Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planned”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

Lessons Learned in Decadal Planning in Space Science

This summary has been prepared by the workshop rapporteurs as a factual summary of what occurred at the workshop. The planning committee's role was limited to planning and convening the workshop. The views contained in the report are those of individual workshop participants and do not necessarily represent the views of all workshop participants, the planning committee, or the National Research Council. This summary was written using video recordings of the entire workshop proceedings. Speakers attributed in this summary were not asked to review the workshop summary before its release. This workshop summary has been reviewed in draft form by individuals chosen for their diverse perspectives and technical expertise, in accordance with procedures approved by the NRC's Report Review Committee. The purpose of this independent review is to provide candid and critical comments that will assist the institution in making its published report as sound as possible and to ensure that the summary meets institutional standards for objectivity, evidence, and responsiveness to the study charge. The review comments and draft manuscript remain confidential to protect the integrity of the deliberative process. We wish to thank the following individuals for their review of this summary: George Paulikas, The Aerospace Corporation (retired), Marcia Rieke, University of Arizona, Kunio Sayanagi, Hampton University, Marcia Smith, Space and Technology Policy Group, LLC, and Warren Washington, National Center for Atmospheric Research. Although the reviewers listed above have provided many constructive comments and suggestions, they did not see the final draft of the workshop summary before its release. The review of this report was overseen by Kenneth Kellermann, National Radio Astronomy Observatory. Appointed by the NRC, he was responsible for making certain that an independent examination of this report was carried out in accordance with institutional procedures and that all review comments were carefully considered. Responsibility for the final content of this report rests entirely with the authors and the institution.

Groswald, Lewis↗

SRT Status and Plans for Version-7

Status of Version-6 at GSFC-GSFC version-6 must match JPL version-6 before we can improve it. Short-range plans evolutionary improvements. Mid-Range plans- New thrusts, Higher spatial resolution retrievals cloud spectral emissivity. Long-range plans- more challenging ideas

Version-6↗

Preparing GMAT for Operational Maneuver Planning of the Advanced Composition Explorer (ACE)

The General Mission Analysis Tool (GMAT) is an open-source space mission design, analysis and trajectory optimization tool. GMAT is developed by a team of NASA, private industry, public and private contributors. GMAT is designed to model, optimize and estimate spacecraft trajectories in flight regimes ranging from low Earth orbit to lunar applications, interplanetary trajectories and other deep space missions. GMAT has also been flight qualified to support operational maneuver planning for the Advanced Composition Explorer (ACE) mission. ACE was launched in August, 1997 and is orbiting the Sun-Earth L1 libration point. The primary science objective of ACE is to study the composition of both the solar wind and the galactic cosmic rays. Operational orbit determination, maneuver operations and product generation for ACE are conducted by NASA Goddard Space Flight Center (GSFC) Flight Dynamics Facility (FDF). This paper discusses the entire engineering lifecycle and major operational certification milestones that GMAT successfully completed to obtain operational certification for the ACE mission. Operational certification milestones such as gathering of the requirements for ACE operational maneuver planning, gap analysis, test plans and procedures development, system design, pre-shadow operations, training to FDF ACE maneuver planners, shadow operations, Test Readiness Review (TRR) and finally Operational Readiness Review (ORR) are discussed. These efforts have demonstrated that GMAT is flight quality software ready to support ACE mission operations in the FDF.

Trajectory analysis↗

Space Resource Utilization: Near-Term Missions and Long-Term Plans for Human Exploration

