Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COMMISSIONING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,117 records · Page 62

Proton beam dynamics in bare IOTA with intense space-charge

We are commissioning a 2.5-MeV proton beam for the Integrable Optics Test Accelerator at Fermilab, allowing experiments in the strong space-charge regime with incoherent betatron tune shifts nearing 0.5. Accurate modelling of space-charge dynamics is vital for understanding planned experiments. We compare anticipated emittance growth and beam loss in the bare IOTA configuration using transverse space-charge models in Xsuite, PyORBIT, and MADX simulation codes. Our findings reveal agreement within a factor of 2 in core phase-space density predictions up to 100 synchrotron periods at moderate beam currents, while tail distributions and beam loss show significant differences.

43 PARTICLE ACCELERATORS↗

Progress towards the completion of the proton power upgrade project

The Proton Power Upgrade project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion in early 2025, 2 MW of beam power will be available for neutron production at the existing first target station (FTS) with the remaining beam power available for the future second target station (STS). The project has installed seven superconducting radio-frequency (RF) cryomodules and supporting RF power systems to increase the beam energy by 30% to 1.3 GeV, and the beam current will be increased by 50%. The injection and extraction region of the accumulator ring are being upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. The first four cryomodules and supporting systems were commissioned in 2022-2023 and supported neutron production at 1.05 GeV, 1.7 MW with high reliability. The first-article 2 MW target was operated successfully for approximately 4400 MW-Hours over two run periods. The long outage began in August 2023 for installation of the remaining technical equipment and construction of the Ring-to-Target Beam Transport tunnel stub that will enable connection to the STS without interrupting operation of the FTS. The upgrade is proceeding on-schedule and on-budget, and resumption of neutron production for the user program is planned for July 2024.

43 PARTICLE ACCELERATORS↗

Optics tuning of the FCC-ee

The Future Circular Collider, FCC-ee, is a proposed next generation electron-positron collider aiming to provide large luminosities at beam energies from 45.6 up to 182.5 GeV. This collider faces a major challenge to deliver the design performance in the presence of realistic lattice errors. A commissioning strategy has been developed including dedicated optics designs, efficient beam-based alignment and optics corrections based on refined optics measurements. First specifications on main magnets, corrector circuits, and instrumentation have also been investigated. A summary of all these aspects is presented in this paper.

Tomas, Rogelio [CERN]↗

Beam results for the new super-conducting booster at Jefferson Lab

The performance results of a new super-conducting booster for the CEBAF injector at Jefferson Lab, could be of interest for other similar electron injectors. A recent addition of this new booster has provided us the ability to achieve a more adiabatic acceleration and therefore an improvement to the beam dynamics and beam brightness. It has also simplified the design and operation of the section of the injector responsible for accelerating the electron beam from a few hundred keV to several MeV (typically 6.7 MeV). The addition of the new booster was part of an upgrade to the CEBAF injector to improve the beam quality for future physics experiments with high sensitivity to beam quality. The booster consists of two cavities: a 2-cell cavity followed by a 7-cell cavity. This combination allows for a wide range of input electron beam energies, from 130 keV to more than 300 keV. In fact, during the last year, the booster was successfully operated with 140,180, and 200 keV input beam energies as the electron gun was being upgraded. This paper describes the new booster, presents beam optics data results from different beam studies, commissioning, and the physics quality beam operation.

Accelerator Physics↗

First degraded beams in the CEBAF injector

The electron beam degrader in the Continuous Electron Beam Accelerator Facility (CEBAF) injector at Jefferson Lab serves to generate electron beams with transverse emittance over 10x the nominal values, with the ultimate goal of using degraded electron beams to measure machine acceptance. Electron beams are degraded through multiple scattering in thin carbon foils, and maximum transverse emittance is defined through two collimating apertures. The degrader device was installed in late 2024, with commissioning and first beams on degrader targets during the 2025 physics run. We report on first operation of the degrader device. This material is based upon work supported by the U.S. Department of Energy, Office of Science, Office of Nuclear Physics under contract DE-AC05-06OR23177.

