS) is an 802 square-kilometer (310 square-miles) United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina. Nuclear weapons material production began in the early 1950's, utilizing five (5) production reactors. In the early 1990's all SRS production reactor operations were terminated. The first reactor closure end-state declaration was documented in a Comprehensive Environmental Response and Compensation and Liability Act (CERCLA) Early Action Record of Decision. The decision for the final closure of the 29,543 square-meter (318,000 square-feet) 105-P Reactor was determined to be in situ decommissioning (ISD). ISD is an acceptable and cost-effective alternative to off-site disposal for the reactor building, which will allow for consolidation of remedial action wastes generated from other cleanup activities within the P Area. ISD is considered protective by the regulators, U.S. Environmental Protection Agency (USEPA) and the South Carolina Department of Health and Environmental Control (SCDHEC), public and stakeholders as waste materials are stabilized / immobilized, and radioactivity is allowed to naturally decay, thus preventing future exposure to the environment. Stakeholder buy-in was critical in the up-front planning in order to achieve this monumental final decision. Numerous public meetings and workshops were held in two different states (covering a 321 kilometer (200-mile) radius) with stakeholder and SRS Citizens Advisory Board (CAB) participation. These meetings were conducted over an eight- month period as the end-state decision making progressed. Information provided to the public evolved from workshop to workshop as data became available and public input from the public meetings were gathered. ISD is being considered for the balance of the four (4) SRS reactors and other hardened facilities such as the chemical Separation Facilities (canyons). Closure of the SRS P Reactor Area was precedent setting and sets the stage for closure of other reactors and hardened facilities. The DOE, USEPA, and SCDHEC engaged in active, up-front, and timely involvement with the SRS. The SRS CAB, elected officials, and citizens of South Carolina and Georgia met to discuss the P reactor area closure and associated risks. Early public involvement gave SRS and the regulators assurance that the selected decision was valid and would not be overturned. Public input improved the process and ensured that the important decision on the final end-state of the reactor facilities was not made in isolation. ISD of P Reactor will provide adequate protection of human health and the environment and the lowest cost since short-term risk is minimized to remedial workers from exposure to contaminated equipment and facilities by leaving the reactor vessel in place allowing for radiological decay over time. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Summary of Building Protection Factor Studies for External Exposure to Ionizing Radiation

Radiation dose assessments are used to help inform decisions to minimize health risks in the event of an atmospheric release of radioactivity including, for example, from a Radiological Dispersal Device, an Improvised Nuclear Device detonation, or a Nuclear Power Plant accident. During these incidents, radiation dose assessments for both indoor and outdoor populations are needed to make informed decisions. These dose assessments inform emergency plans and decisions including, for example, identifying areas in which people should be sheltered and determining when controlled population evacuations should be made. US dose assessment methodologies allow consideration of the protection, and therefore dose reduction, that buildings provide their occupants. However, these methodologies require an understanding of the protection provided by various building types that is currently lacking. To help address this need, Lawrence Livermore National Laboratory, in cooperation with Sandia National Laboratories and the Nuclear Regulatory Commission, was tasked with (a) identifying prior building protection studies, (b) extracting results relevant to US building construction, and (c) summarizing building protection by building type. This report focuses primarily on the protection against radiation from outdoor fallout particles (external gamma radiation).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Competing Interests and Creating Value - Balancing Durable and Enforceable Institutional Controls with Beneficial Reuse - 20320

