Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “assets”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

Thermo-Hydrological Modeling of Thermal Energy Storage in a Depleted Oil Reservoir

Thermal energy storage in oil and gas reservoirs leverages the existing surface and subsurface infrastructure, which can pave the way for economic production of geothermal energy. Existing studies on geothermal energy storage are focused mostly on the use of aquifers with more homogeneous rock and fluid properties. Coupling of heat and fluid flow in a multiphase-multicomponent system, such as an oil reservoir, is imperative especially if existing oil field assets need to be repurposed as required for a sustainable energy transition. The objective is to model the subsurface thermo-hydrological processes associated with reservoir performance and operational sustainability. The model evaluates formation pressure and temperature within the reservoir and at the injection/production wells during multiple charge and discharge cycles. Hot water (approximately 200 degrees C) heated by Concentrating Solar Power (CSP) at high pressure is injected into the existing oil reservoir for storage and produced as thermal energy for power generation, which will be accompanied by enhanced oil recovery. To demonstrate the coupled fluid and heat flow during the injection/production cycle in the subsurface reservoir, TOUGH3 (developed by Berkeley Lab) is used to simulate the thermo-hydrological (TH) processes in a multiphase, multicomponent system. Two well geometries are considered within the reservoir grid: 1) a single-well huff-n-puff system (same well is used for injection and production), and 2) an isolated injection-production well doublet. Seasonal charge and discharge cycling are implemented based on the scheduling specified in the model input file. The model reports pressure, temperature, enthalpy, liquid fluxes, heat fluxes, pore velocities, and changes in porosity & permeability due to temperature and pressure variations during the cyclic Reservoir Thermal Energy Storage (RTES) operations. The results from the simulations can be used to optimize the operational parameters (such as well spacing and injection/production rates) and round-trip efficiency for surface power-plants coupled with thermal energy storage over time. They can also serve as important inputs for levelized cost of storage estimations. The research will help to design and integrate surface renewable energy sources, such as concentrating solar power (CSP), with RTES to help balance out power supply and demand on the grid.

CSP↗

Protective barriers and related methods

Corner assemblies for protective barriers for protecting assets (e.g., electrical power transformers and other substation components). The corner assembly includes two guide structures oriented perpendicular to each other. The corner assembly includes at least two protective member assemblies disposed within the two guide structures. Each protective member assembly includes two side members within protective members extending horizontally between the two side members.

Bratton, Kenneth R.↗

Panel Session 133: Integrating Economic Redevelopment and Workforce Transition Into DOE Site Closure Planning (R1.18)

This panel focused on post-closure impacts to the long-term site workforce and communities in DoE's approach to accelerated site cleanup and expedited reduction of long-term financial liabilities. At sites where Cold-War workers shifted from weapons production to the cleanup effort, a more holistic approach to the workforce transition Post-EM cleanup is needed. This holistic approach would include incentives for expedited closure, trade re-training, and a vision for future site commercial activities. The panel discussed the importance of the right workforce incentives that includes appropriate training for displaced workers so that they can be integrated into a next job. A key aspect of this discussion was to re-assess the current and future land use opportunities related to land re-use concepts. By re-arranging cleanup sequencing is it possible to divest land sooner than originally projected for productive commercial use hence reducing the DOE long-term liability and consequently increasing an economic soft landing for those Cold-War workers. Panelists with presentations: Integrating Economic Redevelopment and Workforce Transition Into DOE Site Closure Planning (Sean Todd); Sustaining, Growing and Re-Developing DOD/DOD Facilities and Assets (Jonathan Taylor)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Double-Shell Tank Primary Bottom Visual Inspection Results - 20025

