Overview of NASA Electrified Aircraft Propulsion Research for Large Subsonic Transports

NASA is investing in Electrified Aircraft Propulsion (EAP) research as part of the portfolio to improve the fuel efficiency, emissions, and noise levels in commercial transport aircraft. Turboelectric, partially turboelectric, and hybrid electric propulsion systems are the primary EAP configurations being evaluated for regional jet and larger aircraft. The goal is to show that one or more viable EAP concepts exist for narrow body aircraft and mature tall-pole technologies related to those concepts. A summary of the aircraft system studies, technology development, and facility development is provided. The leading concept for mid-term (2035) introduction of EAP for a single aisle aircraft is a tube and wing, partially turbo electric configuration (STARC-ABL), however other viable configurations exist. Investments are being made to raise the TRL level of light weight, high efficiency motors, generators, and electrical power distribution systems as well as to define the optimal turbine and boundary layer ingestion systems for a mid-term tube and wing configuration. An electric aircraft power system test facility (NEAT) is under construction at NASA Glenn and an electric aircraft control system test facility (HEIST) is under construction at NASA Armstrong. The correct building blocks are in place to have a viable, large plane EAP configuration tested by 2025 leading to entry into service in 2035 if the community chooses to pursue that goal.

aircraft engines↗

Situated Usability Testing for Security Systems

While usability testing is well established, assessing the usability of security software, tools, or methods deserves more careful consideration. It has been argued that dealing with security has become too difficult for individuals or organizations to manage effectively or to use conveniently. As difficult as it is for system administrators and developers to deal with, security is even more challenging for casual users. Indeed, it is much too easy for casual/home users to configure the security of their systems in non-optimal ways that leave their systems inadvertently insecure. This is exacerbated by the fact that casual users are focused on matters other than security, and likely would prefer not even to think about security. This brief report argues that when security and/or privacy are part of the equation, traditional methods for usability testing should be re-considered. The purpose of this brief report is to argue for and outline a method associated with a new approach to usability testing for examining usable security issues.

99 GENERAL AND MISCELLANEOUS↗

International Space Station Environmental Control and Life Support System Acceptance Testing for Node 1 Atmosphere Control and Supply Subsystem

The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Supply (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper provides a summary of the Node 1 ECLS ACS subsystem design and a detailed discussion of the ISS ECLS Acceptance Testing methodology utilized for that subsystem.

Williams, David E.↗

Impact of Detailed Parameter Modeling of Open-Cycle Gas Turbines on Production Cost Simulation: Preprint

Flexible resources are increasingly important as variable renewable energy deployment in the power system increases. Although many systems are transitioning away from fossil fuels, open-cycle gas turbines are likely to play an important balancing role for some time, thus requiring accurate modeling of their operational parameters. This paper explores the impact of detailed representation of three operational parameters - start- up costs, run-up rates, and forced outage rates - in the production cost model of a system as it adopts higher levels of wind and solar. Using PLEXOS simulations of the NREL-118 bus test system, the study examines how more detailed parameter modeling affects outcomes such as the number of start-ups and shutdowns, ramping and total generation costs for open-cycle gas turbines, as renewable energy levels increase. The results suggest the value of detailed parameter modeling and continued research on combustion turbines' ability to provide flexibility.

economic dispatch↗

SEXTANT X-Ray Pulsar Navigation Demonstration: Flight System and Test Results

The Station Explorer for X-ray Timing and Navigation Technology (SEXTANT) is a technology demonstration enhancement to the Neutron-star Interior Composition Explorer (NICER) mission. NICER is a NASA Explorer Mission of Opportunity that will be hosted on the International Space Station (ISS). SEXTANT will, for the first time, demonstrate real-time, on-board X-ray Pulsar Navigation (XNAV), a significant milestone in the quest to establish a GPS-like navigation capability available throughout our Solar System and beyond. This paper gives an overview of the SEXTANT system architecture and describes progress prior to environmental testing of the NICER flight instrument. It provides descriptions and development status of the SEXTANT flight software and ground system, as well as detailed description and results from the flight software functional and performance testing within the highfidelity Goddard Space Flight Center (GSFC) X-ray Navigation Laboratory Testbed (GXLT) software and hardware simulation environment. Hardware-in-the-loop simulation results are presented, using the engineering model of the NICER timing electronics and the GXLT pulsar simulator-the GXLT precisely controls NASA GSFC's unique Modulated X-ray Source to produce X-rays that make the NICER detector electronics appear as if they were aboard the ISS viewing a sequence of millisecond pulsars.

