Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “distributed system architecture”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

A Review of Software for Designing and Operating Quantum Networks

Quantum networks development is crucial to realizing a production-grade network that can support distributed sensing, secure communication, and utility-scale quantum computation. However, the transition from laboratory demonstration to deployable networks requires software implementations of architectures and protocols tailored to the unique constraints of quantum systems. This paper reviews the current state of software implementations for quantum networks, organized around a three-plane abstraction of infrastructure, logical, and control/service planes. We cover software for both designing quantum network protocols (e.g., SeQUeNCe, QuISP, and NetSquid) and operating testbeds, with a focus on essential control/service plane functions such as entanglement, topology, and resource management, in a proposed taxonomy. Our review highlights a persistent gap between theoretical architecture and protocol proposals and their realization in simulators or testbeds, particularly in dynamic topology and network management. We conclude by outlining open challenges and proposing a roadmap for developing scalable software architectures to enable hybrid, large-scale quantum networks.

Network Design↗

Programming approaches for scalability, performance, and portability of combustion physics codes

Here, this paper presents the process, strategy, and results associated with porting a typical combustion physics flow solver to current state-of-the-art and future massively-parallel computer architectures. Major focus is placed on the distinct algorithmic structure of these types of codes and how it can be integrated with modern programming paradigms for heterogeneous platforms (i.e., distributed many-core systems with accelerators). An end-to-end case study is presented that exemplifies the process in a generic manner, which then serves as a clear guide with respect to the strategy and best practices leading to a robust and adaptable framework that performs well, is durable over time, is portable, and requires minimal human-effort. This end is accomplished beginning with the use of a mature, validated, structured, multiblock code framework optimized for application of both Large Eddy Simulation (LES) and Direct Numerical Simulation (DNS). This code has been ported to a variety of platforms over the past decade, including most recently the Oak Ridge Leadership Computing Facility’s “Summit” Platform. The experience gained on these multiple platforms provides general insights and thus the results presented are not specific to any one code or platform other than the overarching trend toward distributed many-core systems with accelerators in order to move toward exascale performance. The resultant performance and scalability of the ported code is demonstrated on a real-world application; a state-of-the-art rotating detonation rocket engine simulation that matches the complex geometry and boundary conditions imposed as part of a companion experimental campaign.

97 MATHEMATICS AND COMPUTING↗

GridOPTICS Software System

GridOPTICS Software System (GOSS) is a middleware that facilitates creation of new, modular and flexible operational and planning platforms that can meet the challenges of the next generation power grid. GOSS enables Department of Energy, power system utilities, and vendors to build better tools faster. GOSS makes it possible to integrate Future Power Grid Initiative software products/prototypes into existing power grid software systems, including the PNNL PowerNet and EIOC environments. GOSS is designed to allow power grid applications developed for different underlying software platforms installed in different utilities to communicate with ease. This can be done in compliance with existing security and data sharing policies between the utilities. GOSS not only supports one-to-one data transfer between applications, but also publisher/subscriber scheme. To support interoperability requirements of future EMS, GOSS is designed for CIM compliance. In addition to this, it supports authentication and authorization capabilities to protect the system from cyber threats. In summary, the contributions of the GOSS middleware are as follows: A platform to support future EMS development. A middleware that promotes interoperability between power grid applications. A distributed architecture that separates data sources from power grid applications. Support for data exchange with either one-to-one or publisher/subscriber interfaces. An authentication and authorization scheme for limiting the access to data between utilities.

Akyol, BoraA↗

Short-Term Test Results: Transitional Housing Energy Efficiency Retrofit in the Hot-Humid Climate

This project evaluates the renovation of a 5,800 ft2, multi-use facility located in St. Petersburg, on the west coast of central Florida, in the hot humid climate. An optimal package of retrofit measures was designed to deliver 30-40% annual energy cost savings for this building with annual utility bills exceeding $16,000 and high base load consumption. Researchers projected energy cost savings for potential retrofit measures based on pre-retrofit findings and disaggregated, weather normalized utility bills as a basis for simulation true-up. A cost-benefit analysis was conducted for the seven retrofit measures implemented; adding attic insulation and sealing soffits, tinting windows, improving whole building air-tightness, upgrading heating and cooling systems and retrofitting the air distribution system, replacing water heating systems, retrofitting lighting, and replacing laundry equipment. The projected energy cost savings for the full retrofit package based on a post-retrofit audit is 35%. The building's architectural characteristics, vintage, and residential and commercial uses presented challenges for both economic projections and retrofit measure construction.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Short-Term Test Results: Transitional Housing Energy Efficiency Retrofit in the Hot Humid Climate