A pressing need for the Double-Shell Tank Integrity Program at Hanford is of the ability to inspect the bottom of the tanks. Though the DSTs' annulus spaces (the space between the internal and external tank walls) have been inspected visually since 1992 and with Ultrasonic Testing (UT) since 1996, inspections of the tank bottoms have been able to be conducted due to limitations of available technology, omitting about 40 percent of the tank surface below the maximum fill level from routine inspection. Visual inspections of the tank annulus have been conducted up to five times in some DSTs and portions of the annulus space for all of the DSTs has been inspected twice with UT. This region includes the walls of the primary tank and secondary liner along with accessible portions of the secondary liner bottom. Due to this lack of technology, the degradation of the primary tank bottom in Tank AY-102 was undetected until the tank leaked into its annulus space, confirmed in 2012. Since that time, WRPS has been working with the nondestructive examination community and the Pacific Northwest National Laboratory, to evaluate potential technologies to conduct these challenging remote inspections. Recent work has included the development, testing, and deployment of several remote visual inspection technologies to observe the condition of the primary tank bottom of the DSTs by leveraging air distribution slots in the refractory pad on which it rests. Robotic solutions to conduct this inspection were developed with a detailed understanding of the physical configuration and operational logistics. Understanding and subsequent communication of these details to vendors within the robotics and nondestructive examination community was a critical component to the successful production of these new tools. Throughout the FY16-FY18 years, vendors from nondestructive examination community were solicited for ideas to meet the tank bottom inspection challenge. Two tank bottom visual inspection solutions were then pursued to meet that challenge. Both tools were successfully deployed at Tank AP-107, and provided valuable visuals, never before obtained from the under tank environment of a double-shell tank. While there are minor opportunities for improvement identified with each system, general outcomes were overwhelmingly positive. Both systems were successfully able to navigate the refractory air slot pattern from the outer edge to the tank center and record video footage. The micro-crawler provided high quality and very stable footage through the air slot pattern, but took longer to deploy into the slots and traverse through them than the alternative system. The push-pull tethered camera was able to navigate all seven of its target air slots in a matter of a few hours, which included deployment, movement between slot entrances, and complete removal of the system from the annulus environment. Through these air slots, new information was gained about the tank bottom and refractory pad condition of tank AP-107, AP-106, AP-108, and AN-102. While some debris was noted in the air slots, including sand, chipped refractory, and construction materials, the refractory was found to be structurally stable and adequately supporting the primary tank bottom through the full diameter of the tank. Primary tank bottom steel exterior was found to be in good condition, free of ongoing or aggressive corrosion conditions. Looking toward the future, robotic access to and visual inspection of refractory air slots and the primary tank bottom steel has now proven viable. Incorporating periodic air slot inspections as a regular practice within the Double-Shell Tank Integrity Program is the next step, allowing trending of any changes in condition. As ultrasonic testing infrastructure was leveraged to complete the initial system deployments described in this report, it makes sense to adopt that same strategy for ongoing periodic examinations and deploy these primary tank bottom inspection tools alongside ultrasonic testing operations. Development of visual inspection tools to evaluate the primary tank bottom region of the double-shell tanks was planned as the first stage of inspection. Continued development of volumetric sensors and incorporation of these inspection tools into Hanford's ongoing Double-Shell Tank Integrity Program are the next steps, seeking to continuously expand understanding of asset integrity and remaining useful life. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Expedited Walkdowns and Preparation of Cost Estimates for Decontamination and Demolition of Excess Facilities - 20335

