Progress in Offline Software for the GlueX Experiment at Jefferson Lab

The GlueX Experiment will begin taking data next year at CEBAF at Jefferson Lab. CEBAF is being upgraded to deliver 12 GeV electrons and GlueX will receive a secondary, tagged photon beam with linear polarization in a new experimental hall, Hall D. Over the past few years the collaboration has worked preparing offline software to do event simulation, event reconstruction, and data analysis in preparation for the beginning of operations. Progress in these areas will be presented along with a description of data challenges completed to test scaling of computing infrastructure.

Ito, Mark↗

Progress Towards the Reality of Low-Temperature Critical Experiments with Low-Temperature TEX

Integral benchmarks for criticality safety do not exist below room temperature. Incredible support for below room temperature benchmarks is present across the international community. Validation of low-temperature neutron cross sections is necessary to verify any operation at temperatures below room temperature which is typically observed in environments far from the equator. For example, a fissile material transportation truck may routinely observe ambient temperatures down to -40°C, which is the lower temperature bound of the normal conditions of transportation defined in the United States Title 10 Code of Federal Regulations §71.71c2. Similarly, the IAEA, which contains 176 member states, has the same requirement for subcriticality for fissile material transportation. Additionally, sub-room temperature benchmarks can validate newly produced cross sections, that include novel thermal scattering laws, from North Carolina State University. A six-case experiment designed based off the TEX-HEU baseline experiments has been proposed utilizing a chilled vacuum chamber capable of cooling the HEU stack down to -50°C. The six proposed configurations span the entire neutron fission energy range and can be tested at intermediate temperatures between room temperature and -40°C. Of the six configurations, the fastest case utilizes nearly 135 kg of HEU. Understanding the system is required prior to critical experiment operations. In order to test the functionality of the system, testing with surrogate fuel materials has been conducted. The following discusses the design of the low temperature TEX (LT-TEX) experiment as well as the progress made via surrogate testing towards a reality in which low-temperature integral benchmarks exist in the International Criticality Safety Benchmark Evaluation Project (ICSBEP).

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

OECD-NEA HTTF Benchmark Progress and Updates

General slides discussing High Temperature Test Facility benchmark progress, Prismatic HTGR deployment, modeling and simulation tools for validating systems, and verification and validation issues. Also discuss collaboration and conclusions of RELAP5-3D validation activities based on HTTF with trends in data and international impact to accelerate deployment of prismatic HTGR microreactors by providing an opportunity for designers to assess their codes against experimental data and solutions from other codes.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Progress in development of MOSART concept with Th support

A study is under progress to examine the feasibility of Molten Salt Actinide Recycler and Transmuter system with U-Th support (MOSART+Th) fuelled with different compositions of actinide tri-fluorides (AnF{sub 3}) from used LWR fuel. New fast-spectrum design options with homogeneous core and fuel salt with high enough solubility for AnF{sub 3} are being examined because of new goals. Experimental data base created was used for further development of MOSART+Th technology as applied to consumption of AnF{sub 3} while extracting their energy. The flexibility of single fluid MOSART+Th concept fuel cycle is underlined, particularly, possibility of its operation in self-sustainable mode (CR=1) using different loadings and make up. The paper summarizes the current status of the design data for the MOSART+Th concept received within ISTC 3749 Task. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Progress and status of the OpenMC Monte Carlo code

The present work describes the latest advances and progress in the development of the OpenMC Monte Carlo code, an open-source code originating from the Massachusetts Institute of Technology. First, an overview of the development workflow of OpenMC is given. Various enhancements to the code such as real-time XML input validation, state points, plotting, OpenMP threading, and coarse mesh finite difference acceleration are described. (authors)

97 MATHEMATICS AND COMPUTING↗

Progress of the High Level Waste Program at the Defense Waste Processing Facility - 13178

