Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Checkout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,117 records · Page 62

First 210 solar days of Mars 2020 Perseverance Robotic Operations – Mobility, Robotic Arm, Sampling, and Helicopter

This paper includes the summary, lessonslearned, and upcoming plans for the first 210 Mars solar days(sols) of the mission. The focus of the paper is on roboticoperations which has the primary responsibility for strategicplanning, uplink commanding and downlink analysis forrover mobility and navigation, robotic arm operation, thesampling and caching capability including coring, theadaptive caching assembly and the 2nd sample handlingrobotic arm, and interface to the Mars helicopter Ingenuity.As of Sol 210 the rover has driven 2663.65 meters, executed20764 robotic arm and sampling commands, and hassuccessfully completed 13 helicopter flights covering 2382meters horizontal distance. It includes the OperationsReadiness Tests in preparation for landing, landing and initialcheckouts, strategic route planning to the science destinationand waypoints, surface checkout of all of the roboticscapability of the rover. It also discusses the strategic planningand tactical agility needed for interleaving scienceinvestigation and technology demonstration of the Marshelicopter flights where a minimum distance had to bemaintained between the rover and helicopter during flights. Itdiscusses the challenges with planning robotic operations andaddressing anomalies with the larger uncertainty presentduring early mission operations. It also discusses the impacton robotic operations from lessons incorporated fromprevious missions.

Ono, Hiro↗

Testing the Exploration Conops (Excon) Mockup Suit in Lunar Analog Environments in 2022

Understanding how to effectively train for Extravehicular Activities (EVAs) for Artemis missions is critical. Developing high-fidelity simulation environments is important for Artemis mission preparation. Because the actual Lunar exploration environment cannot be fully replicated on Earth, it is paramount to determine where and how to properly train the Artemis team. Tasked by the new Extravehicular Activity and Human Surface Mobility Program(EHP), a team of stakeholders from engineering, flight operations, human health and performance, astromaterials and science, and the crew office worked together to perform EVAs in 3 simulated lunar environments. The overall focus for this test series was developing the capability to perform Artemis simulated EVAs in high-fidelity, full-scale environments. This test series was broken into 3 distinct tests titled after the EHP integrated test team: Joint EVA Test Team (JETT). The test locations are planned to serve as Artemis training sites and were selected because of their relevance to the expected Artemis Lunar terrain. JETT1was conducted near Kilbourne Holeby El Paso, Texas and focused on hardware development and checkout. JETT2 was conducted in the Icelandic Highlands and began the transition towards EVA concept operations(con-ops), risks and technology.JETT3 was conducted near SP Crater by Flagstaff Arizona and focused on simulating the Artemis III mission with a simulated Houston based Flight Control Team (FCT) and a Science Mission Directorate (SMD) science team. All three JETT tests utilized the Excon mockup space suit. The Excon mockup suit is a light-weight, unpressurized Exploration Extravehicular Mobility Unit (xEMU)simulator. While it cannot replicate the feel of working within a pressurized suit, it does introduce similar volume constraints and some of the mobility programing to simulate the user experience in the xEMU. Overall, the JETT testing was able to create a simulated Lunar EVA and have two subjects perform full scale operations in line with Artemis III mission expectations. Future work is planned to continue to improve the simulation quality of Lunar EVA simulations.

spacesuit↗

Evaluation of Planetary Extravehicular Activity Prebreathe Protocols using a 56.5 kPa, 34% O2, 66% N2 Saturation Cabin Atmosphere in an 11-day Hypobaric Hypoxia Study

