Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operational Reliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,117 records · Page 62

Cost-effective Conductor, Cable, and Coils for High Field Rotating Electric Machines

The purpose of the DOE-AMMTO-funded project was to significantly reduce industrial energy intensity through manufacturing innovations. The project focused on superconducting technology for industrial motors to dramatically increase efficiency. The bottleneck in deploying high temperature superconducting (HTS) motors was high cost and low yield of the conductor manufacturing process. The process yield is low because of the defects in the conductor, forcing the manufacturers to cut off defective sections after characterizing each millimeter. Additionally, the piece lengths tend to be low because of the defects. The project tackled the low-yield manufacturing process challenge by devising an innovative method to use defective conductors in bundled cables without losing performance by engineering current sharing among the conductors. The innovation not only lowers the cost of the conductor but also enhances the reliability of HTS motors and other devices to mitigate the defects that might form during the fabrication and operation of the device. With the increasing interest in REBa2Cu3O7-x (REBCO)-coated conductors for various power, energy, and magnet applications, ensuring the reliability of HTS devices is of significant interest. The EERE funding allowed us to make significant progress in understanding the defects in manufactured conductors and the implications of the defects in superconducting electric motors and other superconducting power and energy applications.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cost-Effective Thermally Activated Building Systems to Support a Power Grid System With High Penetrations Of As-Available Renewable Energy Resources

With a goal to reduce the energy cost for building operation as well as to support renewable energy sources (RES) for the power grid reliability, quality, resilience, and dispatchability, this project developed and demonstrated a novel thermally activated building envelope system that integrates Phase Change Material (PCM)-based Thermal Energy Storage (TES) and the hydronic activation into the building envelope. The main objectives of this study are: 1) to design and laboraorty-test a novel thermally activated building envelope system that integrate PCM-based TES and the hydronic activation into building envelope, and 2) to exploit this new system to significantly reduce the energy cost of operating buildings and manage and support renewable energy sources (RES), e.g., solar and wind for the power grid reliability, quality, resilience, and dispatchability. To achieve the project objectives, a new low-cost, fire-retardant PCM packaging technology (CenoPCM) was developed specifically for high-volume building applications.

25 ENERGY STORAGE↗

Achieving an 80% Renewable Portfolio in Alaska's Railbelt: Cost Analysis

This study examines the system-level costs and benefits of increased renewable energy deployment in the Railbelt grid, in the context of a proposed 80% renewable portfolio standard (RPS). This work studies the period from 2024 to 2040 and uses a model that simulates the planning, evolution, and operation of the power system to identify the mix of resources that maintains system reliability at the lowest electricity system cost over the period of analysis. The model tracks several reliability metrics, including the ability to serve demand during all hours of the year, even when normal power system failures occur. The model includes several measures (and associated costs) to address the variable output of renewable resources, including additional operating reserves, fuel storage, cycling of fossil plants, and additional equipment needed to maintain system stability. The Reference (least-cost) scenario results in substantial deployment of renewable energy and cost savings, reaching about 76% of Railbelt generation derived from renewables in 2040. Annual savings average about $105 M/year from 2030 to 2040. About 50% of this generation is from wind by 2040. Enforcing an 80% RPS results in about a 2% cumulative reduction in net savings. Demand is met in all scenarios, relying heavily on use of existing hydropower and fossil-fueled generators during periods of low renewable output. Meeting the increase in variability will require substantial changes in how the system is operated, with inverter-based resources providing nearly 100% of electricity during some periods.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Common Grid Services: Terms and Definitions Report

This document is prepared as part of the Department of Energy’s Grid Modernization Laboratory Consortium (GMLC) 2.5.2 project, whose goal is to develop and socialize a common set of grid service definitions relevant to grid-related interactions with distributed energy resources (DER: responsive generation, storage, and loads) and to advance the concept and requirements of the Energy Services Interface (ESI) to the point of launching related interface standards and guides that can be implemented in communication protocols and business process definitions. The notion of grid services is associated with the definition of an ESI because a key principle of the ESI is that it permits coordination between grid operators and DER facilities in a way that is service-oriented with an understanding of performance expectations. The project investigated the current state of North American grid service definitions from various market operators and utilities, as well as the Federal Energy Regulatory Commission and the North American Electric Reliability Corporation, actively used today (Liu et al. 2022). This document builds on that work to propose terms and definitions for a set of grid service types that address operational objectives commonly found in power system operations. These grid service types derive from existing grid services used in bulk electric market operations, recognizing that each operational authority uses somewhat different names with variations on service performance parameters. Finding commonality at the wholesale or bulk system operation level will hopefully engender progress in seeking agreement on grid services for DER engagement at the distribution level in the emerging retail marketplace.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Enhancing surface activity and durability in triple conducting electrode for protonic ceramic electrochemical cells

