Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “implementation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

Financing Microgrids in the Federal Sector

Recent high-impact events such as hurricanes and wildfires highlight the need for energy system resilience. One potential impact of these events is the loss of utility grid power to federal sites, negatively affecting the ability to carry out their missions. Depending on the need to sustain critical functions, it may be important to continue operations during an outage of the electric grid, or at least have power restored quickly after the event. One approach to addressing this need is through a microgrid. Microgrids can provide a more reliable solution than the traditional approach of using a backup generator at individual buildings. A microgrid can enhance a site’s electrical power system during normal operations, as well as provide reliable backup power to critical loads when electric utility power is interrupted. Many times, certain components of a microgrid (and potentially the entire system) can be justified economically and paid for out of energy savings or avoided costs. In cases where savings can cover the project costs, one of several privately financed procurement mechanisms may be used to implement the project. Procurement options available to all federal agencies include utility energy services contracts (UESC), energy savings performance contracts (ESPC), and utility services contracts (USC); other mechanisms such as a power purchase agreement (PPA), enhanced use lease (EUL), and utility privatization (UP) may also be useful to agencies that have the authority to use them. Implementing a microgrid in a comprehensive effort that also includes energy efficiency can provide an important savings component, while reducing power requirements for critical loads, thus reducing the cost of the microgrid and associated distributed energy resources (DER). However, it can be difficult to achieve enough savings and avoided costs to cover the entire microgrid system, so leveraging these avoided costs in combination with appropriated funds may be necessary to implement the full project. When a site is deciding if a microgrid is the best solution, activities early in the process include identifying critical loads and existing DERs, conversations with the local electric utility, and implementation options that work best for the agency and site. This paper explores procurement options and agreements that may be useful to federal agencies interested in implementing microgrids at their sites. Microgrid complexities, implementation considerations, and suggestions to get started are also discussed. This information will be most useful to agencies when they are exploring electric energy system resilience options and/or considering different procurement options to meet their needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Comprehensive Assessment of On-And Off-Board Vehicle-To-Grid Technology Performance and Impacts on Battery and the Grid

This project defined, developed, and tested the open standards-based requirements, engineering design and system integration of on and off-vehicle Vehicle-to-Grid technologies both on the grid and on the PEV, to assess their effectiveness in implementing the use cases that create value for the grid, which in turn, can be passed on to the ratepayers and the PEV owners. The project comprised of three key categories of work and four key sub-areas of work. The three key categories were: On-Vehicle V2G, Off-Vehicle V2G, and impact of V2G operation on the battery capacity degradation. The four key sub-areas of work under each of these categories were: defining requirements, implementing the technology, performing system integration testing, and estimating the value of each of the grid services under specific assumptions, on a per-vehicle and on an aggregated basis. The technical implementation demonstrated the validity of standards-based approach to grid integration that led to interoperability, in addition to assessing the operational details with grid constraints imposed at the transformer level. The technology implementation also identified the subtle gaps in the standards definition to close the feedback loop on the accuracy of the standards as written, which are being implemented as revisions to the appropriate protocols. The battery impacts assessment developed a test cycle that the batteries from a real PHEV were subjected to for both the mobility-only and mobility with V2G specific energy cycling. While the battery impact results show a clear incremental degradation in response to additional throughput for V2G application purposes, the amount of additional kWh that can be made available without exceeding the end-of-life capacity definition of the battery at its 10-year warranty period was found to be significant. Given that the PEV battery being exercised during testing was a PHEV battery (smaller energy capacity), and 44% of its usable energy (i.e., SOC) was utilized daily for V2G applications, the EVs with much larger batteries will fare much better, either in terms of extracting more value in terms of incremental kWh for V2G, or in terms of relative incremental degradation of the capacity through the battery lifespan. Further, this battery was the second-generation Lithium-Ion chemistry circa 2015, which is at least two generations ago. Continual improvements in electrochemistry and manufacturing techniques as well as on-board capacity will enable the future batteries to provide even more energy for non-mobility-related services. Finally, the valuation of V2G energy services at the premise, distribution, and the ISO/market level was carried out for both the on-vehicle and off-vehicle cases, to understand both the GHG mitigation and operational efficiency improvements in quantitative terms. The analysis indicates that between $\$400$ and $\$1400$ per year of total value to the grid can be realized. When netted of costs to implement V2G either on or off-vehicle, the net value is available to be shared between the ratepayers and the EV owners. Over the life of the EV, therefore, this value becomes significant and can easily provide both ratepayer and EV owner benefits more than the cost of the equipment, either on or off-board, in addition to providing GHG mitigation benefits both on the grid and on the mobility sides. For these benefits to accrue, the key learnings from both the on- and off-vehicle V2G parts of the project indicate the need for at-scale demonstrations through involvement of real EV owners to validate both the technical feasibility, interoperability, as well as real grid benefits by performing extensive data collection and analysis. This will help inform the grid planners, the program designs, and tariff designers, as well as automotive and equipment manufacturers how best to create their products to maximize grid, ratepayer, and EV owner value.