This project evaluates the renovation of a 5,800 ft2, multi-use facility located in St. Petersburg, on the west coast of central Florida, in the hot humid climate. An optimal package of retrofit measures was designed to deliver 30%-40% annual energy cost savings for this building with annual utility bills exceeding $16,000 and high base load consumption. Researchers projected energy cost savings for potential retrofit measures based on pre-retrofit findings and disaggregated, weather normalized utility bills as a basis for simulation true-up. A cost-benefit analysis was conducted for the seven retrofit measures implemented; adding attic insulation and sealing soffits, tinting windows, improving whole building air-tightness, upgrading heating and cooling systems and retrofitting the air distribution system, replacing water heating systems, retrofitting lighting, and replacing laundry equipment. The projected energy cost savings for the full retrofit package based on a post-retrofit audit is 35%. The building's architectural characteristics, vintage, and residential and commercial uses presented challenges for both economic projections and retrofit measure construction.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Next Generation Solid Oxide Fuel Cell Module Development

The overall objective of this project was to develop a transformative Solid Oxide Fuel Cell (SOFC) building block configuration comprised of multi-stack arrays that can be utilized in large-scale power plants. This transformative design signified the benefits of lower performance degradation coupled with improved reliability, low cost, smaller packaging for easier transport and installation, and improved maintenance and field serviceability characteristics. The project goal was to design and fabricate a scalable hot module for housing an array of SOFC stacks and to demonstrate the characteristics of the module gas distribution, insulation and instrumentation, and DC power take-off. The approach was to validate the design of a stack prototype scalable to megawatt (MW) class systems using FuelCell Energy’s Compact SOFC Architecture (CSA) stacks. The scope of work was intended to design, build, and test a compact and low-cost multi-stack sub-module with flexibility to house CSA stacks and scalable to 350 kW which could ultimately be deployed in construction of MW-class systems.

20 FOSSIL-FUELED POWER PLANTS↗

Performance of Power Converters at Cryogenic Temperatures

Power converters capable of operation at cryogenic temperatures are anticipated to play an important role in the power system architecture of future NASA deep space missions. Design of such converters to survive cryogenic temperatures will improve the power system performance and reduce development and launch costs. Aerospace power systems are mainly a DC distribution network. Therefore, DC/DC and DC/AC converters provide the outputs needed to different loads at various power levels. Recently, research efforts have been performed at the NASA Glenn Research Center (GRC) to design and evaluate DC/DC converters that are capable of operating at cryogenic temperatures. This paper presents a summary of the research performed to evaluate the low temperature performance of five DC/DC converters. Various parameters were investigated as a function of temperature in the range of 20 to -196 C. Data pertaining to the output voltage regulation and efficiency of the converters is presented and discussed.

Elbuluk, Malik E.↗

Optimal Design of Integrated Systems Health Management (ISHM) Systems for improving safety in NASA's Exploration Vehicles: A Two-Level Multidisciplinary Design Approach

Integrated Vehicle Health Management (ISHM) systems are used to detect, assess, and isolate functional failures in order to improve safety of space systems such as Orbital Space Planes (OSPs). An ISHM system, as a whole, consists of several subsystems that monitor different components of an OSP including: Spacecraft, Launch Vehicle, Ground Control, and the International Space Station. In this research, therefore, we propose a new methodology to design and optimize ISHM as a distributed system with multiple disciplines (that correspond to different subsystems of OSP safety). A paramount amount of interest has been given in the literature to the multidisciplinary design optimization of problems with such architecture (as will be reviewed in the full paper).

Mehr, Ali Farhang↗

Towards an interplanetary internet: a proposed strategy for standardization

This paper reviews the current set of standard data communications capabilities that exist to support advanced missions, discusses the architectural concepts for the future Interplanetary Internet, and suggests how a standardized set of space communications protocols that can grow to support future scenarios where human intelligence is widely distributed across the Solar System.

interplanetary internet space communications proto↗

Strategies for Ground Testing of Manned Lunar Surface Systems

One of the primary objectives of NASA's Vision for Space Exploration is the creation of a permanently manned lunar outpost. Facing the challenge of establishing a human presence on the moon will require new innovations and technologies that will be critical to expanding this exploration to Mars and beyond. However, accomplishing this task presents an unprecedented set of obstacles, one of the more significant of which is the development of new strategies for ground test and verification. Present concepts for the Lunar Surface System (LSS) architecture call for the construction of a series of independent yet tightly coupled modules and elements to be launched and assembled in incremental stages. Many of these will be fabricated at distributed locations and delivered shortly before launch, precluding any opportunity for testing in an actual integrated configuration. Furthermore, these components must operate flawlessly once delivered to the lunar surface since there is no possibility for returning a malfunctioning module to Earth for repair or modification. Although undergoing continual refinement, this paper will present the current state of the plans and models that have been devised for meeting the challenge of ground based testing for Constellation Program LSS as well as the rationale behind their selection.