US DOE LM has various real property interests at the 100 sites within its current portfolio, with an anticipated total of 127 sites within the next 5 years. Each site has its own narrative with respect to the real property assets. Since the regulatory time frame for long-term surveillance and maintenance activities at some sites can be in perpetuity, durable and effective instruments and documentation are necessary to support LM's unique mission as a federal land manager and steward. More than half of the sites currently in LM's inventory do not allow unrestricted use, and institutional controls (ICs) are required to limit human and environmental exposures to residual contamination. LM's Asset Management program balances protection of human health and the environment with a goal of optimizing its land portfolio through mitigation of risk, limiting liability, and creating value, whether tangible or intangible, in these types of assets. The IC layering strategy utilizes multiple types, restrictions, and legal authorities to protect human health and the environment. This layering strategy influences the transition of these properties into LM's portfolio to assess potential beneficial reuses. The LM's beneficial reuse program aims to repurpose former contaminated sites to restore the environment, protect the public health, revitalize communities, and spur economic growth. LM strives to create value in a perceived valueless asset and reevaluates and revisits the potential opportunities for these sites as long-term surveillance and maintenance activities are performed and objectives are achieved. Beneficial reuse also promotes protectiveness by ensuring activities are compatible with long-term maintenance and protection of public health and the environment as well as ensuring activities are environmentally sound by retaining good stewardship of natural resources. LM has recently revised both the Institutional Control Program Guidance and its Beneficial Reuse Management Plan to integrate the issues of land use with ICs, creating value in these impaired assets. This paper presents the following topics: (1) a general overview of LM's IC and beneficial reuse programs; (2) the unique aspects of each of these programs as a result of the multiple regulatory requirements and programs that affect LM sites; (3) case studies of LM sites to show examples of how LM created value while complying with the ICs and layering strategies; and (4) the most common challenges to beneficial reuses at LM sites and potential options for value creation in impaired assets. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nebraska Integrated Carbon Capture and Storage Pre-Feasibility Study

In collaboration with the Nebraska Public Power District (NPPD), the Energy & Environmental Research Center (EERC) has conducted a pre-feasibility study for a commercial-scale carbon dioxide (CO 2 ) geologic storage complex in western Nebraska integrated with potential CO 2 capture at Gerald Gentleman Station (GGS). GGS is the largest coal-fired electricity-generating station in Nebraska, emitting 8.5 million metric tons (Mt) of CO 2 annually, and is located near the town of Sutherland. This pre-feasibility (Phase 1) project has been executed as part of the U.S. Department of Energy (DOE) CarbonSAFE program, a multiphase initiative to support the deployment of large-scale carbon capture and storage (CCS) projects. Each CarbonSAFE project is required to demonstrate the potential to capture and store at least 50 million tonnes (Mt) of CO 2 over a 25-year operational period. The EERC and NPPD established a coordination team to identify challenges to a potential Nebraska CCS project, comprising local stakeholder organizations, which met twice in Lincoln and via several Webinars, providing feedback and guidance throughout the pre-feasibility study. The EERC also secured the technical support of Schlumberger Carbon Services and Computer Modelling Group Ltd. (CMG). The project comprised four technical themes, all using published information sources. Regional and stakeholder analysis, including identification of sensitive environmental areas, potential resource conflicts, and strategies for public outreach. A review of geographic and socioeconomic characteristics, in combination with geologic characterization in the subbasinal analysis described below, identified an area to the southwest and within a 75-mile radius of GGS as the most prospective for development of a storage site. This area largely avoided lands with protected status such as wetlands. A public outreach plan has also been developed for implementation in any further phases of CCS assessment in western Nebraska, for example a CarbonSAFE Phase 2 feasibility study. Scenario analysis, addressing economic and regulatory factors. GGS is the only single major source of CO 2 emissions capable of satisfying the CarbonSAFE 50-Mt scale requirement within the study region. Chemical absorption using amines was identified as the most viable technology for postcombustion CO 2 capture at GGS. The total cost of a CCS project at GGS was estimated to be between $67/tonne CO 2 for capture and auxiliary boiler to minimize parasitic load and $70/tonne CO 2 avoided cost, using the Carnegie-Mellon University Integrated Environmental Control Model (IECM). The total avoided cost included the capture facility and parasitic load, a flue gas desulfurization plant required for the use of amine solvent technology, transport via pipeline, and dedicated storage infrastructure. Nebraska has no legislation in place to address typical CCS-specific issues, for example pore space ownership for storage. Long-term liability, therefore, falls under the U.S. Environmental Protection Agency Underground Injection Control (UIC) Class 6 program regulations. Subbasinal analysis, addressing the potential for a dedicated subsurface “container” to store the required 50-Mt quantity of CO 2 . Modeling and simulation studies identified an area to the southwest of GGS with the potential for storage of 50 Mt CO 2 in the Cloverly Formation, comprising sandstones with interbedded and intermingled shales. The area of review (AOR) that would be required for monitoring under a Class VI operating permit was estimated to be as high as 400–700 square miles, due to uncertain pressure effects. The viability of this storage option is subject to significant uncertainty due to the relatively limited amount of existing characterization data available to the pre-feasibility study; for example, dynamic simulation indicated that the proposed storage rate might require as little as two or as many as 14 injection wells. A key uncertainty is the relative proportion and distribution of sandstone and shale within the Cloverly Formation. A preliminary, semiquantitative risk assessment also suggested uncertainty over storage capacity and injectivity constitute the most significant project risks at this pre-feasibility stage. No assessed risks were considered to rule out the possibility of a project moving to deployment. National Risk Assessment Partnership (NRAP) validation, using software tools developed by the National Energy Technology Laboratory (NETL) to assess risks associated with the potential 50-Mt CO 2 storage complex. NRAP tools were used to assess hypothetical leakage scenarios. Results broadly supported the conclusion of the semiquantitative risk analysis – for example, even worst-case analysis of theoretical leakage scenarios found limited migration rates and impacts. In summary, the work undertaken in this Phase 1 pre-feasibility study has shown that western Nebraska has potential to host a commercial-scale CCS project, including a dedicated storage “container” for 50 Mt of CO 2 . However, the following key challenges would need to be overcome: The business case for deploying CCS projects is uncertain; recently announced federal tax credits and sales of CO 2 for enhanced oil recovery may not cover the full costs of a CCS project at GGS, as estimated by this pre-feasibility study. The potential 50-Mt CO 2 dedicated storage container defined in this pre-feasibility study should be regarded as having a relatively low level of readiness to support a CCS project. Public outreach would be a vital element in western Nebraska, where sensitivities around such environmental issues as water resource protection and pipeline construction would need to be carefully addressed.