INTRODUCTION: Apollo missions used 100% O2 cabin atmospheres which effectively eliminated the risk of decompression sickness (DCS) during Lunar extravehicular activities (EVAs, ‘spacewalks’); however, this atmosphere presented a flammability risk that is no longer acceptable to NASA. Denitrogenation prebreathe protocols used to mitigate DCS risk for Space Shuttle and International Space Station EVAs are validated for the microgravity environment, but the significantly increased risk of DCS during equivalent ambulatory surface EVAs make these protocols inapplicable to planetary/Lunar missions. A cabin/vehicle “Exploration Atmosphere” of 56.5 kPa (8.2 psia), 34% O2, 66% N2 has been recommended by NASA for future Moon and Mars missions as a compromise that balances subsequent pre-EVA prebreathe duration, hypoxia, and flammability risk, assuming a 29.6 kPa (4.3 psi) spacesuit. Prebreathe validation studies were initiated utilizing a three-story 6m diameter hypobaric chamber at NASA’s Johnson Space Center. Here, we report the results of a 11-day human-in-the-loop system checkout. METHODS: Six volunteers lived in a hyboparic chamber for 11 days with an ‘exploration atmosphere’ of 56.6kPa/34% O2 66% N2. Subjects acclimated to the exploration atmosphere for 48hrs and thereafter participated in five 6-hour simulated EVAs at 34kPa/85% O2 / 15% N2 over the course of 11 days. Prior to each simulated EVA, subjects underwent a 20-minute prebreathe at 85% O2. The EVA simulation was designed to include tasks that are physically and ergonomically representative of future planetary EVAs, proportionate to the subject’s VO2max. Decompression stress was evaluated during the simulated EVA by serial doppler and echocardiographs alternating every 15min, as well as clinical monitoring for DCS signs/symptoms. RESULTS AND DISCUSSION: Venous gas emboli (VGE) were present in 3 of 6 subjects during EVAs, with peak Grade II VGE as evaluated by Doppler and a peak Eftedal-Brubakk score of 5 by cardiac ultrasonography. Two cases of DCS were diagnosed during the 11-day test chamber. No acute hypoxic symptoms were noted. Musculoskeletal and gastrointestinal complaints were noted, likely associated with the exercise load and the food system. Two cases of DCS (8%) does not cross either accept or reject pre-test criterion, so an additional study is planned for 2023 to meet our pre-test thresholds.

Alejandro Garbino↗

Initial Whirl-Flutter Characterization of the TiltRotor Aeroelastic Stability Testbed

This paper discusses the initial wind tunnel test of the TiltRotor Aeroelastic Stability Testbed (TRAST). TRAST is a generic tiltrotor testbed developed in collaboration between NASA and the Army. Ultimately, this test was a checkout of the model systems, functionality and familiarization, but also obtained subcritical whirl-flutter data in the terms of frequency and damping. Flutter data include two main configurations with different pitch spring stiffness, referred to as 4k and 8k, that were tested at various rotor speeds and airspeeds at the NASA Langley Transonic Dynamics Tunnel. The test included two modes of drivetrain operation: powered and windmilling. However, powered mode of operation was only conducted with the 8k pitch spring. This test reinforced the traditional knowledge of whirl-flutter trends such as flutter speed would decrease with an increase in rotor speed. The critical mode consistently being the wing vertical bending mode. The chord mode as expected was not affected by the pitch spring and was likely to go unstable at a tunnel airspeed slightly beyond the wing vertical bending mode. There were also test specific challenges such as the TRAST modal damping was more sensitive to temperature and amplitude motor than was expected. This test gathered valuable data on the baseline characterization of TRAST, how to improve the model and test practices for future wind tunnel testing. Additionally, a new more automated method for experimental subcritical damping determination based on the Stockwell transform has been demonstrated that may lead to more consistent whirl-flutter stability boundaries.

whirl flutter↗

Electric Propulsion for the Psyche Mission: One Year to Launch

NASA’s Psyche mission will launch in 2022 and begin a 3.6-year cruise to the metallic asteroid Psyche, the largest metal asteroid in the solar system. The baseline spacecraft design is a hybrid of JPL’s deep-space heritage subsystems with commercial partner Maxar’s electric propulsion, power, and structure subsystems. The Psyche mission will feature the first use of Hall thrusters for a NASA mission, and the first use of Hall thrusters beyond cis-lunar space. This paper will provide an overview of the electric propulsion subsystem and details of the flight system implementation for the Psyche mission. The concept of operations is discussed including subsystem-level operations, the initial checkout after launch, and cruise and orbital operations. Command and control interfaces with the spacecraft and fault protection design are presented. Finally, the status of subsystem assembly and test is described.