The Defense Waste Processing Facility at the Savannah River Site treats and immobilizes High Level Waste into a durable borosilicate glass for safe, permanent storage. The High Level Waste program significantly reduces environmental risks associated with the storage of radioactive waste from legacy efforts to separate fissionable nuclear material from irradiated targets and fuels. In an effort to support the disposition of radioactive waste and accelerate tank closure at the Savannah River Site, the Defense Waste Processing Facility recently implemented facility and flowsheet modifications to improve production by 25%. These improvements, while low in cost, translated to record facility production in fiscal years 2011 and 2012. In addition, significant progress has been accomplished on longer term projects aimed at simplifying and expanding the flexibility of the existing flowsheet in order to accommodate future processing needs and goals. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation Progress of the High-Risk 618-10 Burial Ground at Hanford 12427

The 618-10 Burial Ground was in operation from 1954 to 1963 and consists of 94 vertical pipe disposal units (VPUs) and 12 solid waste disposal trenches. Remediation of the trenches began in March of 2011 under the River Corridor Closure Contract (RCCC)a. This work was considered to be high risk because the trenches are known to contain a large radiological inventory and have the potential to release airborne contaminants. Remediation is being performed without a containment structure by using a combination of engineering controls and monitoring equipment. The engineering controls include storing material below grade using a surge trench, the application of soil fixatives, and applying material storage limits. The use of radiological and chemical monitoring equipment is also used to provide near real-time information to guide remediation activities and limit contact of waste until risks can be evaluated. Remediation of the trenches is progressing without any significant personnel or environmental issues. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

INL transient reactor restart progress

The United States Department of Energy (DOE) has authorized resumption of transient testing and the restart of the Transient Reactor Test (TREAT) facility. The TREAT reactor was used from 1959 to 1994 to conduct more than 2800 nuclear fuel transient tests prior to being placed in standby in 1994. The plant was extensively upgraded shortly before it was placed in standby. Present day assessments revealed that a sound infrastructure remains at the plant. The assessments included extensive walk-downs and subsequent functional testing. The testing was broad in scope, but ensured that any plant operability issues, including age related degradation were discovered and resolved. The primary age related degradation found was capacitors in Reactor Trip System and Automatic Reactor Control System power supplies. The majority of low voltage power supplies required replacement. Although minimal degradation was evident, in some cases elastomers such as hydraulic hoses were preemptively replaced to take advantage of the existing maintenance window and ensure future reliable operation. Configuration management has been extensively reviewed and the plant components re-labeled using modern standards. The re-labeling required extensive work including updates to plant drawings and procedures. The plant organization has been established to restart the reactor and will subsequently seamlessly transition to reactor operations. For the restart effort, the operating organization is being supplemented by subcontractors including some personnel who were involved in TREAT historical operations. During 2015 and the first half of 2016 substantial progress has been made to renew reactor systems and infrastructure, update procedures and configuration management documents, and put in place a qualified operating organization. Reactor startup is anticipated no later than 2018. (author)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Dismantling of HLLW Process Installations of the German Reprocessing Facility (WAK) - Progress and first Experiences in Hot Application of Remote Techniques - 17083

Decommissioning and dismantling of the former German Pilot Reprocessing Plant Karlsruhe (WAK) including the Vitrification Facility (VEK) is being executed in different Project steps related to the reprocessing, HLLW storage and vitrification complexes. While inside the reprocessing building the total inventory of process equipment has already been dismantled and disposed of, the HLLW storage and vitrification complex has been placed out of operation since vitrification was finalized in year 2010 and is now under deconstruction. This paper describes the progress and experiences made in dismantling of the process cells of the HLLW storage building. The major challenges of the dismantling are the high dose rates up to 70 Sv/h and the locking technology for the removal of the hot cell installations. As well as the adaption and extensive prototype testing of the remote handling equipment which was applied to dismantle the hot cell equipment prior to the start of the dismantling. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Recent Progress in the Understanding of UK Highly Active Liquor Chemistry and Properties - 17144