54 ENVIRONMENTAL SCIENCES↗

Benchmarking performance: Environmental impact statements in Egypt

Environmental impact assessment (EIA) was formally introduced in Egypt in 1994. This short paper evaluates 'how well' the EIA process is working in practice in Egypt, by reviewing the quality of 45 environmental impact statements (EISs) produced between 2000 and 2007 for a variety of project types. The Lee and Colley review package was used to assess the quality of the selected EISs. About 69% of the EISs sampled were found to be of a satisfactory quality. An assessment of the performance of different elements of the EIA process indicates that descriptive tasks tend to be performed better than scientific tasks. The quality of core elements of EIA (e.g., impact prediction, significance evaluation, scoping and consideration of alternatives) appears to be particularly problematic. Variables that influence the quality of EISs are identified and a number of broad recommendations are made for improving the effectiveness of the EIA system.

54 ENVIRONMENTAL SCIENCES↗

Total Integrated Dose to Spent Fuel Pool Level Instrument Probes and Refueling Floor Personnel Dose Rates Meeting NRC Order EA-12-051 for a Typical Boiling Water Reactor - Paper 22

In reviewing the events after the March 11, 2011 Fukushima accident, the Nuclear Regulatory Commission (NRC) issued Order EA-12-051, Reference 1, requiring new reliable spent fuel pool (SFP) instrumentation for pool level determination under beyond design basis event conditions. In 2013, URS prepared a calculation for a typical Boiling Water Reactor to determine the Total Integrated Dose (TID) potentially to be imparted to radiation sensitive underwater probes (one primary and one backup) planned for meeting this Order. Additionally, URS calculated the radiological dose rates to an individual standing on the refueling floor for various SFP fill levels. NEI 12-02, Reference 2, defines the levels at which SFP condition identification is necessary as the following: Level 1 - level that is adequate to support operation of the normal fuel pool cooling system. Level 1 represents the higher of the following two points: - The level at which reliable suction loss occurs due to uncovering of the coolant inlet pipe, weir or vacuum breaker (depending on the design), or - The level at which the water height, assuming saturated conditions, above the centerline of the cooling pump suction provides the required net positive suction head specified by the pump manufacturer or engineering analysis. Level 2 - level that is adequate to provide substantial radiation shielding for a person standing on the spent fuel pool operating deck. Level 2 is based on either of the following: - 10 feet (+/- 1 foot) above the highest point of any fuel rack seated in the spent fuel pools, or - A designated level that provides adequate radiation shielding to maintain personnel radiological dose levels within acceptable limits while performing local operations in the vicinity of the pool. This level shall be based on either plant-specific or appropriate generic shielding calculations, considering the emergency conditions that may apply at the time and the scope of necessary local operations, including installation of portable SFP instrument channel components. Level 3 - level where fuel remains covered and actions to implement make-up water addition should no longer be deferred. Level 3 corresponds nominally (i.e. +/- 1 foot) to the highest point of any fuel rack seated in the spent fuel pool. The URS calculation did not define these levels or determine instrumentation setpoints. However, it determined refueling floor dose rates that could be used as a tool to determine the appropriate water depths for these levels. In determining the TID for the SFP probes and the radiological dose rates to the individual, the following radioactive sources were considered: 1. Spent Nuclear Fuel (SNF) stored in the spent fuel storage racks, 2. Local Power Range Monitors (LPRMs) stored above the top of the racks on hangers on the SFP walls 3. Radioactive material laden filters stored on platforms on top of the racks, and 4. Control Rod Blades (CRBs) stored above the top of the racks on hangers on the SFP walls. The TID for the SFP probes includes both the dose from normal operation (pool full of water) for the remaining plant life (an assumed 40 years, conservatively including an allowance for lifetime extension SFP loading) and, consistent with the NEI 12-02 guidelines, Reference 2, the assumed drop in elevation of the pool water level to the top of the spent fuel racks for a 6 hour period. The acceptable TID for the radiation-sensitive probe as defined by the manufacturer was 2x10{sup 9} rad. The individual on the pool deck was assumed to be standing on the edge of the pool with an unobstructed view of its contents, as a worst case scenario. Dose rates to this individual determined from direct shine from the same 4 sources were determined for SFP water levels varying from 1 ft above the SNF racks to 21 ft above the racks in one foot increments. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

