Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

The Mu2e crystal calorimeter

The Mu2e experiment at Fermilab will search for the charged-lepton flavour violating conversion of negative muons into electrons in the coulomb field of an Al nucleus, planning to reach a single event sensitivity of about $3\cdot10^{−17}$, four orders of magnitude beyond the current best limit.The conversion electron has a clear monoenergetic signature at 104.967 MeV, slightly below the muon rest mass, and will be identified by a complementary measurement carried out by a high-resolution tracker and an electromagnetic calorimeter (EMC). The calorimeter is composed of 1348 pure CsI crystals, each read by two custom UV-extended SiPMs, that are arranged in two annular disks. The EMC should achieve better than 10% energy resolution and 500 ps timing resolution for 100 MeV electrons and maintain extremely high levels of reliability and stability and in a harsh operating environment with high vacuum, 1 T B-field and radiation exposures up to 100 krad and $10^{12} \rm{n}_\rm{1MeVeq}/\rm{cm}^{2}$.The calorimeter technological choice, along with the design of the custom front-end electronics, cooling and mechanical systems were validated through an electron beam test on a large-scale 51-crystals prototype (Module-0) and extensive test campaigns that characterised and verified the performance of crystals, photodetectors, analogue and digital electronics. This included hardware stress tests and irradiation campaigns with neutrons, protons, and photons.The production and QC phases of all calorimeter components is completed apart for the digital electronics that has been revised for improving its resilience to SEU and SEL. A series of vertical slice tests with the final electronics is being carried out on the Module-0 at LNF along with the implementation and validation of the calibration procedures. The first disk has been assembled in 2022 while the second disk is under assembly at the moment of writing. Status of construction will be summarised, along with plans for commissioning and first calibration of the fully assembled disks.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

MOPED: An Alternative Workflow for HERON

MOPED is an alternate workflow to HERON. Preliminary tests display computational advantages of MOPED in terms of run time. While maintaining these advantages, solution convergence remained similar.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Developing VSC-HVDC Oscillation Damping Control Constraints in Unit Commitment

High-voltage direct current (HVDC) systems within the existing power grids will play a pivotal role in enabling high share of renewable power integration and transportation electrification. There is a need for transmission planning models to accurately capture the impact of VSC-HVDC oscillation damping control on the system planning and model the constraints in the security constrained unit commitment (SCUC) problem. In this paper, the SCUC problem in a hybrid DC-AC grid considering damping on electromechanical inter-area oscillation is studied. An electromechanical oscillation-driven transmission capability constraints are derived from system swing equation and incorporated into the SCUC. Multiple system damping control scenarios are set based on the extracted plausible bounds of damping coefficient and inertia constant to linearize the nonlinear expressions. The SCUC problem with proposed constraints is tested on the Reliability Test System Grid Modernization Lab Consortium (RTS-GMLC) via PLEXOS. The impact of the proposed constraints on regional generation, inertia, power flow, annual system cost, and renewable energy curtailment are fully assessed.

damping control↗

Cesium Removal Performance Comparisons of Crystalline Silicotitanate Media Batches with Savannah River Site Waste Simulant

The Tank Closure Cesium Removal (TCCR) system uses ion exchange columns filled with Crystalline Silicotitanate (CST) media to process radioactive waste solutions for the removal of Cs137. TCCR currently focuses on dissolving Savannah River Site (SRS) Tank 10H waste (primarily sodium salt cake solids) within the tank followed by at-tank ion exchange column treatment. Plans are underway to prepare and install a second TCCR unit at SRS. Capacity and particle size differences exist between archived (IE-911) and more recently-prepared CST media batches (9120- B and 9140-B). Side-by-side comparison testing was performed to evaluate the cesium removal performance of each batch to aid in selecting the preferred CST batch and media characteristics to load into the second TCCR unit. Batch contact equilibrium and flow-through column tests have been conducted with three CST batches using an SRS Average Simulant. Simulant batch contact equilibrium cesium loading results for the three CST batches (including two lots of one batch) are provided in Table ES-1. The 35 °C data indicates that the archived IE-911 batch has a higher cesium capacity than recently-prepared CST media and that the minor TCCR CST 9120-B media lot (2099000035) has similar cesium removal performance to the major TCCR lot (2099000034). Tests conducted at 25 ºC for the archived IE-911 CST batch indicated lower cesium removal performance with this simulant batch than was observed recently with a different SRS Average Simulant batch. A dilution factor (DF) is typically utilized when modeling engineered CST media cesium loading performance to account for mass contributions from the binder material. In cases where CST performance is lower than expected, this factor includes corrections for the binder and for low performance. The ZAM (Zheng, Anthony, and Miller) Isotherm Model DF values are provided in Table ES-1 for each simulant batch contact result. DF values near 0.5 were determined for the 9120-B and 9140-B CST batch contact tests while DF values near 0.6 (20% higher) were determined for the tests with IE-911. These dilution factors are lower than recently observed with a different SRS Average Simulant batch (9140-B DF = 0.68; IE-911 DF = 1.0). Based on these results, it appears that some component in the simulant solution used for equilibrium testing may have resulted in reduced cesium loading on the CST media.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Data-Driven Understanding of Low-to-Moderate Income Customers’ Adoption and Financial Qualification in Community Solar (Final Technical Report)