30 DIRECT ENERGY CONVERSION↗

Remapping of Data Between One-Dimensional Meshes

In this report we present two approaches to data remapping between one-dimensional meshes implemented with the c++ programming language. Our goal was to test the performance of two search algorithms, linear and binary, and verify the accuracy of our implementations of the two methods. We first introduce the concept of data remap and meshing components, as well as their various uses. We then delve into the differences between point-wise and conservative remap, the algorithms used in the implementations, and lastly confirm the implementations work as intended when given various inputs. We expect that, after profiling, the binary search algorithm will be more efficient than the linear algorithm for sorted sets of data, the point-wise remap implementation to accurately approximate the data transfer between two meshes, and the conservative remap implementation to conserve the area underneath the curve of two distinct meshes.

97 MATHEMATICS AND COMPUTING↗

Artificial Intelligence for Natural Gas Utilities: A Primer

Modern natural gas utilities face numerous challenges and competing priorities from various stakeholders. Policymakers, customers, and advocacy groups want to see gas utilities improve performance on safety, reliability, resilience, affordability, and environmental stewardship. State utility regulators — public utility commissions — are responsible for overseeing utility performance, ensuring that ratepayer funds are being spent in the public interest, and aligning utility goals with public goals. The use of new technologies is critical to enabling cost-effective performance on these attributes. Artificial intelligence (AI) is a widely used term among utilities and regulators, but the term means different things to different stakeholders, and it is often used to describe data analytics approaches that fall short of the formal definition of AI, which is: “…the ability of a machine to receive inputs and produce a behavior or reaction similar to that of an intelligent human being.” AI (and related tools, techniques, and technologies) can help utilities solve current and emerging challenges. By combining customer and system data with analytical tools and technologies, AI can augment human decision-makers by assisting in identifying problems and events before they occur, enabling resources to be more efficiently directed across utility infrastructure. The intended primary audience for this primer is state regulators, although utilities and other stakeholders might also find it useful and relevant to improve their awareness of AI. The objectives of this primer are to: (a) offer a set of broadly applicable definitions for AI and related terms, allowing regulators, utilities, and other stakeholders to speak the same language; (b) discuss how AI is currently being implemented in the gas utility sector; and (c) understand the challenges affecting AI solutions and how tools might be implemented in the future. This primer fits within NARUC’s goals of providing impartial information to improve the ability of public utility commissions to regulate in the public interest. As such, this primer does not seek to recommend AI over any other investment, nor does it endorse any particular vendor, product, or approach. It does seek to prepare state regulators to oversee AI investments by sharing information about the current landscape of commercially available tools. To these ends, the primer is organized as follows: Section I discusses the current environment in which natural gas utilities operate and how AI, when thoughtfully designed and implemented, can enable utilities to achieve performance goals; Section II offers definitions of AI and related terms within the data analytics discipline; Section III provides three current opportunities for which AI can offer solutions: replacing aging gas distribution infrastructure, preventing excavator damage to gas distribution infrastructure, and improving energy efficiency programs. This section discusses each problem statement in detail. Second, Section III includes a discussion of how costs and benefits of investments to solve each problem are measured. And third, this section offers real-world examples of utility implementation of AI solutions; Section IV discusses challenges with implementing AI, both from the perspective of utilities and regulators; Section V suggests areas in which AI could feasibly be implemented in the near future; Finally, Section VI offers concluding thoughts and areas for further research.

03 NATURAL GAS↗

Development of a Technical, Economic, and Risk Assessment Tool for the Evaluation of Work Reduction Opportunities

Efficient and cost-effective operation of a nuclear power plant (NPP) is essential to ensuring long-term economical and safe operation. Multiple cost saving opportunities exist, referred to here as work reduction opportunities (WRO). These WROs reduce plant operating costs by employing various cost-effective strategies (e.g., implementation of modern technologies). Identifying and objectively screening WROs is an essential task to help reduce overall costs. However, there is no comprehensive framework for assessing WROs in the nuclear industry and evaluating their impact on plant operations. This report presents a novel framework for systematically evaluating WROs from a technical, economic, and risk perspective. As NPPs continue to add new technology and implement modernization strategies into their current processes, potential WROs are commonly identified. Although most WROs have the potential to reduce costs, not all opportunities will result in significant cost savings due to unforeseen risks, large implementation costs, or benefits that fall short of expectations. Examples of this can be the result of a technology that is not fully developed, uncertainty in the amount of cost reduction, or difficulties introducing a new process into an organization. These uncertainties can manifest several ways and can result in a WRO with limited cost savings or even a loss of investment. The framework developed emphasizes the importance of effectively screening the WROs from a holistic perspective to objectively identify inefficiencies and ensure a positive impact to the organization. This report presents the Technical, Economic, and Risk Assessment (TERA) as a key methodology for the screening and evaluation of potential WROs. The TERA framework begins with a screening phase where the process is examined through a hybrid combination of Lean Six Sigma and Integrated Operations for Nuclear (ION) guiding principles. This framework examines the current processes using the Lean Six Sigma SIPOC (Suppliers, Inputs, Process, Outputs, Consumers) methodology but retains the ION key elements of People, Technology, Process, and Governance as important factors to the nuclear decision-making process. By combining the principles of Lean Six Sigma and ION, the developed screening process is specific to the nuclear industry in that it systematically evaluates WROs in order to implement new technology that is comprehensively evaluated. The TERA begins by mapping current processes as they relate to WROs and examining the inefficiencies. Furthermore, the created process map can be used to identify and evaluate potential solutions. Using key performance indicators (KPIs), the TERA evaluates each area—technology, economics, and risk—for uncertainties and to perform cost-benefit analysis. The results of the TERA are important KPIs that allow for an evaluation of different processes and technology implementations. This assessment enables decision-makers to compare various WROs based on metrics and then make informed decisions for which opportunity to implement first. This research includes not only the creation of the TERA framework, but also the evaluation of its performance. A case study for screening potential WROs at Southern Nuclear Company is presented that utilizes the TERA methodology. Through the use of TERA, various WROs were screened, and the solutions evaluated for cost-benefit expectations. The report concludes by summarizing the overall effort and implications for utility modernization. The performance of the screening and TERA are discussed as well as the impact on the nuclear industry. The TERA process enables utilities to evaluate and inform investment decisions for WROs and mitigate any potential risks. Through this research, we provide utilities with a valuable framework to optimize operations, reduce costs, and drive continuous process improvement.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan

The Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan has been developed in accordance with the requirements identified in the: • Interagency Agreement for the Pantex Superfund Site, Article 8.5 Work to be Performed, • Compliance Plan Provision of Hazardous Waste Permit No. 50284, and • Record of Decision for Groundwater, Soil, and Associated Media, Pantex Plant. A Long‐Term Monitoring System Design has been designed to monitor conditions in the perched groundwater including changes in the perched aquifer as a result of implementing the response actions. Monitoring is required for verifying the effectiveness of perched groundwater response actions (i.e., conditions in the perched aquifer are being affected as intended) and for confirming that the perched aquifer and Ogallala Aquifer characterization as defined in the Resource Conservation and Recovery Act Facility Investigation Report and the Corrective Measure Studies/Feasibility Study remains accurate. If monitoring results obtained through the monitoring network identify an unexpected condition or deviation, contingent actions will be considered and implemented as necessary to ensure continued protection of the Ogallala Aquifer and human health and the environment. Potential deviations to expected technology performance may be encountered for each of the four primary response actions that compose the selected remedy for perched groundwater; Playa 1 Pump and Treat System, Southeast Area Pump and Treat System, Southeast Area In‐Situ Bioremediation System (comprised of the Southeast In‐Situ Bioremediation System Original System, Southeast Area In‐Situ Bioremediation System Extension System, Offsite In‐Situ Bioremediation System, Perchlorate/Chromium ISB, Northeast ISB and County Road 8 ISB), and Zone 11 In‐Situ Bioremediation System. Monitoring will also be conducted to determine if there are deviations to the expected characterization, e.g., contaminants not expected as a result of the RCRA Facility Investigation characterization. Deviations to expected conditions in the Ogallala Aquifer could also be encountered if the response actions in the perched groundwater are not performing as expected, i.e., preventing contaminants from migrating to the Ogallala Aquifer. Currently, Pantex has begun investigation of detections of high explosives above groundwater protection standards in wells on the Texas Tech University property and a plume that is moving to the northeast from that area. Due to those detections, this Plan recognizes the fact that future detections in the Ogallala will be focused on first‐ time detections of analytes. After a remedy is determined, this Plan will require modification to address-deviations and contingent actions. This Plan was developed to identify the contingent actions necessary to mitigate impacts resulting from deviations to site conditions or response action performance. The Plan defines the environmental problem being addressed by the response actions, clarifies the expected conditions and objectives of the response actions, and identifies the potential deviations to the response actions (due to site conditions or technology performance) that could be encountered. The deviations were evaluated to determine the likelihood of occurrence, potential impact, and time to respond to avoid impact. The Plan also identifies the monitoring outlined in the Long‐Term Monitoring System Design Report (Consolidated Nuclear Security, 2024) and Sampling Analysis Plan (PanTeXas Deterrence, 2024) that will be used to detect the deviations. Lastly, the Plan specifies the contingent actions that could be implemented in response to the deviations. Because each response focuses on a discrete portion of the perched aquifer and contaminant plume, each response action has a different set of expected conditions, and therefore differing impacts from deviations to the site and technology expectations. As a result, the contingent actions are identified for each response action and potential deviation including specific constituents, location, and conditions. If deviations are encountered that impact the ability of the response action to meet performance objectives, the contingent actions will be focused on ensuring the response action can meet the performance objective. Contingent actions may be implemented as interim actions (ISMs/removal actions) in accordance with the Record of Decision, Interagency Agreement, and Hazardous Waste Permit‐50284, if warranted by the specific circumstances. For deviations to site characterization expected conditions, the contingent action will focus on determination of the source of the deviation, determination of the appropriate response, and evaluation of additional work to be completed. However, if the deviation to characterization impacts the performance of the response action, the contingent action will again focus on ensuring performance objectives can be met. Early source term removals and cleanup actions have been implemented to protect the Ogallala Aquifer. Because of these actions and based on modeling results, the expected conditions in the Ogallala Aquifer are that constituents of concern will not be detected above the Groundwater Protection Standards (GWPSs) nor will they reach potential points of exposure above the GWPS. The primary deviation of concern for the Ogallala is if constituents are detected in the Ogallala Aquifer near or above GWPSs. If it occurs, this change in expected conditions would require further evaluation of site and contaminant characteristics to determine an appropriate course of action. The evaluation would include additional monitoring, source identification, implementation of interim protective measures (if necessary), and delineation of extent. These evaluations are necessary to determine an appropriate response action for the Ogallala. The primary goal of the Plan is to provide for the continued protection of the Ogallala Aquifer and the health of its consumers. In recognition, this Plan presents a flexible and rational approach for making future decisions associated with confirming the change in perched and Ogallala aquifer conditions and identifying a response (technical activities, changes to response actions, regulatory oversight, and public involvement).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FPGA-accelerated SpeckleNN with SNL for real-time X-ray single-particle imaging