Li, Julie↗

Preparations for the Launch, Cruise, and Orbital Operations Phases of the Psyche Mission

“Psyche: Journey to a Metal World” was selected in 2017 as the 14th mission in NASA’s Discovery program. The mission uses an electric propulsion (EP) system to rendezvous with and orbit the large metal asteroid (16) Psyche. Spacecraft development is a hybrid approach with deep-space avionics provided by the Jet Propulsion Laboratory (JPL) and a solar electric propulsion chassis based on Maxar’s 1300-series GEO communications satellites. The payload suite is comprised of a magnetometer, multispectral imager, and gamma ray & neutron spectrometer science instruments and the Deep Space Optical Communications advanced technology demonstration.The spacecraft is currently in the final integration and test phase to support a planned launch period open in August 2022. With under a year until liftoff, final pre-liftoff preparations are underway for the mission’s major in-flight Phases. The Launch Phase is the mission’s only critical event as the vehicle autonomously deploys the solar arrays and delivers the spacecraft to a safe state. Following a planned 70-day Initial Checkout Phase, the spacecraft thrusts with the EP system through the majority of a 3.5-year Cruise Phase, which includes a Mars gravity assist, to rendezvous with (16) Psyche. The Approach Phase uses optical navigation while continuing to thrust with the EP engines to deliver the spacecraft into orbit. Orbital Operations are baselined for 20 months as the spacecraft steps through four progressively lower orbital altitudes to study the largest M-type asteroid in the solar system.

Hart, William↗

Testing the Exploration ConOps (ExCon) Mockup Suit in Lunar Analog Environments in 2022

Understanding how to effectively train for Extravehicular Activities (EVAs) for Artemis missions is critical. Developing high-fidelity simulation environments is important for Artemis mission preparation. Because the actual Lunar exploration environment cannot be fully replicated on Earth, it is paramount to determine where and how to properly train the Artemis team. The overall focus for this test series was developing the capability to perform Artemis simulated EVAs in high-fidelity, full-scale environments. This test series was broken into three distinct tests titled after the EVA & Human Surface Mobility (HSM) Program (EHP) integrated test team: Joint EVA & HSM Test Team (JETT). The test locations are planned to serve as Artemis training sites and were selected because of their relevance to the expected Artemis Lunar terrain. JETT1 was conducted near Kilbourne Hole by El Paso, Texas and focused on hardware development and checkout. JETT2 was conducted in the Icelandic Highlands and began the transition towards EVA concept of operations (con-ops), risks and technology. JETT3 was conducted near SP Crater by Flagstaff, Arizona and focused on simulating the Artemis III mission including a Houston based Flight Control Team (FCT) and a Science Mission Directorate (SMD) science team. All three JETT tests utilized the Exploration Concept of Operations (ExCon) mockup space suit. The ExCon mockup suit is a lightweight, unpressurized Exploration Extravehicular Mobility Unit (xEMU) simulator. While it cannot replicate the feel of working within a pressurized suit, it does introduce similar volume constraints and some of the mobility programing to simulate the user experience in the xEMU. Overall, the JETT testing was able to create a simulated Lunar EVA and have two subjects perform full scale operations in line with Artemis III mission expectations. Future work is planned to continue to improve the simulation quality of Lunar EVA simulations.

spacesuit↗

Mars 2020 Lander Vision System Flight Performance 1

The Mars 2020 Entry Descent and Landing (EDL) system delivered the Perseverance rover to the surface of Mars on February 18th, 2021. A large fraction of the Jezero Crater landing site was covered with landing hazards including cliffs, inescapable dune fields and rocks. These hazards were identified or inferred using orbital imagery before launch so that they could be avoided using Terrain Relative Navigation (TRN) which was composed of two parts: the Lander Vision System (LVS) and Safe Target Selection (STS). During EDL, the LVS successfully estimated map relative position by fusing landmarks matched between descent imagery and a map of the landing site with Inertial Measurement Unit (IMU) data. This position estimate was used by STS to identify the safest target for landing that was also reachable given fuel and other constraints. The EDL system then used the powered descent phase to retarget to this location and land safely. The overall error between the targeted location and actual landing location was 5m which was an order of magnitude less than the 60m touchdown error requirement. This paper will describe the final tests of the LVS before launch, the checkout of the LVS during operations and the LVS performance during EDL.