SEXTANT↗

SEXTANT X-Ray Pulsar Navigation Demonstration: Flight System and Test Results

The Station Explorer for X-ray Timing and Navigation Technology (SEXTANT) is a technology demonstration enhancement to the Neutron-star Interior Composition Explorer (NICER) mission. NICER is a NASA Explorer Mission of Opportunity that will be hosted on the International Space Station (ISS). SEXTANT will, for the first time, demonstrate real-time, on-board X-ray Pulsar Navigation (XNAV), a significant milestone in the quest to establish a GPS-like navigation capability available throughout our Solar System and beyond. This paper gives an overview of the SEXTANT system architecture and describes progress prior to environmental testing of the NICER flight instrument. It provides descriptions and development status of the SEXTANT flight software and ground system, as well as detailed description and results from the flight software functional and performance testing within the high-fidelity Goddard Space Flight Center (GSFC) X-ray Navigation Laboratory Testbed (GXLT) software and hardware simulation environment. Hardware-in-the-loop simulation results are presented, using the engineering model of the NICER timing electronics and the GXLT pulsar simulator-the GXLT precisely controls NASA GSFC's unique Modulated X-ray Source to produce X-rays that make the NICER detector electronics appear as if they were aboard the ISS viewing a sequence of millisecond pulsars

Pulsar↗

Letter Report to Address Comments on the Closure Report for Corrective Action Unit 224: Decon Pad and Septic Systems, Nevada Test Site, Nevada, Revision 0, March 2008

The Closure Report (CR) for Corrective Action Unit (CAU) 224, Decon Pad and Septic Systems, was approved by the Nevada Department of Environmental Protection (NDEP) on November 01, 2007. The approval letter contained the following two comments: Comment 1--For 06-05-01, 06-17-04, 06-23-01 provide evidence that the 6 inch VCP pipe originating from building CP-2 is no longer active and sealed to prevent possible future contamination. Comment 2--For the area that includes 06-03-01, provide evidence that active lines are no longer feeding the North and South lagoons and have been sealed to prevent possible future contamination. To address these comments, closure documentation was reviewed, and site visits were conducted to locate and document the areas of concern. Additional fieldwork was conducted in March 2008 to seal the lines and openings described in the two comments. Photographs were taken of the closed drains and lines to document that the NDEP comments were adequately addressed and potential inadvertent discharge to the environment has been eliminated. Investigation and closure documentation was reviewed to identify the locations of potential drains, lines, and other features that could receive and/or transmit liquid. Based on the investigation findings and subsequent closure activities, no openings, distribution boxes, or other features (excluding known floor drains at CP-2) that could receive liquid were found at the CP-2 location (Figure 1), and potential manholes for the north and south sewage lagoons were identified for Corrective Action Site (CAS) 06-03-01 (Figure 2). The distribution box identified in Figure 1 was not located during the investigation and was assumed to have been previously removed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Earth orbital teleoperator system evaluation: Test report, 1979 - 1980

Areas which have significant influence upon the engineering design of an operational teleoperator are addressed. Teleoperator lighting systems, thruster systems, and stereoptic visual systems are discussed. The effects of specified levels of several teleoperator subsystems on human operator performance are determined. Four evaluations are reviewed, each dealing with operator performance under various task conditions.

