Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “performance test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

NEXT Ion Engine 2000 Hour Wear Test Results

The results of the NEXT 2000 h wear test are presented. This test was conducted with a 40 cm engineering model ion engine, designated EM1, at a 3.52 A beam current and 1800 V beam power supply voltage. Performance tests, which were conducted over a throttling range of 1.1 to 6.9 kW throughout the wear test, demonstrated that EM1 satisfied all thruster performance requirements. The ion engine accumulated 2038 h of operation at a thruster input power of 6.9 kW, processing 43 kg of xenon. Overall ion engine performance, which includes thrust, thruster input power, specific impulse, and thrust efficiency, was steady with no indications of performance degradation. The ion engine was also inspected following the test. This paper presents these findings.

Soulas, George C.↗

A Semi-Empirical Correlation for the Onset of Density Wave Oscillations in a Helical Coil Steam Generator

NuScale Power has completed full length helical coil steam generator (HCSG) tests at SIET Laboratories in Piacenza, Italy. The test program included an investigation of the onset and evolution of density wave oscillations (DWO). This paper describes the mechanisms leading to the onset of DWO as inferred from tests performed in the full-height TF-2 counter-flow test facility. This research supports the concept that the onset of DWO is caused by liquid bridging inside the boiling length of the tubes. Using a separate cylinders approximation, a DWO onset correlation is obtained by performing a steady-state momentum balance on the density front created by liquid bridging. This yields a momentum balance equation in terms of a set of dimensionless superficial velocities, a corresponding dimensionless pressure drop term and an average void fraction. Envelope theory is then used to obtain a critical void fraction which is substituted into the dimensionless momentum balance to obtain a DWO onset correlation similar to the Wallis counter-current flooding correlation. A comparison of the DWO onset correlation to the TF-2 DWO experimental data is presented and shows excellent agreement when the average equilibrium vapor quality is greater than 0.2.

Density Wave Oscillations, Helical Coil Steam Gene↗

Air Force NiH2 IPV storage testing

USAF Phillips Laboratory Nickel Hydrogen IPV storage test, performed at the Naval Surface Warfare Center (NSWC) at Crane Indiana, is discussed. The storage tests is just one component of the USAF Phillips Laboratory Nickel Hydrogen IPV Test Program. The plan was to store cells for a defined period and cycle matching cells to determine the effect on cycle life. The storage period was completed in April 95 and the cycling cells have achieved five years of real time LEO cycling. The two main objectives of the storage test are: to investigate various methods on NiH2 cells by using two different manufacturers and two different storage methods or conditions, and to determine the effect of storage method on cycle performance and cycle life by using matching cells cycling at 25% depth of discharge. The comparisons between individual cycle performance as well as cycle life are also reported. During the test the following variables has been considered: constant potential, cell current, open circuit voltage, and temperature. The results of the test are also discussed using charts and tables.