On the evaluation and selection of network-level traffic control policies: Perimeter control, TUC, and their combination

Perimeter control (PC) of urban traffic networks can be effective in increasing network-wide efficiency. PC operates on the border of a protected region of a traffic network. Most studies thus far considered fixed-time plans for the inner part of these regions. A few studies have shown that combining PC with locally actuated or decentralized traffic control systems may have positive effects on traffic performance, including better-defined Network Macroscopic Fundamental Diagrams (NMFDs), increased network throughput, and reduced delays. The Traffic-responsive Urban Control (TUC) is a real-time network-wide traffic control system with particular design characteristics, such as the balancing of link's occupancies and an inherent gating feature. These characteristics suggest that TUC may enhance the traffic network performance when combined with PC whilst improving the resulting NMFDs and network throughput and delays. Here, in this work, we investigate the effect of feedback perimeter control (FPC), TUC, and their combination on the NMFD and on the traffic conditions of general traffic and public transport in the microsimulation of a realistic model of the Christchurch Central Business District in New Zealand. We perform a thorough investigation of practical aspects of both control strategies and their combination, including parameter tuning and infrastructure requirements, and how they may affect the control system choice. Results show higher throughput and less hysteresis on the NMFDs, particularly when TUC is involved. PC provides benefits concentrated in the protected region which can greatly benefit public transportation if there is an overlap with the transit network. The combination of TUC and FPC boosts network-wide throughput.

33 ADVANCED PROPULSION SYSTEMS↗

Overview of the preliminary design of the ITER plasma control system

An overview of the Preliminary Design of the ITER Plasma Control System (PCS) is described here, which focusses on the needs for 1st plasma and early plasma operation in hydrogen/helium (H/He) up to a plasma current of 15 MA with moderate auxiliary heating power in low confinement mode (L-mode). Candidate control schemes for basic magnetic control, including divertor operation and kinetic control of the electron density with gas puffing and pellet injection, were developed. Commissioning of the auxiliary heating systems is included as well as support functions for stray field topology and real-time plasma boundary reconstruction. Initial exception handling schemes for faults of essential plant systems and for disruption protection were developed. The PCS architecture was also developed to be capable of handling basic control for early commissioning and the advanced control functions that will be needed for future high performance operation. A plasma control simulator is also being developed to test and validate control schemes. To handle the complexity of the ITER PCS, a systems engineering approach has been adopted with the development of a plasma control database to keep track of all control requirements.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Templated Mesoporous Silica Outer Shell for Controlled Silver Release of a Magnetically Recoverable and Reusable Nanocomposite for Water Disinfection

