Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “correctness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

Integrated reference cavity with dual-mode optical thermometry for frequency correction

Photonic integrated resonators have advantages over traditional benchtop cavities in terms of size, weight, and cost with the potential to enable applications that require spectrally pure light. However, integrated resonators suffer from temperature-dependent frequency variations and are sensitive to external environmental perturbations, which hinders their usage in precision frequency applications. One solution is to use interrogation of the cavity temperature through dual-mode optical thermometry (DMOT) by measuring the shift of the resonance frequency difference between two polarization or optical frequency modes. Yet this approach has only been demonstrated in bulk-optic whispering gallery mode and fiber resonators. In this paper, we implement dual-mode optical thermometry in an ultra-high Q integrated silicon nitride resonator. A dual-mode resonance frequency difference temperature sensitivity of 188 ± <#comment/> 15 M H z / K is measured. We demonstrate feedforward DMOT frequency correction that, under an applied external temperature ramp, is able to reduce the optical frequency change to 0.31 kHz/s as compared to an uncorrected 10.03 kHz/s, a factor of 30 × <#comment/> reduction. These results show promise for on-chip frequency correction solutions for quantum, metrology, atomic, and coherent optical communications applications.

Zhao, Qiancheng (ORCID:0000000206968667)↗

A Procedure to Correct the Historical Atmospheric Longwave Irradiance Data When the World Reference Is Established with Respect to the International System of Units

Historical atmospheric longwave irradiance data sets with traceability to the International System of Units (SI) are essential for renewable energy and atmospheric science research and applications. To date, all pyrgeometers used to measure the irradiance are traceable to the interim World Infrared Standard Group (WISG), not to SI units. In 2013, the Absolute Cavity Pyrgeometer (ACP) (Reda et al. 2012) was developed at the National Renewable Energy Laboratory (NREL) to measure the atmospheric longwave irradiance. The ACP has been compared against the InfraRed Integrating Sphere (IRIS), developed by the Physikalisch-Meteorologisches Observatorium Davos/World Radiation Center (PMOD/WRC) (Grobner 2012). The ACP and the IRIS are absolute instruments traceable to SI units through the International Temperature Scale of 1990. Results of six comparisons between the ACP and the IRIS at different locations have shown that the irradiance measured by WISG pyrgeometers underestimates clear-sky atmospheric longwave irradiance by 2 W/m 2 to 6 W/m 2 (Grobner et al. 2014); therefore, once the world reference is established with traceability to SI units, the WISG would be corrected, then used to calibrate field pyrgeometers with traceability to SI units. The following described method is used to correct the historical atmospheric longwave irradiance data sets in anticipation of the WISG scale change.

47 OTHER INSTRUMENTATION↗

Status of Error Correction Studies in Support of FFA@CEBAF

In pursuit of higher energy at the Continuous Electron Beam Accelerator Facility (CEBAF), the FFA@CEBAF energy upgrade study is considering the implementation of a novel technology to recirculate electron beam through the accelerating gradient of the machine more times. The technology in question is Fixed-Field Alternating-gradient (FFA) bending accelerator arcs: these arcs may replace the present highest energy electromagnetic (EM) arcs, and due to a much wider energy acceptance allow several more passes. The survey and beam error tolerance of the FFA arcs need to be well understood prior to commissioning, in addition to the limits of planned correction magnets and diagnostics. This work explores the current state of error tolerance and correction studies in FFA arcs at CEBAF.

Benesch, J.↗

Pulse compressor with aberration correction

In this SBIR project, Electron Optica, Inc. (EOI) is developing an electron mirror-based pulse compressor attachment to new and retrofitted dynamic transmission electron microscopes (DTEMs) and ultrafast electron diffraction (UED) cameras for improving the temporal resolution of these instruments from the characteristic range of a few picoseconds to a few nanoseconds and beyond, into the sub-100 femtosecond range. The improvement will enable electron microscopes and diffraction cameras to better resolve the dynamics of reactions in the areas of solid state physics, chemistry, and biology. EOI’s pulse compressor technology utilizes the combination of electron mirror optics and a magnetic beam separator to compress the electron pulse. The design exploits the symmetry inherent in reversing the electron trajectory in the mirror in order to compress the temporally broadened beam. This system also simultaneously corrects the chromatic and spherical aberration of the objective lens for improved spatial resolution. This correction will be found valuable as the source size is reduced with laser-triggered point source emitters. With such emitters, it might be possible to significantly reduce the illuminated area and carry out ultrafast diffraction experiments from small regions of the sample, e.g. from individual grains or nanoparticles. During phase I, EOI drafted a set of candidate pulse compressor architectures and evaluated the trade-offs between temporal resolution and electron bunch size to achieve the optimum design for two particular applications with market potential: increasing the temporal and spatial resolution of UEDs, and increasing the temporal and spatial resolution of DTEMs. Specialized software packages that have been developed by MEBS, Ltd. were used to calculate the electron optical properties of the key pulse compressor components: namely, the magnetic prism, the electron mirror, and the electron lenses. In the final step, these results were folded into a model describing the key electron-optical parameters of the complete pulse compressor. The simulations reveal that the mirror pulse compressor can reduce the temporal spread of UEDs and DTEMs to the sub-100 femtosecond level for practical electron bunch sizes. EOI’s pulse compressors can be designed and built to attach to different types of UEDs and DTEMs, thus making them suitable for enhancing the study of the structure, composition, and bonding states of new materials at ultrafast time scales to advance material science research in the field of nanotechnology as well as biomedical research.