Sy, A. [Thomas Jefferson National Accelerator Faci↗

First SELAP Algorithm Operational Experience of the New LLRF 3.0 RF Control System

The JLAB LLRF 3.0 system has been developed and is replacing the 30-year-old LLRF systems in the CEBAF accelerator. The LLRF system builds upon 25 years of design and operational RF control experience (digital and analog), and our recent collaboration in the design of the LCLSII LLRF system. The new system also incorporates a cavity control algorithm using a fully functional phase and amplitude locked Self Exciting Loop (SELAP). The first system (controlling 8 cavities) was installed and commissioned in August of 2021. Since then the new LLRF system has been operating with cavity gradients up to 20 MV/m, and electron beam currents up to 350 uA. This paper discusses the operational experience of the LLRF 3.0 SELAP algorithm along with other software and firmware tools like cavity and klystron characterization and quench detection.

Plawski, T. E.↗

A New Experimental Station for Liquid Interface X-Ray Scattering At NSLS-II Beamline 12-ID

Open Platform and Liquids Scattering (OPLS) is a new experimental station recently built and currently being commissioned at the Soft Matter Interfaces (SMI) beamline 12-ID at NSLS-II. The new instrument expands SMI’s beamline scientific capabilities via the addition of X-ray scattering techniques from liquid surfaces and interfaces. The design of this new instrument, located inside the 12-ID beamline shielding enclosure (hutch B), is based on a single Ge (111) crystal deflector, which bounces the incident x-ray beam downward towards a liquid sample which must be maintained in a horizontal orientation (gravity-driven consideration). The OPLS instrument has a variable deflector-to-sample distance ranging from 0.6 m to 1.5 m. X-ray detectors are mounted on a 2-theta scattering arm located downstream of the sample location. The 2-theta arm is designed to hold up to three X-ray detectors, with fixed 2-theta angular offsets, each dedicated to a different X-ray technique such as X-ray reflectivity, grazing-incidence X-ray scattering, and small- and wide-angle X-ray scattering. Currently, the OPLS experimental station intercepts the SMI beam that otherwise propagates to the experimental endstation located in hutch C and can be retracted to a ’parking’ position laterally out of this beam to allow installation of a removable beam pipe that is needed to support operations in hutch C. The design of OPLS is flexible enough to quickly adapt to a planned future configuration of the SMI beamline in which a OPLS is illuminated separately from the main SMI branch via a second, canted undulator source and a separate photon delivery system. In this future configuration, both branches will be able to operate independently and simultaneously.

36 MATERIALS SCIENCE↗

Experimental Studies of Single Invariant Quasi-Integrable Nonlinear Optics at IOTA

The Integrable Optics Test Accelerator is a research electron and proton storage ring recently commissioned at the Fermilab Accelerator Science and Technology facility. Its research program is focused on testing novel techniques for improving beam stability and quality, notably the concept of non-linear integrable optics. In this paper, we report on run 1 results of experimental studies of a quasi-integrable transverse focusing system with one invariant of motion, a Henon-Heiles type system implemented with octupole magnets. Good agreement with simulations is demonstrated on key parameters of achievable tune spread, dynamic aperture, and invariant conservation. We also outline current simulation and hardware improvement efforts for run 2, planned for fall of 2019.

43 PARTICLE ACCELERATORS↗

Online Modelling and Optimization of Nonlinear Integrable Systems

Nonlinear integrable optics was recently proposed as a design approach to increase the limits on beam brightness and intensity imposed by fast collective instabilities. To study these systems experimentally, a new research electron and proton storage ring, the Integrable Optics Test Accelerator, was constructed and recently commissioned at Fermilab. Beam-based diagnostics and online modelling of nonlinear systems presents unique challenges - in this paper, we report on our efforts to develop optimization methods suited for such lattices. We explore the effectiveness of neural networks as fast online surrogate estimators, and integrate them into a beam-based tuning algorithm. We also develop a method of knob dimensionality reduction and subsequent robust multivariate optimization for maximizing key performance metrics under complicated lattice optics constraints.