Here, we encapsulated Fe 3 O 4 @SiO 2 @Ag (MS-Ag), a bifunctional magnetic silver core–shell structure, with an outer mesoporous silica (mS) shell to form an Fe 3 O 4 @SiO 2 @ 2 Ag@mSiO 2 (MS-Ag-mS) nanocomposite using a cationic CTAB (cetyltrimethylammonium bromide) micelle templating strategy. The mS shell acts as protection to slow down the oxidation and detachment of the AgNPs and incorporates channels to control the release of antimicrobial Ag + ions. Results of TEM, STEM, HRSEM, EDS, BET, and FTIR showed the successful formation of the mS shells on MS-Ag aggregates 50–400 nm in size with highly uniform pores ~4 nm in diameter that were separated by silica walls ~2 nm thick. Additionally, the mS shell thickness was tuned to demonstrate controlled Ag + release; an increase in shell thickness resulted in an increased path length required for Ag + ions to travel out of the shell, reducing MS-Ag-mS’ ability to inhibit E. coli growth as illustrated by the inhibition zone results. Through a shaking test, the MS-Ag-mS nanocomposite was shown to eradicate 99.99+% of a suspension of E. coli at 1 × 10 6 CFU/mL with a silver release of less than 0.1 ppb, well under the EPA recommendation of 0.1 ppm. This high biocidal efficiency with minimal silver leach is ascribed to the nanocomposite’s mS shell surface characteristics, including having hydroxyl groups and possessing a high degree of structural periodicity at the nanoscale or “smoothness” that encourages association with bacteria and retains high Ag + concentration on its surface and in its close proximity. Furthermore, the nanocomposite demonstrated consistent antimicrobial performance and silver release levels over multiple repeated uses (after being recovered magnetically because of the oxidation-resistant silica-coated magnetic Fe 3 O 4 core). It also proved effective at killing all microbes from Long Island Sound surface water. The described MS-Ag-mS nanocomposite is highly synergistic, easy to prepare, and readily recoverable and reusable and offers structural tunability affecting the bioavailability of Ag + , making it excellent for water disinfection that will find wide applications.

77 NANOSCIENCE AND NANOTECHNOLOGY↗

Protecting unknown two-qubit entangled states by nesting Uhrig's dynamical decoupling sequences

Future quantum technologies rely heavily on good protection of quantum entanglement against environment-induced decoherence. A recent study showed that an extension of Uhrig's dynamical decoupling (UDD) sequence can (in theory) lock an arbitrary but known two-qubit entangled state to the Nth order using a sequence of N control pulses [Mukhtar et al., Phys. Rev. A 81, 012331 (2010)]. By nesting three layers of explicitly constructed UDD sequences, here we first consider the protection of unknown two-qubit states as superposition of two known basis states, without making assumptions of the system-environment coupling. It is found that the obtained decoherence suppression can be highly sensitive to the ordering of the three UDD layers and can be remarkably effective with the correct ordering. The detailed theoretical results are useful for general understanding of the nature of controlled quantum dynamics under nested UDD. As an extension of our three-layer UDD, it is finally pointed out that a completely unknown two-qubit state can be protected by nesting four layers of UDD sequences. This work indicates that when UDD is applicable (e.g., when the environment has a sharp frequency cutoff and when control pulses can be taken as instantaneous pulses), dynamical decoupling using nested UDD sequences is a powerful approach for entanglement protection.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

A Better Method to Calculate Fuel Burnup in Pebble Bed Reactors Using Machine Learning

Burnup measurement is an important step in material control and accountancy (MC&A) at nuclear reactors, and may be done by examining gamma spectra of fuel samples. Traditional approaches rely on known correlations to specific photopeaks (e.g. 137 Cs) and operate via a standard linear regression method. However, the quality of these regression methods is limited even in the best case, and is significantly poorer at short fuel cool-down times, due to the elevated radiation background by short life-time isotopes, and self-shielding effect of the fuel. For practical operation of pebble bed reactors (PBRs), quick measurements (in minutes) and short cooling times (in hours) are required from a safety and security perspective. We investigated the efficacy and performance of machine learning (ML) methods to predict the burnup of the pebble fuel from full gamma spectra (rather than specific discrete photopeaks) and found a full-spectrum ML approach to far outperform baseline regression predictions in all measurement and cooling conditions - including in operational-like measurement conditions. We also performed model and data ablation experiments to determine the relative performance impact of our ML methods' capacity to model data nonlinearities and the inherent additional information in full spectra. Applying our ML methods, we found a number of surprising results, including improved accuracy at shorter fuel cooling times (the opposite of the norm), remarkable robustness to spectrum compression (via rebinning), and competitive burnup predictions even when using background signal only (i.e. explicitly omitting known isotope photopeaks).

