Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technical levels”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

Potential for radionuclide redistribution due to biotic intrusion: Aboveground biomass study at the Los Alamos National Laboratory for the closure of Material Disposal Area G

Low-level radioactive waste generated at the Los Alamos National Laboratories (LANL) is disposed of at Technical Area (TA) 54, Material Disposal Area (MDA) G. The ability of MDA G to safely contain radioactive waste was evaluated in the facility's performance assessment (PA) and composite analysis (CA). The PA and CA project that, due to uptake and incorporation of radionuclides into aboveground plant material, plant roots penetrating into buried waste may lead to releases of radionuclides to the accessible environment and potentially lead to the exposure to members of the public. The potential amount of contamination deposited on the ground surface, due to plant intrusion into buried waste, is a function of the quantity of litter generated by plants, as well as radionuclide concentrations within the litter. Radionuclide concentrations in plant litter is dependent on the distribution of root mass with depth and the efficiency with which radionuclides are extracted from contaminated soils by the plants roots. In order to reduce uncertainties associated with the PA and CA for MDA G, aboveground biomass surveys, plant litter production rates, and root mass with depth analyses for the four prominent vegetation types (grasses, forbs, shrubs and trees) are being conducted. Sampling occurred during the months of August and September of 2007 which measured aboveground biomass for the types of grasses and forbs that may become established at MDA G after the disposal facility undergoes final closure. Biomass data are representative of the future potential for the amount of contaminated plant litter fall, which could act as a latent conduit for radionuclide transport from the closed disposal area. Follow on work will be conducted to evaluate frequency and coverage of all growth forms, litter production rates will be measured, and root mass with depth for grasses, forbs, shrubs, and trees will be analyzed. Together, data collected are expected to reduce uncertainties associated with the PA and CA for MDA G and ultimately aid in the prevention of radionuclide transport within the environment from the closed disposal area and exposure to the public. In summary: Collection of aboveground grasses and forbs at TA-54 resulted in dry-weight biomass data for two of the four growth forms of interest for the MDA G PA and CA. Shrubs were not encountered in any of the grid cells selected for sampling. Trees were not encountered within MDA J. Mature trees (Juniper) were located in five grid cell locations at Zone 4. Dead and down trees (Pinon) were located in two of the grid cells at Zone 4. The grid size at MDA J was reduced to 15.2 m by 15.2 m (50 ft by 50 ft) because of the anticipated mass to be collected. MDA J has achieved a relatively uniform grass and forbs coverage, and due to time constraints the size was reduced by half. Material that was originally oven dried was weighed again after several weeks. Data from post oven drying reports weight gain, indicating a higher error associated with air versus oven drying methodology. The drying methods will be explored in greater depth with future studies. Future surveys will include measurement of aboveground biomass of shrubs and trees, measurement of litter production rates; root mass with depth for grasses, forbs, shrubs, and trees; and frequency and coverage surveys to determine the percent coverage of each growth form. The collection of this additional data will provide further site-specific information regarding the growth of grasses, forbs, shrubs, and trees within the expected successional growth stages expected at MDA G. These data will be incorporated into the biotic intrusion modeling for the MDA G PA and CA. (authors)