NASA's Human Exploration Plans: A primary goal of all major space faring nations is to explore space: from the Earth with telescopes, with robotic probes and space telescopes, and with humans. For the US National Aeronautics and Space Administration (NASA), this pursuit is captured in three important strategic goals: 1. Ascertain the content, origin, and evolution of the solar system and the potential for life elsewhere, 2. Extend and sustain human activities across the solar system (especially the surface of Mars), and 3. Create innovative new space technologies for exploration, science, and economic future. While specific missions and destinations are still being discussed as to what comes first, it is imperative for NASA that it foster the development and implementation of new technologies and approaches that make space exploration affordable and sustainable. Critical to achieving affordable and sustainable human exploration beyond low Earth orbit (LEO) is the development of technologies and systems to identify, extract, and use resources in space instead of bringing everything from Earth. To reduce the development and implementation costs for space resource utilization, often called In Situ Resource Utilization (ISRU), it is imperative to work with terrestrial mining companies to spin-in/spin-off technologies and capabilities, and space mining companies to expand our economy beyond Earth orbit. In the last two years, NASA has focused on developing and implementing a sustainable human space exploration program with the ultimate goal of exploring the surface of Mars with humans. The plan involves developing technology and capability building blocks critical for sustained exploration starting with the Space Launch System (SLS) and Orion crew spacecraft and utilizing the International Space Station as a springboard into the solar system. The evolvable plan develops and expands human exploration in phases starting with missions that are reliant on Earth, to performing ever more challenging and longer duration missions in cis-lunar space and beyond, to eventually being independent from Earth. The goal is no longer just to reach a destination, but to enable people to work, learn, operate, and live safely beyond the Earth for extended periods of time, ultimately in ways that are more sustainable and even indefinite.

Sanders, Gerald B.↗

End-of-Mission Planning Challenges for a Satellite in a Constellation

At the end of a mission, satellites embedded in a constellation must first perform propulsive maneuvers to safely exit the constellation before they can begin with the usual end-of-mission activities: deorbit, passivation, and decommissioning. The target orbit for these exit maneuvers must be sufficiently below the remaining constellation satellites such that, once achieved, there is no longer risk of close conjunctions. Yet, the exit maneuvers must be done based on the spacecraft's state of health and operational capability when the decision to end the mission is made. This paper focuses on the recently developed exit strategy for the CloudSat mission to highlight problems and issues, which forced the discarding of CloudSat's original EoM Plan and its replacement with a new plan consistent with changes to the spacecraft's original operational mode. The analyses behind and decisions made in formulating this new exit strategy will be of interest to other missions in a constellation currently preparing to update their End-of-Mission Plan.

CloudSat↗

Facility Upgrade/Replacement Tasks ('planned') at the NASA Glenn Research Center 10x10 Supersonic Wind Tunnel

Facility upgrades and large maintenance tasks needed at the NASA Glenn 10x10 Supersonic Wind Tunnel requires significant planning to make sure implementation proceeds in an efficiently and cost effective manner. Advanced planning to secure the funding, complete design efforts and schedule the installation needs to be thought out years in advance to avoid interference with wind tunnel testing. This presentation describes five facility tasks planned for implementation over the next few years. The main focus of the presentation highlights the efforts on possible replacement of the diesel generator and the rationale behind the effort.

Giriunas, Julius A.↗

International Space Station (ISS) Plasma Contactor Unit (PCU) Utilization Plan Assessment Update