47 OTHER INSTRUMENTATION↗

Underground Test Area (UGTA) Closure Report for Corrective Action Unit 98: Frenchman Flat Nevada National Security Site, Nevada, Revision 1 ROTC-1

This Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 98, Frenchman Flat, Nevada National Security Site (NNSS), Nevada. The Frenchman Flat CAU was the site of 10 underground nuclear tests, some of which have impacted groundwater near the tests. This work was performed as part of the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) Activity in accordance with the Federal Facility Agreement and Consent Order (FFACO). This CR describes the selected corrective action to be implemented during closure to protect human health and the environment from the impacted groundwater

54 ENVIRONMENTAL SCIENCES↗

Completion Report for Well ER-2-2 Corrective Action Unit 97: Yucca Flat/Climax Mine

Well ER-2-2 was drilled for the U.S. Department of Energy, Nevada National Security Administration Nevada Field Office in support of the Underground Test Area (UGTA) Activity. The well was drilled from January 17 to February 8, 2016, as part of the Corrective Action Investigation Plan (CAIP) for Corrective Action Unit 97: Yucca Flat/Climax Mine, Nevada Test Site, Nevada. The primary purpose of the well was to collect hydrogeologic data to evaluate uncertainty in the flow and transport conceptual model and its contamination boundary forecasts, and to detect radionuclides in groundwater from the CALABASH (U2av) underground test. Well ER-2-2 was not completed as planned due to borehole stability problems. As completed, the well includes a piezometer (p1) to 582 meters (m) (1,909 feet [ft]) below ground surface (bgs) installed in the Timber Mountain lower vitric-tuff aquifer (TMLVTA) and a 12.25-inch (in.) diameter open borehole to 836 m (2,743 ft) bgs in the Lower tuff confining unit (LTCU). A 13.375-in. diameter carbon-steel casing is installed from the surface to a depth of 607 m (1,990 ft) bgs. Data collected during borehole construction include composite drill cutting samples collected every 3.0 m (10 ft), geophysical logs to a depth of 672.4 m (2,206 ft) bgs, water-quality measurements (including tritium), water-level measurements, and slug test data. The well penetrated 384.05 m (1,260 ft) of Quaternary alluvium, 541.93 m (1,778 ft) of Tertiary Volcanics (Tv) rocks, and 127.71 m (419 ft) of Paleozoic carbonates. The stratigraphy and lithology were generally as expected. However, several of the stratigraphic units were significantly thicker then predicted—principally, the Tunnel formation (Tn), which had been predicted to be 30 m (100 ft) thick; the actual thickness of this unit was 268.22 m (880 ft). Fluid depths were measured in the borehole during drilling as follows: (1) in the piezometer (p1) at 552.15 m (1,811.53 ft) bgs and (2) in the main casing (m1) at 551.69 m (1,810.01 ft) bgs. As expected, field measurements for tritium were above the Safe Drinking Water Act limit (20,000 picocuries per liter). All Fluid Management Plan requirements were met.

54 ENVIRONMENTAL SCIENCES↗

Addendum to the Closure Report for Corrective Action Unit 411: Double Tracks Plutonium Dispersion (Nellis), Nevada Test and Training Range, Nevada, Revision 0

The Corrective Action Unit (CAU) 411 Closure Report (CR) was published in June 2016 (NNSA/NFO, 2016). The purpose of this addendum is to clarify language in the CR relating to the field instrument for the detection of low-energy radiation (FIDLER), provide the waste disposal documentation for waste generated during the corrective action investigation (CAI), and reference a letter from the U.S. Air Force (USAF) regarding the closure of CAU 411.

54 ENVIRONMENTAL SCIENCES↗

Tijeras Arroyo Groundwater Current Conceptual Model and Corrective Measures Evaluation Report - December 2016.