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Adaptive Site Management Strategies for the Hanford Central Plateau Groundwater

Adaptive site management (ASM) is a systematic and iterative management approach that can be used to expedite the remediation of large and/or complex sites. ASM is defined as a formal and systematic project or site management approach centered on rigorous site planning and a firm understanding of site conditions and uncertainties, using science and technology to routinely re-evaluate and prioritize site remedial actions and characterization activities. The goal of the approach is to create a framework of structured and continuous planning, implementation, and assessment processes that accommodates new information and changing site conditions to develop effective and efficient cleanup approaches that achieves the required outcome(s) while optimizing costs, cleanup timeframe, and performance. Central to ASM is an evolving conceptual site model (CSM). Over time, incremental reductions in uncertainty associated with the CSM will occur, while supporting continued progress toward site cleanup and closure through remedy optimization and evaluation. ASM has the potential to expedite cleanup for the Central Plateau area at Hanford through a planned and systematic approach for reducing uncertainty with targeted characterization activities, while continuing remediation activities that advance cleanup for key risk-driving contaminants. A core component of cleanup within the Central Plateau is the 200 West Pump-and-Treat (P&T) system. Even with an active P&T remedy, uncertainty exists with respect to plume distributions, total mass in the aquifer, and currently known continuing sources. Additional uncertainty is associated with multiple contaminant source locations in the vadose zone, which have the potential to create new groundwater plumes in the absence of any source control measures, although not all contaminant fluxes to groundwater will result in contaminant concentrations above cleanup levels. Collectively, these uncertainties need to be addressed in the CSM to support effective and efficient site progress toward cleanup goal(s). Other nontechnical factors that may warrant an ASM approach at the Hanford Central Plateau are associated with the formation of operable units (OUs) used to manage cleanup. With the exception of the 200-ZP-1 OU, the three remaining groundwater OUs only have interim action records of decision. Nine vadose zone source area OUs are also in the early stages of the remedial investigation and feasibility study process, with pending characterization and technology identification activities. A set of proposed site objectives for the Central Plateau are provided in this document as an initial consideration/example and basis for discussion for ASM implementation. These example site objectives were selected with the goal of maintaining protectiveness at the Columbia River through confinement of contaminant plumes within an administratively controlled area below existing surface waste sites and waste disposal facilities. Although site decision makers and regulators need to provide concurrence, these site objectives are used in this document to describe the elements of an ASM approach, including selection of interim objectives and a long-term adaptive management plan. Interim objectives are also defined to yield measurable incremental progress toward the overall site goals. This document identifies initial technical considerations for developing an ASM framework for the Central Plateau cleanup decisions. These considerations are intended to facilitate more specific decisions, such as objectives, near- and long-term actions, and performance metrics, to develop an overall approach that maintains protectiveness but recognizes the uncertainty, long timeframe, and technical challenges that need to be considered in selecting, implementing, and managing remediation at the Hanford Central Plateau.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Embedded Sensors and Controls to Improve Component Performance and Reliability - System Dynamics Modeling and Control System Design

This report documents the current status of the modeling, control design, and embedded control research for the magnetic bearing canned rotor pump being used as a demonstration platform for deeply integrating instrumentation and controls (I&C) into nuclear power plant components. This pump is a highly inter-connected thermo/electro/mechanical system that requires an active control system to operate. Magnetic bearings are inherently unstable system and without active, moment by moment control, the rotor would contact fixed surfaces in the pump causing physical damage. This report details the modeling of the pump rotordynamics, fluid forces, electromagnetic properties of the protective cans, active magnetic bearings, power electronics, and interactions between different dynamical models. The system stability of the unforced and controlled rotor are investigated analytically. Additionally, controllers are designed using proportional derivative (PD) control, proportional integral derivative (PID) control, voltage control, and linear quadratic regulator (LQR) control. Finally, a design optimization problem that joins the electrical, mechanical, magnetic, and control system design into one problem to balance the opposing needs of various design criteria using the embedded system approach is presented.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

SU-F-303-10: Impact of Visual Biofeedback On Respiratory Reproducibility in 4DMRI