With the material system operating at lower temperatures, protonic ceramic electrochemical cells (PCECs) can offer high energy efficiency and reliable performance for both power generation and hydrogen production, making them a promising technology for reversible energy cycling. However, PCEC faces technical challenges, particularly regarding electrode activity and durability under high current density operations. To address these challenges, we introduce a nano-architecture oxygen electrode characterized by high porosity and triple conductivity, designed to enhance catalytic activity and interfacial stability through a self-assembly approach, while maintaining scalability. Electrochemical cells incorporating this advanced electrode demonstrate robust performance, achieving a peak power density of 1.50 W cm −2 at 600 °C in fuel cell mode and a current density of 5.04 A cm −2 at 1.60 V in electrolysis mode, with enhanced stability on transient operations and thermal cycles. The underlying mechanisms are closely related to the improved surface activity and mass transfer due to the dual features of the electrode structure. Additionally, the enhanced interfacial bonding between the oxygen electrode and electrolyte contributes to increased durability and thermomechanical integrity. This study underscores the critical importance of optimizing electrode microstructure to achieve a balance between surface activity and durability.

Protonic Ceramic Electrochemical Cells↗

Status and future plans for C 3 R&D

C 3 is an opportunity to realize an e + e - collider for the study of the Higgs boson at √s = 250 GeV, with a well defined upgrade path to 550 GeV while staying on the same short facility footprint. C 3 is based on a fundamentally new approach to normal conducting linear accelerators that achieves both high gradient and high efficiency at relatively low cost. Given the advanced state of linear collider designs, the key system that requires technical maturation for C 3 is the main linac. This paper presents the staged approach towards a facility to demonstrate C 3 technology with both Direct (source and main linac) and Parallel (beam delivery, damping ring, ancillary component) R&D. The primary goal of the C 3 Demonstration R&D Plan is to reduce technical and cost risk by building and operating the key components of C 3 at an adequate scale. This R&D plan starts with the engineering design, and demonstration of one cryomodule and will culminate in the construction of a 3 cryomodule linac with pre-production prototypes. This R&D program would also demonstrate the linac rf fundamentals including achievable gradient and gradient stability over a full electron bunch train and breakdown rates. It will also investigate beam dynamics including energy spread, wakefields, and emittance growth. This work will be critical to confirm the suitability of the C 3 beam parameters for the physics reach and detector performance in preparation for a Conceptual Design Report (CDR), as well as for follow-on technology development and industrialization. The C 3 Demonstration R&D Plan will open up significant new scientific and technical opportunities based on development of high-gradient and high-efficiency accelerator technology. It will push this technology to operate both at the GeV scale and mature the technology to be reliable and provide high-brightness electron beams. The timeline for progressing with C 3 technology development will be governed by practical limitations on both the technical progress and resource availability. It consists of four stages: Stage 0) Ongoing fundamental R&D on structure prototypes, damping and vibrations. Stage 1) Advancing the engineering maturity of the design and developing start-to-end simulations including space-charge and wakefield effects. This stage will include testing of strucutres operating at cryogenic temperatures. Beam tests would be performed with high beam current to test full beam loading. Stage 2) Production and testing of the first cryomodule at cryogenic temperatures. This would provide sufficient experimental data to compile a CDR and it is anticipated for Stage 2 to last 3 years and to culminate with the transport of photo-electrons through the first cryomodule. Stage 3) Updates to the engineering design of the cryomodules, production of the second and third cryomodule and their installation. Lower charge and lower emittance beams will be used to investigate emittance growth. The successful full demonstration of the 3 cryomodules to deliver up to a 3 GeV beam and achieve the C 3 five gradient will allow a comprehensive and robust evaluation of the technical design of C 3 as well as mitigate technical, schedule, and cost risks required to proceed with a Technical Design Report (TDR).

radiation hardened magnets↗

On the role of Battery Energy Storage Systems in the day-ahead Contingency-Constrained Unit Commitment problem under renewable penetration

