Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operational processes”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

Report to the administrator by the NASA Aerospace Safety Advisory Panel on the Skylab program. Volume 1: Summary report

Contractor and NASA technical management for the development and manufacture of the Skylab modules is reviewed with emphasis on the following management controls: configuration and interface management; vendor control; and quality control of workmanship. A review of the modified two-stage Saturn V launch vehicle which focused on modifications to accommodate the Skylab payload; resolution of prior flight anomalies; and changes in personnel and management systems is presented along with an evaluation of the possible age-life and storage problems for the Saturn 1-B launch vehicle. The NASA program management's visibility and control of contractor operations, systems engineering and integration, the review process for the evaluation of design and flight hardware, and the planning process for mission operations are investigated. It is concluded that the technical management system for development and fabrication of the modules, spacecraft, and launch vehicles, the process of design and hardware acceptance reviews, and the risk assessment activities are satisfactory. It is indicated that checkout activity, integrated testing, and preparations for and execution of mission operation require management attention.

Source record↗

Software fault tolerance in computer operating systems

This chapter provides data and analysis of the dependability and fault tolerance for three operating systems: the Tandem/GUARDIAN fault-tolerant system, the VAX/VMS distributed system, and the IBM/MVS system. Based on measurements from these systems, basic software error characteristics are investigated. Fault tolerance in operating systems resulting from the use of process pairs and recovery routines is evaluated. Two levels of models are developed to analyze error and recovery processes inside an operating system and interactions among multiple instances of an operating system running in a distributed environment. The measurements show that the use of process pairs in Tandem systems, which was originally intended for tolerating hardware faults, allows the system to tolerate about 70% of defects in system software that result in processor failures. The loose coupling between processors which results in the backup execution (the processor state and the sequence of events occurring) being different from the original execution is a major reason for the measured software fault tolerance. The IBM/MVS system fault tolerance almost doubles when recovery routines are provided, in comparison to the case in which no recovery routines are available. However, even when recovery routines are provided, there is almost a 50% chance of system failure when critical system jobs are involved.

Iyer, Ravishankar K.↗

Process Management and Exception Handling in Multiprocessor Operating Systems Using Object-Oriented Design Techniques

The programming of the interrupt handling mechanisms, process switching primitives, scheduling mechanism, and synchronization primitives of an operating system for a multiprocessor require both efficient code in order to support the needs of high- performance or real-time applications and careful organization to facilitate maintenance. Although many advantages have been claimed for object-oriented class hierarchical languages and their corresponding design methodologies, the application of these techniques to the design of the primitives within an operating system has not been widely demonstrated. To investigate the role of class hierarchical design in systems programming, the authors have constructed the Choices multiprocessor operating system architecture the C++ programming language. During the implementation, it was found that many operating system design concerns can be represented advantageously using a class hierarchical approach, including: the separation of mechanism and policy; the organization of an operating system into layers, each of which represents an abstract machine; and the notions of process and exception management. In this paper, we discuss an implementation of the low-level primitives of this system and outline the strategy by which we developed our solution.

Russo, Vincent↗

Processing cargoes for the first two operational STS flights at KSC

Payload and spacecraft check-out procedures followed at Kennedy Space Center (KSC) are described, and examples are furnished of Shuttle missions STS-5 and -6. Reliability must be assured in order to account for isolated operation in GEO once the satellites are released from the Orbiter. The spacecraft processing is handled in distinct flows that depend on the type of boost engine attached, e.g., the PAM-A, -D, or the IUS. Interface verification occurs in the Vehicle Processing Facility (VPF), which is equipped to store the payloads until an Orbiter is ready. Spacecraft are assigned to their respective processing lines by the Launch Site Support Manager. The STS-5 Orbiter was fitted with Getaway Specials, the SBS-C satellite, and the Anik-C spacecraft, and STS-6 carried the TDRSS-A spacecraft, which was mated to an IUS, three Getaway Specials, and two experiments for the pressurized cabin. The time necessary for preparing payloads is intended eventually to be reduced to 3 weeks.

Neilon, J. J.↗

A Process Intensification Approach for CO 2 Absorption Using Amino Acid Solutions and a Guanidine Compound

Environmentally friendly amino-acid salt solutions are used for the absorption of carbon dioxide from concentrated flue-gas streams via chemical absorption. Process intensification reduces operating and capital costs by combining chemical reactions and separation operations. Here, we present a new process-intensification approach that combines the CO 2 capture and the amino-acid regeneration steps into a single process carried out in a slurry three-phase reactor. The absorbed CO 2 precipitates as a solid carbonated guanidine compound. The cycle is completed by separation of the solid precipitate to strip the CO 2 and regenerate the guanidine compound, while the liquid solution is recycled to the slurry reactor. The process was studied by modifying a model developed by the authors for a gas-liquid bubble column without the presence of the guanidine compound. The guanidine precipitation reaction was accounted for using kinetic parameters calculated by the authors in another study. The proposed model was implemented by modifying an existing computer code used for the simulation of gas-liquid bubble columns. The calculated results showed that the proposed cycle can significantly reduce energy, equipment, and operating costs and can make an important contribution to developing a competitive cost-effective large-scale process for CO 2 capture.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Flat-plate solar-array project. Experimental process system development unit for producing semiconductor-grade silicon using the silane-to-silicon process

The engineering design, fabrication, assembly, operation, economic analysis, and process support R and D for an Experimental Process System Development Unit (EPSDU) are reported. About 95% of purchased equipment is received and will be reshipped to the West Coast location. The Data Collection System is completed. In the area of melting/consolidation, to the system using silicon powder transfer, melting and shotting on a pseudocontinuous basis is demonstrated. It is proposed to continue the very promising fluid bed work.