This Tijeras Arroyo Groundwater Current Conceptual Model and Corrective Measures Evaluation Report (CCM/CME Report) has been prepared by the U.S. Department of Energy (DOE) and Sandia Corporation (Sandia) to meet requirements under the Sandia National Laboratories-New Mexico (SNL/NM) Compliance Order on Consent (the Consent Order). The Consent Order, entered into by the New Mexico Environment Department (NMED), DOE, and Sandia, became effective on April 29, 2004. The Consent Order identified the Tijeras Arroyo Groundwater (TAG) Area of Concern (AOC) as an area of groundwater contamination requiring further characterization and corrective action. This report presents an updated Conceptual Site Model (CSM) of the TAG AOC that describes the contaminant release sites, the geological and hydrogeological setting, and the distribution and migration of contaminants in the subsurface. The dataset used for this report includes the analytical results from groundwater samples collected through December 2015.

54 ENVIRONMENTAL SCIENCES↗

Completion Report for Well ER-3-3 Corrective Action Unit 97: Yucca Flat/Climax Mine, Revision 0

Well ER-3-3 was drilled for the U.S. Department of Energy, Nevada National Security Administration Nevada Field Office in support of the Underground Test Area (UGTA) Activity. The well was drilled and completed from February 21 to March 15, 2016, as part of the Corrective Action Investigation Plan (CAIP) for Yucca Flat/Climax Mine Corrective Action Unit (CAU) 97. The primary purpose of the well was to collect hydrogeologic data to assist in validating concepts of the flow system within the Yucca Flat/Climax Mine CAU, and to test for potential radionuclides in groundwater from the WAGTAIL (U3an) underground test.

54 ENVIRONMENTAL SCIENCES↗

Completion Report for Well ER-2-2 Corrective Action Unit 97: Yucca Flat/Climax Mine, Revision 1

Well ER-2-2 was drilled for the U.S. Department of Energy, Nevada National Security Administration Nevada Field Office in support of the Underground Test Area (UGTA) Activity. The well was drilled from January 17 to February 8, 2016, as part of the Corrective Action Investigation Plan (CAIP) for Corrective Action Unit 97: Yucca Flat/Climax Mine, Nevada Test Site, Nevada. The primary purpose of the well was to collect hydrogeologic data to evaluate uncertainty in the flow and transport conceptual model and its contamination boundary forecasts, and to detect radionuclides in groundwater from the CALABASH (U2av) underground test. Well ER-2-2 was not completed as planned due to borehole stability problems. As completed, the well includes a piezometer (p1) to 582 meters (m) (1,909 feet [ft]) below ground surface (bgs) installed in the Timber Mountain lower vitric-tuff aquifer (TMLVTA) and a 12.25-inch (in.) diameter open borehole to 836 m (2,743 ft) bgs in the Lower tuff confining unit (LTCU). A 13.375-in. diameter carbon-steel casing is installed from the surface to a depth of 607 m (1,990 ft) bgs. Data collected during borehole construction include composite drill cutting samples collected every 3.0 m (10 ft), geophysical logs to a depth of 672.4 m (2,206 ft) bgs, water-quality measurements (including tritium), water-level measurements, and slug test data. The well penetrated 384.05 m (1,260 ft) of Quaternary alluvium, 541.93 m (1,778 ft) of Tertiary Volcanics (Tv) rocks, and 127.71 m (419 ft) of Paleozoic carbonates. The stratigraphy and lithology were generally as expected. However, several of the stratigraphic units were significantly thicker then predicted—principally, the Tunnel formation (Tn), which had been predicted to be 30 m (100 ft) thick; the actual thickness of this unit was 268.22 m (880 ft). Fluid depths were measured in the borehole during drilling as follows: (1) in the piezometer (p1) at 552.15 m (1,811.53 ft) bgs and (2) in the main casing (m1) at 551.69 m (1,810.01 ft) bgs. As expected, field measurements for tritium were above the Safe Drinking Water Act limit (20,000 picocuries per liter) for a portion of the Tertiary volcanic section near the water table. Tritium concentrations were at or near the field detection limit in the Lower carbonate aquifer (LCA) while drilling. During drilling, a sample was collected while circulating in the LCA. The sample was submitted for off-site laboratory analysis. The sample results indicated low but measurable tritium concentrations. All Fluid Management Plan requirements were met during drilling activities.

