Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “EXCAVATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,117 records · Page 62

Environmental Restoration of Diesel-Range Organics from Project Chariot, Cape Thompson, Alaska

The Chariot site is located in the Ogotoruk Valley in the Cape Thompson region of northwest Alaska. Project Chariot was part of the Plowshare Program, created in 1957 by the US Atomic Energy Commission (AEC), a predecessor agency of the US Department of Energy (DOE), to study peaceful uses for atomic energy. Project Chariot began in 1958 when a scientific field team chose Cape Thompson as a potential site to excavate a harbor using a series of nuclear explosions. AEC, with assistance from other agencies, conducted more than 40 pretest bioenvironmental studies of the Cape Thompson area between 1959 and 1962; however, the Plowshare Program work at the Project Chariot site (Figure 1) was cancelled because of strong public opposition [1]. No nuclear explosions were ever conducted at the site.

54 ENVIRONMENTAL SCIENCES↗

Progress Toward Cleanup of Operable Unit 1 Groundwater at the US DOE Mound, Ohio, Site: Success of a Phase-Combined Remedy – 15310

Operable Unit 1 (OU-1) soil and groundwater have been affected by volatile organic compounds (VOC) Present groundwater remedy is collection, treatment, and disposal (pump and treat [P&T]) Several combinations of technologies were used to address soil and groundwater contamination Monitored natural attenuation (MNA) is a viable alternative Majority of source term has been excavated VOC concentrations in groundwater have decreased Attenuation mechanisms have been observed in the subsurface at OU-1

54 ENVIRONMENTAL SCIENCES↗

Is There Mahogany Obsidian in Northeastern Sonora, Mexico?

A piece of mahogany obsidian came to the attention of the senior author during an excavation project near the town of Mata Ortiz, Chihuahua, Mexico in 2015. Because mahogany obsidian in northwestern Mexico is particularly rare, the question was raised, what obsidian source did this sample derive? Here, using energy-dispersive X-ray fluorescence (EDXRF) spectrometry, we demonstrate it comes from the Agua Fria obsidian source in northeastern Sonora, Mexico. Unfortunately, we do not know where this sample was collected from. We discuss these results and the significance of this find in this paper, but more investigation is certainly warranted.

58 GEOSCIENCES↗

Building America Case Study: Simplified Air Distribution, Desuperheaters, and Sub-Slab Geothermal Heat Exchangers, Pittsburgh, Pennsylvania

This report presents a cold-climate project that examines an alternative approach to ground source heat pump (GSHP) ground loop design. The innovative ground loop design is an attempt to reduce the installed cost of the ground loop heat exchange portion of the system by containing the entire ground loop within the excavated location beneath the basement slab.

Building America↗

Building America Case Study: Simplified Air Distribution, Desuperheaters, and Sub-Slab Geothermal Heat Exchangers, Pittsburgh, Pennsylvania

This report presents a cold-climate project that examines an alternative approach to ground source heat pump (GSHP) ground loop design. The innovative ground loop design is an attempt to reduce the installed cost of the ground loop heat exchange portion of the system by containing the entire ground loop within the excavated location beneath the basement slab.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Virtual Walk: The Construction of the Long Baseline Neutrino Facility

This 2-minute animation shows a virtual walk through the large caverns of the Long-Baseline Neutrino Facility, which will house the Deep Underground Neutrino Experiment. To create the caverns for the huge DUNE particle detectors, construction crews will excavate more than 800,000 tons of rock a mile underground at the Sanford Underground Research Facility in South Dakota. Scientists and dignitaries broke ground for this project on July 21, 2017. When construction is complete, DUNE scientists will send an intense neutrino beam through 1,300 kilometers of rock from the Department of Energy’s Fermilab to the DUNE particle detectors to understand the role that neutrinos – the most abundant matter particles in the universe – play in our cosmos. About 1,000 scientists from more than 160 institutions in 30 countries work on the Deep Underground Neutrino Experiment.