Lawrence Livermore National Security, LLC (LLNS) is the prime contractor responsible for managing and operating Lawrence Livermore National Laboratory (LLNL). The mission of the LLNL is to strengthen security of the United States through development and application of world-class science and technology to enhance the nation's defense, reduce the global threat from terrorism and weapons of mass destruction, and respond with vision, quality, integrity, and technical excellence to scientific issues of national importance. To accomplish its mission, LLNL must plan and manage its campus space and facilities to optimize use of its relatively small one-square-mile footprint. LLNL currently has numerous excess facilities that require decontamination and demolition (D and D). The LLNL Legacy Facility Program is responsible for stewardship and risk reduction programs to effectively manage these excess assets at LLNL. The Legacy Facility Program identified 10 excess facilities at LLNL that were candidates for demolition based on risks from further degradation of the facilities, potential exposure to hazardous materials, or need for removal to make way for new program facilities. The buildings range from a structure built in 1943 to serve as a US Navy drill hall during World War II, to a facility that provided neutrons to study material properties for the fusion energy program. The National Nuclear Security Administration (NNSA) appropriated FY19 funding for the development of Class 3 estimates for these 10 excess facilities that would be used to develop a Program Management Plan for funding consideration. Class 3 estimates are not conceptual, nor overly detailed, but adequate to be used for budget and appropriation purposes. Using existing strategic sourcing agreements, LLNL was able to organize a team of senior subject matter experts (SMEs) with diverse technical backgrounds across the Department of Energy (DOE) Complex to complete extensive process knowledge (PK) reviews and walk-downs of each excess facility and to deliver accurate and complete estimates under an expedited schedule (i.e., within eight weeks). To facilitate the expedited schedule, LLNL was fully prepared for the arrival of the JGMS team, which consisted of the following companies: J.G. Management Systems, Inc. (JGMS); Strata-G, LLC; and Michael Baker International. LLNL provided background and PK information on the excess facilities, pictures, supporting historical documentation, and radiological survey history as well as escorted access to the facilities. The JGMS team has previous experience supporting Program Management Plans for excess facilities at the Y-12 National Security Complex. The team mobilized to LLNL and performed the facility walk-downs from January 22-25, 2019. Using a methodical evaluation process, expertise, and experience, the team was able to deliver walk-down draft reports and estimates to LLNL before their February 8, 2019 deadline. LLNL then in turn reviewed, completed the estimates by adding waste management costs and other LLNL costs, and delivered the estimates to NNSA by February 15, 2019. The completed final reports, including draft D and D estimates, were delivered to LLNL before their March 6, 2019 deadline. The work was successfully completed ahead of the expedited schedule required by LLNL, resulting in a commendation from the client. This paper describes how the partnership and collaboration as a fully integrated team comprised of the prime contractor, LLNS, and the JGMS team successfully met the needs of the US government, resulting in the performance of expedited site walk-downs, the development of summary evaluation reports, and the preparation of draft Class 3 estimates and preliminary schedules for the D and D of 10 excess facilities at LLNL. The efforts of the team will enable the D and D of the first excess facility in the 2020-2021 time frame. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TORONE: Total Characterisation by Remote Observation of Nuclear Environments - 20591

This paper describes the autonomous robotic systems developed in the TORONE project (Total Characterisation by Remote Observation of Nuclear Environments) for combined characterisation by remote techniques in nuclear environments. There are four main components to the system. Firstly, robot operation which uses a Robot Operating System (ROS) allowing ease of communication between hardware and software alongside robot vision systems such as Lidar and/or photogrammetry. Secondly, radiation detection instrumentation for gamma and neutron sources which is also collimated for spatial resolution. Thirdly, photonic characterisation instrumentation for remote material identification by means of Raman spectroscopy and Laser induced breakdown spectroscopy (LIBS). Finally, a data management system is described which contains the TORONE characterisation data with the ability to overlay material characterisation information onto 3D maps of the nuclear environment. Preliminary results are described alongside discussion of some of the synergies of the combined approach. There are many applications of such an autonomous system in nuclear decommissioning, waste management and asset management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 25: DOE Waste Isolation Pilot Plant (WIPP) Update 2020

This panel focused on the WIPP operational efficiencies and capital improvement progress in the year 2020. Because WIPP is a key component of the US DOE EM cleanup strategy, the progress on returning WIPP to full design capacity and throughput by 2021 is of importance. Panelists with presentations: Status of WIPP Capital Asset Projects (Stephen Smith); WIPP Update (Sean Dunagan); CBFO Update (Greg Sosson)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 34: US DOE Featured Site: Savannah River Operations Office: 70 Years of Service

