Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “compliance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

Evaluation of Apex Alpha with LabWare-LIMS Data Reduction for Alpha Analyses

Savannah River Site's Environmental Bioassay Laboratory is migrating its laboratory information management system (LIMS) from SQL-LIMS to Oracle Labware-LIMS (LW-LIMS) systems to align with the Department of Energy's cyber security policies. Concurrently with the LIMS upgrade, the current VMS based Alpha Measurement System (AMS) software is being replaced with Apex Alpha software to reduce other cyber vulnerabilities, streamline procedural production aspects of data handling, and improve outdated reduction processes to align the program with requirements outlined in ANSI N13.30. The primary technical changes which are being implemented are: - Reagent contributions are added in data reduction, - Moving average background equivalent activity are used for gross signal corrections, - Measured uncertainty of both are included in the decision level and propagated uncertainty, - Tracer levels are increased for precision and accuracy improvements, and - Reports are modified for compliance.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

SoK: A Framework for and Analysis of Software Bill of Materials Tools

Modern software development has gradually become more complex, leveraging available open-source software and third party components. This practice has raised questions about the provenance, licensing, versioning and compliance of reused code and its dependencies. Furthermore, it is par ticularly important to review such code fragments and third party components for known-vulnerabilities before they are included in a software product. A Software Bill of Materials (SBoM) is a mechanism to achieve such an analysis, provid ing transparency and visibility into a software product to both the software developer and its respective consumer. An SBoM lists information and details about all the elements constituting a piece of software and can, therefore, be used to evaluate associated security risk. While the concept of SBoMs is growing in popularity, it is still fairly new to many organizations, causing them to potentially struggle with pro ducing and processing SBoMs and limiting their widespread adoption. In this work, we delve into the area of SBoMs and present the state-of-the-art SBoM tools, creating a framework for analysis and categorizing them based on a diverse set of features and functionalities. We are the first to provide a detailed analysis of 83 open-source SBoM tools along with a perspective on how a potential SBoM user can select a tool based on their specific requirements. Our work aims to help promote understanding of this domain, thereby encouraging and furthering its overall adoption. We additionally seek to pave a path for future work in this area by providing recommendations to tool developers and users, researchers, and standardizing organizations.

99 GENERAL AND MISCELLANEOUS↗

Experiences of Member States in Building a Nuclear Security Infrastructure for New Nuclear Power Programmes

A nuclear power programme has many benefits, but it is a major undertaking that requires careful planning and preparation as well as a substantial investment in time. It also necessitates the establishment of a sustainable national infrastructure with committed and sustained financial and human resources. While nuclear power is not unique in this respect, it is different from other sources of energy because of the risks associated with the use of nuclear material, as well as the need for compliance with international legal instruments, internationally accepted nuclear safety standards, nuclear security guidance, and safeguards requirements. The IAEA’s Milestones in the Development of a National Infrastructure for Nuclear Power, IAEA Nuclear Energy Series No. NG-G-3.1 (Rev. 1), defines a phased approach that identifies 19 infrastructure issues that should be addressed in each of the three phases of the development of a nuclear infrastructure for a nuclear power programme. The publication Evaluation of the Status of National Nuclear Infrastructure Development IAEA Nuclear Energy Series NG-T-3.2 (Rev. 2) provides a methodology to determine the status of the infrastructure conditions covering all 19 issues identified in the Milestones Approach. A companion IAEA Implementing Guide, Establishing the Nuclear Security Infrastructure for a Nuclear Power Programme, IAEA Nuclear Security Series No. 19, provides guidance on the recommended actions to be taken by a State to establish an effective national nuclear security infrastructure for a nuclear power programme using the Milestones Approach. This publication is intended to provide guidance based on the experiences and good practices of Member States with embarking nuclear power programmes as well as Member States that are expanding their nuclear power programmes. The guidance is in the form of case studies, which highlight challenges, issues, and solutions identified by Member States as lessons learned for new nuclear power programmes. This TECDOC is designed to present the experiences of Member States to assist other Member States in developing a nuclear security programme. It addresses the key actions necessary to establish an effective national nuclear security infrastructure for a nuclear power programme consistent with the three phases of the IAEA Milestones Approach. The Member States that provided case studies in this document are at different stages in the development of a nuclear power programme.

