Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “launch services”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

Oxidation-Reduction Resistance of Advanced Copper Alloys

Resistance to oxidation and blanching is a key issue for advanced copper alloys under development for NASA's next generation of reusable launch vehicles. Candidate alloys, including dispersion-strengthened Cu-Cr-Nb, solution-strengthened Cu-Ag-Zr, and ODS Cu-Al2O3, are being evaluated for oxidation resistance by static TGA exposures in low-p(O2) and cyclic oxidation in air, and by cyclic oxidation-reduction exposures (using air for oxidation and CO/CO2 or H2/Ar for reduction) to simulate expected service environments. The test protocol and results are presented.

Greenbauer-Seng, L.↗

Honeycomb vs. Foam: Evaluating Potential Upgrades to ISS Module Shielding

The presence of honeycomb cells in a dual-wall structure is advantageous for mechanical performance and low weight in spacecraft primary structures but detrimental for shielding against impact of micrometeoroid and orbital debris particles (MMOD). The presence of honeycomb cell walls acts to restrict the expansion of projectile and bumper fragments, resulting in the impact of a more concentrated (and thus lethal) fragment cloud upon the shield rear wall. The Multipurpose Laboratory Module (MLM) is a Russian research module scheduled for launch and ISS assembly in 2011 (currently under review). Baseline shielding of the MLM is expected to be predominantly similar to that of the existing Functional Energy Block (FGB), utilizing a baseline triple wall configuration with honeycomb sandwich panels for the dual bumpers and a thick monolithic aluminum pressure wall. The MLM module is to be docked to the nadir port of the Zvezda service module and, as such, is subject to higher debris flux than the FGB module (which is aligned along the ISS flight vector). Without upgrades to inherited shielding, the MLM penetration risk is expected to be significantly higher than that of the FGB module. Open-cell foam represents a promising alternative to honeycomb as a sandwich panel core material in spacecraft primary structures as it provides comparable mechanical performance with a minimal increase in weight while avoiding structural features (i.e. channeling cells) detrimental to MMOD shielding performance. In this study, the effect of replacing honeycomb sandwich panel structures with metallic open-cell foam structures on MMOD shielding performance is assessed for an MLM-representative configuration. A number of hypervelocity impact tests have been performed on both the baseline honeycomb configuration and upgraded foam configuration, and differences in target damage, failure limits, and derived ballistic limit equations are discussed.

Ryan, Shannon J.↗

An Alternative Approach to Human Servicing of Crewed Earth Orbiting Spacecraft

As crewed spacecraft have grown larger and more complex, they have come to rely on spacewalks, or Extravehicular Activities (EVA), for mission success and crew safety. Typically, these spacecraft maintain all of the hardware and trained personnel needed to perform an EVA on-board at all times. Maintaining this capability requires volume and up-mass for storage of EVA hardware, crew time for ground and on-orbit training, and on-orbit maintenance of EVA hardware. This paper proposes an alternative methodology, utilizing launch on-need hardware and crew to provide EVA capability for space stations in Earth orbit after assembly complete, in the same way that one would call a repairman to fix something at their home. This approach would reduce ground training requirements, save Intravehicular Activity (IVA) crew time in the form of EVA hardware maintenance and on-orbit training, and lead to more efficient EVAs because they would be performed by specialists with detailed knowledge and training stemming from their direct involvement in the development of the EVA. The on-orbit crew would then be available to focus on the immediate response to the failure as well as the day-to-day operations of the spacecraft and payloads. This paper will look at how current unplanned EVAs are conducted, including the time required for preparation, and offer alternatives for future spacecraft. As this methodology relies on the on-time and on-need launch of spacecraft, any space station that utilized this approach would need a robust transportation system including more than one launch vehicle capable of carrying crew. In addition, the fault tolerance of the space station would be an important consideration in how much time was available for EVA preparation after the failure. Each future program would have to weigh the risk of on-time launch against the increase in available crew time for the main objective of the spacecraft.

Mularski, John R.↗

Cyclotron Road Partnership (CRADA Final Report)

The Cyclotron Road program was launched in 2015 by LBNL, with support from the DOE Advanced Manufacturing Office (AMO), to accelerate technical innovation in the energy sector. The program brought scientist-entrepreneurs to LBNL to access unique research assets and expertise. In 2016, LBNL partnered with Activate Global, Inc., a 501(c)(3) non-profit, to expand the program and provide enhanced access to capital and business support services. Under this Cooperative Research and Development Agreement (CRADA), LBNL provided technical support and expertise, while Activate engaged with private sector, philanthropic, and government partners to support innovators and research-phase small businesses, aiming to translate high-impact materials and manufacturing technologies from lab to market. The program received funding from various sponsors, including the DOE, DARPA, and the California Energy Commission, and was managed through a collaborative framework that maintained accountability by the participant organization and Berkeley Lab regarding roles and tasks relevant to this collaboration.