Purpose: Precise radiation therapy (RT) for abdominal lesions is complicated by respiratory motion and suboptimal soft tissue contrast in 4DCT. 4DMRI offers improved contrast. However, long scan times and irregular breathing patterns can be limiting. To address this, we introduced visual biofeedback (VBF) into 4DMRI. Methods: Eight healthy volunteers were consented to an IRB-approved protocol. Prospective respiratory-triggered, T2-weighted coronal 4DMRIs were acquired on an open 1.0T MR- SIM. VBF was integrated using an MR-compatible interactive breath-hold control system. Subjects visually monitored their breathing patterns to stay within pre-determined tolerances. 4DMRIs were acquired with and without VBF for 2–8 phase acquisitions. Normalized respiratory waveforms were evaluated for scan time, duty cycle (programmed/acquisition time), breathing period, end-inhale (EI) amplitude, and breathing variability (coefficient of variation, EI-COV). B-spline-based deformable image registration propagated contours from end-exhale (EE) to EI phases. Respiration-induced liver motion was calculated via centroid analysis and compared. Results: Incorporating VBF reduced 2-phase acquisition time (4.7±0.6 and 5.6±1.4 minutes with and without VBF, respectively) while reducing the amplitude EI-COV by 53.0±8.1%. On average, incorporating VBF reduced 8-phase 4DMRI acquisition times by 1.7±1.2 minutes and EI-COVs by 46.0±15.8%. Using VBF yielded higher duty cycles than free breathing (34.7% versus 28.3%, respectively). 4DMRI acquisition time was reduced for the cohort with VBF despite breathing rate remaining similar (10.5±4.0 with vs. 10.6±3.3 BPM without). Respiratory waveforms showed higher EI amplitude with VBF (0.84±0.05 a.u.) as compared to 0.72±0.06 a.u. without. This translated to differences in liver excursions, where superior-inferior, anterior-posterior, and left-right EE-EI displacements were 14.3±3.6, 4.8±2.1, and 1.6±1.0 mm, respectively, with VBF compared to 13.0±6.2, 3.8±2.4, and 1.2±1.4 mm without. Conclusion: Incorporating VBF system into 4DMRI substantially reduced acquisition time and breathing variability. While VBF reduced liver motion variability, differences in excursion were observed, suggesting that implementation will be required throughout the RT workflow. Research supported in part by a grant from Philips HealthCare (Best, Netherlands) and an equipment evaluation agreement with MedSpira.

60 APPLIED LIFE SCIENCES↗

Commissioning of the Varian TrueBeam linear accelerator: A multi-institutional study

Purpose: Latest generation linear accelerators (linacs), i.e., TrueBeam (Varian Medical Systems, Palo Alto, CA) and its stereotactic counterpart, TrueBeam STx, have several unique features, including high-dose-rate flattening-filter-free (FFF) photon modes, reengineered electron modes with new scattering foil geometries, updated imaging hardware/software, and a novel control system. An evaluation of five TrueBeam linacs at three different institutions has been performed and this work reports on the commissioning experience. Methods: Acceptance and commissioning data were analyzed for five TrueBeam linacs equipped with 120 leaf (5 mm width) MLCs at three different institutions. Dosimetric data and mechanical parameters were compared. These included measurements of photon beam profiles (6X, 6XFFF, 10X, 10XFFF, 15X), photon and electron percent depth dose (PDD) curves (6, 9, 12 MeV), relative photon output factors (Scp), electron cone factors, mechanical isocenter accuracy, MLC transmission, and dosimetric leaf gap (DLG). End-to-end testing and IMRT commissioning were also conducted. Results: Gantry/collimator isocentricity measurements were similar (0.27-0.28 mm), with overall couch/gantry/collimator values of 0.46-0.68 mm across the three institutions. Dosimetric data showed good agreement between machines. The average MLC DLGs for 6, 10, and 15 MV photons were 1.33 {+-} 0.23, 1.57 {+-} 0.24, and 1.61 {+-} 0.26 mm, respectively. 6XFFF and 10XFFF modes had average DLGs of 1.16 {+-} 0.22 and 1.44 {+-} 0.30 mm, respectively. MLC transmission showed minimal variation across the three institutions, with the standard deviation <0.2% for all linacs. Photon and electron PDDs were comparable for all energies. 6, 10, and 15 MV photon beam quality, %dd(10){sub x} varied less than 0.3% for all linacs. Output factors (Scp) and electron cone factors agreed within 0.27%, on average; largest variations were observed for small field sizes (1.2% coefficient of variation, 10 MV, 2 Multiplication-Sign 2 cm{sup 2}) and small cone sizes (<1% coefficient of variation, 6 Multiplication-Sign 6 cm{sup 2} cone), respectively. Conclusions: Overall, excellent agreement was observed in TrueBeam commissioning data. This set of multi-institutional data can provide comparison data to others embarking on TrueBeam commissioning, ultimately improving the safety and quality of beam commissioning.