Smellie, Shawn↗

Heat load measurements for the PIP-II pHB650 cryomodule

This study presents a brief overview of the 1st and 2nd phases and an in-depth analysis of the 3rd phase heat load testing performed on the pHB650 (prototype High Beta 650 MHz) cryomodule at PIP2IT (PIP-II Injector Test Facility), with a focus on both the results and the methodological advancements that have improved testing efficiency and accuracy. A key challenge identified in the testing campaign is the higher-than-expected heat loads observed in the first PIP-II (Proton Improvement Plan II) prototype cryomodules (pSSR1 and pHB650) tested at PIP2IT. Elevated heat loads are concerning given the fixed capacity of the PIP-II cryoplant that is currently being installed at Fermilab. However, understanding the sources of these elevated heat loads offers a critical opportunity to implement effective heat load mitigations on upcoming PIP-II cryomodules to stay within the available capacity of the PIP-II cryoplant. The study includes a summary of test results, descriptions of measurement procedures, and key observations on parameters directly and indirectly related to heat load measurements. Direct observations include measured heat loads and the effectiveness of JT heat exchanger under varying conditions, while indirect observation analyze factors such as the temperature distribution on the two-phase pipe and relief piping under varying conditions. Thermal acoustic oscillations (TAO) were identified during testing, which was mitigated by replacing the original G10 stem with a stainless steel stem equipped with wipers for the cryomodule cooldown valve. A major innovation during pHB650 Phase 3 testing was the development of an automated Python script to streamline data acquisition, analysis, and reporting of heat load results. This script automatically retrieved data from ACNET (Accelerator Control Network), performed heat load calculations, and generated detailed reports featuring plots and tables. This advancement significantly reduced manual labor and enhanced the thoroughness of data analysis compared to earlier campaigns. The heat load test reports were promptly uploaded to the electronic logbook shortly after each test, enabling rapid feedback and collaboration between the SRF and cryogenic teams. The heat load measurements included various components: HTTS (high-temperature thermal shield), LTTS (low-temperature thermal shield), 2K isothermal and non-isothermal heat loads. Results were recorded both within the cryomodule and between the bayonet can supply and return. Measurements were conducted under different operating conditions such as "standard", "linac", and "simulated dynamic". Additionally, HTTS and LTTS heat loads were calculated in real time, allowing for the tracking of thermal stability and identification of changes during testing, both in steady-state and transient conditions. The results of this testing campaign not only provide valuable insights into the performance of the pHB650 cryomodule but also highlight best practices and lessons learned that will inform future cryomodule testing at PIP2IT. These include adopting automated tools for data analysis, refining real-time measurement capabilities, and emphasizing detailed pre-test planning. The framework established in this campaign aims to set an improved standard for cryomodule testing and heat load reporting in future cryomodule test campaigns.

Porwisiak, D. [Fermilab; Wroclaw Tech. U.]↗

Flight tests of Viking parachute system in three Mach number regimes. 1: Vehicle description, test operations, and performance

Flight qualifications for parachutes were tested on full-scale simulated Viking spacecraft at entry conditions for the Viking 1975 mission to Mars. The vehicle was carried to an altitude of 36.6 km for the supersonic and transonic tests by a 980.000 cu m balloon. The vehicles were released and propelled to test conditions with rocket engines. A 117,940 cu m balloon carried the test vehicle to an altitude of 27.5 km and the conditions for the subsonic tests were achieved in free fall. Aeroshell separation occurred on all test vehicles from 8 to 14 seconds after parachute deployment. This report describes: (1) the test vehicle; (2) methods used to insure that the test conditions were achieved; and (3) the balloon system design and operations. The report also presents the performance data from onboard and ground based instruments and the results from a statistical trajectory program which gives a continuous history of test-vehicle motions.

Lundstrom, R. R.↗

Radiometric Testing of Germicidal UV Products, Round 2: Upper-Room Luminaires (CALiPER Report)