42 ENGINEERING↗

Confirmation of Radiological Non-Impact Status for TA-08-0032, TA-11-0024 and -0036

Environmental Protection and Compliance, Environmental Stewardship (EPC-ES) has evaluated radiological process knowledge and surveys and found that the structures and associated building materials in Technical Area 8 Building 32 and Technical Area 11 Buildings 24 and 36 (TA-08-0032, TA-11-00024, and TA-11-0036, respectively) are candidates for unrestricted use and public release. This finding is consistent with the requirements of DOE Order 458.1, Radiation Protection of the Public and the Environment and LANL Procedure FSD-004, Environmental Radiation Protection.

54 ENVIRONMENTAL SCIENCES↗

Confirmation of Radiological Non-Impact Status for TA-16-380

Environmental Protection and Compliance, Environmental Stewardship (EPC-ES) has evaluated radiological process knowledge and surveys and found that the structure and associated building materials in Technical Area 16 Building 380 (TA-16-380) are candidates for unrestricted use and public release. This finding is consistent with the requirements of DOE Order 458.1, Radiation Protection of the Public and the Environment and LANL Procedure FSD-004, Environmental Radiation Protection.

54 ENVIRONMENTAL SCIENCES↗

Ultimate FY23 Vacuum Creep Testing Facility Operation Report

This facility operation report covers the refurbishment and initial testing of a vacuum creep frame used to conduct 1300°C tensile and creep tests on Mo- and Nb-based alloys. The report details the refurbishment of the frame and initial operation including 100 h creep experiments compared to similar tests in argon. Unlike the 25 mm dogbone specimens tested in argon, the vacuum load train requires 76 mm dog bone specimens. Testing in vacuum has eliminated concern of O embrittlement in argon and Nb alloy CB103 showed >120% tensile elongation at 1300°C and 1450°C. Also, a window in the vacuum chamber allows the use of digital image correlation (DIC) to measure strain rather than the load train displacement used in the argon frames. Comparison of the displacement and DIC results in the vacuum frame showed significant variation in primary creep deformation, likely due to the machine compliance, but similar secondary creep rates. Recently, ULTIMATE teams have submitted specimens for testing in vacuum. With the relatively low volume of creep testing, the facility performance metric of testing within 4 weeks of receiving specimens has been met.

36 MATERIALS SCIENCE↗

MARSAME Radiological Release Report for Replacement Water Lines from TA-48 to TA-55

Environmental Protection and Compliance, Environmental Stewardship (EPC-ES) has determined that only a portion of the soil associated with Replacement Water Lines from Technical Area (TA)-48 to TA55 (Figure 1) meets the criteria for unrestricted release to the public under Department of Energy (DOE) Order 458.1, Radiation Protection for the Public and the Environment (DOE, 2020). The remaining soil did not meet the criteria for unrestricted release and must be managed appropriately. These conclusions are based on the known history of the area combined with soil sample data collected in 2022; the findings are consistent with DOE Order 458.1 and Los Alamos National Laboratory (LANL) Functional Series Document EPC-ES-FSD-004, Environmental Radiation Protection (LANL, 2021). Sampling and data analysis, as described in this report, were sufficient to meet measurement quality objectives (MQOs) under the Multi-Agency Radiation Survey and Assessment of Materials and Equipment (MARSAME) manual (NUREG, 2009) and LANL procedures (LANL, 2020). Final approvals for waste disposition will come from LANL’s Waste Management Program.