99 GENERAL AND MISCELLANEOUS↗

The issue is leadership

Four NASA Phase B centers (NASA-Johnson, NASA-Marshall, NASA-Goddard, and NASA-Lewis) are responsible for construction, assembly, servicing, habitat, and other particular tasks and functions of the Space Station. The project has been joined by the aerospace programs of Canada, Japan, and the European Space Agency, ensuring technological and financial support, and cooperative use by the participants. Some of the future uses of the Space Station include biomedical research and applications; experiments in solar-terrestrial physics and astronomy; building, maintenance, and launching of space instruments and planetary missions; manufacturing and processing of materials that call for the conditions of microgravity and weightlessness; supporting communication operations; and improving earth and atmospheric observations. The political significance of the Space Station as a symbol of leadership and of friendly cooperation is noted.

Beggs, J. M.↗

Weight savings in aerospace vehicles through propellant scavenging

Vehicle payload benefits of scavenging hydrogen and oxygen propellants are addressed. The approach used is to select a vehicle and a mission and then select a scavenging system for detailed weight analysis. The Shuttle 2 vehicle on a Space Station rendezvous mission was chosen for study. The propellant scavenging system scavenges liquid hydrogen and liquid oxygen from the launch propulsion tankage during orbital maneuvers and stores them in well insulated liquid accumulators for use in a cryogenic auxiliary propulsion system. The fraction of auxiliary propulsion propellant which may be scavenged for propulsive purposes is estimated to be 45.1 percent. The auxiliary propulsion subsystem dry mass, including the proposed scavenging system, an additional 20 percent for secondary structure, an additional 5 percent for electrical service, a 10 percent weight growth margin, and 15.4 percent propellant reserves and residuals is estimated to be 6331 kg. This study shows that the fraction of the on-orbit vehicle mass required by the auxiliary propulsion system of this Shuttle 2 vehicle using this technology is estimated to be 12.0 percent compared to 19.9 percent for a vehicle with an earth-storable bipropellant system. This results in a vehicle with the capability of delivering an additional 7820 kg to the Space Station.

Schneider, Steven J.↗

Weight savings in aerospace vehicles through propellant scavenging

Vehicle payload benefits of scavenging hydrogen and oxygen propellants are addressed. The approach used is to select a vehicle and a mission and then select a scavenging system for detailed weight analysis. The Shuttle 2 vehicle on a Space Station rendezvous mission was chosen for study. The propellant scavenging system scavenges liquid hydrogen and liquid oxygen from the launch propulsion tankage during orbital maneuvers and stores them in well insulated liquid accumulators for use in a cryogenic auxiliary propulsion system. The fraction of auxiliary propulsion propellant which may be scavenged for propulsive purposes is estimated to be 45.1 percent. The auxiliary propulsion subsystem dry mass, including the proposed scavenging system, an additional 20 percent for secondary structure, an additional 5 percent for electrical service, a 10 percent weight growth margin, and 15.4 percent propellant reserves and residuals is estimated to be 6331 kg. This study shows that the fraction of the on-orbit vehicle mass required by the auxiliary propulsion system of this Shuttle 2 vehicle using this technology is estimated to be 12.0 percent compared to 19.9 percent for a vehicle with an earth-storable bipropellant system. This results in a vehicle with the capability of delivering an additional 7820 kg to the Space Station.

Schneider, Steven J.↗

Integrated Ground Operations Demonstration for Responsive Space Access

Integrated Ground Operations Demonstration Units (IGODU) project developed to mature, integrate and demonstrate advancements in cryogenics, system health management and command and control technologies. Two Distinct Testing Environments: a) GODU Integrated Refrigeration and Storage - GODU LH2; b) GODU Autonomous Control - GODU LO2. Scope: I. GODU LH2: a) Investigate alternative storage and distribution architecture for future cryogenic propellant operations. b) Demonstrate advanced cryogenic propellant handling operations (liquefaction, storage and distribution) of normal boiling point and sub-cooled cryogenic propellants. II. GODU L02: a) Develop and demonstrate advanced control and health management technologies and techniques to autonomously control cryogenic propellant servicing operations. b) Investigate modern COTS hardware and control systems in an effort to reduce the "standing army" of engineers associated with maintaining and operating ground systems through the use of health management and autonomous control technologies. Goals: a) Raise Technology Readiness Levels (TRL) and Integration Readiness Levels (IRL) of several key technology development areas. b) Reduce operations lifecycle costs of future test programs and launch complexes. c) Demonstrate technologies for future exploration beyond low earth orbit. d) Serve as test environments for extraterrestrial surface operations.

