Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “design process”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System

On January 27, 2010 the City of North Little Rock, Arkansas received notification of the awarding of a Department of Energy (DOE) grant totaling $450,000 in funding from the American Recovery and Reinvestment Act (ARRA) under the Project Title: Recovery Act: Hydroelectric Facility Improvement Project – Automated Intake Clearing Equipment and Materials Management. The purpose of the grant was for improvements to be made at the City’s hydroelectric generating facility located on the Arkansas River. Improvements were to be made through the installation of an intake maintenance device (IMD) and the purchase of a large capacity wood grinder. The wood grinder was purchased in order to receive the tree limbs, tree trunks, and other organic debris that collects at the intake of the plant during high flow. The wood grinder eliminates the periodic burning of the waste material that is cleared from the intake and reduces any additional air pollution to the area. The resulting organic mulch has been made available to the public at no charge. Design discussion and planning began immediately and the wood grinder was purchased in July of 2010 and immediately put to work mulching debris that was gathered regularly from the intake of the facility. The mulch is currently available to the public for free. A large majority of the design process was spent in discussion with the Corps of Engineers to obtain approval for drawings, documents, and permits that were required in order to make changes to the structure of the powerhouse. In April of 2011, the City’s Project Engineer, who had overseen the application, resigned and left the City’s employ. A new Systems Mechanical Engineer was hired and tasked with overseeing the project. The transfer of responsibility led to a re-examination of the original assumptions and research upon which the grant proposal was based. At that point, the project went under review and a trip was booked for July 2011 to visit facilities that currently had an IMD installed. This further study of facilities revealed that the implementation of the project as originally described, while proving the benefits described in the original grant application, would likely intensify sand intake. Increased sand intake would lead to an increase in required shutdowns for maintenance and more rapid depreciation of key equipment which would result in a loss of generation capacity. A better solution to the problem, one that continued to meet the criteria for the original grant and ARRA standards, was developed. A supporting day trip was planned to visit other facilities located on the Arkansas River to determine how they were coping with the same strong amounts of sand, silt, and debris. Upon returning from the trip to other Arkansas River facilities it was extremely clear what direction to go in order to most efficiently address the issue of generator capacity and efficiency. Of the plants visited on the Arkansas River, every one of them was running what is called a rope packing shaft sealing system as opposed to mechanical shaft seals, which the facility was running. Rope packing is a time proven sealing method that has been around for centuries. It has proved to perform very well in dirty water situations just like that of the Arkansas River. In April of 2012 a scope change proposal was submitted to the DOE for approval. In August of 2012 the City received word that the change of scope had been approved. Plans were immediately set in motion to begin the conversion from mechanical seals to a packing box at the facility. Contractors arrived on October 1st, 2012 and the project team began unwatering the unit for disassembly. The seal conversion was completed on February 29th, 2013 with start-up of the unit. Further testing and adjusting was done throughout the first two weeks of March.

13 HYDRO ENERGY↗

Low Cost Sorbent for Capturing CO 2 Emissions Generated by Existing Coal-fired Power Plants

TDA Research, Inc. has developed a novel sorbent based post-combustion CO 2 removal technology. This low cost sorbent can be regenerated with low-pressure (ca. 1 atm) superheated steam without temperature swing or pressure-swing. The isothermal and isobaric operation is a unique and advantageous feature of this process. The objective of this project was to demonstrate the technical and economic merit of this sorbent based CO 2 capture approach. Through laboratory, bench-scale and field testing we demonstrated that this technology can effectively and efficiently capture CO 2 produced at an existing pulverized coal power plants. TDA Research, Inc is developing both the solid sorbent and the process designed around that material. This project addresses the DOE Program Goal to develop a capture technology that can be added to an existing or new coal fired power plant, and can capture 90% of the CO 2 produced with the lowest possible increase in the cost of energy. .