Zheng, Jason↗

How to Build a Rover: An Overview of the Mars 2020 Mission’s Vehicle System Testbed

While NASA’s Mars rover Perseverance continues to make groundbreaking achievements on the Red Planet, its twin is hard at work here on Earth. The Operational Perseverance Twin for the Integration of Mechanisms and Instruments Sent to Mars, or OPTIMISM, is the Mars 2020 Vehicle System Testbed (VSTB) rover operated by NASA Jet Propulsion Laboratory (JPL) in Pasadena, California. OPTIMISM’s home is the JPL Mars Yard; an outdoor field with red soil that simulates the terrain encountered by Perseverance. The VSTB is a full-scale engineering model of the flight rover, serving a number of functions to ensure mission operations can continue smoothly and on schedule. The VSTB possesses instrumentation, computers, mechanisms, cameras, and a Mobility subsystem that are nearly identical to its extraterrestrial twin. Its high fidelity allows the rover to be a highly effective tool to fully test system functionality and performance prior to commanding the flight rover. The early stages of building OPTIMISM began a few months prior to Perseverance departing JPL for Cape Canaveral, FL in early 2020. Electrical integration of the flight system avionics, and compatibility checkouts of the electrical ground support equipment ensured that the foundation of the electrical system was operational and in place. Next, the internal harnessing was installed and compatibility checks of the rover instrumentation and mechanisms were performed to confirm the system was prepared for full buildup. Finally, mechanical assembly of the rover chassis with its external components completed the integration of the system before it was moved to the Mars Yard for its initial phase of testing to perform verification & validation (V&V) of the Mobility subsystem requirements. By the time Perseverance landed at Jezero Crater in February 2021, the first phase of VSTB operations was underway. Surface guidance, navigation, and control (SGNC) testing for the Mobility subsystem ensured functionality and performance requirements were met for various capabilities such as visual odometry (VO), mapping, and automatic navigation (AutoNav). Subsequent integration of the robotic arm (RA) onto the VSTB enabled the V&V campaign for surface sampling operations (SSO) to commence. As the mission’s engineering operations (EO) have gotten underway, the VSTB has been utilized for an array of purposes including troubleshooting software anomalies, and performing dry-runs for first time activities (FTAs) prior to sending the commands to Perseverance. OPTIMISM will continue to serve mission critical functions as long as Perseverance is roving the Red Planet.

Rojas, Jose Trujillo↗

Initial Characterization of the TiltRotor Aeroelastic Stability Testbed

This paper discusses the initial wind tunnel test of the TiltRotor Aeroelastic Stability Testbed (TRAST). TRAST is a generic tiltrotor testbed developed in collaboration between NASA and the Army. Ultimately, this test was a checkout of the model systems, functionality and familiarization, but also obtained subcritical whirl-flutter data in the terms of frequency and damping. Flutter data include two main configurations with different pitch spring stiffness, referred to as 4k and 8k, that were tested at various rotor speeds and airspeeds at the NASA Langley Transonic Dynamics Tunnel. The test included two modes of drivetrain operation: powered and windmilling. However, powered mode of operation was only conducted with the 8k pitch spring. This test reinforced the traditional knowledge of whirl-flutter trends such as flutter speed would decrease with an increase in rotor speed. The critical mode consistently being the wing vertical bending mode. The chord mode as expected was not affected by the pitch spring and was likely to go unstable at a tunnel airspeed slightly beyond the wing vertical bending mode. There were also test specific challenges such as the TRAST modal damping was more sensitive to temperature and amplitude motor than was expected. This test gathered valuable data on the baseline characterization of TRAST, how to improve the model and test practices for future wind tunnel testing. Additionally, a new more automated method for experimental subcritical damping determination based on the Stockwell transform has been demonstrated that may lead to more consistent whirl-flutter stability boundaries.

whirl flutter↗

Testing the Exploration Conops (Excon) Mockup Suit in Lunar Analog Environments in 2022