The International Space Station (ISS) vehicle undergoes spacecraft charging as it interacts with Earth's ionosphere and magnetic field. The interaction can result in a large potential difference developing between the ISS metal chassis and the local ionosphere plasma environment. If an astronaut conducting extravehicular activities (EVA) is exposed to the potential difference, then a possible electrical shock hazard arises. The control of this hazard was addressed by a number of documents within the ISS Program (ISSP) including Catastrophic Safety Hazard for Astronauts on EVA (ISS-EVA-312-4A_revE). The safety hazard identified the risk for an astronaut to experience an electrical shock in the event an arc was generated on an extravehicular mobility unit (EMU) surface. A catastrophic safety hazard, by the ISS requirements, necessitates mitigation by a two-fault tolerant system of hazard controls. Traditionally, the plasma contactor units (PCUs) on the ISS have been used to limit the charging and serve as a "ground strap" between the ISS structure and the surrounding ionospheric plasma. In 2009, a previous NASA Engineering and Safety Center (NESC) team evaluated the PCU utilization plan (NESC Request #07-054-E) with the objective to assess whether leaving PCUs off during non-EVA time periods presented risk to the ISS through assembly completion. For this study, in situ measurements of ISS charging, covering the installation of three of the four photovoltaic arrays, and laboratory testing results provided key data to underpin the assessment. The conclusion stated, "there appears to be no significant risk of damage to critical equipment nor excessive ISS thermal coating damage as a result of eliminating PCU operations during non- EVA times." In 2013, the ISSP was presented with recommendations from Boeing Space Environments for the "Conditional" Marginalization of Plasma Hazard. These recommendations include a plan that would keep the PCUs off during EVAs when the space environment forecast input to the ISS charging model indicates floating potentials (FP) within specified limits. These recommendations were based on the persistence of conditions in the space environment due to the current low solar cycle and belief in the accuracy and completeness of the ISS charging model. Subsequently, a Noncompliance Report (NCR), ISS-NCR-232G, Lack of Two-fault Tolerance to EVA Crew Shock in the Low Earth Orbit Plasma Environment, was signed in September 2013 specifying new guidelines for the use of shock hazard controls based on a forecast of the space environment from ISS plasma measurements taken prior to the EVA [ISS-EVA-312-AC, 2012]. This NESC assessment re-evaluates EVA charging hazards through a process that is based on over 14 years of ISS operations, charging measurements, laboratory tests, EMU studies and modifications, and safety reports. The assessment seeks an objective review of the plasma charging hazards associated with EVA operations to determine if any of the present hazard controls can safely change the PCU utilization plan to allow more flexibility in ISS operations during EVA preparation and execution.

Hernandez-Pellerano, Amri↗

Center Planning and Development: Multi-User Spaceport Initiatives

The Vehicle Assembly building at NASAs Kennedy Space Center has been used since 1966 to vertically assemble every launch vehicle, since the Apollo Program, launched from Launch Complex 39 (LC-39). After the cancellation of the Constellation Program in 2010 and the retirement of the Space Shuttle Program in 2011, the VAB faced an uncertain future. As the Space Launch System (SLS) gained a foothold as the future of American spaceflight to deep space, NASA was only using a portion of the VABs initial potential. With three high bays connected to the Crawler Way transportation system, the potential exists for up to three rockets to be simultaneously processed for launch. The Kennedy Space Center (KSC) Master plan, supported by the Center Planning and Development (CPD) Directorate, is guiding Kennedy toward a 21st century multi-user spaceport. This concept will maintain Kennedy as the United States premier gateway to space and provide multi-user operations through partnerships with the commercial aerospace industry. Commercial aerospace companies, now tasked with transporting cargo and, in the future, astronauts to the International Space Station (ISS) via the Commercial Resupply Service (CRS) and Commercial Crew Program (CCP), are a rapidly growing industry with increasing capabilities to make launch operations more economical for both private companies and the government. Commercial operations to Low Earth Orbit allow the government to focus on travel to farther destinations through the SLS Program. With LC-39B designated as a multi-use launch pad, companies seeking to use it will require an integration facility to assemble, integrate, and test their launch vehicle. An Announcement for Proposals (AFP) was released in June, beginning the process of finding a non-NASA user for High Bay 2 (HB2) and the Mobile Launcher Platforms (MLPs). An Industry Day, a business meeting and tour for interested companies and organizations, was also arranged to identify and answer any additional questions posed by potential proposers. After amending the AFP and posting additional material for potential users to consider, proposals are being accepted until July 31, at which point they will be evaluated to determine the proposer which best meets the objectives of the government. By identifying VAB HB2 as available and seeking proposals from the commercial sector for VAB HB2 and MLP use, Center Planning and Development is ensuring Kennedy Space Centers relevance in the evolving launch industry of the 21st century.