When Solstice began working in the community solar industry, it quickly became clear that there was a wide disparity along race and class lines in terms of what kind of household traditional solar offerings benefited. Solstice is an organization that aligns itself to the principles of a Just Transition, or the concept that a transition to a green economy should benefit and prioritize historically marginalized groups of people. Given that low-income communities are disproportionately burdened by our current polluting fossil fuel economy, Solstice set out to investigate the root causes of the exclusion of low to moderate income (LMI) households in the community solar market. As we worked more and more with financiers, developers, and LMI households, we recognized that significant barriers to entry in a developer-owned project were credit threshold requirements. A FICO score of 750 and higher discriminates against LMI households that are not financially stable enough to take on multiple lines of credit (or who may not have been deemed credit worthy enough to access a line of credit) yet who may have been reliable utility customers. As Solstice began looking further into preliminary data and speaking to community-based organizations (CBOs) that serve LMI households, we found our hypothesis to be worth investigating; there was indeed a subset of LMI households with poor FICO scores (or no FICO score at all) that had perfect bill payment history. Though initially Solstice was intent on gathering a body of data to prove or disprove this hypothesis, we were also concerned that all this proof of a financially stable and reliable customer was not being incorporated into FICO, and wondered if such a score would be possible. After preliminary research into the existence of alternative scores, Solstice realized that many mission-driven lending institutions rely on alternative metrics that are formulated for their specific industry. However, we also realized that community solar did not have an alternative credit underwriting mechanism, though there was great need from solar financiers for one. We anticipated that the creation of an EnergyScore would contribute to financiers’ need to qualify more people, as these entities are desperately looking for ways to lower the cost of customer acquisition. FICO turns away nearly 50% of potential customers (according to our own acquisition experience), and much of the community solar industry is realizing that FICO is not the perfect qualifying mechanism. Additionally, with a grounding in energy justice, just transitions, and climate justice, Solstice recognizes the need for a solution that addresses a more urgent need for LMI households to access renewable energy savings and relieve energy burdens. With funding from the Department of Energy, we gathered the data necessary to build the EnergyScore, reached out to mission-driven developers willing to test the metric, and secured several demonstration projects to pilot the EnergyScore. After acquiring customers for these demo projects using the EnergyScore, we will be continuously collecting customer payment behavior data. Though it goes beyond the scope of this project, we plan to disseminate this de-identified data with the wider community solar industry, which includes not only financiers and developers, but other mission-driven nonprofits, solar cooperatives, community-based organizations, environmental justice activists, and academics. While we intend to disprove the notion that LMI households cannot be included in projects without acutely increasing the risk to project finances, we also hope the data can be used to negotiate better pricing of systems and terms of ownership for community groups seeking to build inclusive projects.

14 SOLAR ENERGY↗

Concrete Thermal Energy Storage Enabling Flexible Operation without Coal Plant Cycling