54 ENVIRONMENTAL SCIENCES↗

Fiscal Year 2018 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy Standard Disposal Authorization Statement and Tank Closure Documentation (DOE-STD-5002-2017) requires preparation of an Annual Summary Report comparing low-level radioactive waste disposal facilities operations with the Disposal Authorization Statement (DAS) and its supporting technical documents including the performance assessment (PA) and the composite analysis (CA). The fiscal year (FY) 2018 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) was prepared by reviewing planned and discovered changes, waste receipts, monitoring results, research and development (R&D) results, and the status of DAS conditions and issues to assess the validity of the DASs, PAs, and CAs. The Area 3 RWMS was placed in stand-by in 2006 and remained inactive in FY 2018. Resumption of waste disposal operations is planned for FY 2019. No proposed actions, new information, or discoveries affecting the Area 3 RWMS were identified in FY 2018. No significant changes have occurred since preparation of the most recent special analysis, which indicates a continuing reasonable expectation of meeting the PA performance objectives and measures, and the CA dose constraint in DOE O 435.1, “Radioactive Waste Management.” No changes were made to documents supporting the Radioactive Waste Management Basis (RWMB) including the PA, CA, DAS, waste acceptance criteria (WAC), closure plan, monitoring plan, or maintenance plan. Monitoring results for the most recent year with available data, calendar year (CY) 2017, indicate no changes to long-term trends and no results inconsistent with expected performance. R&D results for the Area 3 RWMS Drainage Lysimeter Facility continue to be consistent with the conceptual site model (CSM). All Area 3 RWMS DAS conditions and secondary issues were closed in 2002. The Area 5 RWMS continued disposal operations within the Northern Expansion Area in FY 2018. Eighty-six changes involving proposed actions, new information, or discoveries affecting the Area 5 RWMS PA and CA were screened during FY 2018 in the Unreviewed disposal question (UDQ) process. Twenty-two changes required UDQ evaluations and two changes resulted in unreviewed composite analysis question evaluations. None of the proposed actions, new information, or discoveries had significant impacts on the PAs or CAs. All of the planned changes were implemented. No special analyses were performed, and no changes were made to documents supporting the RWMB including the PA, CA, DAS, WAC, closure plan, monitoring plan, or maintenance plan. Planning continued and construction commenced on development of the Western Expansion Area within the Radioactive Waste Management Complex. All Area 5 RWMS DAS conditions and secondary issues were closed in 2002. The cumulative effects of changes occurring since preparation of the Area 5 RWMS PA and CA were assessed with the current baseline PA/CA model. Model results indicate that there is a reasonable expectation that the PA performance objectives and measures, and the CA dose constraint in DOE O 435.1, “Radioactive Waste Management,” can be met. No PA or CA mean result exceeds 50% of its performance objective. Monitoring results and R&D results continue to be consistent with the CSM. Monitoring results for CY 2017 indicate no changes to long-term trends and no results inconsistent with expected performance. R&D results for the Area 5 RWMS Weighing Lysimeter Facility continue to be consistent with the CSM. The FY 2018 review of Area 3 RWMS and Area 5 RWMS disposal operations supports the following conclusions: The Area 3 and Area 5 RWMS PA and associated CA assumptions and conclusions remain valid based on consideration of all changes identified or planned; The reasonable expectation that the Area 3 and Area 5 RWMSs will meet the performance objectives identified in DOE O 435.1, “Radioactive Waste Management”, remains valid; and The DAS, based on interpretation of the data collected, monitoring results, and other information, continues to be adequate.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Materials education activities

Last year, at NEW: Update '91, a panel discussion was held to address the unique difficulties of attracting and retaining minorities and women in technical studies. Unfortunately, retention in technical majors is a problem of varying proportions for the entire student population, and must be improved in order to maintain the strength of the nation's industrial base. To investigate the cause of student attrition in technical majors, in-depth interviews of both current and former (non-graduating) engineering students at four colleges and universities in Colorado were conducted by Hewitt and Seymour. They found that there was no significant difference in the level of high school preparation and undergraduate academic performance in these two groups, despite the prevailing faculty perception that most students who switch from technical to nontechnical majors were underprepared. The majority of engineering students who changed majors reported that they were turned off by science, while one-third complained of poor teaching.

Ries, Heidi R.↗

Xe-100 Pebble Bed Small Modular Reactor: Solving Critical Challenges to Enable the Xe-100 Pebble Bed Advanced Reactor Concept (ARC) (Final Scientific and Technical Report)

This is the final progress report for the Department of Energy (DOE) – X Energy, LLC cooperative agreement DENE0008472. This report provides a high-level summary of the work performed during the entire period of performance, running from July 1, 2016 – June 30, 2022. This span of time covers the original 5-year award and a one year no-cost extension. There were four tasks within this project: (1) project management, (2) reactor design furtherance, (3) fuel development, and (4) Nuclear Regulatory Commission (NRC) engagement. Detailed reporting during execution of the project was provided by a total of 23 quarterly reports, 42 X-energy technical reports, and voluntary monthly update presentations. Other technical work products include 2 white papers and 2 Topical Report submitted to the Nuclear Regulatory Commission, 15 Potential Inventions documented, 4 patents issued, 3 patents pending, 8 peer reviewed journal articles, and 2 Oak Ridge National Laboratory Technical Manuscripts. All the X Energy milestones/deliverables were met early or on time and are archived in the DOE Office of Nuclear Energy’s Program Information Control System: Nuclear Energy under Fiscal Year 2016, Work Breakdown Structure 2.07 – X-Energy. All other work products are available to DOE upon request.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Waste is our Product. Developing, Implementing and Optimising Waste Management at Dounreay - 19039

