Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Design verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,117 records · Page 62

MOD-1 Wind Turbine Generator Analysis and Design Report, Volume 2

The MOD-1 detail design is appended. The supporting analyses presented include a parametric system trade study, a verification of the computer codes used for rotor loads analysis, a metal blade study, and a definition of the design loads at each principal wind turbine generator interface for critical loading conditions. Shipping and assembly requirements, composite blade development, and electrical stability are also discussed.

Source record↗

Formal Techniques for Synchronized Fault-Tolerant Systems

We present the formal verification of synchronizing aspects of the Reliable Computing Platform (RCP), a fault-tolerant computing system for digital flight control applications. The RCP uses NMR-style redundancy to mask faults and internal majority voting to purge the effects of transient faults. The system design has been formally specified and verified using the EHDM verification system. Our formalization is based on an extended state machine model incorporating snapshots of local processors clocks.

DiVito, Ben L.↗

How to Educate Decision Makers on the Value and Necessity of Modal Testing and Model Correlation: Tips for Young Engineers

Engineers need to effectively communicate the justification and value of their modal testing and model correlation in terminology familiar to decision makers as it relates to the program’s risk tolerance. This communication must relate to the program’s risk tolerance and the metrics used to judge the performance of both the program and individual decision makers. The challenge is the terminologies familiar to engineers and decision makers are quite different and seemingly unrelated. The engineering profession has developed a specific terminology to solve highly technical issues, which are many times themselves unique to very specific engineering problems. It is all too easy for engineers to believe that everyone in their organization, including the decision makers, has an intrinsic understanding of what they do and the value it brings to the program’s success. This is especially true for young engineers who have recently spent the last four plus years in an academic engineering learning environment, which has a highly technical research oriented atmosphere. Effective communication with decision makers is increasingly important as the technical breadth and practical program and project experience level for up and coming decision makers diminishes. It is not unusual for the decision makers to have technical knowledge in a domain different from structural dynamics (e.g., electronics or systems). Competition among satellite manufactures has increased the focus on programmatic cost and ability to deliver on schedule. NASA programs are also seeing more restrictive programmatic cost and schedule constraints, which impact both analysis and testing. It should also be noted that a comprehensive suite of tests are required to verify a satellite’s design capability with some margin. These tests include static strength verification tests, shock, acoustic, and vibration tests (sine and random) of systems, subsystems, and components. Each of these verification tests provide opportunities for model correlation and risk reduction. It is important to recognize dynamic loads/modal test models may not include all of the flight hardware (i.e., harness, coax, waveguides, connectors, etc.) and the previously mentioned tests are still required for qualification/verification of the design. This paper provides tips to young engineers on how to bridge this communications gap, have a better understanding of the environment in which decision makers operate, and assist them to better support successful missions. While this paper primarily focuses on modal testing and model correlation as related to spacecraft missions, the concepts and recommendations presented here are equally applicable to other fields such as aeronautics, automotive, power generation, etc.

Decision Maker↗

How to Educate Decision Makers on the Value and Necessity of Modal Testing and Model Correlation: Tips for Young Engineers

Engineers need to effectively communicate the justification and value of their modal testing and model correlation in terminology familiar to decision makers as it relates to the program’s risk tolerance. This communication must relate to the program’s risk tolerance and the metrics used to judge the performance of both the program and individual decision makers. The challenge is the terminologies familiar to engineers and decision makers are quite different and seemingly unrelated. The engineering profession has developed a specific terminology to solve highly technical issues, which are many times themselves unique to very specific engineering problems. It is all too easy for engineers to believe that everyone in their organization, including the decision makers, has an intrinsic understanding of what they do and the value it brings to the program’s success. This is especially true for young engineers who have recently spent the last four plus years in an academic engineering learning environment, which has a highly technical research oriented atmosphere. Effective communication with decision makers is increasingly important as the technical breadth and practical program and project experience level for up and coming decision makers diminishes. It is not unusual for the decision makers to have technical knowledge in a domain different from structural dynamics (e.g., electronics or systems). Competition among satellite manufactures has increased the focus on programmatic cost and ability to deliver on schedule. NASA programs are also seeing more restrictive programmatic cost and schedule constraints, which impact both analysis and testing. It should also be noted that a comprehensive suite of tests are required to verify a satellite’s design capability with some margin. These tests include static strength verification tests, shock, acoustic, and vibration tests (sine and random) of systems, subsystems, and components. Each of these verification tests provide opportunities for model correlation and risk reduction. It is important to recognize dynamic loads/modal test models may not include all of the flight hardware (i.e., harness, coax, waveguides, connectors, etc.) and the previously mentioned tests are still required for qualification/verification of the design. This paper provides tips to young engineers on how to bridge this communications gap, have a better understanding of the environment in which decision makers operate, and assist them to better support successful missions. While this paper primarily focuses on modal testing and model correlation as related to spacecraft missions, the concepts and recommendations presented here are equally applicable to other fields such as aeronautics, automotive, power generation, etc.