The integration of variable Renewable Energy Sources (vRES) to alleviate greenhouse gas emissions has introduced significant challenges for power systems operations. These challenges include high levels of uncertainty due to the intermittence associated with vRES and therefore impose the need to devise a reliable and cost-effective day-ahead unit commitment and power and reserves scheduling for real-time operations. Also, this increasing penetration of vRES requires higher ramping capabilities from units originally designed for other purposes (e.g., base-load generation), which might be exacerbated during contingency states. Hence, in this work, we propose a methodology to address the day-ahead Contingency-Constrained Unit Commitment (CCUC) problem that leverages the participation of Battery Energy Storage Systems (BESSs) to address load-following and post-contingency management, therefore alleviating the ramping burden on conventional thermal generators. To do so, we formulate a three-level optimization problem that represents the decision-making process of obtaining the least-cost commitment, generation and reserves scheduling, while restricting the Conditional Value-at-Risk (CVaR) of the system imbalance at real-time operations to user-defined tolerance levels. In addition, we devise a computationally efficient solution approach for the proposed problem based on the Column-and Constraint Generation (CCG) algorithmic framework. Two numerical experiments are conducted to empirically illustrate the benefits of the proposed methodology. Key results indicate a reduction in real-time ramping needs and a better usage of the system resources, with a reduction in the overall system commitment levels and reserve scheduling costs when compared to a benchmark case in which storage is not available.

Moreira, Alexandre↗

Report on the Use and Function of the Integrated Operations Capability Analysis Platform (ICAP) and the LWRS Innovation Portal (IP)

The commercial nuclear power industry has achieved excellent safety and reliability performance but is struggling to survive in an electricity market that is increasingly dominated by subsidized renewables and cheap natural gas. These challenges have forced utilities to explore previously uncharted avenues to drastically reduce the operations and maintenance costs of their plants which are the primary drivers of the total cost to produce electricity. The petrochemical industry faced similar challenges some years ago as the costs of extraction and processing were rising while their reservoirs were being depleted along with a drop-in commodity prices that resulted in unsustainable operations. In this challenging climate, they developed a business model called Integrated Operations (IO) that sought to utilize technology to enable news ways of working through the integration of people, technology, process and governance changes. The Light Water Reactor Sustainability (LWRS) program, working with IFE have developed an operating model via transferable learnings from the North Sea O&G industry. This framework is termed “Integrated Operations for Nuclear” (ION). ION is a transformation model that integrates the benefits and features of four principal factors: People, Technology, Process and Governance. The purpose of this report is to describe how to generate an ION business process analysis and utilize this information to reduce O&M costs. In order to make this job easier, DOE LWRS has created a suite of tools that will allow a person who is involved in a transformation effort at their company to build a solid documented business case for embarking on a major transformation effort. These tools, the Integrated Operations Capability Analysis Model (ICAP) and the LWRS Innovation Portal (IP) are described herein with instructions on their use. Instructions on how the interface with the EPRI Business Case Analysis Method (BCAM) are also provided.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

AI Improves the Accuracy, Reliability, and Economic Value of Continental‐Scale Flood Predictions

Accurate flood early warnings are critical to minimize damage and loss of life. Current large‐scale operational forecasting systems, however, have limited accuracy, description of uncertainty, and computational efficiency. While Artificial intelligence (AI) can address these limitations in principle, the accuracy and reliability of AI forecasts have thus far proven insufficient. Here we present a novel hybrid framework that integrates AI‐based machinery termed Errorcastnet (ECN) with the National Water Model (NWM) to showcase the potential of ensemble AI flood forecasts over the contiguous U.S. ECN boosts prediction accuracy four‐ to six‐fold across lead times of 1–10 days, while providing uncertainty quantification. It also outperforms Google's state‐of‐the‐art global AI model. ECN‐based forecasts offer superior economic value (up to four‐fold) for decision‐making as compared to those from NWM alone. ECN performs well in varied ecoregions, physiography, and land management conditions. The framework is computationally efficient, enabling national‐scale ensemble forecasts in minutes.

artificial intelligence↗

Impact of Thermal Stress on Attachment and Stability of High Temperature Strain Sensors