Source record↗

System for testing properties of a network

A method for identifying properties of a downhole electromagnetic network in a downhole tool sting, including the step of providing an electromagnetic path intermediate a first location and a second location on the electromagnetic network. The method further includes the step of providing a receiver at the second location. The receiver includes a known reference. The analog signal includes a set amplitude, a set range of frequencies, and a set rate of change between the frequencies. The method further includes the steps of sending the analog signal, and passively modifying the signal. The analog signal is sent from the first location through the electromagnetic path, and the signal is modified by the properties of the electromagnetic path. The method further includes the step of receiving a modified signal at the second location and comparing the known reference to the modified signal.

02 PETROLEUM↗

Liquid Methane/Liquid Oxygen Propellant Conditioning Feed System (PCFS) Test Rigs

As part of their Propulsion and Cryogenic Advanced Development (PCAD) program, NASA has embarked upon an effort to develop chemical rocket engines which utilize non-toxic, cryogenic propellants such as liquid oxygen (LO2) and liquid methane (LCH4). This effort includes the development and testing of a 100 lbf Reaction Control Engine (RCE) that will be used to evaluate the performance of a LO2/LCH4 rocket engine over a broad range of propellant temperatures and pressures. This testing will take place at NASA-Glenn Research Center's (GRC) Research Combustion Laboratory (RCL) test facility in Cleveland, OH, and is currently scheduled to begin in late 2008. While the initial tests will be performed at sea level, follow-on testing will be performed at NASA-GRC's Altitude Combustion Stand (ACS) for altitude testing. In support of these tests, Sierra Lobo, Inc. (SLI) has designed, developed, and fabricated two separate portable propellant feed systems under the Propellant Conditioning and Feed System (PCFS) task: one system for LCH4, and one for LO2. These systems will be capable of supplying propellants over a large range of conditions from highly densified to several hundred pounds per square inch (psi) saturated. This paper presents the details of the PCFS design and explores the full capability of these propellant feed systems.

Skaff, A.↗

Connected Lighting Systems Efficiency Study: PoE Cable Energy Losses, Part 2

DOE published a report in November 2017 (herein referred to as “Part 1”) summarizing the results of an exploratory study investigating power losses in Ethernet cables used between PoE switches and luminaires in PoE connected lighting systems. Testing was conducted at the Pacific Northwest National Laboratory (PNNL) Connected Lighting Test Bed (CLTB) in September 2017. The results were analyzed to explore the impact of cable selection on PoE lighting system energy efficiency, as well as the effectiveness of guidelines published by the American National Standards Institute (ANSI) C137 Lighting Systems Committee in 2017. The guidance offered in ANSI C137.3-2017 was found to be effective in limiting cable energy losses to 5% in PoE lighting applications, provided that the average cable length on a project does not exceed 50 m. This Part 2 report summarizes the results of a continued investigation of the power losses in Ethernet cables used between PoE switches and luminaires in PoE connected lighting systems. Testing was conducted at the PNNL CLTB in July-August 2018. A test setup comprising a PoE switch, a set of luminaires, and a reference meter was again used to test multiple cable models of varying design. The results were analyzed to explore the impact of cable selection and installation practices (e.g., cable bending, cable bundling, and installation in conduit) on PoE lighting system energy efficiency, as well as the effectiveness of the ANSI C137.3 guidelines. Notably, three cables—two of which were shielded—were previously excluded from the Part 1 study due to compatibility issues. All three cables were included in this Part 2 study, along with a fourth model cable introduced in Part 2. In addition, whereas no patch cords were used in Part 1, patch cords were used in some Part 2 testing. The ANSI C137.3 guidance was again shown to effectively limit power losses to less than 5% in the cables tested (varying in AWG, Category, shielding, fire rating, and manufacturer), and AWG again proved to be the most important cable design variable for energy performance, as expected. However, these findings should not be construed as being representative of all cable models and installation practices. For example, energy losses would be greater when cables are connected to patch cords, bundled in conduit, and loaded with powered devices (PDs) approaching 100 W input power. The other key finding was that with 44 W luminaires as PDs and room ambient temperatures below 30°C, cable energy losses were not substantially increased by cable bending or bundling in uninsulated conduit. However, environments with higher ambient temperatures will have greater energy losses due to increased conductor DCR. In addition, product selection and installation practices will have increased importance as PDs approaching 100 W input power—conveyed by a single Ethernet cable—are introduced following publication of the forthcoming Institute of Electrical and Electronics Engineers (IEEE) Standard 802.3bt. The report also provides recommendations and next steps, which include plans for additional PoE cable energy losses testing with higher-power PDs to more fully explore the potential of PoE lighting systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