The UK's Fast Breeder Reactor Research programme was centred at Dounreay, in the very north of Scotland, from 1955. Since 1994, the site has been focused on decommissioning, and represents one of the most complex, technically challenging and hazardous nuclear clean-up projects in Europe. Since 2012, Dounreay Site Restoration Ltd (DSRL) has been contracted by the NDA as the Site License Company to deliver the defined scope of work, under a Target Cost contract, to decommission the site to achieve the Interim End State by 2030-2033, whilst managing the transition of its people. All parties, including DSRL's Parent Body Organisation Cavendish Dounreay Partnership Ltd (a consortium of Cavendish Nuclear, AECOM, and Jacobs), recognise that there are significant technical and regulatory challenges to achieve this, as well as safely managing the transition for our workforce on what is effectively a 'closure' contract. The product of decommissioning is waste; over the course of the programme, a full range of higher activity and lower level radioactive wastes will be generated, and must be safely managed. This paper will address: - The Policy issues relating to radioactive waste management at Dounreay, including particular issues relating to implementation of Scottish policy, including how Waste Management is Optimised. - An overview of the decommissioning programme and the delivery of an Interim End State; - The type, range and nature of radioactive wastes requiring safe management at Dounreay; - Higher Activity Wastes (HAW): - Setting higher activity waste strategy; defining products and interim storage requirements; - Technical, regulatory and stakeholder issues for HAW strategy; - Lower Activity Wastes: - Setting Low Level Waste (LLW) strategy; defining a disposal product and development and status for Dounreay's LLW Disposal Vaults; - Implementing LLW strategy; - Technical, regulatory and stakeholder issues for LLW strategy; - Optimising Waste Management -Optimising waste from generation (from decommissioning workfaces) through to disposal -why, and how; - The Waste Informed Decommissioning model as a methodology and approach; - Impact and importance of Waste Management on a target cost contract; - Establishment of a Waste Optimisation Programme to drive ownership, delivery and culture change; - Management responsibilities and informing organisational design; - Sharing and learning from Best Practice; - The Challenge - how to ensure workforce and teams are engaged in delivering optimisation requirements; - Conclusions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Two Wire System and Modified Olive Tip to Facilitate Implantation of Fenestrated TEVAR in Patient with Proximal Descending Aortic Pathology: First Two Cases

Introduction: Although Fenestrated TEVAR (F-TEVAR) has been considered to be a more physiologic approach to treat proximal descending aortic pathology, its application is still limited due to availability, cost and technical difficulties. We introduce a new design of fenestrated stent graft with a new delivery system and successfully performed first in human implantation in two patients, one with an aortic aneurysm and one with an acute aortic dissection. Materials and Methods: The design of these two wires fenestrated stent graft include creation of an additional lumen at the side of the olive tip during manufacture, from which an additional wire can be introduced for a side branch passing into the fenestration, running inside the stent graft and exit the delivery sheath through additional hub. The two wires will facilitate delivery and deployment of the stent graft. One patient with descending aortic aneurysm and another with Stanford B aortic dissection is included in this first in human study. Results: The aneurysm and dissection were completely excluded immediately after the TEVAR. Six month follow up CT showed good position of the stent graft and patent LSA in both patients. In the patient with aortic dissection, expansion of the true lumen and partial thrombosis of the false lumen was seen. Conclusions: This is a report of a two wire system in 2 patients with distal aortic arch pathology demonstrating a good technical and clinical success using pre-cannulated fenestrations through a modified nose cone olive. Level of Evidence: Level 4, report of two cases.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Light-absorbing Particles in Snow and Ice: Measurement and Modeling of Climatic and Hydrological Impact