This report analyzes the independently tested performance of eight germicidal ultraviolet (GUV) upper-room luminaires marketed for use in occupied spaces and purchased between March and June 2023. This type of product is mounted to upper walls or ceilings to treat air in the portion of the room above occupants; this allows for safe use of the room when the device is operating, but requires sufficient air mixing between upper and lower portions of the room. Three of the luminaires used UV-emitting LEDs, and the remaining five luminaires used low-pressure mercury (LPM) lamps. Product testing covered radiometric and electrical performance for each luminaire. Initial performance was measured for all eight products, and four were additionally measured after 100 h and 500 h of operation. Measured performance data allowed for comparison against manufacturer or vendor claims if the tested products included such claims. Some products had no performance data available for a given quantity (e.g., UV-C output power), and only four of the eight luminaires had radiant intensity distribution data files in a standard format (e.g., IES LM-63) available for download from product websites. The lack of publicly available performance data makes it difficult for potential buyers and specifiers to identify suitable products and design GUV systems for their specific applications. When products had performance claims, they were sometimes contradictory (e.g., unexplained differences between multiple power values) or ambiguous (e.g., measurement units conflict with quantity, unclear whether luminaire power or lamp power, unclear whether UV output power or UV-C output power). Three of the eight tested luminaires had claimed output power (i.e., radiant flux) values that exceeded measured values by more than an order of magnitude. There was substantial variation in UV-C radiant efficiency, with a measured range of 0.3–1.9% for LED and 0.4–2.1% for LPM, as shown in Figure 1. For example, the LPM luminaire with 0.4% radiant efficiency would need 5 times the amount of electrical energy used by the LPM luminaire with 2.1% radiant efficiency to produce the same amount of UV-C output power. LPM luminaires that had parabolic reflectors aligned with inclined louvers exhibited substantially higher UV-C radiant efficiency than tested luminaires with other designs, potentially cutting energy use by 75%. These results indicate a substantial opportunity for more energy efficient LPM luminaire designs, while demonstrating that UV LED luminaires can offer comparable UV-C radiant efficiency in this application. This may seem surprising, given that LED emitters have lower UV-C radiant efficiency than LPM lamps, but the efficiency-throttling louvers that are generally required for LPM luminaires typically are not needed for LEDs thanks to their directionality. However, lateral beam angles (which describe beam width as viewed from above) were 41–83° for LED luminaires versus 89–110° for LPM luminaires. More luminaires may be required if their lateral beam angles are relatively small, and coverage may be poor if UV-C radiant intensity distribution (i.e., beam shape) is not considered when designing systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Performance and endurance testing of a prototype carbon dioxide and humidity control system for Space Shuttle extended mission capability

An advanced flight prototype regenerable CO2 and humidity control system was delivered to NASA-JSC in February 1980. It is pointed out that this system offers substantial weight savings compared with the Shuttle Orbiter expendable lithium hydroxide CO2 removal system for extended duration missions. The present paper provides a brief description of the 4- to 10-man regenerable CO2 and humidity control system. The potential advantages which can be realized for an extended duration Shuttle mission are considered along with the results of extensive testing conducted at JSC. The performance evaluation and endurance tests show that the system is capable of long-term operation (up to 60 days) without maintenance.

Lin, C. H.↗

Parametric testing of an externally configured thermionic converter

A 25.4-cm long externally configured converter was performance tested by electrically heating the emitter to simulate reactor thermal power input. The measured maximum output power was limited by the maximum input power available from the electric RF induction heater. With maximum heater input power, the converter electric output was 178 W (1.95 W/sq cm) at an emitter temperature of 1946 K. This electric output power was smaller than expected. A reactor-core-length (25.4-cm long) cylindrical thermionic converter power and maintaining the emitter-to-collector gap without shorting are of major importance to the feasibility of a 25.4-cm-long reactor fuel element. The emitter of the converter is located externally to the collector to increase the fuel-volume fraction and to allow redundant collector cooling in a reactor configuration.

Shimada, K.↗

Evaluation of class 2 biological cabinets

Basic investigations, consisting primarily of airflow measurements and visual smoke tests, were made on four commercially available units. The results indicated that performance varied considerably between units. Therefore, it was decided to outline the performance desired and to include in the overall equipment specifications a set of performance tests to assure a clean air safety cabinet with respect to chemical usage. The evaluation was to be based on aerodynamic performance under the various modes of operation.

Chamberlin, R. E.↗

Radiometric Testing of Germicidal UV Products, Round 1: UV-C Towers and Whole-Room Luminaires (CALiPER Summary Report)