Static and dynamic strain sensing is required in high-temperature (HT), harsh-environments (HE) for industrial, aerospace, and energy sector applications to ensure equipment and process safety, reduce the cost of operation and maintenance, and increase process efficiency. Challenges that arise in HT HE sensing applications include device mounting, packaging, integrity, and stability to HT HE conditions. In previously reported work, static and dynamic strain surface acoustic wave resonator (SAWR) sensors were fabricated on langasite (LGS) and mounted on Inconel 625 strain beams for wireless testing up to 400°C. In this work, it has been identified that after subjecting the mounted SAWR strain sensor to thermal cycling between 100°C and 425°C, the measured sensitivity to dynamic strain decreased by 73% due to cracking at the adhesive/LGS interface, further deteriorating after additional thermal cycles. Strain modeling of the mounted LGS sensor chip up to 400°C revealed the existence of concentrated strain at the borders of the LGS chip. Microcracks caused by dicing make the chip boarders the most susceptible location for cracks to initiate when the sensor is subjected to thermal stress. In an attempt to mitigate the high strain at the LGS chip borders due to heating, adhesive shaping is proposed in this work. Simulations indicate a strain reduction of 50% at the border is achieved using both circular and triangular adhesive shapes, while also reducing the maximum strain over the entire adhesive/LGS interface by around 30%. Furthermore, the technique is thus promising for improving the integrity, reliability, and stability of static and dynamic strain sensors, particularly while operating under HT HE with several hundreddegree Celsius temperature excursions.

47 OTHER INSTRUMENTATION↗

Bi-Level Linear Programming Model for Automatic Load Shedding: A Distributed Wide-Area Measurement System-based Solution

Load shedding is currently implemented as a two-step based approach. In the first step, manual load shedding is taken place, were system operators, using estimates, inform distribution utilities of predicted stressful conditions. Information provided include the potential use of energy reserves, as well as load shedding amount. In a second step, automatic load shedding is done. The latter is realized using protection relays. While considering frequency variation, pre-defined values of load to be shed and correspondent number of stages for such to be realized are transformed into relay settings. Under-frequency protection relays use only local measurements towards decision making, thus operate in a decentralized architecture. Decision making is done in milliseconds plus breaker time. While this approach has provided much system reliability, considering the new smart grid paradigm, where system dynamics are much faster due to increasing renewable resources penetration, in some operating conditions it will generate sub-optimal solutions, such as islanding. Phasor measurement units provide a source of information which can be useful for this problem. Centralized architecture-based solutions for automatic load shedding, as present in the state-of-the-art, require though total processing times which are not acceptable for real-life implementation. In this work, considering the above, a bi-level linear programming model is presented. The model is implemented considering a distributed architecture while leveraging phasor measurement units data. The upper-level model estimates the current system state. Results of this model are embedded in a lower-level model, which decision variables are the location and load value to be shed. Easy-to-implement model, built-on the classic weighted least squares solution, highlight potential aspects towards real-life applications.

Bretas, Arturo Suman↗

Autonomous Energy Systems: Building Reliable, Resilient, and Secure Electrified Communities

Technological changes across energy systems are forcing utilities and operators to reconsider their methods for managing power delivery, but few operators have adopted advanced controls and operational software. Their challenge is that every system has peculiar requirements, and the available solutions are relatively new, untested, and difficult to integrate into an operational environment. Through extensive collaboration with utilities and cooperatives, the National Renewable Energy Laboratory has realized the need for autonomous and optimized management of energy resources, leading to the development of Autonomous Energy Systems, a packaged set of controls that is ready to be integrated into existing control rooms.

automation↗

NDX: Neutron Dose Rate Meters with Extended Capabilities

Particle accelerators, irradiation facilities, and nuclear power plants would benefit from using neutron dose rate meters featuring improved energy response covering full range of expected neutron energies, improved dynamic range of measured dose rates while providing the real-time data, and improved ability to operate in harsh radiation environments including heavy photon backgrounds and pulsed beams. The novel design of the neutron moderator for the NDX dose rate meter implements a layer of a Beryllium-loaded medium Z material which, similar to the earlier known WENDI detectors, allows the device to detect higher energy neutron flux and convert it to dose. Using Beryllium helps to fill the known dip in the response functions around 5-50 MeV. Optimized design parameter set, obtained using FLUKA Monte Carlo simulations, features the NDX moderator made of polyethylene embedding a layer of BeCu alloy inside, with the dose rate response constant within ±10% in the neutron energy range from about 100 keV to 500 MeV, and ±25% essentially in the full energy range above thermal. A new sensor technique implemented in the NDX is based on using the Ionization Chamber (IC) filled with 3He gas to capture the moderated neutron fluence, and includes a symmetric IC filled with regular 4He to evaluate the contributions due to the non-neutron ionizing radiation. Advantages of the method include large accessible dynamic range, relative insensitivity of the IC probes to photon radiation fields, and the ability to subtract their contribution. Two prototype NDX detectors were built, calibrated, and operated in various conditions at the CEBAF 12 GeV electron accelerator at JLab. The first results showed reliable neutron dose rate measurements in the presence of overwhelming photon radiation fields, and at practical high dose rate levels of up to approximately 10 Sv/h. Detector design, operation, first results, and further development plans are presented.