20 FOSSIL-FUELED POWER PLANTS↗

Bench-Scale Development of a Hot Carbonate Absorption Process with Crystallization-Enabled High Pressure Stripping for Post-Combustion CO 2 Capture

This report summarizes the methodology and preliminary results of a techno-economic analysis on a hot carbonate absorption process (Hot-CAP) with crystallization-enabled high pressure stripping for post-combustion CO 2 capture (PCC). This analysis was based on the Hot-CAP that is fully integrated with a sub-critical steam cycle, pulverized coal-fired power plant adopted in Case 10 of the DOE/NETL’s Cost and Performance Baseline for Fossil Energy Plants. The techno-economic analysis addressed several important aspects of the Hot-CAP for PCC application, including process design and simulation, equipment sizing, technical risk and mitigation strategy, performance evaluation, and cost analysis. Results show that the net power produced in the subcritical power plant equipped with Hot-CAP is 611 MWe, greater than that with Econoamine (550 MWe). The total capital cost for the Hot-CAP, including CO 2 compression, is $\$ $399 million, less than that for the Econoamine PCC ($\$ $493 million). O&M costs for the power plant with Hot-CAP is $\$ $175 million annually, less than that with Econoamine ($\$ $178 million). The 20-year levelized cost of electricity (LCOE) for the power plant with Hot-CAP, including CO 2 transportation and storage, is 119.4 mills/kWh, a 59% increase over that for the plant without CO 2 capture. The LCOE increase caused by CO 2 capture for the Hot-CAP is 31% lower than that for its Econoamine counterpart.

20 FOSSIL-FUELED POWER PLANTS↗

Centrifugal Contactor Operations for UREX Process Flowsheet

The UREX process separates uranium, technetium, and a fraction of the iodine from the other components of the irradiated fuel in nitric acid solution. The time and equipment requirements were evaluated for treatment of 260-L batches of a solution containing 130 g-U/L using commercial annular centrifugal contactors from CINC Industries. An earlier evaluation was done assuming 150 L of feed solution per batch. Two different contactor versions from CINC were evaluated, the V-2 and V-5 units. The V-2 has a 2-in. (5-cm) rotor with a reported maximum total organic-plus-aqueous throughput of 1.9 L/min. We evaluated this version for a throughput of 1 L/min. The V-5 has a 5-in. (~12.5-cm) rotor with a reported maximum throughput of 19 L/min. We evaluated this unit for throughputs of 10 and 15 L/min. The lower-than-maximum throughputs selected for this evaluation are based on the Argonne National Laboratory (Argonne) ROTOR model, which calculates the operational envelope for a given process O:A (organic-flow-rate/aqueous-flow rate) ratio based on contactor parameters (weir dimensions, rotor diameter, etc.), the physical properties of the two immiscible fluids, and the allowable other-phase-carryover. Because the UREX process designed for this application has O:A ratios ranging from 0.8 to 5.6, adjustments to the weirs in different sections of the contactor bank can broaden the operational envelope for satisfactory separations, but throughput will remain short of the equipment maximum due to the physical characteristics of the two phases.

Pereira, Candido↗

Centrifugal Contactor Operations for UREX Process Flowsheet

The uranium extraction (UREX) process separates uranium and technetium from the other components of the fuel in nitric acid solution. The time and equipment requirements were evaluated for treatment of 260-L batches of a solution containing 130 gU/L using commercial annular centrifugal contactors from CINC Industries. An earlier evaluation was done assuming 150 L of feed solution per batch. Two different contactor versions from CINC were evaluated, the V-2 and V-5 units. The V-2 has a 2-in. (5-cm) rotor with a reported maximum through of 1.9 L/min. We evaluated this version for a throughput of 1 L/min. The V-5 has a 5-in. (~12.5-cm) rotor with a reported maximum throughput of 19 L/min. We evaluated this unit for throughputs of 10 and 15 L/min. The lower-than-maximum throughputs selected for this evaluation are based on Argonne National Laboratory’s (Argonne’s) ROTOR model, which calculates the operational envelope for a given process O:A ratio based on contactor parameters (weir dimensions, rotor diameter, etc.), the physical properties of the two fluids, and the allowable phase carryover. Because the UREX process designed for this application has O:A ratios ranging from 0.8 to 5.6, adjustments to the weirs in different sections of the contactor bank can broaden the operational envelope for satisfactory separations but throughput will remain short of the equipment maximum.