Understanding how to effectively train for Extravehicular Activities (EVAs) for Artemis missions is critical. Developing high-fidelity simulation environments is important for Artemis mission preparation. Because the actual Lunar exploration environment cannot be fully replicated on Earth, it is paramount to determine where and how to properly train the Artemis team. The overall focus for this test series was developing the capability to perform Artemis simulated EVAs in high-fidelity, full-scale environments. This test series was broken into three distinct tests titled after the EVA & Human Surface Mobility (HSM) Program (EHP) integrated test team: Joint EVA & HSM Test Team (JETT). The test locations are planned to serve as Artemis training sites and were selected because of their relevance to the expected Artemis Lunar terrain. JETT1 was conducted near Kilbourne Hole by El Paso, Texas and focused on hardware development and checkout. JETT2 was conducted in the Icelandic Highlands and began the transition towards EVA concept of operations (con-ops), risks and technology. JETT3 was conducted near SP Crater by Flagstaff, Arizona and focused on simulating the Artemis III mission including a Houston based Flight Control Team (FCT) and a Science Mission Directorate (SMD) science team. All three JETT tests utilized the Exploration Concept of Operations (ExCon) mockup space suit. The ExCon mockup suit is a lightweight, unpressurized Exploration Extravehicular Mobility Unit (xEMU) simulator. While it cannot replicate the feel of working within a pressurized suit, it does introduce similar volume constraints and some of the mobility programing to simulate the user experience in the xEMU. Overall, the JETT testing was able to create a simulated Lunar EVA and have two subjects perform full scale operations in line with Artemis III mission expectations. Future work is planned to continue to improve the simulation quality of Lunar EVA simulations.

spacesuit↗

On-Orbit Performance of the NOAA-21 Advanced Technology Microwave Sounder (ATMS)

The Advanced Technology Microwave Sounder (ATMS) instrument provides sounding measurements of Earth’s atmosphere to collect temperature and water vapor data for NOAA’s Joint Polar Satellite System (JPSS) program. ATMS is a total-power passive microwave radiometer with 22 channels spanning a frequency range from 22 to 183 GHz. A general description of the ATMS instrument is detailed in [1]. Three ATMS units are currently on-orbit. The Suomi National Polar-orbiting Partnership (SNPP) unit was launched in 2011 and the NOAA-20 (previously JPSS-1) unit was launch in 2017. Both SNPP and NOAA-20 ATMS units are currently operational and the data is used for numerical weather prediction (NWP) models. The NOAA-21 (formerly JPSS-2) ATMS unit was launched on November 10, 2022 from Vandenberg Space Force Base in California [2]. The ATMS instrument began generating radiance data on November 21, 2022. At the time of this abstract NOAA-21 ATMS is currently completing on-orbit commissioning and checkout activities; it is expected that the commissioning activities will be complete by the IGARSS 2023 conference. This paper will focus on the on-orbit performance of the NOAA-21 ATMS instrument based on measurements and activities from the commissioning period. Comparisons will be made to specifications and to expected performance based on pre-launch test activities. Pre-launch JPSS-2 (NOAA-21) ATMS performance is detailed in [4]. Additionally, the NOAA-21 performance will be compared to the on-orbit performance of the SNPP and NOAA-21 ATMS units. The post-launch performance of SNPP ATMS is detailed in [1][5][6][7]. The post-launch performance of NOAA-20 ATMS is detailed in [5][7][8]. On-orbit performance is evaluated through data collects from nominal mission operations as well as specific post-launch tests and spacecraft maneuvers. Nominal mission operations can be used to evaluate parameters such as instrument thermal stability, Noise Equivalent Delta Temperature (NEDT)/radiometric sensitivity, geolocation, inter-channel noise correlation, striping, and radiometric bias and stability. Shortly after instrument activation, the instrument thermal stability as measured from onboard temperature sensors is evaluated to demonstrate stable and steady-state behavior. Methods for computing NEDT are described in [9][10][11]. Passive geolocation measurements are performed using the coastline inflection point (CIP) method, described in [8][12]. The striping index, used as a metric to quantify striping, is the ratio of along-track variance to cross-track variance of the observed brightness temperature [4][8][14]. Inter-channel noise correlation has been previously reported for SNPP and NOAA-20 [1][8]. Dedicated post-launch tests and spacecraft maneuvers are utilized during the commissioning phase for further evaluation of on-orbit instrument performance. These activities provide information on the optimal space view selection, noise power spectral density (PSD), gain stability, scan bias, interference from onboard transmitters, reflector emissivity, active geolocation, and radiometric bias and stability detection methods. The optimal space view selection is used to determine which of ATMS space view sectors is preferred for minimizing contamination of the space view [1]. Point and stare testing is used to generate noise PSD and gain stability information, as described in [1][8]. Spacecraft roll and pitch maneuvers allow the ATMS to view different zones, including deep space, and the data can be used to provide information on scan biases and antenna sidelobe contamination [1][8]. The pitch maneuver can also be used to assess interference from onboard Ka-band transmitters and reflector emissivity [8]. Active geolocation is evaluated as a method for geolocation, described in [15].