We present the implementation of a specialized version of our previously published unified embedding model, SpeckleNN, for real-time speckle pattern classification in X-ray Single-Particle Imaging (SPI), using the SLAC Neural Network Library (SNL) on an FPGA platform. This hardware realization transitions SpeckleNN from a prototypic model into a practical edge solution, optimized for running inference near the detector in high-throughput X-ray free-electron laser (XFEL) facilities, such as those found at the Linac Coherent Light Source (LCLS). To address the resource constraints inherent in FPGAs, we developed a more specialized version of SpeckleNN. The original model, which was designed for broader classification across multiple biological samples, comprised ~5.6 million parameters. The new implementation, while reducing the parameter count to 64.6K (a 98.8% reduction), focuses on maintaining the model's essential functionality for real-time operation, achieving an accuracy of 90%. Furthermore, we compressed the latent space from 128 to 50 dimensions. This implementation was demonstrated on the KCU1500 FPGA board, utilizing 71% of available DSPs, 75% of LUTs, and 48% of FFs, with an average power consumption of 9.4W according to the Vivado post-implementation report. The FPGA performed inference on a single image with a latency of 45.015 microseconds at a 200 MHz clock rate. In comparison, running the same inference on an NVIDIA A100 GPU resulted in an average power consumption of ~73W and an image processing latency of around 400 microseconds. Our FPGA-accelerated version of SpeckleNN demonstrated significant improvements, achieving an 8.9 × speedup and a 7.8 × reduction in power consumption compared to the GPU implementation. Key advancements include model specialization and dynamic weight loading through SNL, which eliminates the need for time-consuming FPGA design re-synthesis, allowing fast and continuous deployment of models (re)trained online. These innovations enable real-time adaptive classification and efficient vetoing of speckle patterns, making SpeckleNN more suited for deployment in XFEL facilities. This implementation has the potential to significantly accelerate SPI experiments and enhance adaptability to evolving experimental conditions.

47 OTHER INSTRUMENTATION↗

Predicting the Impact of Utility Lighting Rebate Programs on Promoting Industrial Energy Efficiency: A Machine Learning Approach

Implementation costs are a major factor in manufacturers’ decisions to invest in energy-efficient technologies. Emerging technologies in lighting systems, however, typically require small investment costs and offer short, simple payback periods, due, in part, to federal, state, and utility incentive programs. Recently, however, certain state and federal mandates have reduced the support for and efficacy of electricity utility incentivizing programs. To determine the impact of such support programs, this study examined historical data regarding lighting retrofit savings, implementation costs, and utility rebates gathered from 13 years of industrial energy audits by a U.S. Department of Energy Industrial Assessment Center in a midwestern state. It uses a machine learning approach to evaluate the industrial energy and cost-saving opportunities that may have been lost due to decisions attributable to legislative mandates, utility policies, and manufacturers’ calculations and to evaluate the potential effect of lighting rebates on manufacturers’ decisions to implement industrial energy-efficient lighting retrofits. The results indicate that the decision not to implement lighting energy efficiency recommendations resulted in a loss of more than USD800,000 in potential rebates by industries during the study period and that the implementation of lighting energy assessment recommendations could have increased by about 50% if electric utility rebates had been available. These findings can help industries evaluate the benefits of implementing lighting efficiency improvements, and help utilities determine feasible lighting retrofit rebate values for incentivizing such changes by the industries they serve.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Adaptive Fault Detection Based on Neural Networks and Multiple Sampling Points for Distribution Networks and Microgrids

Smart networks such as microgrid (MG) and active distribution networks (ADN) have been recently playing an important role in power system operation. The design and implementation of appropriate protection systems for such networks must be addressed, which imposes new technical challenges. This paper presents the implementation and validation aspects of an adaptive fault detection strategy based on neural networks (NNs) and multiple sampling points for ADN and MG. The solution is implemented on an edge device. Artificial NNs are used to derive a data-driven model that uses only local measurements to detect fault states of the network without the need for communication infrastructure. Multiple sampling points are used to derive a data-driven model, which allows the generalization considering the implementation in physical systems. The adaptive fault detector model is implemented on a Jetson Nano system, which is a single-board computer (SBC) with a small Graphic Processing Unit (GPU) intended to run machine learning loads at the edge. The proposed method is tested in a physical, real-life, low-voltage network located at Universidad del Norte, Colombia. This testing network is based on the IEEE-13 Node Test Feeder scaled down to 220 V. The validation in a simulation environment shows the accuracy and dependability above 99.6%, while the real-time tests show the accuracy and dependability of 95.5% and 100%, respectively. Without hard-to-derive parameters, the easy-to-implement embedded model highlights the potential for real-life applications.