In the UK Highly Active Liquor (HAL) waste is stored in stainless steel tanks prior to encapsulation in glass in one of three lines in the Waste Vitrification Plant (WVP). The chemistry and physical properties of HAL from the historic and ongoing UK reprocessing operations is well understood, following years of operations and associated research and development programmes using primarily non-active simulants. However the imminent progression to POCO of the Highly Active Storage Tanks (HASTs), where the HAL is stored, requires a more in-depth understanding of the properties of the HAL, in particular the solid phases that are known to exist. Changes in operations are expected, including the addition of new chemical wash reagents, which will result in some fundamental changes to the chemistry in the HASTs. This paper will highlight some of the key findings from recent studies into areas such as solids formation and morphology, chemical dissolution and associated re-precipitation of solids, rheology modification and chemical conversion mechanisms. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update on Demolition Strategy and Progress at Hanford's Plutonium Finishing Plant - 17161

U.S. Department of Energy (DOE) contractor CH2M HILL Plateau Remediation Company (CH2M) is currently demolishing the Plutonium Finishing Plant (PFP). The facility is located on the Hanford Site and produced plutonium metal during the Cold War. Production was stopped in 1988, the facility was formally shut-down in 1996 and material processing completed in 2004. In November 2016, the project team, partnering with DOE-Richland Operations Office (DOE-RL) began demolition of the building. CH2M and DOE-RL will demolish PFP as a Hazardous Category II nuclear facility (HazCat II). The PFP is considered one of the most hazardous buildings on the Hanford site; employees have performed some of the most hazardous work anywhere across the DOE Environmental Management complex. Since 2008, employees have removed much of the plutonium-processing infrastructure. Four main buildings make up the majority of the PFP complex. As of November 2016, one building is undergoing demolition, another is ready for demolition and, concurrently, demolition preparations continue in the remaining two buildings. That hazard mitigation work includes removing contaminated ventilation duct work, process lines and performing asbestos abatement. To ensure safe and compliant demolition, CH2M employees researched, trained and deployed personal protective equipment never before used on the Hanford Site to complete some of the most hazardous demolition preparations. Project management commissioned the development of an air dispersion model that dictated ready-for-demolition criteria and established conservative demolition parameters. Management also sequenced project work to allow demolition to occur while demolition preparations continue a safe distance away in adjacent buildings. This paper will allow CH2M and DOE-RL to share lessons learned and progress to date with other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Status of HLW disposal in the USA and rational, progressive, paths forward based upon lessons learned in the USA and abroad since 1973 - 15103

The development of the USA's only candidate (since 1987) HLW-repository at the Yucca Mountain (YM) site, Nevada, was halted by the Obama administration in 2009. Four years later, the Obama administration proposed a new strategy for the back end of the nuclear fuel cycle that would open a consent-based HLW repository 'by 2048'. At the end of 2014, both the YM HLW repository and the new HLW-disposition (storage and disposal) strategy remain on hold due to lack of enabling legislation. With this as background, and based upon our active involvement in, monitoring of, and reporting on HLW management programs in the USA and abroad since 1973, we submit that: 1. Politics, political will, and legal actions and outcomes will continue to govern progress. 2. Public acceptance and sustained support (PASS) may influence politics and political will. 3. PASS is time-dependent and governed by: a. Ideologies; b. Perceived benefits and risks; c. Level and equity of radiation protection provided by applicable regulations; d. Perceived robustness/safety of the proposed disposition concept; and e. Perceived credibility and competency vested in the involved organizations and their respective leaders (= TRUST). We therefore recommend that the USA concurrently pursues at least two, 'centralized' HLW-storage and -disposal solutions based upon best-available relevant knowledge and majority-PASS at facility-host locations. Furthermore, safe(r) and more secure disposal of defense/government-generated HLW could probably commence at least 15 years earlier than 'by 2048' in/at: 1. The YM repository/site. 2. The WIPP repository/site. 3. 'Local' deep boreholes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The decommissioning imperative - motivating progress in us used fuel management - 15185