Pereira, Candido↗

Trial Demonstration of Area Lighting Retrofit: Yuma Border Patrol, Yuma Arizona

The Yuma Sector Border Patrol Area is a high flux lighting application in a high temperature environment, presenting a formidable challenge for light-emitting diodes (LEDs). This retrofit is an Energy Savings Performance Contract ENABLE project under the U.S. Department of Energy (DOE) Federal Energy Management Program. If high flux LED technology performs well in a region with high ambient temperature and solar radiation, it can perform well in most outdoor environments. The design process for the Yuma retrofit has already provided valuable knowledge to CBP and DOE. The LED lighting system selected for the retrofit is expected to reduce energy consumption 69% compared to the incumbent quartz metal halide (QMH) lighting system. If the LED lighting system is installed, GATEWAY will continue to document and disseminate information regarding the installation and long-term performance so that others may also gain valuable knowledge from the Yuma Sector Border Patrol Area lighting retrofit.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Tandem Microwire Solar Cells for Flexible High Efficiency Low Cost Photovoltaics

This project has developed components of a waferless, flexible, low-cost tandem multijunction III-V/Si microwire array solar cell technology which combines the efficiency of wafered III-V photovoltaic technologies with the process designed to meet the Sunshot object. The project focused on design of lattice-matched GaAsP/SiGe two junction cell design and lattice-mismatched GaInP/Si tandem cell design. Combined electromagnetic simulation/device physics models using realistic microwire tandem structures were developed that predict >22% conversion efficiency for known material parameters, such as tunnel junction structure, window layer structure, absorber lifetimes and optical absorption and these model indicate a clear path to 30% efficiency for high quality III-V heterostructures. SiGe microwire arrays were synthesized via Cu-catalyzed vapor-liquid-solid (VLS) growth with inexpensive chlorosilane and chlorogermance precursors in an atmospheric pressure reactor. SiGe alloy composition in microwires was found to be limited to a maximum of 12% Ge incorporation during chlorogermane growth, due to the melting of the alloy near the solidus composition. Lattice mismatched InGaP double heterostructures were grown by selective epitaxy with a thermal oxide mask on Si microwire substrates using metallorganic vapor phase epitaxy. Transmission electron microscopy (TEM) analysis confirms the growth of individual step graded layers and a high density of defects near the wire/III-V interface. Selective epitaxy was initiated with a low temperature nucleation scheme under “atomic layer epitaxy” or “flow mediated epitaxy” conditions whereby the Ga and P containing precursors are alternately introduced into the reactor to promote layer-bylayer growth. In parallel to our efforts on conformal GaInP heteroepitaxy on selectively masked Si microwires, we explored direct, axial growth of GaAs on Si wire arrays as another route to a tandem junction architecture. We proposed axial, lattice-mismatched growth of a GaAs segment that extrude out of a Si wire via a self-aligned SiO 2 hollow cylindrical mask. With this growth strategy, misfit dislocations that would normally form at the GaAs/Si interface during thin film epitaxy may bend over to and thus terminate at the sidewall of the SiO 2 tube. A reactive-ion etching technique was employed 1) to remove Si to form a hollow, self-aligned SiO 2 cylindrical tube as a growth template for GaAs epitaxy using a vertical, showerhead, low-pressure metal-organic chemical-vapor deposition reactor that was operated at 0.1 atm. Successful epitaxy of axial GaAs wires on non-polar, <111>-oriented Si wire substrates was found at temperatures of ~850C. This and the other III-V/Si heterojunction wire synthesis strategies described here are promising approaches to realize future III-V/Si tandem solar cell designs.

