Robust Autonomous and Fault-tolerant DC Microgrid Development for Long-Term Lunar Habitation.
Abstract not provided.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Abstract not provided.
Abstract not provided.
Explore the source record for details and available documents.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Vacuum insulation panels provide much greater resistance to heat transfer than conventional insulation materials, making them ideal for building applications, especially where space is a constraint. Of particular interest is energy retrofits where high insulation values are required with very little or no modifications to existing building envelope elements such as fenestrations and service penetrations. To facilitate the use of vacuum insulation panels (VIPs) in residential and commercial construction, this study investigates the performance of VIPs integrated into polyisocyanurate foam board and vinyl siding after several years of service. Vacuum insulation panels integrated with polyisocyanurate boards were studied in mixed humid and cold climates. The integration of VIPs with vinyl siding was investigated in a mixed humid climate. Periods of service were between two and five years. In all cases, the integrated building components outperformed conventional materials by almost 40 percent during heating and cooling periods. However, the percent reduction in heat gains and losses of the integrated building components decreased with time at a rate between approximately 4% and 10% per year during the service period. In some cases, the rate seems to converge to a steady -state value. Measurements are ongoing to determine if a steady-state value is attained or the panel's insulation value continues to decrease with time. This study is critical in addressing the service life and durability of the building envelope with VIP integrated building components. The effect of these changes will be reviewed in the context of an exterior retrofit.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Abstract not provided.
Abstract not provided.
In a pressurized water reactor (PWR), emergency core cooling (ECC) responds to depressurization due to a vessel penetration break at the top of the pressure vessel by draining water from a body of water through an injection line into the pressure vessel. A barrier operates concurrently with the ECC to suppress flow of liquid water from the pressure vessel out the vessel penetration break. The barrier may comprise one or more of: (1) an injection line extension passing through the central riser to drain water into the central riser; (2) openings in a lower portion of a central riser to shunt some upward flow from the central riser into a lower portion of the downcomer annulus; and (3) a surge line providing fluid communication between a pressurizer volume at the top of the pressure vessel and the remainder of the pressure vessel which directs water outboard toward the downcomer annulus.