The work described in this report is responsive to the Office of Fossil Energy program “Energy Storage for Fossil Power Generation.” The pilot plant built as a result of this project demonstrated the feasibility and performance of a concrete thermal energy storage (CTES) system integrated with a supercritical coal power plant. The 10 MWh electrical (>25 MWh thermal) CTES unit, developed by Storworks Power, was designed to enable flexible operation of coal plants without cycling damage. The project's key technical achievements showcase a significant advancement in energy storage technology. A modular CTES system using 42 “Bolderblocs” units was successfully designed and constructed at Alabama Power’s Plant Gaston Unit 5, with each block containing embedded stainless-steel coils in specialized, cost-effective high-temperature concrete. The system interfaced seamlessly with the plant's 3500 psig (241 barg), 1000°F (538°C) supercritical steam, demonstrating operational flexibility. Over 86 full cycles, the CTES exhibited rapid charging and discharging capabilities, effectively mimicking steam turbine feed conditions and handling varying load profiles and storage durations. Performance validation confirmed the system's ability to consistently meet design target steam conditions of 75 bar-a and ~400°C for nominal baseline discharge. The concrete material withstood repeated thermal cycling without degradation, validating earlier lab-scale tests. Integration of balance of plant components, including a condensate management system with storage tank and air-cooled condenser, minimized plant interfaces and water consumption. A robust control scheme ensured safe, automated operation across various scenarios. Key learnings from the project were invaluable: 1. Initial concrete drying and commissioning procedures were refined for future deployments, enhancing efficiency in subsequent installations. 2. System flexibility exceeded expectations, with rapid response to changing conditions. 3. Design improvements were identified including optimized insulation and piping that will enhance overall system efficiency in future deployments 4. Full cycle thermal roundtrip efficiencies exceeded 88%. While the roundtrip electrical efficiency was somewhat limited by known challenges using input steam, such constraints may be mitigated by swapping steam for hot air as thermal input. 5. A summary of key performance parameters for the pilot test and predicted performance of a full scale commercial system with specified improvements determined from the pilot are shown in Section 8. The project faced challenges, including COVID-19 delays and host plant availability constraints. However, these were overcome through adaptive planning and execution. The successful management of these obstacles demonstrated the resilience and adaptability of the project team and the robustness of the CTES technology. This successful pilot demonstrates the potential for CTES to enhance coal plant flexibility, supporting grid stability as renewable penetration increases. The validated design and operational data provide a solid foundation for scaling up to utility-scale implementations, potentially transforming how thermal plants operate in evolving energy landscapes. The system's ability to rapidly respond to changing grid conditions while maintaining high efficiency makes it a promising solution for balancing intermittent renewable energy sources. Furthermore, the project highlighted the potential for even greater efficiencies in future iterations. The use of air as an input medium could potentially eliminate the limitations observed with steam input, opening new possibilities for energy storage applications beyond coal plant integration. In conclusion, this pilot project not only achieved its primary goals but also uncovered additional benefits and potential applications of the CTES technology. It represents a significant step forward in addressing the challenges of grid stability and flexibility in an increasingly renewable-driven energy landscape.

01 COAL, LIGNITE, AND PEAT↗

Repatriated Desert Bighorn Sheep Population on the Nevada National Security Site

Ecological studies have been conducted on the Nevada National Security Site (NNSS) since the 1960s. Desert bighorn sheep (Ovis canadensis nelsoni) were considered rare visitors on the NNSS, with only 9 recorded observations between 1963 and 2009, all of which were males. Females and young were not documented definitively until winter 2011, when several were killed by a radio-collared female mountain lion (Puma concolor). Following these observations, we initiated a study of desert bighorn sheep on the NNSS to better understand their movements/interactions with other populations, prevalence of disease, population size, origin, radionuclide burdens and potential radiological dose to humans that may consume harvested animals away from the NNSS. We captured and radio-collared 6 sheep (2 females, 4 males) in November 2015, and 15 (7 females, 8 males) in November 2016. We sampled blood for genetic and disease testing and collected nasal swabs for respiratory disease testing. Sheep from the NNSS spent most of their time around Shoshone Mountain, Fortymile Canyon, and Yucca Mountain but also moved to Bare Mountain, Thirsty Canyon, and Black Mountain. Females greatly expanded their core and overall home ranges during spring, whereas males expanded their home ranges during summer. Of 18 sheep sampled for disease, 12 showed an immune response to Mycoplasma ovipneumoniae, and 5 had the bacteria present. Genetic testing revealed that the ancestry of NNSS sheep is from the Bare Mountain (1991-1995, within 24 km of our study area), Specter Range (1990-1995, within 32 km of our study area), and Stonewall Mountain (1975-1983, within 72 km of our study area) reintroduced populations. Radionuclide burden in NNSS sheep was minimal with no significant difference from sheep captured on the Nevada Test and Training Range and northern Nevada. One marked adult male was legally harvested off the NNSS north of Bare Mountain. Finally, this recently colonized reproducing population of sheep on the NNSS warrants further monitoring, protection, and inclusion in resource management plans.