In Vitro Thrombogenicity Testing of Biomaterials in a Dynamic Flow Loop: Effects of Length and Quantity of Test Samples

Abstract The results of in vitro dynamic thrombogenicity testing of biomaterials and medical devices can be significantly impacted by test conditions. To develop and standardize a robust dynamic in vitro thrombogenicity tool, the key test parameters need to be appropriately evaluated and optimized. We used a flow loop test system previously developed in our laboratory to investigate the effects of sample length and the number of samples per test loop on the thrombogenicity results. Porcine blood heparinized to a donor-specific target concentration was recirculated at room temperature through polyvinyl chloride (PVC) tubing loops containing test materials for 1 h at 200 mL/min. Four test materials (polytetrafluoroethylene (PTFE), latex, PVC, and silicone) with various thrombotic potentials in two sample lengths (12 and 18 cm) were examined. For the 12-cm long materials, two different test configurations (one and two samples per loop) were compared. Thrombogenicity was assessed through percent thrombus surface coverage, thrombus weight, and platelet count reduction in the blood. The test system was able to effectively differentiate the thrombogenicity profile of the materials (latex > silicone > PVC ≥ PTFE) at all test configurations. Increasing test sample length by 50% did not significantly impact the test results as both 12 and 18 cm sample lengths were shown to equally differentiate thrombotic potentials between the materials. The addition of a second test sample to each loop did not increase the test sensitivity and may produce confounding results, and thus a single test sample per loop is recommended.

Engineering↗

Initial Studies Toward Real-Time Transmission Path Rating

Demand continues to increase while transmission line construction is being constrained by multiple factors— economic, environmental, and political. Effective and efficient utilization of transmission lines is thus of great importance in an open access environment. Large blocks of power are transferred from areas with inexpensive generation to heavy load demand areas or areas with high generation costs. This results in some transmission paths being loaded closer to their path ratings, which limits further power transfer between areas. Traditionally, rating of important paths was determined off line by assuming the worst-case study scenario; once determined, it could be used for years. With increasing uncertainty arising from rapid growth of renewable energy and smart technologies, path rating studies are needed in near-real time to account for the latest system status and support a reliable and economic power grid. This paper adopts a simplified procedure based on standards of the North American Electric Reliability Corporation (NERC) to determine total transfer capability (TTC) or transfer limit for the purpose of demonstrating the benefits and necessity of real-time path rating. Initial studies are conducted to compute TTC of a two-area test system and a 39-bus test system. Results indicate that path rating can be significantly affected by loading conditions, generator schedules, system topology and other factors.

Singh, Ruchi↗

Distributed Control and Optimization of Virtual Inertia in Power Systems

The integration of renewable energy sources into power grids through inverter-based resources (IBRs) reduces system inertia, leading to faster frequency dynamics and potential grid instability. This paper proposes a distributed, consensus-based approach for the real-time control and optimization of inertia sources during system disturbances, enhancing both system stability and economic performance. Furthermore, we integrate this approach with the traditional inertia placement problem, demonstrating its suitability for existing frameworks. We validate its effectiveness in a 4-bus test system and a two-area 8-bus test system, showcasing its potential for scalable, dynamic inertia management in low-inertia grids.