The Savannah River Site celebrates its 70. anniversary on November 28, 2020. On this date in 1950, President Harry S. Truman requested the Dupont Company to design, build and operate what was then known as the Savannah River Plant in response to the Soviet Union's detonation of its first atomic weapon, which set the Cold War into motion. During the 1950's, six South Carolina towns were relocated for the construction of SRS and by 1953, the 310 square mile site was complete. Nearly 40,000 workers were employed t build five nuclear reactors and support facilities, two chemical separations plants, heavy water extraction plant, nuclear fuel and target fabrication facility tritium extraction facility and waste management facilities. SRS played a key role in winning the Cold War and for seven decades, SRS has been a leader within the DOE complex. Today, the site supports environmental stewardship and maintains the nation's nuclear deterrent while ensuring the safekeeping and disposal of domestic and international nuclear materials. The site continues to support the nation's nuclear defense as it explores new potential NNSA missions. SRS has a proud 70- year history and looks forward to a future of service as a national asset and strong community partner. The session was kicked off with a video message from Secretary of Energy, Dan Brouillette, who thanked employees past and current for their efforts. The video also provided an overview of the history and future of the Site. This panel provided an overview of the Savannah River Site's 70 years of service (history, challenges, opportunities, and future) presented by the SRS's Senior leadership and the local Aiken, South Carolina Mayor. Panelists with presentations: US DOE Secretary Dan Brouillette's Overview of DOE and SRS - A Legacy of 70 Years of Service (Amy Boyette); 70 Years of Service (Michael Budney); 70 Years of Service (Stuart MacVean); SRS Liquid Waste (Thomas Foster); National Nuclear Security Administration (Nicole Nelson-Jean)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of Historical EM Practices and Policies for Management of Cleanup Program and Address GAO Concerns - 20222

As Department of Energy (DOE) Environmental Management (EM) program policies and management practices are revised over time, it might be useful to periodically reflect on the DOE EM program's past to identify practices that have worked and those that might be appropriate for possible reuse in the future. An added impetus to examine alternative approaches is the recent Government Accountability Office (GAO) report entitled 'Nuclear Waste Cleanup - DOE Could Improve Program and Project Management by Better Classifying Work and Following Leading Practices.' The February 2019 GAO report states that EM categorizes most of its work in a way that does not adequately involve independent experts and DOE senior leadership. It also noted that EM has not followed leading practices for program and project management that could help keep the cleanup efforts on schedule and control costs. The GAO report recommended that EM, working with DOE Office of Project Management (PM): - Establish requirements and then assess EM's ongoing operations activities to determine if some activities should be reclassified as capital asset projects based on these newly established requirements. - Review and revise EM's 2017 cleanup policy to include program management leading practices related to scope, cost, schedule performance, and independent reviews. - Update the cleanup policy to require that earned value management (EVM) systems be maintained and used in a way that follows EVM best practices. - Develop a policy to ensure that work is categorized as level of effort (LOE) only in appropriate, specified circumstances, such as when work is not measurable or when measurement is impractical. - Integrate EVM data into EM's performance metrics for operations activities. To assist with improving program performance and implementing audit recommendations, this paper reviewed past successful cleanups such as Weldon Springs, Rocky Flats, Fernald, Ashtabula, Battelle Columbus (abs, and other historical resources and people with experience during the early years of EM program. As such, there are several past practices which may well be suited for reuse today. Some of these practices include: - In 1990's, as the DOE EM cleanup program, known as Environmental Restoration came into effect, the known cleanup scope at each geographic location or site was organized into four levels ranging from overall site-wide cleanup effort to the individual 'release sites', providing high granularity to the program. - The cleanup program was organized by geography (Northwest, Southwest, Eastern Area Programs, etc.). These 'sub-program' managers provided a degree of Headquarters oversight and management allowing upper management (EM-1, 2, and 3) to focus on major decisions and issues. - Budget levels at selected cleanup sites were funded above 'minimum-safety' levels to accelerate actual cleanup work. - Past practice utilized EVM techniques and uniform EM oversight over all discrete project-like activities, providing for a coordinated cleanup effort. - EM managed LOE activities using benchmarking and best in class management practice techniques to help manage costs. - EM managed and reviewed entire site cleanup baselines, not only individual projects, focusing on a successful overall outcome. - Sites had a 'Road map' or 'Management Action Plan' that provided the overall strategy or plan for that site's cleanup - this helped with understanding and coordination of efforts. - EM had a robust lessons-learned program and database to capture and transmit worthy ideas. - EM had well-structured cleanup baseline change control policies to control cost and schedule changes, at the contractor and higher Headquarters levels. Finally, some of the GAO observations may be valid, however it is not clear as to their extent. For example, for some operation types of work, the use of the Level of Effort (LOE) earned value method to track progress may be appropriate. Also, to ensure independence of thought, and to obtain useful insight on past practices, it may be suitable to have former EM employees to assist with understanding past practices or to verify that activities have been properly identified. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Feedback from International Decommissioning Planning Projects - 20269