54 ENVIRONMENTAL SCIENCES↗

Bat Smart Curtailment: Efficacy and Operational Testing

Curtailment, or blanket curtailment, is a leading method to mitigate the impacts to bats from operating wind turbines. Although this strategy results in considerable decreases in bat fatalities, it also results in decreased energy production. In 2019, Natural Power was awarded funding by the Department of Energy to assess the readiness of the informed smart curtailment technology, EchoSense (formerly referred to as Detection and Active Response Curtailment, [DARC]). The research undertaken by this project expands the understanding of alternative methods, known as smart curtailment, to maintain a reduction in bat fatalities while simultaneously recovering lost energy associated with blanket curtailment. The overall project was composed of three major tasks; Task 1 was focused on cybersecurity compliance of the EchoSense system in accordance with the North American Electric Reliability Corporation Critical Infrastructure Protection (“NERC CIP”) standards, Task 2 assessed the mechanical loads exerted on turbines when operating under a smart curtailment regime, and Task 3 assessed the efficacy of the EchoSense system at an operational wind farm. Regarding Task 1, an external review by the National Renewable Energy Laboratory determined that the EchoSense system did not create any new cybersecurity weaknesses and was compliant with the NERC CIP standards. As a result of this process, Natural Power developed some best practices (10.1) for wind- wildlife technology developers. In conjunction with the National Renewable Energy Laboratory, the results (10.2) of the loads testing demonstrated that the periodic curtailment and release of turbines by the EchoSense system did not have any detrimental impact on the mechanical components of a wind turbine (Task 2). During the late summer to fall of 2020 and 2021, Natural Power demonstrated that the use of the EchoSense smart curtailment system resulted in no significant difference in bat fatalities compared to blanket curtailment with cut-in speeds at 6.9 m/s (2020) and 5.0 m/s (2021) while resulting in a significant difference in decreased lost energy (Task 3). This translates to an average of 41% (2020) and 56% (2021) reduction in per turbine energy loss compared to blanket curtailment. The reduction in energy loss that would have been achieved by EchoSense curtailment compared to blanket curtailment, if applied across all 69 turbines, is roughly equivalent to having an additional turbine on site. These results are notable for finding a balance between the environmental impact of wind energy and the economic feasibility in energy production associated with mitigating that impact. https://www.naturalpower.com/us/expertise/service/engineering-operations/echosense

17 WIND ENERGY↗

Confirmation of Radiological Non-Impact Status for TA-22 Magazines

Environmental Protection and Compliance, Environmental Stewardship (EPC-ES) has evaluated radiological process knowledge and surveys and found that the structures and associated building materials in magazines and process building at Technical Area 22 (TA-22) are candidates for unrestricted use and public release. TA-22 magazines included in this analysis are: buildings TA-0011, -0012, -0014, -0015, -0016, -0017, -0019, -0021, -0022, -0023, -0024, -0035, and -0069 and building TA-22-0025, which is an a process building. This finding is consistent with the requirements of DOE Order 458.1 Radiation Protection of the Public and the Environment and LANL Procedure FSD-004 Environmental Radiation Protection.

54 ENVIRONMENTAL SCIENCES↗

Confirmation of Radiological Non-Impact Status for TA-37 Magazines

Environmental Protection and Compliance, Environmental Stewardship (EPC-ES) has evaluated radiological process knowledge and surveys and found that the structures and associated building materials in magazines at Technical Area 37 (TA-37) are candidates for unrestricted use and public release. TA-37 magazines included in this analysis are: buildings TA- 0006, -0008, -0009, -0019, and -0020. This finding is consistent with the requirements of DOE Order 458.1 Radiation Protection of the Public and the Environment and LANL Procedure FSD-004 Environmental Radiation Protection.