Beyer, Jeff↗

Distributed Timing and Localization (DiGiTaL)

The Distributed Timing and Localization (DiGiTaL) system provides nano satellite formations with unprecedented,centimeter-level navigation accuracy in real time and nanosecond-level time synchronization. This is achieved through the integration of a multi-constellation Global Navigation Satellite System (GNSS) receiver, a Chip-Scale Atomic Clock (CSAC), and a dedicated Inter-Satellite Link (ISL). In comparison, traditional single spacecraft GNSS navigation solutions are accurate only to the meter-level due to the sole usage of coarse pseudo-range measurements. To meet the strict requirements of future miniaturized distributed space systems, DiGiTaL uses powerful error-cancelling combinations of raw carrier-phase measurements which are exchanged between the swarming nano satellites through a decentralized network. A reduced-dynamics estimation architecture on board each individual nano satellite processes the resulting millimeter-level noise measurements to reconstruct the fullformation state with high accuracy.

Small Spacecraft↗

Blockchain Application Within a Multi-Sensor Satellite Architecture

With the thrust towards multi-sensor satellite architectures for earth and space exploration, such as constellations and swarms, new technologies are required to enable the transition to this future capability. One of the areas of interest is establishing secure, efficient and prioritized data and command communication pathways among ground and space-based sources for such systems. This paper presents early research results on the potential role, capabilities and value of blockchain usage within constellation and swarm satellite architectures. It demonstrates the use of blockchain's smart contract and distributed ledger capabilities for secure and prioritized multi-sensor satellite collaborative data exchanges, as well as the logging and tracking of command and control events. Adapting and utilizing this emerging technology will aid in addressing technology gaps expected from future constellation flight architectures, such as managing collective computational operations (correlation), dynamic and autonomous observation planning, time-critical events, and provenance tied to ground and space-based autonomous operations and control recordkeeping. In this scenario blockchain is applied in encrypted command transmittal to multiple, yet specific, entities enabling acknowledgement transmittals, performance scalability, and automatic event-based triggering.

Mital, Rohit↗

GridOPTICS Software System

GridOPTICS Software System (GOSS) is a middleware that facilitates creation of new, modular and flexible operational and planning platforms that can meet the challenges of the next generation power grid. GOSS enables Department of Energy, power system utilities, and vendors to build better tools faster. GOSS makes it possible to integrate Future Power Grid Initiative software products/prototypes into existing power grid software systems, including the PNNL PowerNet and EIOC environments. GOSS is designed to allow power grid applications developed for different underlying software platforms installed in different utilities to communicate with ease. This can be done in compliance with existing security and data sharing policies between the utilities. GOSS not only supports one-to-one data transfer between applications, but also publisher/subscriber scheme. To support interoperability requirements of future EMS, GOSS is designed for CIM compliance. In addition to this, it supports authentication and authorization capabilities to protect the system from cyber threats. In summary, the contributions of the GOSS middleware are as follows: A platform to support future EMS development. A middleware that promotes interoperability between power grid applications. A distributed architecture that separates data sources from power grid applications. Support for data exchange with either one-to-one or publisher/subscriber interfaces. An authentication and authorization scheme for limiting the access to data between utilities.

Akyol, Bora A↗

Cybersecurity for Fast Charging EV Infrastructure

The integration of electric vehicles (EVs) into electric grid operations can potentially leave the grid vulnerable to cyberattacks from both legacy and new equipment and protocols, including extreme fast-charging infrastructure. This paper introduces a co-simulation platform to perform cyber vulnerability analysis of EV charging infrastructure and its dependencies on communications and control systems. Grid impact scenarios through linkages to power system simulation tools such as OpenDSS and vehicle infrastructure-specific attack paths are discussed. An adaptive platform that assists with predicting and solving evolving cybersecurity challenges is demonstrated with a cyber-energy emulation that accelerates the analysis of cyberattacks and system behavior.

ADVANCED PROPULSION SYSTEMS,POWER TRANSMISSION AND↗

21st Century Computer Architecture

Because most technology and computer architecture innovations were (intentionally) invisible to higher layers, application and other software developers could reap the benefits of this progress without engaging in it. Higher performance has both made more computationally demanding applications feasible (e.g., virtual assistants, computer vision) and made less demanding applications easier to develop by enabling higher-level programming abstractions (e.g., scripting languages and reusable components). Improvements in computer system cost-effectiveness enabled value creation that could never have been imagined by the field's founders (e.g., distributed web search sufficiently inexpensive so as to be covered by advertising links). The wide benefits of computer performance growth are clear. Recently, Danowitz et al. apportioned computer performance growth roughly equally between technology and architecture, with architecture credited with ~80x improvement since 1985. As semiconductor technology approaches its "end-of-the-road" (see below), computer architecture will need to play an increasing role in enabling future ICT innovation. But instead of asking, "How can I make my chip run faster?," architects must now ask, "How can I enable the 21st century infrastructure, from sensors to clouds, adding value from performance to privacy, but without the benefit of near-perfect technology scaling?". The challenges are many, but with appropriate investment, opportunities abound. Underlying these opportunities is a common theme that future architecture innovations will require the engagement of and investments from innovators in other ICT layers.