Decommissioning of Nuclear Power Plants is an increasing reality in many countries with nuclear power. Already many years before final shutdown, planning of the decommissioning work is usually started in order to understand for example the costs, waste volume capacity and licensing work needed. In many countries it is required to have a final decommissioning plan before any decommissioning work is allowed to start. Westinghouse has been involved in international decommissioning planning for more than 30 years, where the first 20 years was mostly funding and preliminary plans due to that decommissioning was many years away. However, as many more plants are now moving into decommissioning, the focus has shifted to final decommissioning plans with budgets instead of funding plans, strategic decisions instead of choices, waste volume specifications instead of estimates and a defined approach instead of what ifs. Westinghouse has developed a methodology based on the planning and execution of many decommissioning projects in Europe, America and Asia. That international experience and understanding helps the customers to adopt a systematic planning process where strategy development is done with the end state in mind, where the goals are clearly outlined and the starting point described. The process and steps to reach the desired end state need to be clearly defined and all options/alternatives evaluated from a cost/benefit point of view. This is followed by a thorough and quantitative risk analysis in order to give solid recommendations and credible conclusions. One important feedback has been that real decommissioning experience from reference projects is invaluable for an efficient and timely progress in order not to spend unnecessary time and effort on understanding the barriers and links between different activities in decommissioning. Skilled project managers or engineers can drive the project forward, but without decommissioning experience previously gained, valuable lessons learned are not used and the same mistakes can be made again. Many utilities have invested in knowledge transfer from other decommissioning projects through site visits, exchange programs and supplier meetings, which is a valuable asset and way of implementing lessons learned from performed decommissioning projects into the planning process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Importance of Inventory for Informing Waste Strategy - 20280

A waste inventory aims to present the best available information about the nature, quantity and location of radioactive wastes and materials at a facility, site or in a country. Quality inventory data is necessary for developing appropriate strategies and plans for managing radioactive wastes and materials, with high standards of protection for people and the environment. The inventory of wastes will change over time due to a wide range of technical, commercial or policy reasons, for example, if reactor lifetimes are extended, if decommissioning strategies change or if new technologies are introduced for managing waste. Inventory information can also improve as better waste characterisation data becomes available. At a facility or site level, good quality inventory data are needed to underpin decision making about the waste management options and to demonstrate compliance with the chosen treatment or disposal route. At a site and country level, knowledge of the inventory can drive the improvement to waste strategy; waste management asset and service planning; and implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Attack Surface of Renewable Energy Technologies

This slide deck presents an overview of the threat landscape for renewable energy technologies. It highlights he growing penetration of renewable resources and potential impact of an attack. Standard architectures are shared to highlight where vulnerabilities may exist and attack paths to reach critical infrastructure. We discuss threat actors and attack paths. Several recent events impacting renewable energy assets or companies are explained.

14 SOLAR ENERGY↗

Effect of Drying on Corrosion Mitigation of Hanford Transfer Lines

Radioactive waste is stored in underground, carbon-steel double-shell tanks at the Department of Energy Hanford site. The waste is transferred between the tanks and other assets using the transfer lines spanning throughout the various tank farms at Hanford. The transfer lines consist of a pipe-in-pipe design, small diameter pipes, and are not piggable. Recent inspection data of the transfer lines have shown areas with corrosion on both interior of the encasements and exterior of the primary pipes, with nearly 50 percent wall loss on the primary pipes and nearly 25% wall loss on the encasement pipes due to pitting corrosion. The visual inspections of the transfer lines have shown presence of corrosion products near the pipeline risers and beyond. It has been hypothesized that the corrosion is predominantly due to the high humidity conditions and in some cases is driven by the presence of residual hydrotest water in the encasement and the associated contact with the safety significant primary pipe. Therefore, drying of the transfer lines could lead to corrosion mitigation. Experimental studies are being conducted to understand the effect of environmental conditions, especially, relative humidity and temperature, on transfer line grade carbon steel corrosion and on mitigating corrosion. The experimental conditions are selected based on the seasonal temperature changes, and relative humidity conditions ranging from 30 to 100 percent. The experimental data will be used as guidance for maintaining a dry environment that will help mitigate the transfer-line corrosion caused by the high humidity conditions.