14 SOLAR ENERGY↗

Advanced thermal barrier coatings for operation in high hydrogen content fueled gas turbines

The Center for Thermal Spray Research (CTSR) at Stony Brook University in partnership with its industrial Consortium for Thermal Spray Technology is investigating science and technology related to advanced metallic alloy bond coats and ceramic thermal barrier coatings for applications in the hot section of gasified coal-based high hydrogen turbine power systems. In conjunction with our OEM partners (GE and Siemens) and through strategic partnership with Oak Ridge National Laboratory (ORNL) (materials degradation group and high temperature materials laboratory), a systems approach, considering all components of the TBC (multilayer ceramic top coat, metallic bond coat & superalloy substrate) is being taken during multi-layered coating design, process development and subsequent environmental testing. Recent advances in process science and advanced in situ thermal spray coating property measurement enabled within CTSR has been incorporated for full-field enhancement of coating and process reliability. The development of bond coat processing during this program explored various aspects of processing and microstructure and linked them to performance. The determination of the bond coat material was carried out during the initial stages of the program. Based on tests conducted both at Stony Brook University as well as those carried out at ORNL it was determined that the NiCoCrAlYHfSi (Amdry) bond coats had considerable benefits over NiCoCrAlY bond coats. Since the studies were also conducted at different cycling frequencies, thereby addressing an associated need for performance under different loading conditions, the Amdry bond coat was selected as the material of choice going forward in the program. With initial investigations focused on the fabrication of HVOF bond coats and the performance of TBC under furnace cycle tests , several processing strategies were developed. Two-layered HVOF bond coats were developed to render optimal balance of density and surface roughness and resulted in improved TBC lifetimes. Processing based approaches of identifying optimal processing regimes deploying advanced in-situ coating property measurements and in-flight diagnostic tools were used to develop process maps for bond coats. Having established a framework for the bond coat processing using the HVOF process, effort were channeled towards fabrication of APS and VPS bond coats with the same material composition. Comparative evaluation of the three deposition processes with regard to their microstrcuture , surface profiles and TBC performance were carried out and provided valuable insights into factors that require concurrent consideration for the development of bond coats for advanced TBC systems. Over the course of this program several advancements were made on the development of durable thermal barrier coatings. Process optimization techniques were utilized to identify processing regimes for both conventional YSZ as well as other TBC compositions such as Gadolinium Zirconate and other Co-doped materials. Measurement of critical properties for these formed the initial stages of the program to identify potential challenges in their implementation as part of a TBC system. High temperature thermal conductivity measurements as well as sintering behavior of both YSZ and GDZ coatings were evaluated as part of initial efforts to undersand the influence of processing on coating properties. By effectively linking fundamental coating properties of fracture toughness and elastic modulus to the cyclic performance of coatings, a durability strategy for APS YSZ coatings was developed. In order to meet the goals of fabricating a multimaterial TBC system further research was carried out on the development of a gradient thermal conductivity model and the evaluation of sintering behavior of multimaterial coatings. Layer optimization for desired properties in the multimaterial TBC was achieved by an iterative feedback approach utilizing process maps and in-situ and ex-situ coating property sensors. Addressing the challenges pertaining to the integration of the two materials YSZ and GDZ led to one of most the critical outcomes of this program, the development of durable multimaterial, multifunctional TBC systems.