Johnson, Robert G.↗

Learning from GES DISC's MLS and OMI Data Users: Metrics Matter

It has been over 15 years since Aura research satellite launched in 2004 to observe the Earth's ozone layer, air quality, and climate from four different instruments - the High Resolution Dynamics Limb Sounder (HIRDLS), the Microwave Limb Sounder (MLS), the Ozone Monitoring Instrument (OMI), and the Tropospheric Emission Spectrometer (TES). Observations from the Aura mission have established a concrete understanding of the changing chemistry of our atmosphere.The NASA Goddard Earth Sciences Data and Information Services Center (GES DISC) is the official archive and distribution center for the HIRDLS, MLS, and OMI instruments. This presentation will report metrics of data usage and services on these instruments. Key to GES DISC's mission to provide better data support is gaining a better understanding of our users' needs and behaviors as they discover, access and utilize these data. We will summarize the users' needs from these instruments based on user inquiry information collected over the Aura mission lifetime and present findings from this ensemble metrics.

Metrics↗

Friction Plug Welding of 2195 Al-Cu-Li for Manned Space Launch Vehicles

Friction Plug Welding (FPW) is currently being studied for use on the Space Transportation System's Super Light weight External Tank. This process has demonstrated the potential to solve on of Al-Li 2195's most challenging aspects repair welding. The current weld repair process is successful, but is labor intensive and inconsistent. Technology advances in FPW and tooling designs will be presented. The results of plug welding optimization, production implementation, considerations and cost benefit analysis are discussed. Among the tests to be discussed are tensile, surface crack tension, simulated service, liquid oxygen compatibility results and methods of repairing plug repairs. Tool design, computerized process control equipment and database record retention and analyses may also be addressed.

Takeshita, Riki P.↗

An Alternative Approach to Human Servicing of Crewed Earth Orbiting Spacecraft

As crewed spacecraft have grown larger and more complex, they have come to rely on spacewalks, or Extravehicular Activities (EVA), for assembly and to assure mission success. Typically, these spacecraft maintain all of the hardware and trained personnel needed to perform an EVA on-board at all times. Maintaining this capability requires up-mass, volume for storage of EVA hardware, crew time for ground and on-orbit training, and on-orbit maintenance of EVA hardware. This paper proposes an alternative methodology, utilizing either launch-on-need hardware and crew or regularly scheduled missions to provide EVA capability for space stations in low Earth orbit after assembly complete. Much the same way that one would call a repairman to fix something at their home these EVAs are dedicated to maintenance and upgrades of the orbiting station. For crew safety contingencies it is assumed the station would be designed such the crew could either solve those issues from inside the spacecraft or use the docked Earth to Orbit vehicles as a return lifeboat, in the same manner as the International Space Station (ISS) which does not rely on EVA for crew safety related contingencies. This approach would reduce ground training requirements for long duration crews, save Intravehicular Activity (IVA) crew time in the form of EVA hardware maintenance and on-orbit training, and lead to more efficient EVAs because they would be performed by specialists with detailed knowledge and training stemming from their direct involvement in the development of the EVA. The on-orbit crew would then be available to focus on the immediate response to any failures such as IVA systems reconfiguration or jumper installation as well as the day-to-day operations of the spacecraft and payloads. This paper will look at how current unplanned EVAs are conducted on ISS, including the time required for preparation, and offer an alternative for future spacecraft. As this methodology relies on the on-time and on-need launch of spacecraft, any space station that utilized this approach would need a robust transportation system, possibly including more than one launch vehicle capable of carrying crew. In addition, the fault tolerance of the future space station would be an important consideration in how much time was available for EVA preparation after the failure. Ideally the fault tolerance of the station would allow for the maintenance tasks to be grouped such that they could be handled by regularly scheduled maintenance visits and not contingency launches. Each future program would have to weigh the risk of on-time launch against the increase in available crew time for the main objective of the spacecraft. This is only one of several ideas that could be used to reduce or eliminate a station's reliance on rapid turnaround EVAs using on-board crew. Others could include having shirt-sleeve access to critical systems or utilizing low pressure temporarily pressurized equipment bays.