42 ENGINEERING↗

Subtask 1.3 – Integrated Carbon Capture and Storage for North Dakota Ethanol Production

The Energy & Environmental Research Center (EERC), in partnership with Red Trail Energy, LLC (RTE), a North Dakota ethanol producer; the North Dakota Industrial Commission (NDIC) Renewable Energy Program (REP); and the U.S. Department of Energy (DOE), conducted a feasibility and implementation study for a commercial carbon capture and storage (CCS) effort. This subtask provided technical support and developed recommended practices of how small-scale industrial CO2 emitters (<1,000,000 tonnes of CO2 emitted annually) may economically deploy CCS. The 64-million-gallon dry mill RTE ethanol facility, emitting an average 180,000 tonnes of CO2 annually, was the subject of the case study. The positive outcome of this research, which shows technical and economic potential for ethanol–CCS in North Dakota, has resulted in RTE acquiring an approved Permit to Drill on December 2, 2019, for a stratigraphic test well in early 2020, a necessary step toward a North Dakota CO2 Storage Facility Permit (SFP) for the RTE CCS effort. Outcomes include 1) validating the Broom Creek Formation as a regional target for CCS, 2) determining the full carbon life cycle of an industrial fuel production facility with CCS, 3) developing a field implementation plan (FIP) for small-scale CCS, and 4) determining the validity and pathway for using CCS to meet low-carbon fuel (LCF) standards. The technical team included the EERC, RTE, Trimeric Corporation, Schlumberger Carbon Services, and Computer Modelling Group (CMG). Findings from activities conducted November 2016 – May 2020 are summarized as follows. Several key steps have been accomplished toward validating the Broom Creek Formation as a CO2 injection and storage target at the RTE CCS site, including verification of the presence and structure of sandstone layers that may comprise the potential CO2 storage reservoir and the several thousand feet of overlying confining zone. Work included site characterization using existing data, interpretation of seismic data within the study area, and geologic modeling simulation of CO2 injection. Interpreted results estimate 3000 feet of confining zone between the Broom Creek Formation (storage target) and the lowermost underground source of drinking water (e.g., the Fox Hills Formation). The thickness of the Broom Creek injection target varies 230–420 ft within the survey area. Results were used to inform the location of a stratigraphic test well and associated characterization test program. No impediments were identified within the targeted CO2 storage complex that would prevent the project from moving forward. A stratigraphic test well is the next step to validate these results and to acquire remaining data necessary to develop a North Dakota CO2 SFP application. The EERC generated full carbon life cycle estimates for CCS integration with the RTE ethanol facility. Results indicated that an average 40% reduction in CO2 emissions is possible through CCS implementation. Approximately half of the carbon in the overall life cycle for a dry mill ethanol plant is generated through the fermentation process and emitted to the atmosphere; this is the CO2 stream targeted for CCS. The remaining carbon is attributed to corn feedstock farming (diesel, fertilizer), energy for fuel processing (natural gas, electricity), and transportation (diesel) of the fuel product. Life cycle carbon estimates are also affected by the anticipated energy consumption of a potential capture facility, which depend on the type of CO2 product generated. For example, a 30%–40% net CO2 emission reduction is estimated if a liquefied CO2 facility were incorporated compared to a 40%–50% net CO2 reduction if a supercritical “injection-grade” CO2 product is generated; i.e., more energy is required to further refine the CO2 stream, affecting the full carbon life cycle estimates. A CCS FIP was developed and initiated at the RTE CCS site, resulting in the development of several guidance documents: a CO2 Capture Process Design Package, a North Dakota CO2 geologic Storage Permits Template, and a Public Outreach Package for CCS in North Dakota. General FIP components include CO2 capture system, pipeline and well designs; monitoring, verification, and accounting (MVA) plans; geologic characterization and testing programs; and permitting and outreach plans. Vendor bids were also acquired for the CO2 liquefaction facility. Near-surface characterization (groundwater and soil gas sampling) and geologic characterization (seismic survey) were initiated to inform development of a UIC Class VI-compliant MVA plan compliant with a North Dakota CO2 SFP. Designs (well and geologic testing) were completed for a stratigraphic test well compliant with a North Dakota CO2 SFP. In addition, the outreach plan was executed, including community open houses, meetings with city/county/state officials, and development of public materials. Although other entities continued to mature incentive programs in 2019–2020, California and the Internal Revenue Service (IRS) currently provide the most advanced economic opportunities for CCS integrated with fuel production. The California Low-Carbon Fuel Standard (LCFS) adopted a CCS Protocol in January 2019, allowing submittal of a design-based pathway (DBP) application for an approved temporary (not certified) carbon intensity value for a fully engineered facility. An ethanol–CCS DBP application to the California LCFS Program (officially approved February 28, 2020) was developed to show that the RTE CCS effort meets LCFS requirements. The approved DBP provides confidence to advance the project and supports potential investments. Other entities continue to mature incentive programs. The IRS issued guidance in February 2020 that addresses the definition of beginning of construction and revenue procedure on partnerships for the Enhancement of Carbon Dioxide Sequestration Credit (a.k.a. Section 45Q) CCS tax credit program; the IRS anticipates issuing further guidance on issues such as secure geologic storage, utilization qualifications, and recapture of claimed credits. Maturing incentive programs coupled with workable permitting regulations provide confidence to advance CCS projects in North Dakota and support financial investment to proceed with designing, constructing, and implementing CCS projects at small-scale fuel production facilities. The largest hurdles for CCS implementation at small-scale industrial systems are often business/economic-related (i.e., not technical). Market uncertainty already exists for agriculture-based alternative fuels such as corn ethanol, for which production has increased by ~33%, and prices have correspondingly lowered since 2015. Passing the Section 45Q tax credit program improves economic feasibility for CCS but may require external investors for a small business to achieve maximum benefits. Public–private partnerships with NDIC and DOE have resulted in foundational technical and regulatory knowledge, growing stakeholder confidence, and a pathway to implementation that enables similar industrial CCS projects in the region to advance. This subtask was funded through the EERC–DOE Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by NDIC and RTE. The authors would also like to thank CMG, ESRI, IHS, Neuralog, and Schlumberger for allowing the use of their software packages in support of this work.