54 ENVIRONMENTAL SCIENCES↗

2022 Climate Change Vulnerability Assessment and Resilience Plan Summary

Los Alamos National Laboratory (LANL, or the Laboratory) produced a Vulnerability Assessment and Resilience Plan (VARP) following Department of Energy (DOE) Guidance to assess and manage climate change related risks to the Laboratory’s assets and operations. This is a condensed summary of the Laboratory’s 2022 VARP – the full version of the document is not publicly available at this time. The VARP was led by the Pollution Prevention (P2) Program in the Environmental Protection and Compliance Division (EPC-DO) and covers the entirety of the 36-square-mile LANL site in Los Alamos, New Mexico. A Steering Committee, composed of representatives from the three main Laboratory Directorates and the Los Alamos Field Office, identified real property Critical Assets based on their Mission Dependency Index (MDI) scores. LANL used MDI scores of 70 and above, which are considered Mission-Critical, to generate a list of 141 Critical Asset facilities.

54 ENVIRONMENTAL SCIENCES↗

2019 Groundwater Monitoring Report Project Shoal Area: Subsurface Corrective Action Unit 447

The Project Shoal Area is a site in Nevada where an underground nuclear test was conducted in 1963. It later came to be known as the Shoal, Nevada, Site. Surface contamination at the site has been remediated, but investigation of groundwater contamination resulting from the test is still in the corrective action process. Annual sampling and water-level monitoring are conducted as part of the subsurface corrective action strategy, which has focused on revising the site conceptual model and evaluating the adequacy of the monitoring well network. It has also included enhancements to the monitoring well network to address uncertainties in the groundwater flow direction and the cause of rising water levels in site wells west of the shear zone since the first hydrologic characterization (HC) wells were installed in 1996. Revisions to the site conceptual model and enhancements to the monitoring strategy were provided to Nevada Division of Environmental Protection (NDEP) in the Addendum to: Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for the Subsurface Corrective Action Unit 447 Shoal, Nevada, Site. NDEP approved the addendum to the CADD/CAP, which included an expanded contaminant boundary and compliance boundary for the site.

54 ENVIRONMENTAL SCIENCES↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada For Calendar Year 2022

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act (RCRA) Permit Number NEV HW0101 (Rev. 6) associated with the following closed corrective action units (CAUs): CAU 90, Area 2 Bitcutter Containment; CAU 91, Area 3 U-3fi Injection Well; CAU 92, Area 6 Decon Pond Facility; CAU 110, Area 3 WMD U-3ax/bl Crater; CAU 111, Area 5 WMD Retired Mixed Waste Pits; CAU 112, Area 23 Hazardous Waste Trenches. All post-closure inspections and evaluations were performed in accordance with requirements set out in RCRA Permit NEV HW0101, Rev. 6.

54 ENVIRONMENTAL SCIENCES↗

Integrated Issues and Risk Management: A Theoretical Framework Overview

The contractor requirements document for DOE O 226.1B, Implementation of Department of Energy Oversight Policy, requires DOE/NNSA contractors to establish an assurance system that includes, among other things, “Rigorous, risk-informed, and credible self-assessment and feedback and improvement activities. Assessment programs must be risk-informed, formally described and documented, and appropriately cover potentially high consequence activities” and “Contains an issues management process that is capable of categorizing the significance of findings based on risk and priority and other appropriate factors….” However, the term “risk-informed” is not defined in this or any other DOE order, and no formal guidance on how to integrate the two concepts currently exists. The Risk Management Guide for Defense Programs released by NA-18, Office of Systems Engineering and Integration (SE&I), states it is “a framework and general guidance to program office personnel on the effective management of program risks and issues”, however it then defines issues as “events with 100% likelihood of affecting program objectives” and states “unless specified otherwise, the term “risk” will also serve to represent issues for the remainder of this plan,” severally limiting its ability to provide adequate guidance on this topic. Outside of DOE scope, the U.S. Nuclear Regulatory Commission (U.S. NRC) imposes similar requirements. ASME NQA-1-2015 Requirement 16 states “Conditions adverse to quality shall be identified promptly and corrected as soon as practicable. In the case of a significant condition adverse to quality, the cause of the condition shall be determined, and corrective action taken to preclude recurrence. The identification, cause, and corrective action for significant conditions adverse to quality shall be documented and reported to appropriate levels of management. Completion of corrective actions shall be verified”. The purpose of this document is to provide a best-in-class framework for an integrated risk and issues management process. This process would provide a robust feedback loop between risk management and issues management to: Enhance risk identification and characterization, use risk handling principles to improve corrective action planning, and ensure regulatory compliance.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Los Alamos National Laboratory Floodplain Assessment for the Technical Area 8 to Technical Area 22 Natural Gas Line Replacement Project