36 MATERIALS SCIENCE↗

Hydrogen Selective Exfoliated Zeolite Membranes

The objective of this project was to develop and evaluate an innovative membrane technology at process conditions that would be representative of Integrated Gasification Combined Cycle (IGCC) advanced power generation with pre-combustion capture of carbon dioxide (CO 2 ). This research focused on hydrogen (H 2 )-selective zeolite membranes that could be utilized to separate conditioned syngas into H 2 -rich and CO 2 -rich components. Both experiments and process design and optimization calculations were performed to evaluate the concept of ultra-thin membranes made from zeolites nanosheets. In this work, efforts in the laboratory were made to tackle two fundamental challenges in application of zeolite membranes in harsh industrial environments, namely, membrane thickness and membrane stability. Conventional zeolite membranes have thicknesses in the micron range, limiting their performance. In this research, we developed a method for fabrication of ultimately thin zeolite membranes based on zeolite nanosheets. A range of layered zeolites (MWW, RWR, NSI structure types) suitable for hydrogen separation was successfully exfoliated to their constituent nanosheets. Further, membranes were made from one of these zeolites, MWW, to demonstrate the potential of this group of materials. Moreover, long-term steam stability of these zeolites (up to 6 months) was investigated in high concentrations of steam (35 mol% and 95 mole%), high pressure (10 barg), and high temperatures (350 °C and 600 °C) relevant to conditions of water-gas-shift and steam methane reforming reactions. It was found that certain nanosheets are stable, and that stability depends on the concentration of structural defects. Additionally, models that represent a water-gas-shift (WGS) membrane reactor equipped with the zeolite membrane were developed for systems studies. These studies had the aim of analyzing the effect of the membrane reactor integration into IGCC plants in terms of performance and economic aspects of the plants. Specifically, simulation and design optimization studies were performed using the developed stand-alone membrane reactor models to identify the membrane selectivity and permeance characteristics necessary to achieve desired targets of CO 2 capture and H 2 recovery, as well as guide the selection of the optimal reactor design that minimizes the membrane cost as a function of its surface area required. The isothermal membrane reactor model was also integrated into IGCC system models using both the MATLAB and Aspen software platforms and techno-economic analyses of the integrated plants have been carried out to evaluate the feasibility of replacing current technologies for pre-combustion capture by the proposed novel approach in terms of satisfying stream constraints and achieving the DOE target goal of 90% CO 2 capture. The results of the performed analyses based on present value of annuity calculations showed break even costs for the membrane reactor within the feasible range for membrane fabrication. However, the predicted membrane performance used in these simulations exceeded the performance achieved experimentally. Therefore, further work is required to improve membrane performance.

01 COAL, LIGNITE, AND PEAT↗

Metabolic Engineering and Modeling of Metabolic Pathways to Improve Hydrogen Production by Photosynthetic Bacteria

Rising energy demands and the imperative to reduce carbon dioxide (CO 2 ) emissions are driving research on biofuels development. Hydrogen gas (H 2 ) is one of the most promising biofuels and is seen as a future energy carrier by virtue of the fact that 1) it is renewable, 2) does not evolve the “greenhouse gas” CO 2 in combustion, 3) liberates large amounts of energy per unit weight in combustion (having about 3 times the energy content of gasoline), and 4) is easily converted to electricity by fuel cells. Among the various bioenergy strategies, environmental groups and others say that the concept of the direct manufacture of alternative fuels, such as H 2 , by photosynthetic organisms is the only biofuel alternative without significant negative criticism [1]. Biological H 2 production by photosynthetic microorganisms requires the use of a simple solar reactor such as a transparent closed box, with low energy requirements, and is considered as an attractive system to develop as a biocatalyst for H 2 production [2]. Various purple bacteria including Rhodopseudomonas palustris, can utilize organic substrates as electron donors to produce H 2 at the expense of solar energy. Because of the elimination of energy cost used for H 2 O oxidation and the prevention of the production of O 2 that inhibits the H 2 -producing enzymes, the efficiency of light energy conversion to H 2 by anoxygenic photosynthetic bacteria is in principle much higher than that by green algae or cyanobacteria, and is regarded as one of the most promising cultures for biological H 2 production [3]. Here implemented a simple and relatively straightforward strategy for hydrogen production by photosynthetic microorganisms using sunlight, sulfur- or iron-based inorganic substrates, and CO 2 as the feedstock. Carefully selected microorganisms with bioengineered beneficial traits act as the biocatalysts of the process designed to both enhance the system efficiency of CO 2 fixation and the net hydrogen production rate. Additionally we applied metabolic engineering approaches guided by computational modeling for the chosen model microorganisms to enable efficient hydrogen production.