42 ENGINEERING↗

EERC Final Topical Report – Findings on Subtask 3.2 – Produced Water Management Through Geologic Homogenization, Conditions, and Reuse

The Energy & Environmental Research Center (EERC) was awarded a contract by the North Dakota Industrial Commission (NDIC) Oil and Gas Research Program (NDIC No. G-051-101) to conduct a study on the recycling of water used in oil and gas operations, also known as produced water, from oil- and gas-producing regions of North Dakota as directed by Section 19 of North Dakota House Bill 1014. This final report provides a compilation of results of the study, which include regulatory, scientific, technological, and feasibility methods and considerations associated with North Dakota produced water management. The report provides a synopsis of this project’s previously submitted produced water assessment report entitled “Produced Water Management and Recycling Options in North Dakota” (Energy & Environmental Research Center, 2020), with updated values provided as appropriate. The report provides the results from the investigation of a novel produced water management strategy, referred to as geologic homogenization, conditioning, and reuse (GHCR), which aims to use a subsurface geologic formation as a natural medium for managing produced water recycling and reuse. Water management is a significant technical and economic challenge for sustainable oil and gas production, and water volumes are intrinsically linked to oil production volumes. North Dakota oil production rose to over 1.5 million barrels (MMbbl)/day in 2019, and despite a downturn in oil price in early 2020, North Dakota oil production has recovered to 1.1 MMbbl/day as of August 2021. Bakken petroleum system development between 2008 and 2020 has resulted in a nearly fourfold increase in produced water volumes to 642 MMbbl/yr in 2020 after peaking at 740 MMbbl/yr in 2019 and a fivefold increase in saltwater disposal (SWD) volumes to 565 MMbbl/yr in 2020 after a peak of 682 MMbbl/yr in 2019. Produced water and SWD volumes are forecasted to double by 2030. SWD is the primary method of produced water management used in North Dakota, with approximately 95% of the SWD volume occurring through subsurface injection into sandstones of the Dakota Group (Dakota). Localized pressurization of the Dakota resulting from SWD and projected increases in produced water volumes could impact the economics of North Dakota oil production. As a result, there is an emerging need to pursue alternative produced water management approaches, including recycling and reuse. While produced water recycling is not yet widespread, commercial operators are making strides in overcoming the technical challenges of using high salinity produced water in completion operations (Marathon Oil, 2020). As water management continues to be a key focal point in companies’ environmental, social, and governance (ESG) initiatives, focus on water management, including recycling, will likely continue to increase. Laboratory column testing, field sample collection, geologic modeling and numerical simulation, and techno-economic analysis all indicate that GHCR could feasibly be implemented as a potential water management option. Laboratory column testing and field sample collection indicate that the Inyan Kara sandstone and native formation fluid are capable of homogenizing with the Bakken produced water to a point where the fluid composition appears to stabilize. Extracting that stabilized fluid could be considered homogeneous and capable of providing individual batches of hydraulic fracturing fluid. Numerical simulation results indicate that extraction of fluids from the Inyan Kara in a GHCR implementation scenario is capable of reducing formation pressure, which would help ease localized pressurization of the Inyan Kara and extend the available capacity for nearby existing SWD wells. Economic analysis indicates that there are scenarios where GHCR implementation can be a competitive or even lower-cost option than a conventional water management approach. Site-specific conditions will dictate the economic potential of GHCR, but potentially attractive sites for GHCR implementation will be those that are located above a pressurized zone of the Inyan Kara, need six or more Bakken infill wells, and face high costs for conventional SWD and/or freshwater. Based on the regulatory review, drilling into the Inyan Kara for SWD and to harness as a source water for industrial use have precedent in North Dakota, and a workable regulatory solution for GHCR seems likely. However, restrictions in the state regarding surface storage and transport of produced fluids may limit some activities, which will affect how GHCR could ultimately be implemented. In summary, this study reveals pursuing GHCR can be a viable approach to water management in North Dakota. The GHCR concept addresses some of the challenges that hinder the more traditional approaches to recycling in the industry. Furthermore, an assessment of the current landscape of water management within the state reveals the ongoing trend of increasing volumes of produced water and SWD. Projections reveal that the volumes of produced water that need to be managed are expected to double over the next decade (Energy & Environmental Research Center, 2020). With the continued development of the Bakken and continuing driving factors related to ESG initiatives, implementing a practice such as GHCR is a feasible approach to adding recycling of produced water to industry within the state. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission Oil and Gas Research Program. References Energy & Environmental Research Center, 2020, Produced water management and recycling options in North Dakota: Final Report for North Dakota Legislative Management Energy Development and Transmission Committee and North Dakota Industrial Commission. Marathon Oil, 2020, Sustainability report: https://cdn.sanity.io/files/ghcnw9z2/website/ 91744eb6ef8fbe59505a911c6b8d2e8dd9a537fa.pdf?dl (accessed November 2021).