Decision Maker↗

Verifying Mars 2020 Sampling and Caching Robotic Functions with Position Budgeting Process and Tool

The Mars 2020 Perseverance Rover was launched on July 30th, 2020 with one of the most complex robotic systems ever implemented on an interplanetary mission. Much of this robotic complexity resides in the Rover Sampling and Caching Subsystem (SCS) to enable collection of Martian samples for eventual return to earth and preparation of surfaces for close-up surface science observations. Two robotic arms are used by SCS: the large Robotic Arm (RA) positions the coring drill and science instruments mounted to the Turret for surface interactions, and the smaller Sample Handling Assembly (SHA) manipulates Sample Tube Assemblies (STA) within the Adaptive Caching Assembly (ACA) to prepare them for sample collection, processing, and hermetic sealing. The robotic arms interact with the Martian surface and other SCS components in many ways and in a variety of configurations, with positioning accuracy requirements ranging from tens of millimeters for some surface interactions down to sub-millimeter accuracy for some ACA interactions.This paper describes the process and tool used to calculate the SCS robotic interaction positioning budgets and verify the as-built hardware when delivered. To ensure that these robotic systems are able to perform their tasks, each robotic interaction with another element was broken down into its composite functions. To calculate a positioning budget margin for each function, an allowable was defined and then compared to the list of error sources that contribute to misalignment. Across the subsystem, over 250 functions were identified to be assessed, with almost 500 error sources feeding into their budget calculations. In addition to using as-built values in the budgets for SCS Verification and Validation (V&V) after the hardware was complete, these budgets were populated with design data during the design phase to identify areas of concern and guide hardware design to ensure positive position budget margins.Because of the size of the SCS team that had inputs to the positioning budgets and the sheer number of items in the budgets that needed to be created, updated, and verified, having a tool that would allow for simultaneous access and robust data integrity and processing was imperative. To accomplish this, a web-based MySQL database was created that allowed users to create function position budgets, link individual errors and allowables to them, and view function position budget margin reports. Each error and allowable records data for lateral, normal, angular, and clocking errors, with the ability to add as-built data for up to four different hardware builds. Margin reports can be generated for either design values alone or replacing design data with as-built data when available. These as-built reports are used for final verification of the SCS positioning requirements. Ultimately, the SCS positioning budget process and database tool led to successful interactions during test and an SCS robotic system that is ready to perform sample acquisition and caching on the surface of Mars.

Williams, Jeffrey↗

Standardized Radiation Shield Design Methods: 2005 HZETRN

Research committed by the Langley Research Center through 1995 resulting in the HZETRN code provides the current basis for shield design methods according to NASA STD-3000 (2005). With this new prominence, the database, basic numerical procedures, and algorithms are being re-examined with new methods of verification and validation being implemented to capture a well defined algorithm for engineering design processes to be used in this early development phase of the Bush initiative. This process provides the methodology to transform the 1995 HZETRN research code into the 2005 HZETRN engineering code to be available for these early design processes. In this paper, we will review the basic derivations including new corrections to the codes to insure improved numerical stability and provide benchmarks for code verification.

Wilson, John W.↗

Provable Transient Recovery for Frame-Based, Fault-Tolerant Computing Systems

We present a formal verification of the transient fault recovery aspects of the Reliable Computing Platform (RCP), a fault-tolerant computing system architecture for digital flight control applications. The RCP uses NMR-style redundancy to mask faults and internal majority voting to purge the effects of transient faults. The system design has been formally specified and verified using the EHDM verification system. Our formalization accommodates a wide variety of voting schemes for purging the effects of transients.

DiVito, Ben L.↗

Spacelab development and its operational verification

This paper gives a brief status report on the current Spacelab program and describes how the results of ground and flight tests will be combined to provide the operational verification of the system. For the on-going project, data on design, testing and fabrication plans are presented. In particular, recent changes to meet the constraints of a 'build-to-cost' project are described. In the operational verification of Spacelab, ground and flight tests which ESA and NASA will perform are addressed. The installation of test instrumentation and the performance of integrated tests will be accomplished in the US. Experiments for the first flight will be integrated into Spacelab racks and pallets and simulated mission tests performed. On-orbit, system thermal surveys are planned and stress data will be obtained during launch and re-entry.