Edward Kim↗

Pre-Launch Performance Trending of Joint Polar Satellite System (JPSS) Advanced Technology Microwave Sounder (ATMS)

The Advanced Technology Microwave Sounder (ATMS) microwave radiometer instrument is utilized on-board NOAA’s Joint Polar Satellite System (JPSS) fleet of spacecraft to perform temperature and water vapor soundings of Earth’s atmosphere. Consisting of 22 channels over a frequency range from 22 to 183 GHz, ATMS provides high-impact observations for numerical weather prediction (NWP) models. A general description of the ATMS instrument is discussed in [1]. There are five ATMS flight units in the polar-orbiting JPSS program; three are currently on-orbit and two are pending launch. The first ATMS was flown on the Suomi National Polar-orbiting Partnership (SNPP) satellite, launched in 2011. The second ATMS was launched on the NOAA-20 (previously JPSS-1) satellite in 2017. The third ATMS was launched on the NOAA-21 (previously JPSS-2) satellite in 2022. The SNPP and NOAA-20 ATMS units are operational. The NOAA-21 ATMS unit is completing on-orbit commissioning and checkout, having achieved provisional maturity status in December 2022 with validated maturity expected in May 2023 [2]. The fourth and fifth ATMS units are planned for the JPSS-3 (launch ~2028) and JPSS-4 (launch ~2032) satellites [3]. This paper will focus on trending performance characteristics of each JPSS ATMS build from the pre-launch activities. Pre-launch trending of some parameters have been previously published up to the JPSS-3 mission [4][5]. This paper differs from and expands the scope of the prior work as it will include all five of the JPSS ATMS builds. The entire suite of JPSS ATMS units have completed their pre-ship instrument-level I&T and verification activities. These activities include a radiometric performance characterization of each instrument. In addition to comparing the performance across builds, the performance will also be compared to requirements and specifications where applicable. The on-orbit performance of the launched units will be excluded from the scope of this paper in order to focus on evaluations that are common across all builds. The post-launch performance of SNPP ATMS is detailed in [1][6][7][8]. The post-launch performance of NOAA-20 ATMS is detailed in [6][8][9]. The pre-launch characterization of the ATMS occurs at both subassembly-level and instrument-level testing. The antenna subsystem is tested at Northrop Grumman’s Compact Antenna Test Range (CATR) in Azusa, CA [9]. This testing characterizes the antenna pattern and the pointing performance of the scan drive mechanism and antenna subsystem. Trended parameters from this evaluation will include beam pointing accuracy, beamwidth, and beam efficiency. These parameters are captured in each instrument’s Calibration Data Book [10]. Instrument-level radiometric performance evaluation is primarily done during thermal vacuum (TVAC) calibration testing at Northrop Grumman’s Azusa, CA facility [9]. A general description of the calibration activities is presented in [1][9]. The testing involves inferring a scene target brightness temperature (TB) and comparing it to the actual scene TB while the instrument is at flight-like temperature and pressure environmental conditions. Trended parameters from this activity will include Noise Equivalent Delta Temperature (NEDT), nonlinearity, radiometric accuracy, gain stability, striping, and inter-channel noise correlation. The trending evaluation will allow for a direct comparison of the ATMS performance across builds. The paper will highlight observed performance improvements.