60 APPLIED LIFE SCIENCES↗

Approach to Quality Assurance for Complex Environmental Modeling - 20407

A strong Quality Assurance (QA) program for complex environmental modeling is essential for regulatory and public acceptance and trust, but it does not have to be onerous. Neptune and Company, Inc. (Neptune) has developed a strong QA program that improves transparency, traceability, reproducibility, and therefore, defensibility and trust. Neptune's QA program has evolved over the past 27 years, transitioning from an ad hoc QA program, to a program that is currently Nuclear Quality Assurance-1 (NQA-1) compliant, and will soon be NQA-1/DOE approved for DOE EM modeling work. In addition, Neptune is a qualified laboratory assessor and qualified auditor for reference materials, a proficiency testing provider, and fully complies with the Environmental Protection Agency (EPA) QA program. Neptune's President and CEO, Kelly Black, was recently named the Chairperson of the International Organization for Standardization (ISO) Technical Committee 69, Application of Statistical Methods. A strong QA program has been developed for Neptune's radiological performance assessment (PA) program. Although pieces of their QA program are currently in development, their current program includes document control using Subversion, issue tracking and work flow tracking using JIRA, and transparency and traceability via a system of 'calc sheets' for documentation of all data analysis and modeling combined with 'check print' documentation of QA checking, and rigorous model testing and configuration control. All work is reviewed by an independent subject matter expert who is not associated with the collection and assembly of information, for an internal peer review. The program is enforced with a handful of Standard Operation Procedures (SOPs), Work Instructions, QA Project Plans (QAPPs), and Quality Management Plans (QMPs) that are updated frequently, with required annual training and acknowledgment. In addition, effective communication of modeling approaches and results to clients and stakeholders are integral to their QA program. Many of their models are built using the GoldSim modeling platform, for which their models are well-known for their level of transparency, documentation, and QA traceability. This level of QA is also applied to their process-level models. Neptune has taken some lessons learned from the extremely rigorous QA program required for the Yucca Mountain Project (YMP), and imposed the YMP requirements of complete traceability, transparency, and reproducibility, but avoided the inflexibility of a QA program that likely contributed to the suspect e-mails in 2005 that resulted in loss of trust in the YMP, and in nuclear waste disposal (and nuclear power) in general. There are far too many examples of loss of public trust due to poor QA that could have been easily avoided with a simple and straight-forward QA program combined with stakeholder engagement. The purpose of this paper is to share features of Neptune's Radiological Performance Assessment program QA program, and some of their QA related lessons learned over the past 27 years of QA for complex environmental modeling. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ATR Fuel Management

The sixth Core Internals Changeout (CIC) of ATR was completed on March 21, 2022, and Nuclear Testing (NT) commenced shortly thereafter. In support of NT, 235U flux wires were attached to flux wands using electrical tape and installed in water channels 2, 6, 11, 15 and 19 in each of the 40 ATR Mark VII fuel elements that comprise an ATR core to perform low power flux measurements during ATR Cycle 170CIC NT-3. The flux wands were fabricated from Poly (Methyl Methacrylate), or PMMA. Irradiated cobalt capsules were loaded in the ATR Northeast Irradiation Housing Assembly (NEIHA), the East Flux Trap (EFT), South Flux Trap (SFT), inboard A-positions and various H-positions as a 170CIC NT-3 core reactivity hold-down mechanism. The PMMA flux wands received significant gamma dose from the irradiated cobalt during NT-3 which caused discoloration, embrittlement and swelling of the flux wands. The removal of the degraded flux wands from the 0.078 in. wide by 50 in. long fuel element coolant channels has been a unique challenge. This presentation summarizes the cleaning techniques used to remove the flux wand debris from the elements, an aggressive PMMA irradiation experiment performed concomitantly with initial cleaning efforts, and planned inspection and qualification techniques that will be applied in the future to potentially requalify the impacted elements for re-use.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

2021 ATR Strategic Plan

Collaborative development of nuclear energy science and technology by three major sectors—academia, the commercial nuclear power industry, and the federal government—is key to meeting the challenges of nuclear energy. All three share a common need for experimental capabilities, whether for basic science investigations, applied research in nuclear fuels and materials, or validation of data. The Advanced Test Reactor (ATR) provides the unique irradiation capabilities to support the need.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