Light absorbing particles (LAP, e.g., black carbon, brown carbon, and dust) influence water and energy budgets of the atmosphere and snowpack in multiple ways. In addition to their effects associated with atmospheric heating by absorption of solar radiation and interactions with clouds, LAP in snow on land and ice can reduce the surface reflectance (a.k.a., surface darkening), which is likely to accelerate the snow aging process and further reduces snow albedo and increases the speed of snowpack melt. LAP in snow and ice (LAPSI) has been identified as one of major forcings affecting climate change, e.g. in the fourth and fifth assessment reports of IPCC. However, the uncertainty level in quantifying this effect remains very high. In this review paper, we document various technical methods of measuring LAPSI and review the progress made in measuring the LAPSI in Arctic, Tibetan Plateau and other mid-latitude regions. We also report the progress in modeling the mass concentrations, albedo reduction, radiative forcing, andclimatic and hydrological impact of LAPSI at global and regional scales. Finally we identify some research needs for reducing the uncertainties in the impact of LAPSI on global and regional climate and the hydrological cycle.

light absorbing particles↗

A methodology for optimal MSW management, with an application in the waste transportation of Attica Region, Greece

Highlights: • A two-step (strategic and detailed optimal planning) methodology is used for solving complex MSW management problems. • A software package is outlined, which can be used for generating detailed optimal plans. • Sensitivity analysis compares alternative scenarios that address objections and/or wishes of local communities. • A case study shows the application of the above procedure in practice and demonstrates the results and benefits obtained. - Abstract: The paper describes a software system capable of formulating alternative optimal Municipal Solid Wastes (MSWs) management plans, each of which meets a set of constraints that may reflect selected objections and/or wishes of local communities. The objective function to be minimized in each plan is the sum of the annualized capital investment and annual operating cost of all transportation, treatment and final disposal operations involved, taking into consideration the possible income from the sale of products and any other financial incentives or disincentives that may exist. For each plan formulated, the system generates several reports that define the plan, analyze its cost elements and yield an indicative profile of selected types of installations, as well as data files that facilitate the geographic representation of the optimal solution in maps through the use of GIS. A number of these reports compare the technical and economic data from all scenarios considered at the study area, municipality and installation level constituting in effect sensitivity analysis. The generation of alternative plans offers local authorities the opportunity of choice and the results of the sensitivity analysis allow them to choose wisely and with consensus. The paper presents also an application of this software system in the capital Region of Attica in Greece, for the purpose of developing an optimal waste transportation system in line with its approved waste management plan. The formulated plan was able to: (a) serve 113 Municipalities and Communities that generate nearly 2 million t/y of comingled MSW with distinctly different waste collection patterns, (b) take into consideration several existing waste transfer stations (WTS) and optimize their use within the overall plan, (c) select the most appropriate sites among the potentially suitable (new and in use) ones, (d) generate the optimal profile of each WTS proposed, and (e) perform sensitivity analysis so as to define the impact of selected sets of constraints (limitations in the availability of sites and in the capacity of their installations) on the design and cost of the ensuing optimal waste transfer system. The results show that optimal planning offers significant economic savings to municipalities, while reducing at the same time the present levels of traffic, fuel consumptions and air emissions in the congested Athens basin.

42 ENGINEERING↗

A phytophotonic approach to enhanced photosynthesis

Photosynthesis is the dominant biotic carbon sink on earth and hence presents an opportunity for enhanced sequestration of CO 2 . If the average net carbon fixation efficiency of terrestrial plants could be increased by 3.3%, all anthropogenic CO 2 accumulating in the atmosphere could instead be reduced and incorporated into terrestrial biomass. Plants make inefficient use of the overly abundant sunlight available to them, a result of having evolved to be competitive and survive highly dynamic environmental conditions rather than maximize photosynthetic productivity. We explore herein a phytophotonic approach to enhanced photosynthesis, whereby sunlight is redistributed by means of luminescent or persistent luminescent (PersL) materials. Phytophotonics has potential at varied scales, ranging from photobioreactors to greenhouses all the way to crops in the field, the latter having the potential to impact planetary CO 2 levels. The approach is three-fold: a spectral redistribution to relieve high-light-stress at the top surface of leaves and increasingly drive photosynthesis deeper in leaves and canopies; a minute-scale temporal redistribution to bridge periods of intermittent shade and reduce shock associated with variable light conditions; and a multiple-hour temporal redistribution to shift a fraction of high-intensity midday lighting to evening hours. Based on simulations of photoluminescent materials and light quality experiments with a model algal system, it is shown that while lengthening daylight hours will require significant improvements in PersL materials, the other two approaches show more immediate promise. We demonstrate a means of concentrating PersL light from SrAl 2 O 4 :Eu,Dy, approaching levels needed to effectively bridge periods of natural shade, and outline the scientific questions and technical hurdles remaining to realize the benefits of the proposed spectral shift.