Edward J Kim↗

The Assembly, Test, and Integration of LOFTID (Low-Earth Orbit Flight Test of an Inflatable Decelera-tor)

R.J. Bodkin Biography Mr. Bodkin worked in industry for a rapid prototype company focusing on UAVs and manned experimental aircraft. Later he served as the Inflation System Lead on IRVE-II and 3 and the Re-Entry Vehicle Lead for LOFTID at NASA Langley Research Center. Introduction: The Low-Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID), developed in partnership with United Launch Alliance (ULA) and flown in conjunction with the National Oceanic and Atmospheric Administration (NOAA) Joint Polar Satellite System-2 (JPSS-2) satellite, demonstrated Hypersonic Inflatable Aerodynamic Decelerator (HIAD) technology has progressed and is ready for mission infusion. LOFTID’s success demonstrates that aeroshells are not limited to the internal diame-ter of the launch vehicle payload fairing, allowing larger payloads to be deployed to the surfaces of planetary bodies with atmospheres. The challenges of assembling, integrating, and testing this revolutionary spacecraft will be dis-cussed as well as issues associated with doing this with a fixed launch date the project did not control. Assembly: Because LOFTID flew as a rideshare partner with JPSS-2, it was constrained with addi-tional schedule, milestone, and technical require-ments that were beyond the project’s control. As-sembly of the LOFTID hardware was challenged with the normal mechanical fit issues while also having to navigate the SARS-COVID-II pandemic. Challenges ranged from availability of team per-sonnel required on-site for vehicle assembly to dif-ficulties associated with team collaboration while working remotely and increased costs and lead times of components due to supply chain con-straints. Numerous additional challenges cascaded from the additional time required. Integration: LOFTID flew as a secondary pay-load to JPSS-2 in a mission-unique configuration, directly under JPSS-2 primary payload, inside the Payload Adapter that integrated JPSS-2 to the Atlas V launch vehicle. A mission unique Payload Adapt-er Separation System (PASS) was required to sepa-rate the Payload Adapter from the Launch Vehicle prior to the start of the LOFTID flight demonstra-tion. Development of this system was challenging due to a shortened development schedule resulting from the iterative nature of Payload Adapter devel-opment with the partners at ULA. Preparations to integrate the main segments of the LOFTID vehicle posed unique challenges of having to accommodate issues with a fixed launch date that led to some cre-ative solutions to the integration. The partnership agreement with ULA and JPSS-2 resulted in a mass simulator designed to be installed late in the inte-gration in the event the LOFTID vehicle was not ready in time.. Test: LOFTID testing was carried out in several phases. Some components were tested at the com-ponent level, others at the sub-system levels and then finally the integrated vehicle level. This culmi-nated with the Complete Systems Test (CST) per-formed in a vacuum chamber as one of the final checkouts prior to disassembly for re-packing of the aeroshell. CST challenges will be discussed as well as obstacles encountered post-CST. After CST, the vehicle was disassembled so the HIAD could be repacked, and the vehicle was reassembled for ac-ceptance vibration testing. Testing concluded with the fully assembled vehicle being shipped to the launch site for final testing and integrations with the Payload Adapter to JPSS-2 for launch and opera-tions. Conclusion: The challenges posed by the AI&T for LOFTID could inform the planetary community of some of the opportunities and challenges of de-veloping technologies on a rideshare with a rela-tively small budget.

R.J. Bodkin↗

High-Speed Video of Lightning Strikes to Communications Tower on 7 August 2023

NASA operates a high-speed camera (a MIRO M310 manufactured by Vision Research) on the fourth floor of the Operations and Checkout Building pointed at the communications tower that is in the Industrial Area of Kennedy Space Center. Figure 1 shows the location of the camera and tower. Figure 2 shows the camera view during daylight. On 7 August 2023 between 11 pm and 12 am eastern standard time, three lightning flashes to the tower were recorded.

lightning↗

2021-2022 Long-Term Groundwater Monitoring Report Industrial Area Kennedy Space Center, Florida