AGC-4 Experiment Irradiation Monitoring Data Qualification Final Report

The Graphite Technology Development Program ran a series of six experiments to quantify the effects of irradiation on nuclear grade graphite. This report focuses on the fourth experiment, Advanced Graphite Creep 4 (AGC 4). The Advanced Reactor Development (ARD) Technology Development Office (TDO) Program for research and development activities require documentation of qualified monitoring data to design and license the first high-temperature reactor nuclear plant. Qualified data meets the requirements for use as described in the experiment planning and quality assurance documents. Failed data do not meet the requirements and provide no useable information. Trend data may not meet all requirements but still provide some useable information. Use of Trend data requires assessment of how any deficiencies affect a particular use of the data. AGC-4 began with Advanced Test Reactor (ATR) Cycle 157D on May 30, 2015. After irradiating the graphite for two cycles, the capsule was removed from the reactor after ATR Cycle 158A, which ended on January 2, 2016, due to interference with another experiment. Irradiation was resumed with Cycle 162A on October 7, 2017 after the interfering experiment was removed from the reactor. AGC-4 irradiation completed by the end of Cycle 166B on January 10, 2020. Between Cycles 162A and 166B, AGC-4 capsule was removed from the reactor core during two Powered Axial Locator Mechanism (PALM) Cycles 163A and 165A to avoid overheating. All thermocouples (TCs) have functioned throughout the AGC-4 experiment. A total of 9,256,184 out of all 11,167,213 temperature records (or 82.9%) are Qualified for use by the ARD Program and 1,911,029 missing values are Failed. Argon, helium, and total gas flow data were within expected ranges, except only eight out-of-range values occurred during outages. A total of 21,240,627 out of all 22,288,5103 gas flow rates (or 92.8%) are Qualified for use by the ARD Program and 1,644,476 are Failed records mostly due to missing values. Discharge gas line moisture values were consistently low during full ATR power, except for 162B, when moisture content was increasing to more than 200 ppmv by the end of this cycle. During outages, moisture content reached as high as 700 ppmv. 1,089,941 out of a total of 1,107,331 moisture values (or 98.4%) are within the measurement range of the instrument and are Qualified for use by the ARD Program and 17,390 missing moisture values are Failed. Graphite creep specimens were subjected to one of three loads: 393, 491, or 589 lbf. For a brief period during Cycle 157D between 12:19 on June 2, 2015, and 08:23 on June 11, 2015, the load cells were wired incorrectly, resulting in missing stack load data. Missing stack loads were estimated from measured ram pressures using regression equations developed from the existing data from Cycle 157D. Estimated stack loads during this period are considered to be an accurate representation of actual load applied to the stacks. These loads deviate slightly from the planned loads. This deviation does not prevent the data from being Qualified for use but must be taken into account when analyzing the effect of load on creep. 6,095,728 out of a total of 6,403,985 moisture values (or 95.2%) are within the measurement range of the instrument and are Qualified for use by the ARD Program and 308,257 missing load values are Failed. Stack displacement increased consistently throughout the eight cycles, with total displacement reached highest value of 2.4 in by the end of irradiation. During ATR outages, a set of pneumatic rams raised the stacks of graphite creep specimens to ensure the specimens were not stuck within the test train. This stack raising was performed seven times throughout irradiation. All stacks were raised successfully each time. 4,744,974 out of a total of 6,094,513 displacement values (or 77.9%) are within the measurement range of the instrument and are Qualified for use by the ARD Program and 1,349,539 displacement values are Failed mostly due to missing values. Analyses were conducted on correlations between TCs to look for trends and step changes that might indicate instrument degradation or failure. Correlation analysis was used to identify instances when TCs form short circuits, referred to as virtual junctions, which result in TCs reporting temperatures from some location in the capsule other than the location where they were intended to read. No evidence of virtual junctions was found. Analyses were also conducted on control charts of temperature differences of between two TCs, which are expected to behave consistently throughout the entire irradiation period. Upward or downward trend over time indicates at least one TC in the pair was drifted. Examining control charts for all 66 possible pairs out of twelve TCs installed in the AGC-4 capsules reveal no clear drift failures occurred, except unstable behavior of two TCs in Zone 3, TC-7 and TC-8, over irradiation time. In conclus

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Off-Gas Design and Testing from Advanced Chlorination Process