02 PETROLEUM↗

Modelica-json: Transforming energy models to digitize the control delivery process

Building simulation models are typically not used to generate the documentation required for bidding and project delivery of commercial building systems, or for their semantic modeling and commissioning. This paper presents a software tool that aids in digitizing the control delivery process, spanning simulation during design to implementation and formal verification during commissioning. The tool can generate from Modelica models digital documentation of control sequences. This digital documentation, along with other project drawings and specifications can be used for project bidding. It can also be used for implementation of control sequences through machineto-machine translation to commercial legacy control products, for which we are currently developing the proposed ASHRAE Standard 231P based on the presented work. Moreover, as-installed control sequences can be formally verified against the design specification, and a semantic model in Brick can be exported to aid in configuration of building analytics and fault detection. The paper presents what we believe is the first translation of a Modelica-implemented control sequence to a native implementation on a commercial control platform, using the webCTRL product line from Automated Logic. The paper also shows how a webCTRL implementation can be formally verified against its Modelica specification. These use cases have all been demonstrated with a prototype implementation that is now being further developed.

Wetter, Michael↗

Modbus RTU for Embedded Cyber Secure Inverter Controller

The Modbus communication protocol is a widely adopted communication standard in industrial control systems. This communication protocol is known for being reliable and straightforward to implement while being versatile in terms of its operating parameters while supporting multiple formats over various hardware infrastructures and architectures. Many intelligent devices such as Programmable Logic Controllers (PLCs), Human-Machine Interfaces (HMIs), Internet-of-Things (IoT), and various Operational Technologies (OT) utilize Modbus for their communication systems. These types of systems must communicate with each other through a standardized and central communication process. To support the integration of these modular systems, a Field-Programmable Gate Array (FPGA) can act as an embedded central routing fabric for this communication to take place. Embedded systems are versatile enough to interface with various devices and systems to accomplish various goals. Additionally, embedded systems require relatively small physical designs to minimize the required resources to facilitate the intended application by providing low-level system access. This minimization of system resources goes hand in hand with reducing the financial cost of a proposed solution or system. As remotely collaborating researchers often use FPGAs to prototype designs that are required to have a method for data transmission among systems, it is imperative to provide a baseline standard for communications among devices and systems. A typical method of implementing the Modbus RTU communication protocol in an embedded environment is using integrated logic architectures within the FPGA called “Intellectual Property (IP) cores.” IP cores can be designed using integrated logic or circuit designs to function as an embedded processor. These IP cores can then perform the required computational actions to support the Modbus RTU communication protocol by utilizing high-level programming languages such as the C programming language. The hardware description language of Very High-Speed Integrated Circuit Hardware Description Language (VHDL) allows for the control of real hardware at the logic gate and signal level. These logic gates and signals can be designed and controlled to perform desired actions based on the system design. Programming an FPGA using VHDL allows an individual to access the lowest abstraction level of the system during FPGA development. This level of abstraction is referred to as the register-transfer level (RTL), which gives access to manipulating values and variables at the register level. This register-level manipulation provides precision over creating the logical circuit within the FPGA, thus minimizing the required code to perform desired operations. The Modbus RTU communication protocol can be implemented within an FPGA using VHDL programming to establish a standardized and embedded serial communication pathway. This implementation provides a standardized communication protocol to streamline research efforts among researchers, thus increasing the efficiency of research efforts. Additionally, this Modbus RTU implementation requires fewer resources when compared to typical communication protocol implementations that utilize an IP core, reducing the hardware requirement for effective research efforts.

communication↗

Porting the Nonlinear Optimization Library HiOp to Accelerator-Based Hardware Architectures