The National Nuclear Security Administration (NNSA), a semi-autonomous agency within the U.S. Department of Energy (DOE), is proposing new construction that crosses through upper Pajarito Canyon and upper Starmer Canyon from Technical Area (TA) 8 to TA-22 at Los Alamos National Laboratory (LANL). The project proposes to install a new 12 inch natural gas line to replace the existing 70+ year old natural gas line. Replacement will prevent loss of service to several LANL TAs and Bandelier National Monument. The project activities within the 100- year floodplains include 1) new natural gas line installation to replace and existing aging gas line, 2) relocating a section of fence and 3) three construction equipment and materials storage areas. NNSA has prepared this floodplain assessment in accordance with 10 Code of Federal Regulations (CFR) Part 1022 Compliance with Floodplain and Wetland Environmental Review Requirements (10 CFR Part 1022) (CFR 2003) which was promulgated to implement DOE requirements under Executive Order 11988 Floodplain Management (EO 1977). A floodplain is defined in 10 CFR 1022 as “the lowlands adjoining inland and coastal waters and relatively flat areas and flood prone areas of offshore islands,” and a base floodplain as “the 100-year floodplain, that is, a floodplain with a 1.0 percent chance of flooding in any given year (CFR 2003).” This floodplain assessment evaluates potential impacts to floodplain values and functions from implementation of the proposed action, identifies alternatives to the Proposed Action, and allows for meaningful public comment.

54 ENVIRONMENTAL SCIENCES↗

Evaluation of Building 23-702, Los Alamos Scientific Laboratory H-8 Foil Handling Building, Mercury, Area 23, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE) National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to demolish Building 23-702, the Los Alamos Scientific Laboratory (LASL) H-8 Foil Handling Building (Nevada State Historic Preservation Office [SHPO] Resource No. B15278) at the Nevada National Security Site (NNSS) in Nye County, Nevada. The NNSA/NFO is implementing a long-term project to modernize the town of Mercury for future mission needs. The project is considered an undertaking subject to review under Title 54 of United States Code (USC) § 306108, commonly known as Section 106 of the National Historic Preservation Act, Title 54 USC § 300101, et seq., and its implementing regulations, Title 36 of the Code of Federal Regulations (36 CFR) Part 800. In 2018, Desert Research Institute (DRI) completed an architectural survey of the town of Mercury. This effort resulted in the identification, recordation, and evaluation of the Mercury Historic District (MHD, SHPO Resource No. D230), including the identification of its contributing elements (Reno et al. 2018). The MHD was recommended eligible for listing in the National Register of Historic Places (NRHP, National Register) under the Secretary of the Interior’s (SOI) Significance Criteria A and C, as defined in 36 CFR Part 60.4, as a significant concentration of buildings and structures with a direct and important association with Cold War-era nuclear testing from 1951 through 1992. As part of the modernization program for Mercury, the NNSA/NFO and the SHPO executed the 2018 Programmatic Agreement Between the National Nuclear Security Administration Nevada Field Office and the Nevada State Historic Preservation Officer Regarding Modernization and Operational Maintenance of the Nevada National Security Site, at Mercury in Nye County, Nevada (Mercury PA). The Mercury PA includes streamlined Section 106 procedures for undertakings in the MHD based on contributing element categories. Building 23-702 is identified in Appendix C of the Mercury PA as a Category I contributing element, indicating that it might be individually eligible for the NRHP. It is a historic property for the purposes of Section 106 compliance and subject to the stipulations of the Mercury PA. Per Stipulation VI of the Mercury PA, when the Area of Potential Effect (APE) for an undertaking includes Category I elements, the NNSA/NFO must evaluate the Category I elements for individual NRHP eligibility under all of the SOI Significance Criteria prior to initiating any activity that may affect the elements. The purpose of this report is to evaluate Building 23-702 as a potential individually eligible historic property in fulfillment of Stipulation VI of the Mercury PA. The evaluation detailed herein concludes that Building 23-702 is not individually eligible for listing in the NRHP. Although it retains aspects of integrity and continues to contribute to the MHD, it is not individually significant under any of the SOI Significance Criteria.