Source record↗

The Preparation for and Execution of Engineering Operations for the Mars Curiosity Rover Mission

The Mars Science Laboratory Curiosity Rover mission is the most complex and scientifically packed rover that has ever been operated on the surface of Mars. The preparation leading up to the surface mission involved various tests, contingency planning and integration of plans between various teams and scientists for determining how operation of the spacecraft (s/c) would be facilitated. In addition, a focused set of initial set of health checks needed to be defined and created in order to ensure successful operation of rover subsystems before embarking on a two year science journey. This paper will define the role and responsibilities of the Engineering Operations team, the process involved in preparing the team for rover surface operations, the predefined engineering activities performed during the early portion of the mission, and the evaluation process used for initial and day to day spacecraft operational assessment.

Mars↗

Mass Analyzers Facilitate Research on Addiction

The famous go/no go command for Space Shuttle launches comes from a place called the Firing Room. Located at Kennedy Space Center in the Launch Control Center (LCC), there are actually four Firing Rooms that take up most of the third floor of the LCC. These rooms comprise the nerve center for Space Shuttle launch and processing. Test engineers in the Firing Rooms operate the Launch Processing System (LPS), which is a highly automated, computer-controlled system for assembly, checkout, and launch of the Space Shuttle. LPS monitors thousands of measurements on the Space Shuttle and its ground support equipment, compares them to predefined tolerance levels, and then displays values that are out of tolerance. Firing Room operators view the data and send commands about everything from propellant levels inside the external tank to temperatures inside the crew compartment. In many cases, LPS will automatically react to abnormal conditions and perform related functions without test engineer intervention; however, firing room engineers continue to look at each and every happening to ensure a safe launch. Some of the systems monitored during launch operations include electrical, cooling, communications, and computers. One of the thousands of measurements derived from these systems is the amount of hydrogen and oxygen inside the shuttle during launch.

Source record↗

Earth Observing System (EOS) Aqua & Aura Space Weather Effects on Operational Collision Avoidance

This presentation will describe recent EOS Aqua and Aura operational collision avoidance experience during periods of solar and geomagnetic storm activity. It will highlight challenges faced by the operations team during short-notice, high-risk predicted close approaches. The presentation will highlight the evolution of the operational collision avoidance process for the EOS Aqua and Aura missions. The presentation will highlight operational challenges that have occurred, process improvements that have been implemented and identify potential future challenges.

Operational collision avoidance↗

Phase Inversion in a Two-phase, BCC+B2, Refractory High Entropy Alloy

A phenomenon of "phase inversion", presumably the first ever experimental evidence in metallic alloys, is shown in a refractory high entropy alloy (RHEA), Al0.5NbTa0.8Ti1.5V0.2Zr. Phase inversion in crystalline solid systems is driven by the differences in elastic modulus of the two phases. Quenching from a high-temperature single phase field, the RHEA exhibits a co-continuous mixture of a disordered BCC and an ordered B2 phase, that upon isothermal annealing at 600°C develops via spinodal decomposition into a continuous B2 matrix with discrete cuboidal BCC precipitates aligned along the <001> directions. Longer term annealing at 600°C results in the development of necking constrictions along the B2 channels, eventually pinching-off these channels and making the BCC phase continuous with discrete B2 precipitates. This inversion the process can be related to the simultaneous operation of two processes:(i) spheroidization of the initially discrete cuboidal BCC precipitates driven by a reduction in the total interface energy and (ii) an increase in the stiffness of the B2 phase, relative to the BCC phase, due to chemical composition changes during annealing, forcing the B2 regions to become discrete driven by the reduction in the total elastic strain energy.

Soni, Vishal↗

ARM FY2024 Radar Plan

The U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) user facility’s radar capability aims to provide high-quality radar observations to the scientific community, advancing the understanding of clouds and precipitation processes and ultimately improving climate models. ARM operates radars across a spectrum of frequencies with diverse scanning capacities (Table 1) to meet these scientific goals. The maintenance, operations, and management of these distributed radars at sites in various climate regimes require a substantial staffing commitment. However, the existing staffing resources are constrained, making it impractical to sustain the consistent high-quality operations that are expected by the ARM user community. In response, ARM needs to develop priorities for the radar team each year. This report lays out the forthcoming priorities for Financial Year 2024 (FY24), aiming to establish a structure for the ongoing management of radar operations and data processing.