59 BASIC BIOLOGICAL SCIENCES↗

Upgrade to Ion Exchange Modeling for Removal of Technetium from Hanford Waste Using SuperLig ® 639 Resin

This report documents the development and application of computer models to describe the sorption of pertechnetate [TcO 4 - ], and its surrogate perrhenate [ReO 4 - ], on SuperLig ® 639 resin. Two models have been developed: 1) A thermodynamic isotherm model, based on experimental data, that predicts [TcO 4 - ] and [ReO 4 - ] sorption as a function of solution composition and temperature and 2) A column model that uses the isotherm calculated by the first model to simulate the performance of a full-scale sorption process. The isotherm model provides a synthesis of experimental data collected from many different sources to give a best estimate prediction of the behavior of the pertechnetate-SuperLig ® 639 system and an estimate of the uncertainty in this prediction. The column model provides a prediction of the expected performance of the plant process by determining the volume of waste solution that can be processed based on process design parameters such as column size, flow rate and resin physical properties.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Upgrade to Ion Exchange Modeling for Removal of Technetium from Hanford Waste Using SuperLig ® 639 Resin

This report documents the development and application of computer models to describe the sorption of pertechnetate [TcO 4 ⁻], and its surrogate perrhenate [ReO 4 ⁻], on SuperLig ® 639 resin. Two models have been developed: 1) A thermodynamic isotherm model, based on experimental data, that predicts [TcO 4 ⁻] and [ReO 4 ⁻] sorption as a function of solution composition and temperature and 2) A column model that uses the isotherm calculated by the first model to simulate the performance of a full-scale sorption process. The isotherm model provides a synthesis of experimental data collected from many different sources to give a best estimate prediction of the behavior of the pertechnetate-SuperLig ® 639 system and an estimate of the uncertainty in this prediction. The column model provides a prediction of the expected performance of the plant process by determining the volume of waste solution that can be processed based on process design parameters such as column size, flow rate and resin physical properties.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Upgrade to Ion Exchange Modeling for Removal of Technetium from Hanford Waste Using SuperLig ® 639 Resin

This report documents the development and application of computer models to describe the sorption of pertechnetate [TcO 4 ⁻], and its surrogate perrhenate [ReO 4 ⁻], on SuperLig ® 639 resin. Two models have been developed: 1) A thermodynamic isotherm model, based on experimental data, that predicts [TcO 4 ⁻] and [ReO 4 ⁻] sorption as a function of solution composition and temperature and 2) A column model that uses the isotherm calculated by the first model to simulate the performance of a full-scale sorption process. The isotherm model provides a synthesis of experimental data collected from many different sources to give a best estimate prediction of the behavior of the pertechnetate-SuperLig ® 639 system and an estimate of the uncertainty in this prediction. The column model provides a prediction of the expected performance of the plant process by determining the volume of waste solution that can be processed based on process design parameters such as column size, flow rate and resin physical properties.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Gearbox Reliability Collaborative Phase 3 Gearbox 2 Test Report

Many gearboxes in wind turbines have not been achieving their expected design life [1]; they do, however, commonly meet or exceed the design criteria specified in current standards in the gear, bearing, and wind turbine industry as well as third-party certification criteria. The cost of gearbox replacements and rebuilds, as well as the downtime associated with these failures, has elevated the cost of wind energy. In 2006, the U.S. Department of Energy established the National Renewable Energy Laboratory (NREL) Gearbox Reliability Collaborative (GRC). Its key goal is to understand the root causes of premature gearbox failures and improve their reliability [2]. The GRC is examining a hypothesis that the gap between design-estimated and actual wind turbine gearbox reliability is caused by underestimation of loads, inaccurate design tools, the absence of critical elements in the design process, or insufficient testing. This test report describes the recent tests of GRC gearbox (GB) 2 in the National Wind Technology Center (NWTC) dynamometer and documents any modifications to the original test plan [3]. In this manner, it serves as a guide for interpreting the publicly released data sets with brief analyses to illustrate the data. Specific objectives of the test were to assess the effect of dynamic nontorque load (NTL) on the planetary section, generator misalignment on the highspeed shaft (HSS), and field representative conditions on the gearbox in general. Detailed analysis of those test objectives will be presented in subsequent publications.