43 PARTICLE ACCELERATORS↗

A 500 KV INVERTED GEOEMTRY FEEDTHROUGH FOR A HIGH VOLT-AGE DC ELECTRON GUN

The Continuous Electron Beam Accelerator Facility injector at Jefferson Lab (JLab) utilizes an inverted-geometry ceramic insulator photogun operating at 130 kV direct current to generate spin-polarized electron beams for high-energy nuclear physics experiments. A second photogun delivers 180 keV beam for commissioning a SRF booster in a testbed accelerator, and a larger version delivers 300 keV magnetized beam in a test stand beam line. This contribution reports on the development of an unprecedented inverted-insulator with cable connector for reliably applying 500 kV DC to a future polarized beam photogun, to be designed for operating at 350 kV without field emission. Such a photogun design could then be used for generating a polarized electron beam to drive a spin-polarized positron source as a demonstrator for high energy nuclear physics at JLab. There are no commercial cable connectors that fit the large inverted insulators required for that voltage range. Our proposed concept is based on a modified epoxy receptacle with intervening SF6 layer and a test electrode in a vacuum vessel.

Hernandez-Garcia, C.↗

Nb₃Sn Coating of a 2.6 GHz SRF Cavity by Sputter Deposition Technique

Nb₃Sn is of interest as a coating for SRF cavities due to its higher transition temperature Tc ~18.3 K and superheating field Hsh ~400 mT, both are twice that of Nb. Nb₃Sn coated cavities can achieve high-quality factors at 4 K and can replace the bulk Nb cavities operated at 2 K. A cylindrical magnetron sputtering system was built, commissioned, and used to deposit Nb₃Sn on the inner surface of a 2.6 GHz single-cell Nb cavity. With two identical cylindrical magnetrons, this system can coat a cavity with high symmetry and uniform thickness. Using Nb-Sn multilayer sequential sputtering followed by annealing at 950°C for 3 hours, polycrystalline Nb₃Sn films were first deposited at the equivalent positions of the cavity’s beam tubes and equator. The film’s composition, crystal structure, and morphology were characterized by energy dispersive spectroscopy, X-ray diffraction, and atomic force microscopy. The Tc of the films was measured by the four-point probe method and was 17.61 to 17.76 K. Based on these studies, ~1.2 micron thick Nb₃Sn was deposited inside a 2.6 GHz Nb cavity. We will discuss first results from samples and cavity coatings, and the status of the coating system.

43 PARTICLE ACCELERATORS↗

Analog Signal Multiplexing System for the Iota Proton Injector

The Fermilab Accelerator Science and Technology (FAST) Facility at FNAL is a dedicated research and development center focused on advancing particle accelerator technologies for future applications worldwide. Currently, a key objective of FAST Operations is to commission the 2.5 MeV IOTA Proton Injector (IPI) and enable proton injection into the Integrable Optics Test Accelerator (IOTA) storage ring. The low and medium-energy sections of the IPI include four frame-style dipole trims and two multi-function correctors with independently controlled coils, requiring readout of 32 analog channels for current and voltage monitoring in total. To reduce cost and optimize rack space within the PLC-based control system, a 32-to-4 analog signal multiplexing system was designed and implemented. This system enables real-time readback of excitation parameters from all magnetic correctors. This paper presents the design, construction, implementation, and performance of the multiplexing system.

MacLean, Daniel R. [Fermilab] (ORCID:0000000210103↗

Mu2e resonant extraction regulation system simulation in delivery ring

Mu2e is an upcoming experiment at Fermilab that relies on the slowly extracted 8 GeV proton beam from the Delivery Ring. The experiment imposes strong requirements on the spill uniformity. To address these requirements, the fast spill regulations system is being developed and commissioned. To inform this development and optimize the system performance we are carrying out the detailed simulations of the regulation process. The simulation includes the effect of six harmonic sextupoles that excite the third-integer resonance and three fast ramping quadrupoles that drive the horizontal tune to 29/3. The components of spill regulation system are designed to mitigate long-term drifts in the beam, ensuring stable operation over extended timescales, as well as addresses rapid variations within single spill. In this study, we review the regulation system design, simulation of the slow regulation, and the fast regulation PID regulation to curtail random variations in the extraction rate that could occur within a single spill.

Narayanan, Aakaash [Fermilab]↗

Preliminary Introduction of the IOTA Bake System

The Integrable Optics Test Accelerator (IOTA) ring is vital to the advancement of accelerator sciences, and a large part of its attractiveness to accelerator physicists is its modularity and the versatility that this function provides. Up until this point, the FAST accelerator has provided electron beam for the studies in IOTA. With the soon to be commissioned IOTA Proton Injector in lieu, the requirement for better vacuum to support future proton studies in the ring have arrived. Our solution is the IOTA Bake System which has the goal of facilitating this requirement.