Bignier, M.↗

Swarm Mentality: Toward Automatic Swarm State Awareness with Runtime Verification

Cyber-Physical Systems (CPSs) already exhibit impressive performance in all areas of human life, and swarms of CPSs promise to increase their capabilities even further. However, to effectively utilize CPS swarms their complexity of operation has to scale sub-linearly with the number of swarm members. Presenting the swarm to an operator as a single entity almost eliminates the additional per-member overhead entirely. To operate a swarm as one entity, and/or to increase the swarm’s autonomy, the operator and the swarm members need to reason and communicate at the same level of abstraction, i.e. the swarm needs a sense of “self.” Therefore, we require the ability to specify whole swarm properties yet monitor them at the member level. We examine one architecture for achieving this awareness by: 1) Defining a taxonomy for comparing techniques that synthesize this belief-state 2) Propose use of the Runtime Verification formal method to fill this role 3) Present preliminary designs for extending and embedding such a system in the Distributed Spacecraft Autonomy architecture to generate per-member monitors from swarm level specification.

Runtime Verification↗

Pollutant emissions from and within a model gas turbine combustor at elevated pressures and temperatures

Conventional and advanced gas turbine engines are coming under increased scrutiny regarding pollutant emissions. This, in turn, has created a need to obtain in-situ experimental data at practical conditions, as well as exhaust data, and to obtain the data in combustors that reflect modern designs. The in-situ data are needed to (1) assess the effects of design modifications on pollutant formation, and (2) develop a detailed data base on combustor performance for the development and verification of computer modeling. This paper reports on a novel high pressure, high temperature facility designed to acquire such data under controlled conditions and with access (optical and extractive) for in-situ measurements. To evaluate the utility of the facility, a model gas turbine combustor was selected which features practical hardware design, two rows of jets (primary and dilution) with four jets in each row, and advanced wall cooling techniques with laser drilled effusive holes. The dome is equipped with a flat-vaned swirler with vane angles of 60 degrees. Data are obtained at combustor pressures ranging from 2 to 10 atmospheres of pressure, levels of air preheat to 427 C, combustor reference velocities from 10.0 to 20.0 m/s, and an overall equivalence ratio of 0.3. Exit plane and in-situ measurements are presented for HC, O2, CO2, CO, and NO(x). The exit plane emissions of NO(x) correspond to levels reported from practical combustors and the in-situ data demonstrate the utility and potential for detailed flow field measurements.

Drennan, S. A.↗

Laboratory verification optical signal coupling. IMBLMS phase B.4, appendix C, section 12

The design of optical couplers is described for use in the IMBLMS hardwire mode. One coupler transmits data from the bio-belt to the central data system and the other coupler transmits audio frequencies in the opposite direction, from the central data system to the bio-belt. The objective is to isolate the ground system at the body worn bio-belt electronics and the main ground at the central data system, or biomedical and behavioral station. The safety of the subject wearing the bio-belt measuring electronics is the purpose in isolating the wearer from the main system ground.

Source record↗

Scientific Verification of Faraday Rotation Modulators: Detection of Diffuse Polarized Galactic Emission

The design and performance of a wide bandwidth linear polarization-modulator based on the Faraday effect is described. Faraday Rotation Modulators (FRMs) are solid-state polarization switches that are capable of modulation up to approx 10 kHz. Six FRMs were utilized during the 2006 observing season in the Background Imaging of Cosmic Extragalactic Polarization (BICEP) experiment; three FRMs were used at each of BICEP fs 100 and 150 GHz frequency bands. The technology was verified through high signal-to-noise detection of Galactic polarization using two of the six FRMs during four observing runs in 2006. The features exhibit strong agreement with BICEP fs measurements of the Galaxy using non-FRM pixels and with the Galactic polarization models. This marks the first detection of high signal-to-noise mm-wave celestial polarization using fast, active optical modulation. The performance of the FRMs during periods when they were not modulated was also analyzed and compared to results from BICEP fs 43 pixels without FRMs.

Moyerman, S.↗

Demonstration of Model-Based Design for Digital Controller Using Formal Methods

This report describes work originally performed in FY19 that assembled a workflow enabling formal verification of high-consequence digital controllers. The approach builds on an engineering analysis strategy using multiple abstraction levels (Model-Based Design) and performs exhaustive formal analysis of appropriate levels – here, state machines and C code – to assure always/never properties of digital logic that cannot be verified by testing alone. The operation of the workflow is illustrated using example models and code, including expected failures of verification when properties are violated.