43 PARTICLE ACCELERATORS↗

Historical analysis of SO{sub 2} pollution control policies in China

Coal is not only an important energy source in China but also a major source of air pollution. Because of this, China's national sulfur dioxide (SO{sub 2}) emissions have been the highest in the world for many years, and since the 1990s, the territory of China's south and southwest has become the third largest acid-rain-prone region in the world. In order to control SO{sub 2} emissions, the Chinese government has formulated and promulgated a series of policies and regulations, but it faces great difficulties in putting them into practice. In this retrospective look at the history of SO{sub 2} control in China, we found that Chinese SO{sub 2} control policies have become increasingly strict and rigid. We also found that the environmental policies and regulations are more effective when central officials consistently give environmental protection top priority. Achieving China's environmental goals, however, has been made difficult by China's economic growth. Part of this is due to the practice of environmental protection appearing in the form of an ideological 'campaign' or 'storm' that lacks effective economic measures. More recently, better enforcement of environmental laws and regulations has been achieved by adding environmental quality to the performance assessment metrics for leaders at all levels. To continue making advances, China needs to reinforce the economic and environmental assessments for pollution control projects and work harder to integrate economic measures into environmental protection. Nonetheless, China has a long way to go before economic growth and environmental protection are balanced.

01 COAL, LIGNITE, AND PEAT↗

Control System Applicable Use Assessment of the Secure Computing Corporation - Secure Firewall (Sidewinder)

Battelle’s National Security & Defense objective is, “applying unmatched expertise and unique facilities to deliver homeland security solutions. From detection and protection against weapons of mass destruction to emergency preparedness/response and protection of critical infrastructure, we are working with industry and government to integrate policy, operational, technological, and logistical parameters that will secure a safe future”. In an ongoing effort to meet this mission, engagements with industry that are intended to improve operational and technical attributes of commercial solutions that are related to national security initiatives are necessary. This necessity will ensure that capabilities for protecting critical infrastructure assets are considered by commercial entities in their development, design, and deployment lifecycles thus addressing the alignment of identified deficiencies and improvements needed to support national cyber security initiatives. The Secure Firewall (Sidewinder) appliance by Secure Computing was assessed for applicable use in critical infrastructure control system environments, such as electric power, nuclear and other facilities containing critical systems that require augmented protection from cyber threat. The testing was performed in the Pacific Northwest National Laboratory’s (PNNL) Electric Infrastructure Operations Center (EIOC). The Secure Firewall was tested in a network configuration that emulates a typical control center network and then evaluated. A number of observations and recommendations are included in this report relating to features currently included in the Secure Firewall that support critical infrastructure security needs.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Unified Model of Current-Limiting Grid-Forming Inverters for Large-Signal Analysis

Grid-forming (GFM) inverters can hardly withstand any overloading. As such, GFM inverters need a current limiter in their control system to avoid hardware damage during overloading or grid disturbances. When the current limiter is engaged for inverter protection, however, it dynamically changes the inverter output impedance, which can significantly affect the system behavior against large disturbances. For example, when the current limiter curtails the output power, the primary controller of the GFM inverter-which generates the voltage and angle reference-is prone to losing synchronization with the grid. This can cause large-signal instability in the network. This paper presents a unified GFM current-limiter model to gain a deeper understanding of the impact of the GFM inverter current limiting on large-signal instability and other system behaviors. The unified model captures several well-known current limiters for GFM inverters, and it reveals their large-signal equivalence characterized by the limiter angle. We use the unified model to present in-depth insights into the driving forces that cause large-signal instability in GFM inverter-driven grids. Further, this paper illustrates that the unified model can be used as a tool for assessing the system-level impacts of various GFM current-limiter designs during grid disturbances. Using numerical, analytical, electromagnetic transient models, and a hardware setup, the validity of the unified model is evaluated.

24 POWER TRANSMISSION AND DISTRIBUTION↗