AFP↗

NASA Plan for Increasing Access to the Results of Scientific Research

This plan is issued in response to the Executive Office of the President's February 22, 2013, Office of Science and Technology Policy (OSTP) Memorandum for the Heads of Executive Departments and Agencies, "Increasing Access to the Results of Federally Funded Scientific Research." Through this memorandum, OSTP directed all agencies with more than $100 million in annual research and development expenditures to prepare a plan for improving the public's access to the results of federally funded research. The National Aeronautics and Space Administration (NASA) invests on the order of $3 billion annually in fundamental and applied research and technology development1 across a broad range of topics, including space and Earth sciences, life and physical sciences, human health, aeronautics, and technology. Promoting the full and open sharing of data with research communities, private industry, academia, and the general public is one of NASA's longstanding core values. For example, NASA's space and suborbital mission personnel routinely process, archive, and distribute their data to researchers around the globe. This plan expands the breadth of NASA's open-access culture to include data and publications for all of the scientific research that the Agency sponsors.

Source record↗

Technology Alignment and Portfolio Prioritization (TAPP): Advanced Methods in Strategic Analysis, Technology Forecasting and Long Term Planning for Human Exploration and Operations, Advanced Exploration Systems and Advanced Concepts

The Advanced Concepts Office (ACO) at NASA, Marshall Space Flight Center is expanding its current technology assessment methodologies. ACO is developing a framework called TAPP that uses a variety of methods, such as association mining and rule learning from data mining, structure development using a Technological Innovation System (TIS), and social network modeling to measure structural relationships. The role of ACO is to 1) produce a broad spectrum of ideas and alternatives for a variety of NASA's missions, 2) determine mission architecture feasibility and appropriateness to NASA's strategic plans, and 3) define a project in enough detail to establish an initial baseline capable of meeting mission objectives ACO's role supports the decision­-making process associated with the maturation of concepts for traveling through, living in, and understanding space. ACO performs concept studies and technology assessments to determine the degree of alignment between mission objectives and new technologies. The first step in technology assessment is to identify the current technology maturity in terms of a technology readiness level (TRL). The second step is to determine the difficulty associated with advancing a technology from one state to the next state. NASA has used TRLs since 1970 and ACO formalized them in 1995. The DoD, ESA, Oil & Gas, and DoE have adopted TRLs as a means to assess technology maturity. However, "with the emergence of more complex systems and system of systems, it has been increasingly recognized that TRL assessments have limitations, especially when considering [the] integration of complex systems." When performing the second step in a technology assessment, NASA requires that an Advancement Degree of Difficulty (AD2) method be utilized. NASA has used and developed or used a variety of methods to perform this step: Expert Opinion or Delphi Approach, Value Engineering or Value Stream, Analytical Hierarchy Process (AHP), Technique for the Order of Prioritization by Similarity to Ideal Solution (TOPSIS), and other multi­‐criteria decision-making methods. These methods can be labor-intensive, often contain cognitive or parochial bias, and do not consider the competing prioritization between mission architectures. Strategic Decision-Making (SDM) processes cannot be properly understood unless the context of the technology is understood. This makes assessing technological change particularly challenging due to the relationships "between incumbent technology and the incumbent (innovation) system in relation to the emerging technology and the emerging innovation system." The central idea in technology dynamics is to consider all activities that contribute to the development, diffusion, and use of innovations as system functions. Bergek defines system functions within a TIS to address what is actually happening and has a direct influence on the ultimate performance of the system and technology development. ACO uses similar metrics and is expanding these metrics to account for the structure and context of the technology. At NASA technology and strategy is strongly interrelated. NASA's Strategic Space Technology Investment Plan (SSTIP) prioritizes those technologies essential to the pursuit of NASA's missions and national interests. The SSTIP is strongly coupled with NASA's Technology Roadmaps to provide investment guidance during the next four years, within a twenty-year horizon. This paper discusses the methods ACO is currently developing to better perform technology assessments while taking into consideration Strategic Alignment, Technology Forecasting, and Long Term Planning.