42 ENGINEERING↗

Numerical Simulation Applications in the Design of EGS Collab Experiment 1

The United States Department of Energy, Geothermal Technologies Office (GTO) is funding a collaborative investigation of enhanced geothermal systems (EGS) processes at the meso-scale. This study, referred to as the EGS Collab project, is a unique opportunity for scientists and engineers to investigate the creation of fracture networks and circulation of fluids across those networks under in-situ stress conditions. The EGS Collab project is envisioned to comprise three experiments and the site for the first experiment is on the 4850 Level (4,850 feet below ground surface) in phyllite of the Precambrian Poorman formation, at the Sanford Underground Research Facility, located at the former Homestake Gold Mine, in Lead, South Dakota. Principal objectives of the project are to develop a number of intermediate-scale field sites and to conduct well-controlled in situ experiments focused on rock fracture behavior and permeability enhancement. Data generated during these experiments will be compared against predictions of a suite of computer codes specifically designed to solve problems involving coupled thermal, hydrological, geomechanical, and geochemical processes. Comparisons between experimental and numerical simulation results will provide code developers with direction for improvements and verification of process models, build confidence in the suite of available numerical tools, and ultimately identify critical future development needs for the geothermal modeling community. Moreover, conducting thorough comparisons of models, modelling approaches, measurement approaches and measured data, via the EGS Collab project, will serve to identify techniques that are most likely to succeed at the Frontier Observatory for Research in Geothermal Energy (FORGE), the GTO's flagship EGS research effort. As noted, outcomes from the EGS Collab project experiments will serve as benchmarks for computer code verification, but numerical simulation additionally plays an essential role in designing these meso-scale experiments. This paper describes specific numerical simulations supporting the design of Experiment 1, a field test involving hydraulic stimulation of two fractures from notched sections of the injection borehole and fluid circulation between sub-horizontal injection and production boreholes in each fracture individually and collectively, including the circulation of chilled water. Whereas the mine drift allows for accurate and close placement of monitoring instrumentation to the developed fractures, active ventilation in the drift cooled the rock mass within the experimental volume. Numerical simulations were executed to predict seismic events and magnitudes during stimulation, initial fracture orientations for smooth horizontal wellbores, pressure requirements for fracture initiation from notched wellbores, fracture propagation during stimulation between the injection and production boreholes, tracer travel times between the injection and production boreholes, produced fluid temperatures with chilled water injections, pressure limits on fluid circulation to avoid fracture growth, temperature environment surrounding the 4850 Level drift, and fracture propagation within a stress field altered by drift excavation, ventilation cooling, and dewatering.

15 GEOTHERMAL ENERGY↗

Electrochemical production of metal hydroxide using metal silicates

Systems are described for dissolving metal silicates to: produce metal hydroxide; remove carbon dioxide or other acid gases from the atmosphere or other gas mixture by reacting such gases with the metal hydroxide; penetrate or excavate metal silicates; extract metals or silicon-containing compounds from metal silicates; and produce hydrogen and oxygen or other gases.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

A hybrid hydraulic-electric architecture (HHEA) for High Power Off-Road Mobile Machines

Traditionally, off-road mobile machines such as excavators and wheel loaders are primarily powered by hydraulics and throttling valves are used to control their work circuits. In recent years, two general trends are towards more energy-efficient systems and electrification. With electrification, both efficiency and control performance can be improved by the elimination of throttling losses and the use of high-bandwidth inverter control. Electrification is generally accomplished with Electro-hydraulic actuators (EHA) but they are limited to lower-powered systems due to the high cost of electric machines capable of high power or high torque. This paper presents preliminary results of a new system architecture for off-road vehicles to improve efficiency and control performance. The architecture combines hydraulic power and electric power in such a way that the majority of power is provided hydraulically while electric drives are used to modulate this power. The hybrid hydraulic-electric architecture (HHEA) and its rationale are described. In addition, a case study is presented to illustrate its operation, its potential for energy saving, and its benefits of component downsizing. The case study indicates that compared to a baseline load sensing system, the HHEA has the potential to reduce energy consumption by more than 50%. Furthermore, the torque capability of the electrical components need only be ~ 28% of what is required for the direct application of EHA.

24 POWER TRANSMISSION AND DISTRIBUTION↗

LBNF CMGC Delivery Method: ICE Process

The Construction Manager/General Contractor (CM/GC) delivery method is intended to benefit the design process, value engineering, risk mitigation, and schedule optimization while promoting construction and design innovation. This delivery method is particularly suited for complex projects that require significant consideration of contractor means and methods. Fermilab’s Far Site Conventional Facilities proceeded with a CM/GC delivery method to account for the unique conditions of excavating over 300,000 cubic yards of rock in tunnels and caverns that will be constructed approximately 5000-ft deep in the repurposed Homestake Mine in Lead, SD. The experiences of the Independent Cost Estimating (ICE) process are presented.