While interior point method has been the centerpiece of nonlinear programming tools used in science and engineering, its reliance on linear solvers that can tackle sparse symmetric indefinite and highly ill-conditioned problems made it difficult to implement it effectively on hardware accelerators. HiOp optimization package attempts to provide an implementation of the interior point method suitable for hardware accelerators by compressing the original sparse problem to produce an underlying linear problem that is dense and of manageable size. Implementations of dense linear solvers are more mature and utilize hardware accelerators better than their sparse counterparts. There is a number of important domain problems, such as optimal power flow analysis for power grids, where the sparse problem can be effectively compressed and deploying dense linear solver within the interior point method can improve performance. Here we describe a portable implementation of HiOp optimization engine, which uses a linear solver from Magma library and runs entirely on hardware accelerators. To compress the problem, HiOp uses customized mixed dense-sparse linear algebra. All HiOp kernels are implemented using Umpire and RAJA portability libraries. We describe details of the implementation and discuss trade-offs between performance, portability and development cost.

97 MATHEMATICS AND COMPUTING↗

A time‐varying formulation of the curled wake model within the FAST.Farm framework

Abstract In this article, we present a time‐varying formulation of the curled wake model that we implemented in FAST.Farm. The curled wake model, originally developed for steady‐state conditions, is used to produce realistic wake profiles behind a wind turbine in yawed (or skewed) conditions. We begin by introducing the key elements of the FAST.Farm framework. Then, after briefly summarizing the original wake dynamics formulation of FAST.Farm based on a polar wake profile, we present the new time‐varying formulation of the curled wake model, compare the two, and highlight the differences with the original curled wake model. After discussing some implementation details, we present different applications with increasing levels of complexity: single turbine with uniform and turbulent inflow, fixed and transient yaw, and multiple turbines. We verify our results using the original FAST.Farm implementation and large‐eddy simulations. The results with the new curled wake model are improved compared to the original implementation, as they include cross‐flow velocities and wake asymmetry. Yet, large‐eddy simulation results show a more pronounced lateral convection of the wake and a stronger concentration of vorticity at the top vortex. The new curled wake implementation in FAST.Farm should enable the calculation of not only generator power but also wind turbine structural loads for applications involving intentional or unintentional skewed flow and wind‐farm control involving wake steering.

17 WIND ENERGY↗

Experimental Characterization of OpenMP Offloading Memory Operations and Unified Shared Memory Support

The OpenMP specification recently introduced support for unified shared memory, allowing implementation to leverage underlying system software to provide a simpler GPU offloading model where explicit mapping of variables is optional. Support for this feature is becoming more available in different OpenMP implementations on several hardware platforms. A deeper understanding of the different implementation’s execution profile and performance is crucial for applications as they consider the performance portability implications of adopting a unified memory offloading programming style. This work introduces a benchmark tool to characterize unified memory support in several OepnMP compilers and runtimes, with emphasis on identifying discrepancies between different OpenMP implementations as to how they various memory allocation strategies interact with unified shared memory. The benchmark tool is used to characterize OpenMP compilers on three leading High Performance Computing platforms supporting different CPU and device architectures. The benchmark tool is used to assess the impact of enabling unified shared memory on the performance of memory-bound code, highlighting implementation differences that should be accounted for when applications consider performance portability across platforms and compilers.

Elwasif, Wael↗

Online transfer learning strategy for enhancing the scalability and deployment of deep reinforcement learning control in smart buildings

In recent years, advanced control strategies based on Deep Reinforcement Learning (DRL) proved to be effective in optimizing the management of integrated energy systems in buildings, reducing energy costs and improving indoor comfort conditions when compared to traditional reactive controllers. However, the scalability and implementation of DRL controllers are still limited since they require a considerable amount of time before converging to a near-optimal solution. This issue is currently addressed in literature through the offline pre-training of the DRL agent. However this solution results in two main critical issues: (1) the need to develop a building surrogate model to perform the training task, and (2) the need to perform a fine-tuning process over several training episodes to obtain a near-optimal control policy. In this context, this paper introduces an Online Transfer Learning (OTL) strategy that exploits two knowledge-sharing techniques, weight-initialization and imitation learning, to transfer a DRL control policy from a source office building to various target buildings in a simulation environment coupling EnergyPlus and Python. A DRL controller based on discrete Soft Actor–Critic (SAC) is trained on the source building to manage the operation of a cooling system consisting of a chiller and a thermal storage. Several target buildings are defined to benchmark the performance of the OTL strategy with that of a Rule-Based Controller (RBC) and two DRL-based control strategies, deployed in offline and online fashion. The strategy adopted for OTL emulates the real world implementation with a simulation process by implementing the transferred DRL agent for a single episode in the target buildings. Target buildings have the same geometrical features and are served by the same energy system as the source building, but differ in terms of weather conditions, electricity price schedules, occupancy patterns, and building envelope efficiency levels. The results show that the OTL strategy can reduce the cumulated sum of temperature violations on average by 50% and 80% respectively when compared to RBC and online DRL while enhancing the energy system operation with electricity cost savings ranging between 20% and 40%. Furthermore, the OTL agent performs slightly worse than the offline DRL controller but it does not require any modeling effort and can be implemented directly on target buildings emulating a real-world implementation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