Mularski, John R.↗

Ideas for Infusing In-Space Servicing, Assembly, and Manufacturing Concepts into Nuclear Electric Propulsion Architectures

NASA is currently investigating nuclear electric propulsion (NEP) for human Mars transport within the space nuclear propulsion portfolio. NEP spacecraft have the following characteristics, they: 1) include very large structures (~100-meter length); 2) are comprised of many components/modules; and 3) have very long lifetimes (e.g., 50 years for fuel rods). Thus, NEP spacecraft can be classified as a “persistent asset,” which is any zero-g or planetary surface system that benefits from in-space assembly (ISA) or multiple visits for servicing, repairs, and upgrades. NEP spacecraft will benefit from taking advantage of, and incorporating, In-space Servicing, Assembly, and Manufacturing (ISAM) capabilities in the spacecraft architecture from the onset, enabling system maintenance, repair, and evolution. ISA has a long history of being proposed for, and studied as, a means for achieving large systems in space. More recently, the benefits of ISA have been recognized by NASA, the Department of Defense (DOD), other government agencies, and commercial space companies, and thus, ISAM is being actively pursued at a national level. Past and current strategies for achieving large structures in space have relied largely on two strategies; the first is to launch monolithic structures (designed to meet launch vehicle requirements for payload size and mass) that are docked or berthed to other monolithic structures on-orbit to form a larger structure (e.g., the International Space Station [ISS]); the second is folding and packaging large structures to fit inside a payload fairing and deploying the full-sized structure (unaided) once on-orbit (e.g., the James Webb Space Telescope [JWST]). To date, conceptual architecture studies performed for NEP spacecraft capable of human-rated Mars transport have only included a combination of the two previously mentioned strategies. This paper will propose ideas for infusing ISAM strategies into NEP vehicle architectures that leverage existing and near future technologies and enable the resulting NEP systems to be realized in a more time- and cost-efficient manner.

in-space assembly↗

Modular antenna pointing system for the Explorer platform satellite

A Modular Antenna Pointing System (MAPS) is described which was designed for on-orbit servicing and on-orbit exchange. The MAPS provides a data link between the Explorer Platform (EP) satellite and the Tracking and Data Relay Satellite (TDRS). The MAPS consists of a two axis gimbal set used fo position a High Gain Antenna (HGA) toward TDRS, system control electronics, and an extendable mast. The system was qualified and integrated with the EP satellite for an April 1992 launch.

Andrus, James↗

Ideas For Infusing In-Space Servicing, Assembly and Manufacturing Concepts into Nuclear Electric Propulsion Architectures

NASA is currently investigating nuclear electric propulsion (NEP) for human Mars transport within the space nuclear propulsion portfolio. NEP spacecraft have the following characteristics, they: 1) include very large structures (~100-meter length); 2) are comprised of many components/modules; and 3) have very long lifetimes (e.g., 50 years for fuel rods). Thus, NEP spacecraft can be classified as a “persistent asset,” which is any zero-g or planetary surface system that benefits from in-space assembly (ISA) or multiple visits for servicing, repairs, and upgrades. NEP spacecraft will benefit from taking advantage of, and incorporating, In-space Servicing, Assembly, and Manufacturing (ISAM) capabilities in the spacecraft architecture from the onset, enabling system maintenance, repair, and evolution. ISA has a long history of being proposed for, and studied as, a means for achieving large systems in space. More recently, the benefits of ISA have been recognized by NASA, the Department of Defense (DOD), other government agencies, and commercial space companies, and thus, ISAM is being actively pursued at a national level. Past and current strategies for achieving large structures in space have relied largely on two strategies; the first is to launch monolithic structures (designed to meet launch vehicle requirements for payload size and mass) that are docked or berthed to other monolithic structures on-orbit to form a larger structure (e.g., the International Space Station [ISS]); the second is folding and packaging large structures to fit inside a payload fairing and deploying the full-sized structure (unaided) once on-orbit (e.g., the James Webb Space Telescope [JWST]). To date, conceptual architecture studies performed for NEP spacecraft capable of human-rated Mars transport have only included a combination of the two previously mentioned strategies. This paper will propose ideas for infusing ISAM strategies into NEP vehicle architectures that leverage existing and near future technologies and enable the resulting NEP systems to be realized in a more time- and cost-efficient manner.