When the Yucca Mountain project was terminated in 2010 there was approximately 3500 metric tons of used fuel stored at Independent Spent Fuel Storage Installations (ISFSIs) at which there was no operating reactor (10 shutdown plant sites and the GE Morris facility). By 2015, four additional sites with five reactors will have shut down, causing the amount of used fuel 'stranded' at sites where there is no operating reactor to nearly double to approximately 6900 metric tons which will be stored at a total of 15 sites. At each of these sites, once the reactors are decommissioned, the only thing preventing the land from being returned to communities for other uses is the remaining presence of the used fuel. The cost of maintaining 15 stand-alone ISFSIs is born by electric ratepayers and taxpayers. Going forward, the costs of maintaining stand-alone ISFSIs is certain to grow even if the number of stand-alone ISFSIs does not grow beyond the already announced shutdown of the Oyster Creek reactor in 2019 (which would increase the amount of stranded used fuel by another 10% and create a 16. stand-alone ISFSI). One reason for this cost escalation will be the need for ISFSI owners to renew storage licenses, and implement aging management programs to support these renewals, due to the continued delay in the federal program for removing the used fuel. Storage licenses at 10 of 16 stand-alone ISFSIs will expire by 2021, which is the earliest projected date at which the Department of Energy (DOE) has indicated it could have a pilot interim storage facility available - and nearly 3 decades before DOE projects a repository will be available. The burden and cost of continuing to renew storage licenses - and manage aging storage facilities - at 16 stand-alone sites instead of moving stranded used fuel to a single consolidated storage location or repository will likely be significant. Industry resources are increasingly being channeled into dry storage aging management activities as public and regulator interest in potential long-term degradation mechanism continues to grow. Whether the ultimate destination for used fuel is Yucca Mountain or some other location, the current stalemate preventing progress in the federal program to move it must be broken - and the increasing prominence of the decommissioned reactor quandary may very well be a pivotal factor in breaking that stalemate. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress toward cleanup of operable unit 1 groundwater at the US DOE0 Mound, Ohio, site: success of a phased-combined remedy - 15310

Industrial solvents (primarily trichloroethene) and other volatile organic compounds (VOCs) that originated from the former solid waste landfill contaminated the groundwater in the Buried Valley Aquifer beneath the Mound, Ohio, Site. The landfill was used from 1948 to 1974 for the disposal of trash, debris, and liquid waste. In 1977, much of the waste was relocated and encapsulated onsite. The landfill site and surrounding area (Operable Unit 1 [OU-1]) occupy approximately 1.6 hectares (4 acres) in the southwestern portion of the site. The historical pathway of concern consisted of leaching of contaminants from site soils or disposed wastes down into the groundwater, entrainment in the flowing groundwater, and migration toward former Mound site water-production wells. A groundwater pump-and-treat (P and T) system was initiated in 1996 to interdict the plume and a soil vapor extraction system was installed and operated from 1997 to 2003 to remove the bulk of the VOC sources from the vadose zone. Physical removal of the landfill waste and contaminated soil was performed between 2006 and 2010. Approximately 76,000 cubic meters (99,400 cubic yards) of material were removed from the OU-1 landfill area; the remaining soils in the OU-1 area meet the site cleanup objectives for future industrial or commercial use. Operation of the groundwater P and T system continued throughout this period. During the remediation time frame, groundwater monitoring and a number of innovative characterization campaigns were completed to assess the contaminant and biogeochemical conditions in the subsurface at OU-1. For example, in 2013 an integral pumping test was performed to characterize the amount (mass) of the low-level VOCs in groundwater. Soil and groundwater were also collected to obtain site-specific data to identify if geochemical conditions support natural attenuation reactions. Contaminant and hydrogeologic data collected from this test, as well as historical data, were evaluated to identify the distribution and potential sources of VOCs, refine the hydrogeologic description, update the conceptual model of VOC fate and transport, and determine if monitored natural attenuation remains a viable option to address VOCs in groundwater. To date, the performance of the phased-combined remedy has resulted in significant reductions in the concentrations of VOCs in the groundwater. For example, in 2013 the trichloroethene in all wells was less than 40 micrograms per liter, with a plurality of the wells near or below maximum contaminant levels. The generally observed declining concentration trends and the low concentrations for 2013 represent the net impact of source removal actions, P and T operation, and natural attenuation. In accordance with the current conditions, the joint US DOE and regulator Core Team is proceeding with a field demonstration of enhanced attenuation-an engineering and regulatory strategy that was recently developed by the Interstate Technology and Regulatory Council. Enhanced attenuation strategies focus on altering a target site in such a way that it can transition to natural attenuation. The combination of technologies to be deployed includes neat (pure) vegetable oil deployment in the deep vadose zone of the former landfill area and emulsified vegetable oil deployment within the footprint of the groundwater plume. In the first part of the deployment, neat oil spreads laterally and forms a thin layer on the water table beneath residual soil sources to intercept and reduce future VOC loading and to reduce oxygen inputs to the local groundwater. In the second part of the deployment, emulsified oil forms active bioremediation treatment zones within the plume footprint to degrade existing groundwater contaminants (via reductive dechlorination, co-metabolism, or both) and stimulates long-term attenuation capacity in the down-gradient plume (via co-metabolism). If the proposed activities are successful, they will accelerate the progress of the Mound OU-1 toward remedial goals and convert the current active P and T remedy into a passive attenuation-based remedy that represents a cost-effective final step in a phased remediation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementation of Enhanced Attenuation at the DOE Mound Site OU-1 Landfill: Accelerating Progress and Reducing Costs - 16270