Degtiarenko, Pavel V.↗

Data-Driven State of Health Estimation for Second-Life Batteries Using Interpolated Synthetic Data and Feature Selection

Accurate estimation of the State of Health (SOH) for second-life batteries (SLBs) is crucial given their increasing use in energy storage applications. Precise SOH prediction is essential for safe operation and robust battery management systems. A major challenge is the limited availability of datasets for building reliable degradation models. To address this, synthetic data generation through linear interpolation is performed to extend the available data, making it more representative of real-world battery operating conditions. By analyzing feature correlation with SOH, the most relevant features are selected for the model. The proposed approach employs a convolutional neural network (CNN) model trained on this interpolated, feature-selected dataset, using time series data of voltage, temperature, and current over a cycle. By focusing on highly correlated features, the model achieves over 95% accuracy, with mean absolute error and root mean squared error up to 2.27% and 2.64%, respectively, in SOH estimation for two battery datasets tested. These results highlight the potential of combining synthetic data generation and feature selection to enhance SOH predictions, showcasing the superior performance of the proposed CNN model for both new batteries and SLBs.

feature selection↗

Electrical Substation Configuration Effect on Substation Reliability

It is crucial that the U.S. electrical grid be reliable, due to its critical role in the economy and our national defense/security. Many common tasks and industrial operations rely on proper electrical power distribution. In designing new bus systems or evaluating existing ones, the type of configuration employed affects the level of risk, reliability, maintenance, and cost involved. The present work utilizes Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) to perform a probabilistic risk assessment (PRA)-based sensitivity study on substation reliability in regard to different bus configurations. This study examines single bus, main and transfer, breaker and a half, double bus/double breaker, and ring bus configurations applied to busses with different numbers of lines. The case variances, methods, and rankings presented herein can help guide bus configurations for electrical grid design/analysis in the future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Climate-Induced Tradeoffs in Planning and Operating Costs of a Regional Electricity System

Electricity grid planners design the system in order to supply electricity to end users reliably and affordably. Climate change threatens both objectives through potentially compounding supply- and demand-side climate-induced impacts. Uncertainty surrounds each of these future potential impacts. Given long planning horizons, system planners must weigh investment costs against operational costs under this uncertainty. Here, we developed a comprehensive and coherent integrated modeling framework combining physically-based models with cost-minimizing optimization models in the power system. We applied this modeling framework to analyze potential tradeoffs in planning and operating costs in the power grid due to climate change in the Southeast U.S. in 2050. We find that planning decisions that do not account for climate-induced impacts would result in a substantial increase in social costs associated with loss of load. These social costs are a result of under-investment in new capacity and capacity deratings of thermal generators when we included climate change impacts in the operation stage. Finally, these results highlight the importance of including climate change effects in the planning process.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Geometric Optimization of an Electrochemical Purification Cell to Prevent Corrosion in CSP Plants During Operation

When exposed to moisture or oxygen, molten chloride salts produce corrosive impurities which degrade containment alloys. This can significantly decrease the lifetime and increase costs of molten-salt-based systems. To overcome this barrier, we designed and modeled an electrochemical purification cell to remove the corrosive impurity MgOH+. Various reactor architectures, including continuous stirred tank reactors (CSTRs) and plug flow reactors (PFRs) were investigated. Steady-state thermoelectric properties were evaluated using analytical methods, allowing assessment of the effects of structure and design parameters such as flow rate, cell length, and cross-sectional area of molten salt. The results suggest that our design could most effectively increase reliability and decrease costs of molten-chloride-salt-based systems by protecting them during continuous operation using an annular plug flow reactor.

analytical modeling↗

PIP-II cryoplant non thermal cycling updates

The Proton Improvement Plan-II (PIP-II) is a crucial upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LINAC) with 23 cryomodules operating at 2 K. The LINAC thermohydraulic conditions are satisfied by the cryogenic subsystems: Cryogenic Distribution System (CDS), a helium refrigerator cold box (CB), a warm compression station (WCS) and a helium recovery system (RSYS). The accelerator has a strict requirement of non-thermal cycling of the LINAC cryomodules during planned and unplanned subsystem outages. This paper presents an integrated reliability analysis of the PIPII cryoplant. The study evaluates both normal and abnormal operating modes, with a focus on identifying integrated scenarios that put subsystems components under stress. The conclusions of this study will help build redundancy to mitigate LINAC thermal cycling risks during planned and unplanned subsystem outages.

43 PARTICLE ACCELERATORS↗