This summary report analyzes the independently tested performance of 13 germicidal ultraviolet (GUV) products purchased between February and July 2022. A companion full report provides additional information and discussion of the tested products, test methods, and results. The products were of three different types: • Seven portable, consumer-oriented GUV towers designed to be placed on the floor or a desk of an unoccupied room to disinfect air and surfaces. Five of these products used LED sources and two products used low-pressure mercury (LPM) sources. • One non-portable GUV whole-room luminaire designed to be installed on a ceiling to disinfect air when a room is occupied. This product used an LED source. • Five non-portable GUV troffer or high-bay style whole-room luminaires designed to be installed in or suspended from a ceiling to disinfect air and surfaces when a room is unoccupied. All five used LPM sources. Radiometric and electrical performance was evaluated for all 13 products. Photobiological safety was also assessed for two of the products because their documentation included testable claims. The test results were compared across products and to manufacturer or vendor claims. The testing identified many issues related to the accuracy of reported GUV product performance. Claims were often untestable, contradictory, ambiguous, or used incorrect units and/or terminology. And when claims were testable, they often did not match test results. For example, three products that claimed to emit UV-C emitted only UV-A. These product claim issues were more numerous with consumer-oriented tower products, but problems with accurate performance claims were found across all products. The UV-C radiant efficiency of the products varied widely, even among similar products using the same source technologies. For example, the UV-C radiant efficiency of LPM products varied by greater than a factor of three for the same product type, indicating a large potential energy savings opportunity for products that are better designed for efficiency. LED products had orders-of-magnitude lower UV-C radiant efficiency than LPM products. Several testing challenges and limitations were identified. Most significant among these is the capability to accurately test and report the performance of larger GUV products. Integrating spheres require a specialized and costly coating to test UV, and the testing laboratory for this round of products had only a 20-inch diameter hemisphere with this capability. Only 2 of the 10 UV-C emitting products could be tested in this sphere. Goniometer testing had a different size limitation in that mirrors typically used to increase goniometer test distance to the far field are not reflective of UV and therefore could not be used to increase test distance. As a result, 7 of 13 products could not be tested far field. The implication is that electronic files of UV-C intensity data typically imported into design software for designing GUV applications may not be reliable for predicting irradiance at arbitrary far-field distances. It is currently unclear if these are industry-wide testing laboratory limitations, and what solutions may exist to address them. Specifiers and buyers of GUV products will need accurate performance claims and data to safely and effectively deploy GUV technology to reduce the transmission of diseases in buildings. This CALiPER GUV Round 1 report demonstrates the significant education and training that is needed for manufacturers and vendors to accurately test and report the performance of their GUV products. Further standards and guidelines are needed to improve test methods, address testing limitations, and improve reporting of product performance. Additionally, the wide range in UV-C radiant efficiency of GUV products means there is a large energy-savings opportunity for more energy efficient GUV products.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Performance of the Aspect Camera Assembly for the Advanced X-Ray Astrophysics Facility: Imaging

The Aspect Camera Assembly (ACA) is a "state-of-the-art" star tracker that provides real-time attitude information to the Advanced X-Ray Astrophysics Facility - Imaging (AXAF-I), and provides imaging data for "post-facto" ground processing. The ACA consists of a telescope with a CCD focal plane, associated focal plane read-out electronics, and an on-board processor that processes the focal plane data to produce star image location reports. On-board star image locations are resolved to 0.8 arcsec, and post-facto algorithms yield 0.2 arcsec star location accuracies (at end of life). The protoflight ACA has been built, along with a high accuracy vacuum test facility. Image position determination has been verified to < 0.2 arcsec accuracies. This paper is a follow-on paper to one presented by the author at the AeroSense '95 conference. This paper presents the "as built" configuration, the tested performance, and the test facility's design and demonstrated accuracy. The ACA has been delivered in anticipation of a August, 1998 shuttle launch.