in-space assembly↗

An Alternative Approach to Human Servicing of Manned Earth Orbiting Spacecraft

As manned spacecraft have grown larger and more complex, they have come to rely on spacewalks or Extravehicular Activities (EVA) for both mission success and crew safety. Typically these spacecraft maintain all of the hardware and trained personnel needed to perform an EVA on-board at all times. Maintaining this capability requires volume and up-mass for storage of EVA hardware, crew time for ground and on-orbit training, and on-orbit maintenance of EVA hardware . This paper proposes an alternative methodology to utilize launch-on-need hardware and crew to provide EVA capability for space stations in Earth orbit after assembly complete, in the same way that most people would call a repairman to fix something at their home. This approach would not only reduce ground training requirements and save Intravehicular Activity (IVA) crew time in the form of EVA hardware maintenance and on-orbit training, but would also lead to more efficient EVAs because they would be performed by specialists with detailed knowledge and training stemming from their direct involvement in the development of the EVA. The on-orbit crew would then be available to focus on the immediate response to the failure as well as the day-to-day operations of the spacecraft and payloads. This paper will look at how current ISS unplanned EVAs are conducted, including the time required for preparation, and offer alternatives for future spacecraft utilizing lessons learned from ISS. As this methodology relies entirely on the on-time and on-need launch of spacecraft, any space station that utilized this approach would need a robust transportation system including more than one launch vehicle capable of carrying crew. In addition the fault tolerance of the space station would be an important consideration in how much time was available for EVA preparation after the failure. Each future program would have to weigh the risk of on-time launch against the increase in available crew time for the main objective of the spacecraft.

Mularski, John↗

Census Cities Project and atlas of urban and regional change

The research design and imagery utilization for urban applications of remote sensing are reviewed, including the combined use of sensor and census data and aircraft and spacecraft sensor platforms. The related purposes of the Census Cities Project are elucidated: (1) to assess the role of remote sensors on high altitude platforms for comparative study of urban areas; (2) to detect changes in selected U.S. urban areas between the 1970 census and the time of launching of an earth-orbiting sensor platform prior to next census; (3) to test the satellite sensor platform utility to monitor urban change and serve as a control for sensor image interpretation; (4) to design an information system for incorporating graphic sensor data with census-type data gathered by traditional techniques; (5) to identify and to design user-oriented end-products or information services; and (6) to ascertain what organizational capability would be needed to provide such services on a continuing basis. A need to develop not only a spatial data information system, but also a methodology for detecting and interpreting change is implied.

Wray, J. R.↗

Low earth orbit infrastructure to accommodate manned lunar missions

In order to establish bases on the lunar and Mars surfaces, a significant amount of orbital infrastructure including assembly platforms, cryogenic fluids depots, and Space Station Freedom, will be required in LEO. These facilities will be required to perform a myriad of functions ranging from orbital demonstration of advanced technology systems and establishment of life science capabilities to servicing and refurbishment of reusable lunar transfer vehicles. This paper addresses the requirements levied on these facilities and provides an overview of potetial LEO infrastructure elements that satisfy various advanced manned missions. Of key importance to the success of the manned lunar mission are (1) the evolutionary growth of Space Station Freedom to serve as a transportation node and (2) the development of a Shuttle-derived launch vehicle to deliver mission elements to LEO.

Cirillo, William M.↗

The link evaluation terminal for the advanced communications technology satellite experiments program

The experimental NASA satellite, Advanced Communications Technology Satellite (ACTS), introduces new technology for high throughput 30 to 20 GHz satellite services. Contained in a single communication payload is both a regenerative TDMA system and multiple 800 MHz 'bent pipe' channels routed to spot beams by a switch matrix. While only one mode of operation is typical during any experiment, both modes can operate simultaneously with reduced capability due to sharing of the transponder. NASA-Lewis instituted a ground terminal development program in anticipation of the satellite launch to verify the performance of the switch matrix mode of operations. Specific functions are built into the ground terminal to evaluate rain fade compensation with uplink power control and to monitor satellite transponder performance with bit error rate measurements. These functions were the genesis of the ground terminal's name, Link Evaluation Terminal, often referred to as LET. Connectors are included in LET that allow independent experimenters to run unique modulation or network experiments through ACTS using only the RF transmit and receive portions of LET. Test data indicate that LET will be able to verify important parts of ACTS technology and provide independent experimenters with a useful ground terminal. Lab measurements of major subsystems integrated into LET are presented. Bit error rate is measured with LET in an internal loopback mode.

May, Brian D.↗