54 ENVIRONMENTAL SCIENCES↗

Completion Report for Well ER-4-1 Corrective Action Unit 97: Yucca Flat/Climax Mine, Revision 0

Well ER-4-1 was drilled for the U.S. Department of Energy, Nevada National Security Administration Nevada Field Office in support of the Underground Test Area (UGTA) Activity. The well was drilled and completed from March 23 to April 13, 2016, as part of the Corrective Action Investigation Plan (CAIP) for Yucca Flat/Climax Mine Corrective Action Unit (CAU) 97. The primary purpose of the well was to collect hydrogeologic data to assist in validating concepts of the groundwater flow system within the Yucca Flat/Climax Mine CAU, and to test for potential radionuclides in groundwater from the STRAIT (U4a) underground test. The completed well includes one piezometer (p1), to a depth of 663.16 meters (m) (2,175.71 feet [ft]) below ground surface (bgs) and open from the Alluvial aquifer (AA3) to the Oak Spring Butte confining unit (OSBCU) hydrostratigraphic units; and a main completion (m1), which includes 6.625-inch (in.) casing with slotted interval (m1) installed to 906.80 m (2,975.05 ft) bgs in the Lower carbonate aquifer (LCA). A 13.375-in. diameter surface casing was installed from the surface to a depth of 809.00 m (2,654.21 ft) bgs. Well ER-4-1 experienced a number of technical issues during drilling, including borehole instability and sloughing conditions. An intermediate, 10.75-in./9.625-in. casing string was installed to 856.94 m (2,811.48 ft) bgs to control these issues. Borehole stability and erosion problems appear to be associated with the Tunnel Formation (Tn) and the Older tunnel beds (Ton). Overall efforts to stabilize the borehole were successful. Data collected during borehole construction include composite drill cutting samples collected every 3.0 m (10 ft), a partial suite of geophysical logs to a maximum depth of 766.57 m (2,515 ft) bgs, water-quality measurements (including tritium), water-level measurements, and two depth-discrete bailer samples collected at 538.89 m and 646.18 m (1,768 ft and 2,120 ft) bgs respectively. The well penetrated 187.45 m (615 ft) of Quaternary/Tertiary alluvium (QTa), 671.47 m (2,203 ft) of Tertiary Volcanic rocks (Tv), and 66.20 m (217.19 ft) of Paleozoic rocks (|). The stratigraphy and lithology were generally as expected with some exceptions. The top of Paleozoic rocks (|) was predicted to occur at 822.35 m (2,698 ft) bgs and was intercepted at 858.93 m (2,818 ft), a difference of 36.58 m (120 ft). As expected, the Paleozoic rocks (|) are the principal water producing formation in Well ER-4-1. Depth to water was measured after drilling as follows: In the piezometers: p1 at 320.39 m (1,051.16 ft) bgs, (measured January 4, 2017); and in the main production casing interval: m1 at 539.17 m (1,768.92 ft) bgs, (measured December 12, 2016) Geophysical logs and depth-discrete bailer sample analytical results suggest likely zones of prompt injection (underground-test-related) fission products from 472.44 to 481.48 m (1,550 to 1,580 ft) bgs and at approximately 539.50 m (1,770 ft) bgs. Subsequent work at Well ER-4-1 will be included in future reports. Field measurements for tritium were mostly below the Safe Drinking Water Act limit (20,000 picocuries per liter) with the exception of two zones showing elevated tritium concentrations. The first zone is located at approximately 365.76 to 390.14 m (1,200 to 1,280 ft) bgs and a second zone at approximately 542.54 to 566.93 m (1,780 to 1,860 ft) bgs. All Fluid Management Plan requirements were met.

54 ENVIRONMENTAL SCIENCES↗

Corrections to the General (2,4) and (4,4) FDTD Schemes

The sampling weights associated with two general higher order FDTD schemes were derived by Smith, et al. and published in a IEEE Transactions on Antennas and Propagation article in 2012. Inconsistencies between governing equations and their resulting solutions were discovered within the article. In an effort to track down the root cause of these inconsistencies, the full three-dimensional, higher order FDTD dispersion relation was re-derived using Mathematica TM . During this process, two errors were identi ed in the article. Both errors are highlighted in this document. The corrected sampling weights are also provided. Finally, the original stability limits provided for both schemes are corrected, and presented in a more precise form. It is recommended any future implementations of the two general higher order schemes provided in the Smith, et al. 2012 article should instead use the sampling weights and stability conditions listed in this document.

97 MATHEMATICS AND COMPUTING↗

Revised Tijeras Arroyo Groundwater Current Conceptual Model and Corrective Measures Evaluation Report - February 2018.