Thompson, T. K. [Fermilab]↗

Preliminary Results from Magnetic Field Scanning System for a Single-Cell Niobium Cavity

One of the building blocks of modern particle accelerators is superconducting radiofrequency (SRF) cavities. Niobium is the material of choice to build such cavities, which operate at liquid helium temperature (2 - 4 K) and have some of the highest quality factors found in Nature. There are several sources of residual losses, one of them is trapped magnetic flux, which limits the quality factor in SRF cavities. The flux trapping mechanism depends on different niobium surface preparations and cool-down conditions. Suitable diagnostic tools are not yet available to study the effects of such conditions on magnetic flux trapping. A magnetic field scanning system (MFSS) for SRF cavities using Hall probes and Fluxgate magnetometer has been designed, built, and is commissioned to measure the local magnetic field trapped in 1.3 GHz single-cell SRF cavities at 4 K. In this contribution, we will present the preliminary results from MFSS for a single cell niobium cavity.

Ciovati, G.↗

STC Qualification Tests of PIP-II HB650 Cavities

Design of the high beta 650 MHz prototype cryomodule for PIP-II is currently undergoing at Fermilab. The cryomodule includes six 5-cell elliptical SRF cavities with accelerating voltage up to 20 MV and low heat dissipation (Q₀ > 3.3 · 10^{z}EhNZeHn). Characterization of performance of fully integrated jacketed cavities with high power coupler and tuner is crucial for the project. Such a characterization of jacketed cavity requires a horizontal test cryostat. The Fermilab Spoke Test Cryostat (STC) has been upgraded to accommodate testing of 650 MHz cavities. Commissioning of upgraded STC has been reported at SRF’19 conference. In this paper we present results of testing of the prototype HB650 cavity in upgraded STC facility. We characterize cavity performance and qualify it for the prototype HB650 cryomodule assembly.

43 PARTICLE ACCELERATORS↗

FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. During the first 12 months of user operations, the FRIB accelerator complex delivered 5250 beam hours, including 1528 hours to nine science experiments conducted with primary beams of 36Ar, 48Ca, 70Zn, 82Se, 124Xe, and 198Pt at beam energies >200 MeV/u; 2724 hours for beam developments, studies, and tuning; and 998 hours to industrial users and non-scientific programs using the FRIB Single Event Effect (FSEE) beam line. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on FRIB status and progress since SRF2021, emphasizing lessons learned during the transition from beam commissioning to machine operations, challenges and resolutions for the power ramp-up, progress with accelerator improvements, and R&D for the energy upgrade.

43 PARTICLE ACCELERATORS↗

Detecting the undetected: Dealing with non-routine events using advanced M&V meter-based savings approaches

In a rapidly evolving energy industry, utilities are dealing with new challenges like integrating distributed energy resources and market saturation for advanced lighting retrofits. Demand-side management programs require new approaches to meet aggressive carbon reduction goals. Advanced measurement & verification (M&V) is an energy data analysis method using smart meter data in combination with analytics to quantify energy efficiency project savings. Advanced M&V shows great promise for supporting next generation commercial programs including retro commissioning, multi-measure retrofits, and behavior change programs. Advanced M&V captures real project impacts at the meter, but sometimes non-project events can also impact consumption (so-called “non-routine events” [NREs]). Accurately detecting and accounting for NREs is important for reducing uncertainty of savings estimates and helps manage investment risk for different stakeholders (e.g., utilities, building owners, ESCOs). Recent research has shown promise in establishing data-driven techniques to identify and adjust for NREs, but fundamental questions still remain, such as: how can you distinguish NREs from acceptable noise in energy consumption profiles? What is the frequency and magnitude of NREs? Can their detection and adjustment be automated and streamlined? This paper documents the state of the art in NRE quantification and analysis. The results of research to quantify the frequency, nature and direction of NREs, and methods and metrics for determining a trigger threshold for taking action on NREs are presented. The paper also documents the latest technical guidance on application of NRE detection and adjustment methods.

Fernandes, Samuel↗