Yadav, Ajay [ORNL] (ORCID:000000016111881X)↗

A Practical Approach to Starting Fission Surface Power Development

The Prometheus Power and Propulsion Program has been reformulated to address NASA needs relative to lunar and Mars exploration. Emphasis has switched from the Jupiter Icy Moons Orbiter (JIMO) flight system development to more generalized technology development addressing Fission Surface Power (FSP) and Nuclear Thermal Propulsion (NTP). Current NASA budget priorities and the deferred mission need date for nuclear systems prohibit a fully funded reactor Flight Development Program. However, a modestly funded Advanced Technology Program can and should be conducted to reduce the risk and cost of future flight systems. A potential roadmap for FSP technology development leading to possible flight applications could include three elements: 1) Conceptual Design Studies, 2) Advanced Component Technology, and 3) Non-Nuclear System Testing. The Conceptual Design Studies would expand on recent NASA and DOE analyses while increasing the depth of study in areas of greatest uncertainty such as reactor integration and human-rated shielding. The Advanced Component Technology element would address the major technology risks through development and testing of reactor fuels, structural materials, primary loop components, shielding, power conversion, heat rejection, and power management and distribution (PMAD). The Non-Nuclear System Testing would provide a modular, technology testbed to investigate and resolve system integration issues.

Mason, Lee S.↗

Water and Climate Impacts on Power System Operations: The Importance of Cooling Systems and Demand Response Measures

The U.S. electricity sector is highly dependent upon water resources; changes in water temperatures and water availability can affect operational costs and the reliability of power systems. Despite the importance of water for power system operations, the effects of changes in water characteristics on multiple generators in a system are generally not modeled. Moreover, demand response measures, which can change the magnitude and timing of loads and can have beneficial impacts on power system operations, have not yet been evaluated in the context of water-related power vulnerabilities. This effort provides a first comprehensive vulnerability and cost analysis of water-related impacts on a modeled power system and the potential for demand response measures to address vulnerability and cost concerns. This study uniquely combines outputs and inputs of a water and power plant system model, production cost, model, and relative capacity value model to look at variations in cooling systems, policy-related thermal curtailments, and demand response measures to characterize costs and vulnerability for a test system. Twenty-five scenarios over the course of one year are considered: a baseline scenario as well as a suite of scenarios to evaluate six cooling system combinations, the inclusion or exclusion of policy-related thermal curtailments, and the inclusion or exclusion of demand response measures. A water and power plant system model is utilized to identify changes in power plant efficiencies resulting from ambient conditions, a production cost model operating at an hourly scale is used to calculate generation technology dispatch and costs, and a relative capacity value model is used to evaluate expected loss of carrying capacity for the test system.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

AXAF VETA-I mirror ring focus measurements

The AXAF VETA-I mirror ring focus measurements were made with an HRI (microchannel plate) X-ray detector. The ring focus is a sharply focused ring formed by X-rays before they reach the VEAT-I focal plane. It is caused by spherical aberrations due to the finite source distance and the despace in the VETA-I test. The ring focus test reveals some aspects fo the test system distortions and the mirror surface figure which are difficult or impossible to detect at the focal plane. The test results show periodic modulations of the ring radius and width which could be caused by gravity, thermal, and/or epoxy shrinkage distortions. The strongest component of the modulation had a 12-fold symmetry, because these distortions were exerted on the mirror through 12 flexures of the VETA-I mount. Ring focus models were developed to simulate the ring image. The models were compared with the data to understand the test system distortions and the mirror glass imperfection. Further studies will be done to complete this work. The ring focus measurement is a very powerful test. We expect that a similar test for the finally assembled mirror of AXAD-I will be highly valuable.

Tananbaum, H. D.↗

Analyzing the Impacts of Increased Wind Power on Generation Revenue Sufficiency

The Revenue Sufficiency Guarantee (RSG), as part of make-whole (or uplift) payments in electricity markets, is designed to recover the generation resources' offer-based production costs that are not otherwise covered by their market revenues. Increased penetrations of wind power will bring significant impacts to the RSG payments in the markets. However, literature related to this topic is sparse. This paper first reviews the industrial practices of implementing RSG in major U.S. independent system operators (ISOs) and regional transmission operators (RTOs) and then develops a general RSG calculation method. Finally, an 18-bus test system is adopted to demonstrate the impacts of increased wind power on RSG payments.

17 WIND ENERGY↗