The U.S. Department of Energy (DOE) and the management and operating (M&O) contractor for Sandia National Laboratories beginning on May 1, 2017, National Technology & Engineering Solutions of Sandia, LLC (NTESS), hereinafter collectively referred to as DOE/NTESS, prepared this Revised Tijeras Arroyo Groundwater Current Conceptual Model (CCM) and Corrective Measures Evaluation (CME) Report , referred to as the Revised CCM/CME Report, to meet requirements under the Sandia National Laboratories-New Mexico (SNL/NM) Compliance Order on Consent (Consent Order). The Consent Order became effective on April 29, 2004. The Consent Order identifies the Tijeras Arroyo Groundwater (TAG) Area of Concern (AOC) as an area of groundwater contamination requiring further characterization and corrective action. In November 2004, New Mexico Environment Department (NMED) approved the July 2004 CME Work Plan. In April 2005, DOE and the SNL M&O contractor at the time, Sandia Corporation (Sandia), hereinafter collectively referred to as DOE/Sandia, submitted a CME Report, but NMED did not finalize review of that document. In December 2016, DOE/Sandia submitted a combined and updated CCM/CME Report. NMED issued a disapproval letter in May 2017 that included comments on the December 2016 CCM/CME Report. In August 2017, NMED and DOE/NTESS staff held a meeting to discuss and clarify outstanding issues. This Revised CCM/CME Report addresses (1) the issues presented in the NMED May 2017 disapproval letter and (2) findings from the August 2017 meeting.

54 ENVIRONMENTAL SCIENCES↗

AFCI Glovebox Radiological Release - Evaluation, Corrective Actions and Testing

Scope of Report Releases of airborne radioactivity occurred in the Advanced Fuel Cycle Initiative (AFCI) glovebox enclosure (room) located in the Fuel Manufacturing Facility (FMF) at the Idaho National Laboratory (INL) in late August and early September, 2014. The subsequent investigation activities identified two primary issues: 1) The AFCI glovebox confinement was compromised providing a pathway for airborne radiological contamination releases, particularly when arc melting activities with transuranics were performed. 2) The Continuous Air Monitors (CAMs) located in the AFCI enclosure did not correctly identify americium (Am)-241 (predominant isotope in release) and provided nonconservative responses. This report documents the results of the investigations into both issues and the corrective actions taken. Finally, lessons learned are provided.

99 GENERAL AND MISCELLANEOUS↗

Doppler Broadening Resonance Correction for Free-gas Scattering in MCNP6.2

The traditional treatment for epithermal neutron scattering in continuous-energy Monte Carlo codes is the free-gas scattering model with the scattering cross-section assumed constant in energy. Ouislomen and Sanchez demonstrated in 1991 that scattering resonances can cause significant departures from the free-gas model, and Becker proposed a correction to the Monte Carlo free-gas scattering model in 2009. Becker’s Doppler Broadening Resonance Correction was tested in mcnp5 in 2011 and recently implemented in mcnp6.2 .

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Investigation of Computational Corrections to X-Ray Computed Tomography for Dimensional Metrology of Complex Additively Manufactured Parts

X-ray computed tomography (CT) is a nondestructive evaluation technique that may be used to image complex internal features without the line-of-sight restrictions inherent in conventional optical and contact (stylus) metrology instrumentation. Applications of CT metrology include material defects (porosity), dimensions and surface texture. However, scan artifacts, such as streaking, caused primarily by beam hardening and scatter, limit the accuracy of CTbased metrology. Reduction of these artifacts would improve the accuracy material properties and dimensional metrology information. This paper reports on the development of additively manufactured (AM) Ti5553 and 316L measurement phantoms with integral lattice (lattice) structures specifically designed to exhibit these artifacts. The phantoms were scanned in three CT systems and a scanning-probe CMM measurement. Surfaces generated from uncorrected CT data exhibited “dimple” defects that are not present in the CMM measurement. Correction methods were developed in Livermore Tomography Tools (LTT) software and this paper reports on the successful correction of these artifacts. This work is expected to have application in areas where characterization of defects, dimensions and surface texture using CT are critical.

42 ENGINEERING↗

Investigation of Automated Corrective Actions for Special Protection Schemes

The constantly evolving nature of the grid is compelling the design process of Remedial Action Schemes (RAS) to keep up with the changes. This document proposes a flexible and computationally efficient approach to automatically determine RAS corrective actions that alleviate line overloading violations. Statistical and functional characteristics summarized from RAS implemented in real power systems are used to guide the design parameters. This report also leverages sensitivity-based techniques to determine corrective actions for specific contingencies quickly without repeated numerical simulations. Finally, future directions for implementing this approach for a fully automated, online RAS are discussed.

24 POWER TRANSMISSION AND DISTRIBUTION↗