17 WIND ENERGY↗

Strategy Guideline: Accurate Heating and Cooling Load Calculations

This guide presents the key criteria required to create accurate heating and cooling load calculations and offers examples of the implications when inaccurate adjustments are applied to the HVAC design process. The guide shows, through realistic examples, how various defaults and arbitrary safety factors can lead to significant increases in the load estimate. Emphasis is placed on the risks incurred from inaccurate adjustments or ignoring critical inputs of the load calculation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Calibration and Forward Uncertainty Propagation for Large-eddy Simulations of Engineering Flows

The objective of this work is to investigate the efficacy of using calibration strategies from Uncertainty Quantification (UQ) to determine model coefficients for LES. As the target methods are for engineering LES, uncertainty from numerical aspects of the model must also be quantified. 15 The ultimate goal of this research thread is to generate a cost versus accuracy curve for LES such that the cost could be minimized given an accuracy prescribed by an engineering need. Realization of this goal would enable LES to serve as a predictive simulation tool within the engineering design process.

42 ENGINEERING↗

Advanced Simulation and Computing Co-Design Strategy

This ASC Co-design Strategy lays out the full continuum and components of the co-design process, based on what we have experienced thus far and what we wish to do more in the future to meet the program’s mission of providing high performance computing (HPC) and simulation capabilities for NNSA to carry out its stockpile stewardship responsibility.

97 MATHEMATICS AND COMPUTING↗

Low Cost, High Capacity Regenerable Sorbent for Carbon Dioxide Capture from Existing Coal-fired Power Plants

In this project TDA Research, Inc (TDA) has developed a new post combustion carbon capture technology based on a vacuum swing adsorption system that uses a steam purge and demonstrated its technical feasibility and economic viability in laboratory-scale tests and tests in actual coal derived flue gas. TDA uses an advanced physical adsorbent to selectively remove CO 2 from the flue gas. The sorbent exhibits a much higher affinity for CO 2 than N 2 , H 2 O or O 2 , enabling effective CO 2 separation from the flue gas. We also carried out a detailed process design and analysis of the new system as part of both sub-critical and super-critical pulverized coal fired power plants. The new technology uses a low cost, high capacity adsorbent that selectively removes CO 2 in the presence of moisture at the flue gas temperature without a need for significant cooling of the flue gas or moisture removal. The sorbent is based on a TDA proprietary mesoporous carbon that consists of surface functionalized groups that remove CO 2 via physical adsorption. The high surface area and favorable porosity of the sorbent also provides a unique platform to introduce additional functionality, such as active groups to remove trace metals (e.g., Hg, As). In collaboration with the Advanced Power and Energy Program of the University of California, Irvine (UCI), TDA developed system simulation models using Aspen PlusTM simulation software to assess the economic viability of TDA’s VSA-based post-combustion carbon capture technology. The levelized cost of electricity including the TS&M costs for CO 2 is calculated as $116.71/MWh and $113.76/MWh for TDA system integrated with sub-critical and super-critical pulverized coal fired power plants; much lower than the $153.03/MWhand $147.44/MWh calculated for the corresponding amine based systems. The cost of CO 2 captured for TDA’s VSA based system is $38.90 and $39.71 per tonne compared to $65.46 and $66.56 per tonne for amine based system on 2011 $ basis, providing 40% lower cost of CO 2 captured. In this analysis we have used a sorbent life of 4 years. If a longer sorbent life can be maintained (which is not unreasonable for fixed bed commercial PSA systems), this would lower the cost of CO 2 captured by $0.05 per tonne (e.g., to $38.85 and $39.66 per tonne at 5 years sorbent replacement). These system analysis results suggest that TDA’s VSA-based post-combustion capture technology can substantially improve the power plant’s thermal performance while achieving near zero emissions, including greater than 90% carbon capture. The higher net plant efficiency and lower capital and operating costs results in a substantial reduction in the cost of carbon capture and cost of electricity for the power plant equipped with TDA’s technology.

20 FOSSIL-FUELED POWER PLANTS↗