Pelletier, Douglas↗

EPA and Idaho National Laboratory create first of its scale

Advancing the science and engineering of decontaminating water distribution systems and safely disposing of high-volumes of contaminated water are high priorities for the EPA. To help address these science gaps, EPA homeland security researchers have developed the first-of-its-scale Water Security Test Bed (WSTB). Water is an important component of everyday life. We rely on safe, clean water for our health and the health of the environment. Protecting this vital resource is critical to living safely and securely. The U.S. Environmental Protection Agency is responsible for working with water utilities to protect water systems from contamination and to clean up systems that become contaminated. Purposeful or inadvertent distribution system contamination can result in large amounts of infrastructure and water that must be cleaned. Water distribution systems contamination can be caused by, for example, natural disasters such as Superstorm Sandy or by individuals hoping to cause harm. The WSTB, constructed at the Department of Energy’s (DOE) Idaho National Laboratory, replicates a section of a typical municipal drinking water system including a piping system with roughly 445 feet of pipe and two fire hydrants laid out in an “L” shape using 40-year-old, eight-inch cement mortar lined, ductile iron pipes, excavated after twenty years of use for water conveyance. Researchers built the WSTB above ground for easy access during experiments, and to facilitate fast leak detection. Over the next several years, EPA and partner researchers will conduct experiments using simulants of various biological, chemical, and radioactive materials that simulate high toxic versions of these agents. At this “full” sized system, researchers will demonstrate approaches to contamination detection, sensor and model testing, infrastructure decontamination, water treatment and cyber testing developed at lab and pilot scale. Researchers are also able to verify if laboratory results that were effective in controlled conditions are as effective in full-scale testing. Having the ability to conduct bench scale studies in a real world setting can help address specific research gaps, and help water researchers understand conditions in which real world drinking water systems operate.

54 ENVIRONMENTAL SCIENCES↗

OPTIMAL CONTROL AND ENERGY-SAVING ANALYSIS OF COMMON PRESSURE RAIL ARCHITECTURES: HHEA & STEAM

In recent years several novel hydraulic architectures have been proposed with the intention of significantly increasing system efficiency. Two of these architectures, Steigerung der Energieeffizienz in der Arbeitshydraulik mobiler Arbeitsmaschinen (STEAM), and the Hybrid Hydraulic-Electric Architecture (HHEA), use a system of multiple common pressure rails (CPRs) to serve the multiple degrees-of-freedom of the machine. The key difference is that STEAM throttles hydraulic power from these rails while HHEA combines electric and hydraulic power to meet actuator demands. As a throttle-less architecture, HHEA is expected to save more energy than STEAM at the expense of added complexity. Therefore, it is useful to quantify this additional energy saving. Both systems have discrete operational choices corresponding to how the CPRs are utilized for each actuator. It is necessary to determine optimal operation for each of these architectures for analysis and fair comparison. Techniques for optimal operation of the HHEA have been developed previously from the Langrange multiplier method. Applying the same optimal control method to STEAM encountered some technical challenge leading to the optimal control algorithm not being able to satisfy certain constraints. The issue is analyzed and solved by adding noise to the optimization. Using this proposed algorithm, case studies are performed to compare the energy-saving potentials of STEAM and HHEA for two sizes of excavators and a wheel-loader performing representative duty cycles. The baseline is a standard load-sensing architecture. Results show that STEAM and HHEA can reduce energy consumption between 35-65% and 50-80% respectively