Shukla, Pavan K.↗

Understanding Line Losses and Transformer Losses in Rural Isolated Distribution Systems: Preprint

Rural, isolated power systems in the mainland U.S. and in states like Alaska and Hawaii are powered by assets like diesel generators. These rural, isolated power systems also cannot operate at the higher band of medium voltage (like 69kV). They are primarily in the 12 to 14 kV range to keep the cost of the distribution investments lower. Because of this mid-band medium voltage range, the line losses and distribution transformers losses consume significant diesel consumption (almost 10 percent of the peak load). This work considers one such power system powering an isolated system and presents key findings online losses, and transformer losses. Understanding and documenting the impacts is critical for these communities operating their power systems and take actions to reduce expensive diesel consumption. In this paper, we will present one such typical grid and model it in electromagnetic transients (EMT) domain. We used the tower structure, under ground cabling installation to develop high fidelity models of lines. We also used high fidelity models of distribution transformers to present the no-load losses and full load loses. We will also present technical solutions available commercially off-the-shelf to reduce these losses and reduce diesel consumption. This work will be a primer for communities to understand the technical challenges and to understand the possible solution available to solve such challenges for rural, isolated power system operators.

blackstart↗

Enhancing Resilience of our Nation’s Critical Infrastructure

Due to the ever-changing risk environment that faces the Nation’s critical infrastructure, it is essential that a comprehensive, collaborative approach is taken to enhance the resilience of the infrastructure assets and systems that are relied upon by the American people. To address the gaps that exist in infrastructure resilience research and development, Idaho National Laboratory (INL) created the Resilience Optimization Center (IROC) to bring together multi-disciplinary subject matter experts internally across the laboratory, as well as from public and private entities, other national laboratories, and academia to address some of the Nation’s more challenging infrastructure problems. These experts are working to provide easier access to subject matter experts; providing feasible, optimized solutions that yield observable results; and creating collaborative teams that apply a cyber-physical-dependencies approach. Though a variety of research initiatives, IROC is striving to provide end-to-end solutions, bridging the gap between cyber and physical infrastructure through research, analysis, testing, and validation.

99 GENERAL AND MISCELLANEOUS↗

Tangible Solutions for Grid Operation Upgrade

Many countries worldwide are setting clean energy targets to decarbonize the energy sector and add higher wind and solar capacities. Given their distributed nature, variable renewable energy (VRE) assets can have unique grid integration considerations, and require grid operation practices to be modernized. When transitioning to higher renewable energy levels, many system operators configure a dedicated renewable energy desk to manage renewable energy resource operation in the system control center. Further, system operation planning is conducted with VRE and load forecasting to enable reliable real-time system operation. NREL has partnered with many system operators in the region to identify appropriate technology and grid modernization solutions. NREL and partners from system operators in the region will present on the challenges and some solutions that have been applied and share best practices such as energy management system upgrades, VRE forecasting framework, grid flexibility improvements, and staff training.

emerging economies↗

Design, Deployment, and Characterization of the World’s First Flexible Large Power Transformer

As we know, power transformers are the most critical asset of the transmission network. Although highly reliable, they still can fail prematurely or ultimately retire at the end of their service life. In today’s design practices, transformers are tailored to their specific application and therefore cannot replace each other unless identical. Additionally, they provide minimal support to the grid operation and therefore limit the grid flexibility and resiliency when facing severe conditions. In this presentation, we will introduce the concept of flexible power transformer and demonstrate how one single unit can serve as a spare to multiple units in a given fleet, allow to control the power flow between transformers or lines operating in parallel and ultimately be used to limit subsequent faults in transmission lines. We will also introduce the world’s first prototype in operation, a 60MVA, 165kV flexible autotransformer.

flexible power transformer, autotransformer, varia↗

DOE HFTO H2IQ Hour: NREL ARIES Flatirons Campus MW-Scale Hydrogen System Research

This webinar will highlight the status and initial performance of the grid-integrated megawatt-scale hydrogen electrolysis, compression, storage, and fuel cell generator system at NREL's Flatirons campus. The presentation will also include information about on-going research using this capability as well as future areas of research asset development.

ARIES↗