Chlorination of Zr alloy cladding with sulfur-chloride reagents is being considered as a means of separating the main metal from alloying elements, imbedded U, actinides, and fission and activation products to purify the Zr. This would allow the Zr to be disposed of as low-level nuclear waste or possibly be recycled. A multistage process was developed that involves several steps and waste streams. Recycling of sulfur-chloride reagents S 2 Cl 2 and SOCl 2 is planned to minimize the waste stream. The generation of off-gas and entrainment of volatiles is anticipated to be minimized. However, given the complex nature of spent nuclear fuel (SNF), some volatile components will be generated, including the solvents themselves; Cl 2 used for the regeneration of S 2 Cl 2 ; volatile fission product chlorides, such as Sb and 3 H; and chlorinated alloying components, such as Sn, Nb, Fe, and Mo. This report discusses the chemical phenomena that might give rise to volatile species and their planned capture. The volatility of the transition metals will depend on their oxidation state and the compounds that are formed, such as Zr tritide. Loading radionuclides in the process off-gas will depend on the inputs to the process. For instance, processing separated Zr to reduce waste will have a much lower loading of radionuclides than if alternative chlorination were used for decladding SNF. Much of the volatile process streams will be part of the solvent recycling, which may involve online scrubbing. Generally, a caustic scrubber should be included in the off-gas to remove acidic vapors (e.g., Cl 2 , SOCl 2 ). The decontamination procedures for removing these species could involve pretreatment (i.e., heating) options or reduction by contact with H 2 . This report discusses these options along with a framework for testing these alternatives in future experiments. Technologies for off-gas capture will leverage those developed in the Materials Recovery and Waste Forms program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Considerations on MURR Control Blade Design Change and Testing using a New Metal Matrix Composite

The University of Missouri Research Reactor (MURR) is one of six research reactors, including a critical facility, that are pursuing conversion as part of a collaboration with the U.S. Department of Energy National Nuclear Security Administration Material Management and Minimization Office of Reactor Conversion and Uranium Supply, under the U.S. High Performance Research Reactors (USHPRR) conversion project. Five of the six USHPRR are planned to convert from highly enriched uranium (HEU) fuel using a low-enriched uranium (LEU) high assay monolithic alloy of uranium-10 wt% molybdenum (U-10Mo). As part of the conversion safety analysis, it is necessary to demonstrate the safety performance of the proposed core fueled with LEU as compared to the current HEU cores. The MURR reactor is planning to switch to a new control blade design that uses a metal matrix composite of boron carbide (B 4 C) and aluminum as the absorber in place of Boral®. Since MURR is expected to adopt the new metal matrix composite control blade design prior to conversion, the impact of the new blade design on the neutronics characteristics of the MURR cores for conversion are analyzed in this work through updates to incorporate the changes to the blade design in conversion models as they directly impact the LEU conversion safety analysis. The quantitative comparison shows that the neutronics and thermal hydraulic behavior of one metal matrix composite blade replacing a Boral blade is comparable for the two example MURR LEU and HEU cores states considered. Geometrical changes in the metal matrix composite blade design, combined with a 4% increase in areal boron density, showed local heating effects up to 20% higher than the Boral design. As expected, the metal matrix composite showed slightly lower heat depositions and absorber region temperatures for the LEU cases compared to HEU. Although this analysis was comparative for a single blade, maximum control blade temperatures for both Boral, metal matrix composite, and HEU/LEU remained below 100 °C, though additional analysis at a core level could differ. A qualitative irradiation behavior assessment concludes that the mechanisms that may drive swelling and blistering in the current Boral design are eased by the adoption of the metal matrix composite design. The work concludes that the two blade designs are essentially equivalent with regards to neutronics, thermal hydraulics, and expected material behavior under irradiation. However, due to the geometrical changes to the blades including redesigned and thinner cladding, new testing and increased surveillance for distortion and swelling are recommended to confirm the performance of the metal matrix composite control blade design. Where testing is completed prior to conversion, the only anticipated impacts on conversion to LEU U-10Mo fuel would be the need for models and safety analysis incorporating the metal matrix composite control blades.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Stress Testing California's Hydroclimatic Whiplash: Potential Challenges, Trade‐Offs and Adaptations in Water Management and Hydropower Generation