59 BASIC BIOLOGICAL SCIENCES↗

Implementation of optimum solar electricity generating system

Under the 10{sup th} Malaysian Plan, the government is expecting the renewable energy to contribute approximately 5.5% to the total electricity generation by the year 2015, which amounts to 98MW. One of the initiatives to ensure that the target is achievable was to establish the Sustainable Energy Development Authority of Malaysia. SEDA is given the authority to administer and manage the implementation of the feed-in tariff (FiT) mechanism which is mandated under the Renewable Energy Act 2011. The move to establish SEDA is commendable and the FiT seems to be attractive but there is a need to create awareness on the implementation of the solar electricity generating system (SEGS). In Malaysia, harnessing technologies related to solar energy resources have great potential for implementation. However, the main issue that plagues the implementation of SEGS is the intermittent nature of this source of energy. The availability of sunlight is during the day time, and there is a need for electrical energy storage system, so that there is electricity available during the night time as well. The meteorological condition such as clouds, haze and pollution affects the SEGS as well. The PV based SEGS is seems to be promising electricity generating system that can contribute towards achieving the 5.5% target and will be able to minimize the negative effects of utilizing fossil fuels for electricity generation on the environment. Malaysia is committed to Kyoto Protocol, which emphasizes on fighting global warming by achieving stabilization of greenhouse gas concentrations in the atmosphere at a level that would prevent dangerous anthropogenic interference with the climate system. In this paper, the technical aspects of the implementation of optimum SEGS is discussed, especially pertaining to the positioning of the PV panels.

14 SOLAR ENERGY↗

Impact of post-event avoidance behavior on commercial facilities sector venues-literature review.

The terrorist attacks of September 11, 2001 (9/11), focused a great deal of interest and concern on how individual and social perceptions of risk change behavior and subsequently affect commercial sector venues. Argonne conducted a review of the literature to identify studies that quantify the direct and indirect economic consequences of avoidance behaviors that result from terrorist attacks. Despite a growing amount of literature addressing terrorism impacts, relatively little is known about the causal relationships between risk perception, human avoidance behaviors, and the economic effects on commercial venues. Nevertheless, the technical and academic literature does provide some evidence, both directly and by inference, of the level and duration of post-event avoidance behaviors on commercial venues. Key findings are summarized in this Executive Summary. Also included as an appendix is a more detailed summary table of literature findings reproduced from the full report.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

LIFE Cost of Electricity, Capital and Operating Costs

Successful commercialization of fusion energy requires economic viability as well as technical and scientific feasibility. To assess economic viability, we have conducted a pre-conceptual level evaluation of LIFE economics. Unit costs are estimated from a combination of bottom-up costs estimates, working with representative vendors, and scaled results from previous studies of fission and fusion plants. An integrated process model of a LIFE power plant was developed to integrate and optimize unit costs and calculate top level metrics such as cost of electricity and power plant capital cost. The scope of this activity was the entire power plant site. Separately, a development program to deliver the required specialized equipment has been assembled. Results show that LIFE power plant cost of electricity and plant capital cost compare favorably to estimates for new-build LWR's, coal and gas - particularly if indicative costs of carbon capture and sequestration are accounted for.

42 ENGINEERING↗

Modeling Clean and Secure Energy Scenarios for the Indian Power Sector in 2030

Recent developments in renewable energy (RE) related to upward revisions to potential estimates, declining costs, and improved performance have created new opportunities for using RE to cost-effectively meet energy security challenges in India. Under the “Modestly Secure and Clean” scenario, 40% of energy needs in 2030 are met by wind (15%), solar (10%), other RE (5%), and energy efficiency (10%) at a cost comparable to the “Baseline” scenario where only 10% of the electricity demand is provided by these resources and will lead to elimination of coal imports. If the rapid drop of solar prices continues, an electricity mix where 60% of the demand is provided by these sources can be achieved at comparable costs. Given the seasonal and diurnal complementary nature of solar and wind resources in India, and high- level of correlation with the load shape, such a mix is both cost effective and technically feasible.