A field demonstration of enhanced attenuation (EA) was initiated in 2014 to expedite the remediation of industrial solvents in the groundwater impacted by the former landfill Operable Unit 1 (OU-1) at the US Department of Energy (DOE) Mound, Ohio, Site. EA uses active engineering solutions to alter the target site so that the contaminant plume will passively stabilize and shrink. For OU-1, the EA was implemented by targeted injection of an electron donor (vegetable oil) to create 'structured geochemical zones'. Volatile organic compounds (VOCs) in the altered subsurface system encounter alternating anaerobic and aerobic environments along the plume flow path. The effect of these structured geochemical zones is effective and rapid degradation of parent compounds such as trichloroethene (TCE) and tetrachloroethene (PCE), and daughter compounds such as cis-1,2-dichloroethene and vinyl chloride. EA at Mound OU-1 provides a transition to natural attenuation and is an alternative to the baseline pump-and-treat (P and T) system. Industrial solvents (primarily TCE) and other VOCs that originated from the former solid-waste landfill contaminated the groundwater in the Buried Valley Aquifer beneath the Mound site. A groundwater P and T system was initiated in 1996 to control the plume, and a soil vapor extraction system was installed and operated from 1997 to 2003 to remove the bulk of the VOC sources from the vadose zone. Physical removal of the landfill waste and contaminated soil was performed between 2006 and 2010. Approximately 76,100 cubic meters (99,500 cubic yards) of material were removed from the OU-1 landfill area. Operation of the groundwater P and T system continued throughout this period. The principles and technical basis of the ongoing EA field demonstration were developed by the Interstate Technology and Regulatory Council. The goal of the EA implementation is to provide a bridge between active groundwater treatments and monitored natural attenuation. EA relies on understanding and manipulating the contaminant mass balance. Technologies are applied to sustainably reduce the contaminant loading from the source and/or increase the rate of natural attenuation processes within the plume. In 2014, a core team that included DOE, the US Environmental Protection Agency (EPA), the Ohio EPA, and technical support organizations evaluated remedial options for OU-1. During the 2014 evaluation, the team projected a cleanup time frame for the baseline P and T system of 26 additional years and a cleanup time frame for the EA remedy of 13 years. On the basis of that evaluation, EPA approved the implementation of the EA remedy that required the shutdown of the P and T system. The combination of technologies implemented for OU-1 EA included (a) neat vegetable oil in the vadose zone in the former landfill and (b) emulsified vegetable oil within the footprint of the groundwater plume. In the first part of the deployment, neat oil spreads laterally and forms a thin layer on the water table beneath residual soil sources to intercept and reduce future VOC loading and to reduce oxygen inputs to the local groundwater. In the second part of the deployment, emulsified oil forms active bioremediation anaerobic treatment zones within the plume footprint to degrade existing groundwater contaminants (via reductive dechlorination, co-metabolism, or both) and stimulates long-term attenuation capacity in the down-gradient aerobic plume (via co-metabolism). The results from the first year of the field demonstration indicate that the dissolved TCE and PCE plumes have decreased in size and mass. Statistical tests indicate that the VOC concentrations in the majority of the source-area wells are decreasing. The VOC concentrations throughout the plume are projected to be below the target maximum contaminant level of 2 to 5 μg/L within 5 to 10 years-sooner than the design projection of 13 years. The biogeochemistry and microbial community within the structured geochemical zones are consistent with the design and appear to be stable. At Mound OU-1, EA has accelerated progress toward the remedial action objectives and reduced costs. Ongoing monitoring will determine whether the EA remedy has transitioned the site into monitored natural attenuation status and whether the EA will continue to be effective, timely, and sustainable. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Collaborative working is driving progress in hazard and risk reduction delivery at Sellafield - 16387