24 POWER TRANSMISSION AND DISTRIBUTION↗

CRITICAL MINERAL RESOURCE ASSESSMENT OF COALS FROM THE POWDER RIVER BASIN, WYOMING, USA

Coal and associated sediments are potential sources of Rare Earth Elements (REE) and other critical minerals necessary for many consumer and defense-related products and development of energy technologies. For this study, 15 samples were sourced from Dry Fork Mine within the Powder River Basin near Gillette, Wyoming, to determine REE content along with select transition metals (t-metals) of interest in non-combusted coals and associated sediments. An excavator collected samples along a mine highwall, within benched intervals representing a foot to a few feet of coal strata. Homogenized sample subsets were crushed in an aluminum-ceramic vial, then passed through a 106-micron sieve. Sieved samples were pyrolyzed by a LECO TGA-108, which concurrently measured sample moisture, volatile, and ash content. Residual ash was then fused into a glass bead with lithium metaborate at a 6:1 Li-metaborate to sample ratio and then dissolved in 20% nitric acid. The nitric acid solutions containing digested beads were then diluted and passed through a 0.45 micron syringe filter. Filtered samples were analyzed by ICP-MS for REE and select t-metals. Reagent blanks were analyzed to assess for any potential contamination. Total REE plus Y (REE+Y) concentrations across the 15 samples range from 52 ppm to 1015 ppm with an average of 477 ppm on a dry ash basis. When normalized to upper continental crust (UCC; Taylor and McLennan, 1985) values, 13 of the 15 samples show average enrichment factors (EF) for REE+Y greater than 1. EF values indicate M-type enrichment (Sm through Er), as opposed to distinct preferential enrichment of light or heavy REE. T-metals with the highest average concentrations are V, Cu, Ni, and Zr at 215, 243, 123, and 118 ppm, respectively. Multiple t-metals had EF>1; however, Cu, Ge, and Sb have the highest average EF relative to UCC for t-metals, at 9.7, 8.0, and 17.0, respectively.

Copeland, Grant↗

Risk-Quantified Decision-Making at Rocky Flats

Surface soils in the 903 Pad Lip Area of the Rocky Flats Environmental Technology Site (RFETS) were contaminated with {sup 239/240}Pu by site operations. To meet remediation goals, accurate definition of areas where {sup 239/240}Pu activity exceeded the threshold level of 50 pCi/g and those below 50- pCi/g needed definition. In addition, the confidence for remedial decisions needed to be quantified and displayed visually. Remedial objectives needed to achieve a 90 percent certainty that unremediated soils had less than a 10 percent chance of {sup 239/240}Pu activity exceeding 50-pCi/g. Removing areas where the chance of exceedance is greater than 10 percent creates a 90 percent confidence in the remedial effort results. To achieve the stipulated goals, the geostatistical approach of probability kriging (Myers 1997) was implemented. Lessons learnt: Geostatistical techniques provided a risk-quantified approach to remedial decision-making and provided visualizations of the excavation area. Error analysis demonstrated compliance and confirmed that more than sufficient soils were removed. Error analysis also illustrated that any soils above the threshold that were not removed would be of nominal activity. These quantitative approaches were useful from a regulatory, engineering, and stakeholder satisfaction perspective.

54 ENVIRONMENTAL SCIENCES↗

UK mining invests, suppliers profit

In the midst of a major economic crisis in the United Kingdom, equipment suppliers have been reporting a number of considerable purchases by British coal mining companies. In December 2008, Liebherr-Great Britain delivered the first two of four Rq350 Litronic hydraulic excavators for use at the Broken Cross opencast coal site in Lanarkshire, Scotland. Ten Terex TR100 rigid haulers were delivered to the site in late 2008. Hatfield Colliery at Stainforth, South Yorkshire, has been reopened by PowerFuel. The main equipment for two longwall faces was supplied by Joy Mining Machinery UK Ltd. 2 photos.

01 COAL, LIGNITE, AND PEAT↗

Air Permit Compliance for Hanford Waste Retrieval Operations Involving Multi-Unit Emissions

Since 1970, approximately 38,000 suspect-transuranic and transuranic waste containers have been placed in retrievable storage on the Hanford Site in the 200 Areas burial grounds. Hanford's Waste Retrieval Project is retrieving these buried containers and processing them for safe storage and disposition. Container retrieval activities require an air emissions permit to account for potential emissions of radionuclides. The air permit covers the excavation activities as well as activities associated with assaying containers and installing filters in the retrieved transuranic containers lacking proper venting devices. Fluor Hanford, Inc. is required to track radioactive emissions resulting from the retrieval activities. Air, soil, and debris media contribute to the emissions and enabling assumptions allow for calculation of emissions. Each of these activities is limited to an allowed annual emission (per calendar year) and contributes to the overall total emissions allowed for waste retrieval operations. Tracking these emissions is required to ensure a permit exceedance does not occur. A tracking tool was developed to calculate potential emissions in real time sense. Logic evaluations are established within the tracking system to compare real time data against license limits to ensure values are not exceeded for either an individual activity or the total limit. Data input are based on field survey and workplace air monitoring activities. This tracking tool is used monthly and quarterly to verify compliance to the license limits. Use of this tool has allowed Fluor Hanford, Inc. to successfully retrieve a significant number of containers in a safe manner without any exceedance of emission limits. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Structural Characterization of the 216-Z-9 Crib Prior to Decontamination and Demolition Using Robot Crawler and High Resolution Photography