Funaro, Gregory V.↗

Improved Test Planning and Analysis Through the Use of Advanced Statistical Methods

The goal of this work is, through computational simulations, to provide statistically-based evidence to convince the testing community that a distributed testing approach is superior to a clustered testing approach for most situations. For clustered testing, numerous, repeated test points are acquired at a limited number of test conditions. For distributed testing, only one or a few test points are requested at many different conditions. The statistical techniques of Analysis of Variance (ANOVA), Design of Experiments (DOE) and Response Surface Methods (RSM) are applied to enable distributed test planning, data analysis and test augmentation. The D-Optimal class of DOE is used to plan an optimally efficient single- and multi-factor test. The resulting simulated test data are analyzed via ANOVA and a parametric model is constructed using RSM. Finally, ANOVA can be used to plan a second round of testing to augment the existing data set with new data points. The use of these techniques is demonstrated through several illustrative examples. To date, many thousands of comparisons have been performed and the results strongly support the conclusion that the distributed testing approach outperforms the clustered testing approach.

Green, Lawrence L.↗

NASA HRP Plans for Collaboration at the IBMP Ground-Based Experimental Facility (NEK)

NASA and IBMP are planning research collaborations using the IBMP Ground-based Experimental Facility (NEK). The NEK offers unique capabilities to study the effects of isolation on behavioral health and performance as it relates to spaceflight. The NEK is comprised of multiple interconnected modules that range in size from 50-250m(sup3). Modules can be included or excluded in a given mission allowing for flexibility of platform design. The NEK complex includes a Mission Control Center for communications and monitoring of crew members. In an effort to begin these collaborations, a 2-week mission is planned for 2017. In this mission, scientific studies will be conducted to assess facility capabilities in preparation for longer duration missions. A second follow-on 2-week mission may be planned for early in 2018. In future years, long duration missions of 4, 8 and 12 months are being considered. Missions will include scenarios that simulate for example, transit to and from asteroids, the moon, or other interplanetary travel. Mission operations will be structured to include stressors such as, high workloads, communication delays, and sleep deprivation. Studies completed at the NEK will support International Space Station expeditions, and future exploration missions. Topics studied will include communication, crew autonomy, cultural diversity, human factors, and medical capabilities.

Cromwell, Ronita L.↗

Modeling and Simulation Plans in Support of Low Cost, Size, Weight, and Power Surveillance Systems for Detecting and Tracking Non-Cooperative Aircraft

RTCA Special Committee (SC) 228 has initiated a second phase for the development of minimum operational performance standards (MOPS) for UAS detect and avoid (DAA) systems. Technologies to enable UAS with less available Size, Weight, and Power (SWaP) will be considered. RTCA SC-228 has established sub-working groups and one of the sub-working groups is focused on aligning modeling and simulations activities across all participating committee members. This briefing will describe NASAs modeling and simulation plans for the development of performance standards for low cost, size, weight, and power (C-SWaP) surveillance systems that detect and track non-cooperative aircraft. The briefing will also describe the simulation platform NASA intends to use to support end-to-end verification and validation for these DAA systems. Lastly, the briefing will highlight the experiment plan for our first simulation study, and provide a high-level description of our future flight test plans. This briefing does not contain any results or data.

surveillance↗

GPM Orbital Maintenance Planning and Operations in Low Solar Activity Environment

The orbital maintenance operations of the GPM Core Observatory was predicted to have routine drag makeup maneuvers to maintain the mission orbit. The maneuver frequency and estimated fuel usage calculated prelaunch were very comparable to the actual values observed after launch for the first two years. However, when the solar minimum was being entered, instead of seeing the need for less frequent station keeping maneuvers the operations team had to adjust the maneuver plan operations in order to maintain orbit requirements during the low atmospheric drag period predicted to last as long as 2021. This paper will provide the original plan, requirements and restriction, and the plan changes that were made to adjust to this condition. The document will also discuss lessons learned.