This report presents the groundwater sampling results from the National Aeronautics and Space Administration (NASA) Industrial Area (IA) 2021-2022 Long-Term Monitoring (LTM) activities and results of the 2023 DPT activities at three of the sites. The NASA IA LTM Program includes the following 14 sites: - Ransom Road Landfill (RRLF) – Solid Waste Management Unit (SWMU) 003 - Orsino Storage Yard (ORSY) – SWMU 004 - Building M7-0505 Treatment Tank Area (M505) – SWMU 039 - Hypergol Maintenance Facility Hazardous Waste South Staging Area (HMF South) – SWMU 070 - Operations and Checkout Building (O&C) – SWMU 076 - Vertical Processing Facility (VPF) – SWMU 077 - Environmental Health Facility (EHF) – SWMU 079 - Kennedy Athletic, Recreation, and Social Park 1 (KARS Park 1) – SWMU 084 - Engineering Development Laboratory (EDL) – SWMU 085 - Launch Equipment Test Facility (LETF) – SWMU 091 - Mobil Service Station (MOBIL) – SWMU 093 - General Services Administration Seized Property (GSSP) – SWMU 095 - Space Station Processing Facility (SSPF) – SWMU 098 - Fuel Storage Area #1 Underground Storage Tank (UST) [Building 1044] (FSA1) – Potential Release Location (PRL) 157 Groundwater levels were gauged at each site during the 2021 and 2022 LTM field activities. Sampling events for the IA LTM Program are conducted seasonally during the dry and wet seasons, which occur in May and November, respectively. The sites in the NASA IA LTM Program are sampled on annual, biennial, or 5-year sampling frequencies based on historical trends. Due to contract transitions and monitoring well installations, 2021 dry season activities were conducted during September 2021, while dry season activities for 2022 resumed in May 2022.

groundwater↗

Orbit Determination For Lucy's First Asteroid Encounter: The Dinkinesh (1999VD57) Flyby

Lucy, NASA’s 13th Discovery program mission, launched on October 16, 2021, is enroute to explore the Jupiter-Trojan asteroids situated at the L4 and L5 Lagrange points. Along this trajectory, Lucy will conduct flybys of two main belt asteroids and perform three Earth fly-bys. This paper delves into the Orbit Determination (OD) process during the Dinkinesh flyby, marking Lucy’s inaugural encounter with an asteroid. The Dinkinesh flyby achieved a significant milestone, flawlessly completing the engineering systems checkout. The discussion herein encompasses the OD strategy, setup, and computed OD solutions during operations. The paper further explores the impact of solar conjunction on the OD solutions and decisions and sheds light on the discovery of Selam, a contact binary orbiting Dinkinesh. Preliminary reconstructed trajectories for both Lucy and Dinkinesh, and an initial state of Selam, are presented. The close approach radial distance of Lucy from Dinkinesh was 430.63 km±0.02km in formal uncertainty.

Jeroen L. Geeraert↗

Off-Earth Servicing Component Advancement (OESCA) Flight-like Coriolis Mass Flowmeter Development

With the completion of this initial technology development effort, additional work will be required for infusion and advancement through TRL 7. The remainder of the flight-level environmental testing (electromagnetic interference and compatibility or electromagnetic interference/electromagnetic compatibility (EMI/EMC), thermal vacuum or TVAC, along with vibration and shock testing) and post-test functional checkouts will need to be completed and are currently planned as part of an awarded STMD Early Career Initiative (ECI) Project called Advancement of Exploration Components for In-Space Servicing or AXCIS. The results and reports from these additional tests during the ECI effort will complete the technology development package, advancing the TRL to 5 or 6 while providing a vendor capable of manufacturing flight units and a flight-ready design as well as lessons-learned from the environmental testing. The Coriolis flowmeter development unit would then be incorporated into a demonstration testbed system for microgravity testing to further understand how it functions and performs in a space-like environment, advancing the developed technology to TRL 6 or 7. Following this infusion path will enable NASA program(s)/proposal(s) to procure a flight-rated high accuracy Coriolis mass flowmeter for incorporation into in-space and Lunar/Martian surface spacecraft propellant resupply systems which, after successful mission use, will bring the TRL to 7+.

Amy Felt↗