A new way of working has been adopted at the Sellafield site in the United Kingdom which is delivering benefits in terms of accelerating hazard and risk reduction safely and securely at the site. This new way of working involves a collaborative approach on crucial aspects of the plan of work for Sellafield between: - Sellafield Ltd (the site's management and operations contractor), - The Nuclear Decommissioning Authority (the site's owner and Sellafield Ltd's customer), - The Office for Nuclear Regulation (the UK's nuclear safety and security regulator), - The Environment Agency (England's environmental regulator), - The UK Government's Department of Energy and Climate Change, - The UK Government's Shareholder Executive, part of the Department of Business, Innovation and Skills. The new way of working is founded upon fully aligning the individual strategies of each of these six organisations towards the common goal of accelerated risk and hazard reduction and then ensuring good communications so these strategies remain fully aligned. To this end a number of issues were identified by the six organisations which were considered to be slowing the progress of the risk and hazard reduction work, from which a set of 'strategic themes' was developed to facilitate different ways of thinking and so solve these issues. The strategic themes are: - Looking for blockers and how they can be removed, - Avoiding overly complex solutions by utilising the concept of fit for purpose, - The effective use of resources, - Prioritisation arrangements, - Incentivisation, - The appetite for risk, - Avoiding distractions and diversions, - Effective use of communications so that the more effective and efficient ways of working, and the improvements that are generated, are promulgated throughout Sellafield Ltd. These strategic themes have been applied with great effect in a number of areas delivering risk reduction benefits. For example: - The removal of ageing fuel from Sellafield's oldest pond, the Pile Fuel Storage Pond; a significant milestone in the site's hazard and risk reduction agenda. - Implementing an alternative ILW approach. - Managing stocks of Highly Active Liquor (HAL). - 'Re-purposing' existing Waste Management Facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Canada's Nuclear Legacy Liabilities Program - Ten Years of Progress and Achievements - 16456

Nuclear legacy liabilities have resulted from more than 60 years of nuclear research and development carried out on behalf of Canada. The liabilities are located at Atomic Energy of Canada Limited's (AECL) Chalk River Laboratories in Ontario and Whiteshell Laboratories in Manitoba, as well as three shutdown prototype reactors in Ontario and Quebec that are being maintained in a safe storage state. Estimated at about $10.6 billion (B) (current day Canadian dollars), these liabilities consist of disused nuclear facilities and associated infrastructure, a wide variety of buried and stored waste, and contaminated lands. The Government of Canada established the Nuclear Legacy Liabilities Program (NLLP) in 2006 to implement a long-term strategy to safely and cost-effectively reduce risks and liabilities, and invested approximately $1.4 B over the 10-year duration of the Program to implement the strategy. Risks and liabilities were reduced through projects and activities that decommissioned and removed out-dated facilities, remediated lands affected by past practices, and improved the management of legacy radioactive waste. The NLLP formally ended in September 2015 when the restructuring of AECL's Nuclear Laboratories was completed, and a Government-owned Contractor-operated (GoCo) management model came into effect. The nuclear decommissioning and waste management work that was previously carried out under the NLLP was transitioned into the new GoCo contract. Over the 10-year duration of the NLLP, the Program achieved good progress in addressing health, safety and environmental priorities, reducing liabilities, and providing the studies, plans and facilities that will be needed to enable subsequent phases of the strategy. The NLLP provided a strong basis for the GoCo contractor to accelerate risk and liability reduction at AECL sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