Michaels, Dan↗

Testing of the International Space Station and X-38 Crew Return Vehicle GPS Receiver

This paper discusses the process and results of the performance testing of the GPS receiver planned for use on the International Space Station (ISS) and the X- 38CrewReturnVehicle(CRV). The receiver is a Force-19 unit manufactured by Trimble Navigation and modified in software by NASA:s Goddard Space Flight Center (GSFC) to perform navigation and attitude determination in space. The receiver is the primary source of navigation and attitude information for ISS and CRV. Engineers at GSFC have developed and tested the new receiver with a Global Simulation Systems Ltd (GSS) GPS Signal Generator (GPSSG). This paper documents the unique aspects of ground testing a GPS receiver that is designed for use in space. A discussion of the design of tests using the GPSSG, documentation, data capture, data analysis, and lessons learned will precede an overview of the performance of the new receiver. A description of the challenges that were overcome during this testing exercise will be presented. Results from testing show that the receiver will be within or near the specifications for ISS attitude and navigation performance. The process for verifying other requirements such as Time to First Fix, Time to First Attitude, selection/deselection of a specific GPS satellite vehicles (SV), minimum signal strength while still obtaining attitude and navigation, navigation and attitude output coverage, GPS week rollover, and Y2K requirements are also given in this paper.

Simpson, James↗

FY2020 Rotating Bed Reactor for Iodine Removal from WTP Melter Effluent to Support DFLAW Start-Up

In Performance Assessment (PA) of the Hanford Integrated Disposal Facility (IDF), 129 I is a significant contributor to the risk. The 2017 IDF PA accounted for 0.22% of the total 129 I inventory in Hanford tank waste as residing in the solidified liquid waste from the Effluent Treatment Facility (ETF). However, recent estimates suggest that higher percentages of the iodine processed at the Hanford Waste Treatment and Immobilization Plant (WTP) may be present in the liquid waste routed to the Liquid Effluent Retention Facility (LERF) for eventual treatment at the ETF. In addition, a recent integrated melter test performed at the Vitreous State Laboratory (VSL) at The Catholic University of America (CUA) showed the possibility that a significant fraction (>50%) of the total iodine in the melter feed could be present in the aqueous waste stream destined for the ETF. This stream represents a combination of the Effluent Management Facility (EMF) evaporator overhead condensate and the liquid waste from the WTP off-gas caustic scrubber. Higher levels of 129 I in this stream could affect the LERF and ETF Hazard Categorizations as well as the acceptability of the solidified ETF liquid secondary waste brine for disposal at the IDF. Accordingly, there is a need to investigate and develop potential methods and processes to mitigate this risk. Washington River Protection Solutions, LLC (WRPS) tasked Atkins and VSL to perform development and testing work to evaluate potential methods for removal of iodine species from the waste stream routed to the LERF. In particular, the testing investigated the use of an Atkins-SpinIonic™ Rotating Bed Reactor (RBR) system as a potential alternative to conventional column-based ion exchange or absorption processes. The present report provides results obtained from testing with an RBR system for the removal of iodine from simulants of the projected WTP waste stream that discharges to the LERF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Leading Your Leaders