The Department of Energy, Richland Operations Office is preparing to conduct a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) removal action for the decontamination and demolition of the above-grade mining structures and equipment at the 216-Z-9 Crib. An investigation of the condition of the mining complex was initiated to determine constraints necessary for safely conducting the removal of the buildings. While crib headspace chemical analysis and nondestructive analysis of the interior of the buildings was completed to address radiological contamination concerns, the primary concern regarding the removal of the above-grade structures located on the crib cover involves determining the loading capacity and structural integrity of the crib cover slab. Additional concerns included headspace gases and radionuclide contamination. Until the structural analysis was completed, loading limits on the crib cover had been restricted. Photographic documentation revealed the loss of protective tiles and acid resistant coating from the underside of the cover raising a question of concrete stability. The investigation relied heavily on the use of high resolution photography with high intensity lighting for photographic documentation of the underside of the crib cover, followed by structural analysis of the documentation by a team of qualified engineers. Deployment of a robot crawler with attached camera and positioning of a fixed camera were integral to this structural characterization effort. Results of the photographic documentation were of sufficient quality to allow for bounding decisions to be made regarding the loading of the crib cover while performing the demolition of the mining structures (glovebox, excavator, bucket) and the associated buildings. The 216-Z-9 Crib, also known as the 216 Z-9 Recuplex CAW (CA column waste) Waste Disposal Cavern, the Z-9 Trench and the Z-9 Crib was constructed as an engineered trench with an open area beneath a concrete slab. The crib is located near the Plutonium Finishing Plant (PFP) facility, at the Hanford Nuclear Reservation in Eastern Washington State. The crib was used as a disposal site for effluent chemical and radiological wastes from the recovery of uranium and plutonium through extraction or RECUPLEX process, a method that recovered uranium and plutonium from liquid and solid wastes and scraps from other PFP processes. During its operating life, from 1955 through 1962, the Z-9 Crib received liquid wastes totaling approximately four million liters, or one million gallons. Analyses of the crib soil in seven locations to a depth of up to two meters (six feet) beneath the crib floor indicated that the plutonium content of the crib soil ranged from 50 to 150 kg (the highest concentration measured was 34.5 g/L of soil). While performing the structural evaluation of the crib cover, additional characterization information was obtained on the radiological and chemical conditions of the crib and structures. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In Situ Stabilization of Inactive Low Level Waste Pipelines in the Melton Valley Watershed at Oak Ridge National Laboratory

The Melton Valley watershed at Oak Ridge National Laboratory (ORNL) contained an inactive waste pipeline system consisting of approximately 12 kilometers of buried waste pipelines and over 142 m{sup 3} in surface/subsurface appurtenances (e.g., vents, valve pits, pump vaults, etc.). Historically, the system was used to transport liquid low level and process waste between generator facilities in Melton Valley, storage and disposal sites in Melton Valley, and storage/treatment facilities in Bethel Valley. The selected remedy in the Melton Valley Record of Decision (ROD) for inactive pipelines was isolation, removal, or stabilization. Pipeline remediation activities began in the summer of 2005 and were completed in the spring of 2006. The task entailed an iterative process of selecting pipeline access points, excavating and exposing pipelines, performing tapping, draining and cutting activities, either installing fittings for grouting or plugging and capping the lines. Grouting was accomplished using paired access points, with one location serving as the grout injection point and the other as vent/drain and grout confirmation point. Grouting was conducted by pumping a cement-bentonite grout into the specially installed fittings and typically proceeded from a low point to a high point to ensure complete filling of the pipeline (i.e., no void space). The project successfully grouted a total of 8,454 meters (linear distance) of pipeline; another 3,573 meters of pipeline was stabilized through isolation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