54 ENVIRONMENTAL SCIENCES↗

Mariner Mars 1971 project. Volume 3: Mission operations system implementation and standard mission flight operations

The Mariner Mars 1971 mission which was another step in the continuing program of planetary exploration in search of evidence of exobiological activity, information on the origin and evolution of the solar system, and basic science data related to the study of planetary physics, geology, planetology, and cosmology is reported. The mission plan was designed for two spacecraft, each performing a separate but complementary mission. However, a single mission plan was actually used for Mariner 9 because of failure of the launch vehicle for the first spacecraft. The implementation is described, of the Mission Operations System, including organization, training, and data processing development and operations, and Mariner 9 spacecraft cruise and orbital operations through completion of the standard mission from launch to solar occultation in April 1972 are discussed.

Source record↗

Artificial intelligence applied to process signal analysis

Many space station processes are highly complex systems subject to sudden, major transients. In any complex process control system, a critical aspect of the human/machine interface is the analysis and display of process information. Human operators can be overwhelmed by large clusters of alarms that inhibit their ability to diagnose and respond to a disturbance. Using artificial intelligence techniques and a knowledge base approach to this problem, the power of the computer can be used to filter and analyze plant sensor data. This will provide operators with a better description of the process state. Once a process state is recognized, automatic action could be initiated and proper system response monitored.

Corsberg, Dan↗

A classification procedure for the effective management of changes during the maintenance process

During software operation, maintainers are often faced with numerous change requests. Given available resources such as effort and calendar time, changes, if approved, have to be planned to fit within budget and schedule constraints. In this paper, we address the issue of assessing the difficulty of a change based on known or predictable data. This paper should be considered as a first step towards the construction of customized economic models for maintainers. In it, we propose a modeling approach, based on regular statistical techniques, that can be used in a variety of software maintenance environments. The approach can be easily automated, and is simple for people with limited statistical experience to use. Moreover, it deals effectively with the uncertainty usually associated with both model inputs and outputs. The modeling approach is validated on a data set provided by NASA/GSFC which shows it was effective in classifying changes with respect to the effort involved in implementing them. Other advantages of the approach are discussed along with additional steps to improve the results.

Briand, Lionel C.↗

Mark 3 correlator hardware and software

The Mark 3 correlator system is described in some detail. The correlator system is based on a modular philosophy. Each correlator module independently processes the data from one track pair. Therefore, 28 modules are necessary to complete a full one baseline processor and 84 modules for a full 3 baseline processor. Each correlator module has two interfaces: (1) data and clock from each of the two tracks to be correlated and (2) Computer Automated Measurement and Control (CAMAC) dataway interface to the computer. The processor is organized around the IEEE CAMAC standard architecture, housing 15 correlator modules in each of 6 crates. This allows one pass processing of a full 3 baseline 28 track observation or a 6 baseline (4 station) 14 track observation. The correlator architecture allows easy expansion for up to 8 stations. The computer system is an HP 1000 system utilizing a 16 bit minicomputer with disc and tape peripherals. The processing software is also organized in a modular fashion with many independent but cooperative programs controlling the operation of the Mark 3 processor. Processing time through the correlator is normally real time or faster, with graphics displays providing real time monitor and control of the processing operation.

Whitney, A. R.↗

Permanent presence - Making it work; Proceedings of the Twenty-second Goddard Memorial Symposium, Greenbelt, MD, March 15, 16, 1984

Among the topics discussed are: electrophoresis operations in space for pharmaceutical processing; Space Station program operations; and Space Station platform configurations. Consideration is also given to: the human role in future space systems; EVA operations; spherical shell applications; and a container material for alloy processing in near-zero gravity. Among additional topics discussed are: Space Station platform thermal control; environmental control and life support for an evolving capability manned Space Station; and the commercial prospects of the Space Station.

Bekey, I.↗

Historical data and analysis for the first five years of KSC STS payload processing

General and specific quantitative and qualitative results were identified from a study of actual operational experience while processing 186 science, applications, and commercial payloads for the first 5 years of Space Transportation System (STS) operations at the National Aeronautics and Space Administration's (NASA) John F. Kennedy Space Center (KSC). All non-Department of Defense payloads from STS-2 through STS-33 were part of the study. Historical data and cumulative program experiences from key personnel were used extensively. Emphasis was placed on various program planning and events that affected KSC processing, payload experiences and improvements, payload hardware condition after arrival, services to customers, and the impact of STS operations and delays. From these initial considerations, operational drivers were identified, data for selected processing parameters collected and analyzed, processing criteria and options determined, and STS payload results and conclusions reached. The study showed a significant reduction in time and effort needed by STS customers and KSC to process a wide variety of payload configurations. Also of significance is the fact that even the simplest payloads required more processing resources than were initially assumed. The success to date of payload integration, testing, and mission operations, however, indicates the soundness of the approach taken and the methods used.

Ragusa, J. M.↗