97 MATHEMATICS AND COMPUTING↗

Cooperative Research and Development Agreement (CRADA) NFE-18-07194 with TerraPower LLC (Final Report)

Because of the potential economic and safety benefits of the molten salt reactor (MSR) concept, development of several designs has been initiated around the world over the past decade. New international nuclear safeguards needs and verification challenges are likely to arise because of the commercial interests in MSRs and the number of MSR design variants. As a result, work was undertaken to explore the cross-cutting issues specific to the application of international nuclear safeguards (i.e., safeguards) to liquid-fueled molten salt reactors (LFMSRs). Through a public-private partnership, a report was developed that focuses on the TerraPower Molten Chloride Fast Reactor (MCFR) design that has received a funding award from the US Department of Energy (DOE), Office of Nuclear Energy. The report is intended to provide a preliminary analysis for a safeguards-by-design (SBD) effort to inform designers about how safeguards could be applied to LFMSRs by the International Atomic Energy Agency (IAEA).Although the report specifically focuses on the TerraPower design, the conclusions are applicable to the main design features of LFMSRs and can be used to extrapolate how existing IAEA safeguards measures for other fuel cycle facilities can be appropriately applied or modified. The report evaluates the appropriate safeguards approaches for LFMSRs, presents existing safeguards inspection technologies are still valid for LFMSRs, and identifies new challenges that will require novel measurement instruments to meet verification standards of the IAEA and the international safeguards regime. This document summarizes the results of the work performed under the full report developed as part of the Cooperative Research and Development Agreement (CRADA). This summary does not contain any protected CRADA information and is intended for public release.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Generic Modeling Process to Support Functional Fault Model Development

Functional fault models (FFMs) are qualitative representations of a system's failure space that are used to provide a diagnostic of the modeled system. An FFM simulates the failure effect propagation paths within a system between failure modes and observation points. These models contain a significant amount of information about the system including the design, operation and off nominal behavior. The development and verification of the models can be costly in both time and resources. In addition, models depicting similar components can be distinct, both in appearance and function, when created individually, because there are numerous ways of representing the failure space within each component. Generic application of FFMs has the advantages of software code reuse: reduction of time and resources in both development and verification, and a standard set of component models from which future system models can be generated with common appearance and diagnostic performance. This paper outlines the motivation to develop a generic modeling process for FFMs at the component level and the effort to implement that process through modeling conventions and a software tool. The implementation of this generic modeling process within a fault isolation demonstration for NASA's Advanced Ground System Maintenance (AGSM) Integrated Health Management (IHM) project is presented and the impact discussed.

Design Analysis↗

Evaluation of Precision Landing Performance Using A Generalized Aerospace Simulation in Simulink Framework

NASA’s science and exploration goals to return to the Moon and beyond will need to perform precision landings to place humans and cargo supplies near places of scientific interest, surface resources, or pre-established basecamps. With the maturation of new navigation technology, such as terrain relative navigation, precision landing is now feasible, enabling new exploration sites, such as the lunar poles. However, verification of precision landing performance becomes crucial since not reaching the designated landing site would have a high risk of loss of mission. Therefore, having a high-fidelity simulation platform to evaluate six degrees of freedom vehicle performance during high-risk phases of flight such landing is a fundamental part of the system verification and risk reduction. The NASA Marshall Space Flight Center has developed the GeneraLized Aerospace Simulation in Simulink® (GLASS) tool which incorporates guidance, navigation, and control algorithms, as well as vehicle and environmental models, such as gravity, vehicle mass properties, navigation sensors, propulsion, and terrain models. GLASS uses the MathWorks® Simulink® environment which provides a model-based design framework that allows the incorporation of vehicle models in a modular architecture. The Simulink® environment provides seamless integration with all the MathWorks® capabilities and toolboxes, such as control design toolboxes and Simscape™ Multibody™ dynamics toolbox. The MathWorks® environment also allows for guidance, navigation, and control algorithms to be auto coded in C language, enabling quick software and hardware in the loop testing. This paper provides an overview of GLASS capabilities for analyzing precision landing performance, including navigation trades applied to a NASA human lander reference design architecture.

Guidance↗

Robust Stability Analysis of the Space Launch System Control Design: A Singular Value Approach

Classical stability analysis consists of breaking the feedback loops one at a time and determining separately how much gain or phase variations would destabilize the stable nominal feedback system. For typical launch vehicle control design, classical control techniques are generally employed. In addition to stability margins, frequency domain Monte Carlo methods are used to evaluate the robustness of the design. However, such techniques were developed for Single-Input-Single-Output (SISO) systems and do not take into consideration the off-diagonal terms in the transfer function matrix of Multi-Input-Multi-Output (MIMO) systems. Robust stability analysis techniques such as H(sub infinity) and mu are applicable to MIMO systems but have not been adopted as standard practices within the launch vehicle controls community. This paper took advantage of a simple singular-value-based MIMO stability margin evaluation method based on work done by Mukhopadhyay and Newsom and applied it to the SLS high-fidelity dynamics model. The method computes a simultaneous multi-loop gain and phase margin that could be related back to classical margins. The results presented in this paper suggest that for the SLS system, traditional SISO stability margins are similar to the MIMO margins. This additional level of verification provides confidence in the robustness of the control design.

Pei, Jing↗