flight dynamics↗

Swarm Size Planning Tool for Multi-Job Type Missions

As part of swarm search and service (SSS) missions, swarms are tasked with searching an area while simultaneously servicing jobs as they are encountered. Jobs must be immediately serviced and can be one of multiple types. Each type requires that vehicle(s) break off from the swarm and travel to the job site for a specified amount of time. The number of vehicles needed and the service time for each job type are known. Once a job has been successfully serviced, vehicles return to the swarm and are available for reallocation. When planning SSS missions, human operators are tasked with determining the required number of vehicles needed to handle the expected job demand. The complex relationship between job type parameters makes this choice challenging. This work presents a prediction model used to estimate the swarm size necessary to achieve a given performance. User studies were conducted to determine the usefulness and ease of use of such a prediction model as an aid during mission planning. Results show that using the planning tool leads to 7 times less missed area and a 50 percent cost reduction.

Chandarana, Meghan↗

Launch Vehicle Estimating Factors for Use in Advance Space Mission Planning

This launch vehicle reference document contains mission characteristic and launch vehicle capability data for use by NASA and particularly the Office of Space Science and Applications (OSSA) in the preparation of future mission plans. The data in this reference book are derived from sources that are considered to be sufficiently accurate for advance planning. In no instance should these data be used for detailed mission planning without concurrence of the Director of Launch Vehicle and Propulsion Programs. This edition reflects updates in vehicle performance and possible availability and introduces a section on the Space Shuttle. The Shuttle section has been coordinated with the Office of Manned Space Flight.

McGolrick, Joseph E.↗

The Last Orbit: Planning Cassini's Plummet into Saturn

Cassini’s final orbit around Saturn will culminate in a dramatic ending as the spacecraft plunges into the ringed planet’s atmosphere, never to escape or be heard from again. The last hours of the mission prior to the final loss of signal have some of the most unique and valuable science to date. Cassini will take a unique trajectory to dive deep into the atmosphere on its approach to final disposal and no spacecraft, Cassini included, has entered these depths of Saturn’s atmosphere. The science community has placed heavy emphasis onthis once-in-a-lifetime opportunity to inspect these deeper regions of Saturn’s atmosphere. The Cassini project specifically aims to collect the very last bits of data during the final plunge to get samples of the deepest regions before the spacecraft is lost forever. The desire to collect the final bits of data presents several challenges. Cassini’s Mission Planning (MP) team has developed an End of Mission (EOM) scenario to tackle these demands. The EOM scenario outlines the framework for the entire last orbit of the mission and details thestrategy for data collection and transmission. Attaining near real-time transmission is key for the acquisition of the very last bits of data. The Cassini spacecraft will use a new mode of operations to successfully achieve this real-time transmission. In addition to this primary investigation and planning for telecommunications, key risks have been studied within the realm of the last orbit. Ultimately, this paper shows how the Cassini Project plans to ensurethe return of every last bit of data before the spacecraft is consumed by Saturn forever.

Bittner, Molly E.↗

Further Development of the NASA X-57 Maxwell Mission Planning Tool for Mods II, III, and IV

The experimental, fully electric X-57 Maxwell is designed to enable lower energy con-sumption at cruise compare to a fuel burning baseline. This is to be achieved using a sumof subsystem benefits incorporated in the electric, airframe, and propulsion systems. AMission Planning Tool captures the three stages of X-57 development in order to assess thedesign of each subsystem in the context of the whole aircraft. The Mission Planning Toolfor the fully electric X-57 Maxwell captures the aerodynamics, propulsion, heat transfer,and power system of the aircraft with trajectory optimization capabilities. It is able tomodel these subsystems through all phases of flight, from taxi to landing. Through thismultidisciplinary approach, we are able to predict the benefit of each subsystem and theeffect of key design assumptions and how the aircraft will react if they are not met or ex-ceeded. As the aircraft progresses and systems are tested, we can use the Mission PlanningTool to continue to predict performance. This paper details the continued development ofthe X-57 Mission Planning Tool and demonstrates its capabilities.

trajectory↗