Even though working on a problem has been your primary effort for the past year, your leadership may have heard about this once in a briefing a decade ago. Now they are basically clueless. Pretend that you are talking to your daughter's fifth-grade class. Explain how your complicated gizmo works. If possible, do not use acronyms. Define your terms. Put your work in context. Assume your leader has no idea what you do, who you work for, or what your gizmo does. That is a good place to start. Remember, taking the next century to study the problem or spending the Gross National Product to invent a new solution are probably not going to be acceptable solutions. Real engineers and technicians build real hardware that works in the real world in a reasonable manner within a reasonable time at a reasonable cost. True, skimping on time or money can cause mistakes, but folks whose gizmos are delayed unreasonably or cost more than is practical get their programs canceled, force the business into bankruptcy, or give the market over to the competition. Real engineers and technicians always consider cost and schedule in their work. Raising questions is important. However, we are in the business of doing things. Engineers and technicians are paid to get things done. Yes, you have to identify the problem, frame the design, identify the tests, perform the analysis, and assemble the hardware. But the goal is to solve the problem. Nobody ever said flying in space was easy. We make it look easy the same way that an Olympic champion makes her sport look easy: by working hard at improving performance every day. Better are the results of a well-defined test. Remember that a test on a laboratory bench is always an approximation of reality, and rules similar to those for good analysis also apply. One should always be mindful of Mechelay's rule: "It is better to be stupid than to run a stupid test." Often we try to overtest. If a piece of hardware passes an unbelievably difficult test, then life is good. More often when an unbelievably difficult test fails, we are left with a very long discussion of why and what was wrong in the design or execution of the test. Make sure that the test is well defined. Even then, it is important to explain to your leaders what inherent accuracy (or error) the test conditions or equipment have and what the assumptions or initial conditions were for the test. Test results without a good understanding of the test's accuracy or the pedigree of the test assumptions are worth very little. Finally, there is flight test data. Always limited, never at the edge of the envelope, it still shows how the real hardware works in a combined environment. Flight experience is dangerous because it typically doesn't show how close to the edge of the cliff the equipment is operating, but it does demonstrate how the hardware really works. A flight test is the ultimate test, again taken with the knowledge that it is probably not the extreme but something more like the middle of the environmental and systems performance. Good understanding of a problem and its solution always relies on a combination of all these methods. Be sure to lead your leaders by using all the tools you have at your disposal. At the end of the day, decisions in space flight always come down to a risk trade. Our business is not remotely safe, not in the sense that the public, the media, or our legislators use the term. Everything we do has a risk, cost, schedule, or performance trade-off. For your leaders to make an appropriate decision, you need to educate them, lead them, talk with them, and engage them in the discussion until full understanding takes place. It's your job. *

Hale, Wayne N.↗

Testing of the International Space Station and X-38 Crew Return Vehicle GPS Receiver

This paper discusses the process and results of the performance testing of the GPS receiver planned for use on the International Space Station (ISS) and the X-38 Crew Return Vehicle (CRV). The receiver is a Force-19 unit manufactured by Trimble Navigation and modified in software by the NASA Goddard Space Flight Center (GSFC) to perform navigation and attitude determination in space. The receiver is the primary source of navigation and attitude information for ISS and CRV. Engineers at GSFC have developed and tested the new receiver with a Global Simulation Systems Ltd (GSS) GPS Signal Generator (GPSSG). This paper documents the unique aspects of ground testing a GPS receiver that is designed for use in space. A discussion of the design of tests using the GPSSG, documentation, data capture, data analysis, and lessons learned will precede an overview of the performance of the new receiver. A description of the challenges that were overcome during this testing exercise will be presented. Results from testing show that the receiver will be within or near the specifications for ISS attitude and navigation performance. The process for verifying other requirements such as Time to First Fix, Time to First Attitude, selection/deselection of a specific GPS satellite vehicles (SV), minimum signal strength while still obtaining attitude and navigation, navigation and attitude output coverage, GPS week rollover, and Y2K requirements are also given in this paper.

Simpson, James↗

Three-Man Solid Electrolyte Carbon Dioxide Electrolysis Breadboard

The development of the Three-Man (2.2 lb CO2/man-day) Solid Electrolyte CO2 Electrolysis Breadboard consisted of a Phase 1 and 2 effort. The Phase 1 effort constituted fabrication of three electrolysis cell types and performing parametric testing, off-design testing, and cell life testing. The Phase 2 consisted of the preliminary design, incorporation of palladium (Pd) tubes for hydrogen separation from the electrolyzer cathode feed gases, design support testing, final design, fabrication, and performance testing of the breadboard system. The results of performance tests demonstrated that CO2 electrolysis in an oxygen reclamation system for long duration space-based habitats is feasible. Closure of the oxygen system loop, therefore, can be achieved by CO2 electrolysis. In a two step process the metabolic CO2 and H2O vapor are electrolyzed into O2, H2, and CO. The CO can subsequently be disproportionated into carbon and CO2 in a carbon deposition reactor and the CO2 in turn be recycled and electrolyzed for total O2 recovery. The development effort demonstrated electrolyzer system can be designed and built to operate safely and reliably and the incorporation of Pd tubes for hydrogen diffusion can be integrated safely with predictable performance.

Isenberg, Arnold O.↗