97 MATHEMATICS AND COMPUTING↗

Solar-terrestrial data access distribution and archiving

It is recommended that a central data catalog and data access network (CDC/DAN) for solar-terrestrial research be established, initially as a NASA pilot program. The system is envisioned to be flexible and to evolve as funds permit, starting from a catalog to an access network for high-resolution data. The report describes the various functional requirements for the CDC/DAN, but does not specify the hardware and software architectures as these are constantly evolving. The importance of a steering committee, working with the CDC/DAN organization, to provide scientific guidelines for the data catalog and for data storage, access, and distribution is also stressed.

Source record↗

Predicting Crew Time Allocations for Lunar Orbital Missions Based on Historical ISS Operational Activities

As the National Aeronautics and Space Administration continues to define candidate architectures for the planned lunar “Gateway”, it will be necessary to have a detailed understanding of how the crew will inhabit, operate, and maintain the spacecraft. The nature of the Gateway vehicle systems configuration and operations will have a direct impact on the scope of work activities required of the crew. Crew work schedules are sensitive to variations in spacecraft architecture, visiting vehicle activities, and logistics operations – particularly within short duration missions as initially planned for the lunar Gateway. These system and operational configurations must be taken into account when planning for crew time availability to conduct science activities on Gateway missions. This paper presents a methodology that is used to predict crew time distributions for lunar Gateway missions, as applied in NASA’s Exploration Crew Time Model (ECTM). The process utilized for evaluating crew time distributions is based on the categorization of all crew activities into a standardized ontology. Historical ISS daily crew timeline data from July 20, 2011 (post STS retirement) to present day was captured via the Operational Planning Timeline Integration System (OPTimIS) database and characterized according to the standardized ontology. This process enabled correlation and statistical analysis of the ISS data according to common mission parameters such as crew size, ECLSS system design, vehicle traffic operations, and logistics delivery operations. The results of the statistical analysis are a set of crew time distributions for each activity category. These distributions are then utilized within the ECTM to examine crew time allocations based on mission parameter inputs, which serve to characterize the Gateway mission configurations. Results for predicted crew time allocations for representative short duration Gateway missions are presented. These results can be used to evaluate crew schedule availability for science and utilization activities. Variations in expected mission architectures and mission operations are accounted for to correct crew time predictions. The analysis is being leveraged to plan utilization capability objectives that are achievable on the Gateway missions, as well as inform the viability of various mission architecture options.

Stromgren, Chel↗

Panel to review EOSDIS plans

Formed in Jan. 1992, the Panel to Review EOSDIS Plans was charged with advising NASA on its plans for developing the Earth Observing System (EOS) Data and Information System (EOSDIS). Specifically, the panel was asked to do the following: assess the validity of the engineering and technical underpinnings of the EOSDIS; assess its potential value to scientific users; suggest how technical risk can be minimized; and assess whether current plans are sufficiently resilient to be adaptable to changing technology and requirements such as budget environments, data volumes, new users, and new databases. The panel completed an interim report (Addendum A) and transmitted it to NASA and other interested parties in the government on 9 Apr. 1992. Because of a delay in NASA's plans to select the contractor for EOSDIS, the panel was not able to complete its review of the program according to the original government request. With the issuance of a letter report (Addendum B) on 28 Sep. 1992, the panel became inactive until such time as NASA could release the details of the contractor's proposed architecture, schedule, and costs for developing EOSDIS. In early 1993, NASA awarded the contract for the EOSDIS Core System (ECS). On 20 Apr. 1993, NASA asked the panel to reconvene to do the following: ( 1) complete its review of NASA's approach to the EOSDIS architecture and implementation; (2) appraise NASA's responses to the panel's previous recommendations; and (3) review the planning for EOSDIS in the context of NASA's role in the Global Change Data and Information System (GCDIS) implementation plan. To respond to the NASA charge, the panel met three times in 1993 including sessions with NASA officials and the EOSDIS contractor. In addition, several of the panel members visited individual Distributed Active Archive Centers (DAAC's) to obtain additional views of EOSDIS. The panel has now obtained substantial information on the EOSDIS budget, contractor work program, and current baseline architecture that was not previously available, due to procurement restrictions. This report presents the panel's findings and recommendations based on this additional information.

Source record↗