54 ENVIRONMENTAL SCIENCES↗

Report Series: Finding of Effect, and Mitigation Documentation for Building 23-702, Mercury, Area 23, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to demolish Building 23-702 in the town of Mercury (Nevada State Historic Preservation Office [SHPO] Resource No. B15278), which is on the Nevada National Security Site (NNSS) in Nye County, Nevada (see Figure 1). The purpose of the undertaking is related to the modernization of Mercury for future mission needs. The NNSA/NFO will implement this undertaking in accordance with the Programmatic Agreement between the National Nuclear Security Administration Nevada Field Office and the Nevada State Historic Preservation Officer Regarding Modernization and Operational Maintenance of the Nevada National Security Site, at Mercury in Nye County, Nevada, hereafter referred to as the Mercury PA. Building 23-702 was built in 1965 as a foil handling building for the Los Alamos Scientific Laboratory (LASL), who worked on the design and engineering of nuclear weapons and other nuclear experiments. The building appeared to have secondarily functioned as a storage for radioactive sources in the 1980s and 1990s. The building was operational until 2004, then deactivated sometime between 2005 and 2014. The town of Mercury and the immediate surrounding area have been formally determined eligible for listing in the National Register of Historic Places (National Register, NRHP) as the Mercury Historic District (MHD, SHPO Resource No. D230) under Criteria A and C for its importance in supporting nuclear testing and scientific research from 1951 through 1992. Building 23-702 was identified as a contributing element to the MHD in a 2018 architectural survey of the district (Reno et al.) and recorded on a Nevada Architectural Resource Assessment (ARA) form (Reno et al. 2017). Building 23-702 was also identified in Appendix C of the Mercury PA as a Category I contributing element, indicating that it might be individually eligible for the NRHP. It is a historic property for the purposes of compliance with Section 106 of the National Historic Preservation Act (NHPA) and subject to the stipulations of the Mercury PA.

54 ENVIRONMENTAL SCIENCES↗

The Energy and Operational Impacts of Using 0-10V Control for LED Streetlights

Lighting systems have historically utilized either a proprietary control method, or one of a handful of standardized methods (e.g., 0-10V, DALI, DMX512) aimed at facilitating vendor interoperability. The utility and market success of the standardized methods has been limited for a variety of reasons. Although 0-10V is presently the most commonly available control interface for indoor and outdoor products in North America – even after the emergence of LED products and “connected lighting systems” with more modern network interfaces and luminaire-level sensors and intelligence – the use of 0-10V methods has significant tradeoffs. For instance, it is difficult to predict relative luminaire light output and input power at any particular control voltage, and performance across luminaires is inconsistent. This study characterizes 23 LED streetlights that claimed dimmability via a 0-10V interface, quantifies the performance variation found in market-available LED drivers, and explores the potential impact of the most recent 0-10V voluntary standard (ANSI C137.1-2022). Notably, the tested products were all manufactured prior to the release of this standard, and thus do not make compliance claims. Variation in response to 0-10V control voltages was expected to be more significant across different make/model luminaires than different units of the same make/model; the test population was structured based on this expectation. The 23 tested luminaires comprised 21 unique make/model streetlights from 14 different manufacturers. Three samples of one make/model streetlight were included in the test population to facilitate a limited exploration of unit-to-unit variation. The 21 unique make/model luminaires contained 20 unique make/model LED drivers from eight different driver manufacturers. Luminaire input power and current were measured at 11 control voltages (0.5 V and 1–10 V in 1 V increments).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