25 ENERGY STORAGE↗

Technology Assessment Of A Fuel Cell Vehicle: 2017 Toyota Mirai

The technical objectives of the technology assessment of this advanced production vehicle are to: establish vehicle level energy consumption, efficiency, and performance data on varying drive cycles at ambient temperatures ranging from 20F to 95F with a stretch goal of testing a cold start at 0F; measure the performance envelops and synergies between the fuel cell system and the hybrid system (incl. fuel cell system idle); and generate an efficiency map of the fuel cell systems.

33 ADVANCED PROPULSION SYSTEMS↗

FY 2017 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy Standard Disposal Authorization Statement and Tank Closure Documentation (DOE-STD-5002-2017) requires preparation of an Annual Summary Report comparing low-level radioactive waste disposal facilities operations with the Disposal Authorization Statement (DAS) and its supporting technical documents including the performance assessment (PA) and the composite analysis (CA). The fiscal year (FY) 2017 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) was prepared by reviewing planned and discovered changes, waste receipts, monitoring results, research and development (R&D) results, and the status of DAS conditions and issues to assess the validity of the DASs, PAs, and CAs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Solar-Centered Grid Project Final Technical Report

This final technical Report for the Solar-Centered Grid project examines interactions of barriers to high levels of solar penetration at the Balancing Authority level and explores approaches to solutions to several such barriers. Results of a study to pool ACE variability and responsibility among disparate neighboring BAs are presented, as well as a methodology and results of a study for predicting ACE and frequency deviations in the sub-10-minute timeframe to serve as the underpinning for operational tools for managing fast solar ramps at the BA level. An example of approximate methods for cost-benefit analysis for probabilistic control center tools is presented, followed by a draft guide of best practices for such analysis.

14 SOLAR ENERGY↗

Community Resilience Options: A Menu for Enhancing Local Energy Resilience

This document highlights areas of potential community resilience improvements, especially those that relate to clean energy deployment for communities and municipalities. The National Renewable Energy Laboratory (NREL) defines resilience as "a system's ability to anticipate, prepare for, and adapt to changing conditions and withstand, respond to, and recover rapidly from disruptions through sustainable, adaptable, and holistic planning and technical solutions." This document introduces 10 categories of resilience-enhancing projects at a high level, intended for community members and decision-makers new to the topic to build their understanding of which solutions fit their community best. These categories focus primarily on community-scale measures and different options may be available at larger scales. Full implementation of the measures described here requires in-depth, site-specific considerations that go beyond the scope of this document.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Technology Development and Integration for Volume Production of High Purity Rare Earth Metals from Phosphate Processing

Under this project and in collaboration with Pacific Northwest National Laboratory (PNNL), Oak Ridge National Laboratory (ORNL), Florida International University (FIU), and Mosaic, the FIPR Institute successfully developed and demonstrated on laboratory batch scale a complete processing technology for production of high-purity rare earth elements (REE) in the form of mixed rare earth oxides (MREO) and rare earth metals (REM) using phosphoric acid sludge (a byproduct from phosphate mining) as the REE feedstock. Based on the research results, a technical research plan has been developed with expanded team members to elevate the technology readiness level (TRL) of the subject technology from 4 to 6 by conducting continuous testing of the processing flowsheet with the ultimate goal of producing about 900 tons per year of REM using the phosphate mining byproduct. Those 900 tons of REM would contain approximately 180 tons of Y, 120 tons of Nd, 50 tons of Gd, 37 tons of Dy, 33 tons of Sm, and 31 tons of Pr, meeting the US demand of roughly 39%, 6%, 42%, 48%, 101% and 7% for these elements, respectively. The advanced technologies for REE separation and purification involves three technology companies: K-Technologies, Inc. would test their continuous-ion-exchange/continuous-ion chromatography technologies on both the REE leachate and solvent extraction concentrate for 4 production of high-purity individual or binary REM. Rare Earth Salts would test their innovative electrochemical technology on the REE leachate or re-dissolved MREO in dilute acid for production of high-purity individual or binary REM. Rare Earth Technologies, Inc. would evaluate their advanced chromatographic separation technology on the dissolved MREO product for production of high-purity individual or binary REM.

36 MATERIALS SCIENCE↗