Abstract Inter‐annual precipitation in California is highly variable, and future projections indicate an increase in the intensity and frequency of hydroclimatic “whiplash.” Understanding the implications of these shocks on California's water system and its degree of resiliency is critical from a planning perspective. Therefore, we quantify the resilience of reservoir services provided by water and hydropower systems in four basins in the western Sierra Nevada. Using downscaled runoff from 10 climate model outputs, we generated 200 synthetic hydrologic whiplash sequences of alternating dry and wet years to represent a wide range of extremes and transitional conditions used as inputs to a water system simulation model. Sequences were derived from upper (wet) and lower (dry) quintiles of future streamflow projections (2030–2060). Results show that carryover storage was negatively affected in all basins, particularly in those with lower storage capacity. All basins experienced negative impacts on hydropower generation, with losses ranging from 5% to nearly 90%. Reservoir sizes and inflexible operating rules are a particular challenge for flood control, as in extremely wet years spillage averaged nearly the annual basins' total discharge. The reliability of environmental flows and agricultural deliveries varied depending on the basin, intensity, and duration of whiplash sequences. Overall, wet years temporarily rebound negative drought effects, and greater storage capacity results in higher reliability and resiliency, and lesser volatility in services. We highlight potential policy changes to improve flexibility, increase resilience, and better equip managers to face challenges posed by whiplash while meeting human and environmental needs.

Environmental Sciences & Ecology↗

Scalable Electrolytic Systems for Renewable Hydrogen Production (Cooperative Research and Development Final Report, CRADA Number CRD-18-747)

The project focuses on offshore wind energy which is an emergent renewable energy source in the United States. Onsite hydrogen production for this sector is not available. The overall goal of GTA's work is development of scalable multi-megawatt water electrolysis systems that exclude platinum group metals, are constructed from readily available commodity materials and are mass produced using advanced manufacturing and robotics. They fabricated and successfully tested a scalable TRL 4 laboratory prototype that demonstrated promising results for achieving the goal. They further performed calculations and prepared scale drawings for an envisioned onsite TRL 8 electrolytic hydrogen production system at an offshore 8 MW wind turbine. The work plan of the CRADA proposal between NREL and GTA focuses on validation of the current TRL 4 prototype with potential development and refinement for advancement to a TRL 5 system. GTA, Inc. proposes joining the H2@Scale consortium to leverage DOE funds, benefit from and contribute to the common knowledge-base and work with NREL as a CRADA partner.

30 DIRECT ENERGY CONVERSION↗

FAST-1.0 Software Release Document

The purpose of this document is to detail the release of FAST-1.0 and the documents that accompany the development and testing of FAST-1.0. Design requirements were for FAST-1.0 developed in the NRC Statement of Work (SOW) for NRC Agreement Number NRC-HQ-25-14-D-001 and are transcribed to this document as part of the Software Quality Assurance Plan for the FAST Code System, PNNL-28767. FAST 1.0 represents the merger of the FRAPCON and FRAPTRAN codes and as such FAST-1.0 performs steady state and transient fuel performance calculations described below. FAST-1.0 calculates the steady state response of light-water reactor fuel rods during long-term burnup. The code calculates temperature, pressure, and deformation of a fuel rod as functions of time-dependent fuel rod power and coolant boundary conditions. The phenomena modeled by the code include: 1) heat conduction through fuel and cladding to the coolant; 2) cladding elastic and plastic deformation; 3) fuel-cladding mechanical interaction; 4) fission gas release from the fuel and rod internal pressure; and 5) cladding oxidation. FAST is used to perform independent calculations for regulatory evaluations of fuel performance under normal operation and anticipated operational occurrences (AOOs).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

LLNL ES&H Analytical Services and Instrumentation Analytical Laboratory (ALAB) (CY2022 Management Review Report)

"An annual review shall be conducted of the analytical activities to ensure continuing suitability, adequacy, and effectiveness." (ALAB-01 Rev 6 ALQAP section 6.11.2) "The laboratory management shall review its management system at planned intervals, in order to ensure its continuing suitability, adequacy and effectiveness..."(ISO/IEC 17025:2017 Section 8.9.1) "In accordance with a predetermined schedule and procedure, the laboratory's top management shall periodically conduct a review of the laboratory's management system and testing and/or calibration activities to ensure their continuing suitability and effectiveness, and to introduce necessary changes or improvements. "(TNI Standard EL-V1M2-2016-Rev2.1:Quality Systems General Requirements)

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