Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Test Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

Raising Nuclear Thermal Propulsion (NTP) Technology Readiness Above 3

NTP development is currently supported by the NASA program office "Advanced Exploration Systems". The concept is a main propulsion option being considered for human missions to Mars in the 2030's. Major NTP development took place in the 1960's and 1970's under the Rover/NERVA program. The technology had matured to TRL 6 and was preparing to go to TRL 7 with a prototype flight engine before the program was cancelled. Over the last 40 years, a variety of continuations started, but only lasted a few years each. The Rover/NERVA infrastructure is almost all gone. The only remains are a few pieces of hardware, final reports and a few who worked the Rover/NERVA. Two types of nuclear fuel are being investigated to meet the current engine design specific impulse of 900 seconds compared to approximately 850 seconds demonstrated during Rover/NERVA. One is a continuation of composite fuel with new coatings to better control mid-band corrosion. The other type is a CERMET fuel made of Tungsten and UO2. Both fuels are being made from Rover/NERVA lessons learned, but with slightly different recipes to increase fuel endurance at higher operating temperatures. The technology readiness level (TRL) of these current modified reactor fuels is approximately TRL 3. To keep the development cost low and help mature the TRL level past 4 quickly, a few special non-nuclear test facilities have been made to test surrogate fuel, with depleted uranium, as coupons and full length elements. Both facilities utilize inductive heating and are licensed to handle depleted uranium. TRL 5 requires exposing the fuel to a nuclear environment and TRL 6 requires a prototype ground or flight engine system test. Currently, three different NTP ground test facility options are being investigated: exhaust scrubber, bore hole, and total exhaust containment. In parallel, a prototype flight demonstration test is also being studied. The first human mission to Mars in the 2030's is currently 2033. For an advanced propulsion concept to be seriously considered for use, the engine development plans need to show it is feasible and affordable to reach TRL 8 by 2027 and can be qualified for human mission use.

Gerrish, Harold P., Jr.↗

Evaluation of Carbon Composite Overwrap Pressure Vessels Fabricated Using Ionic Liquid Epoxies Project

The intent of the work proposed here is to ascertain the viability of ionic liquid (IL) epoxy based carbon fiber composites for use as storage tanks at cryogenic temperatures. This IL epoxy has been specifically developed to address composite cryogenic tank challenges associated with achieving NASA's in-space propulsion and exploration goals. Our initial work showed that an unadulterated ionic liquid (IL) carbon-fiber composite exhibited improved properties over an optimized commercial product at cryogenic temperatures. Subsequent investigative work has significantly improved the IL epoxy and our first carbon-fiber Composite Overwrap Pressure Vessel (COPV) was successfully fabricated. Here additional COPVs, using a further improved IL epoxy, will be fabricated and pressure tested at cryogenic temperatures with the results rigorously analyzed. Investigation of the IL composite for lower pressure liner-less cryogenic tank applications will also be initiated. It is expected that the current Technology Readiness Level (TRL) will be raised from about TRL 3 to TRL 5 where unambiguous predictions for subsequent development/testing can be made.

Grugel, Richard↗

NASA Stennis Space Center Integrated System Health Management Test Bed and Development Capabilities

Integrated System Health Management (ISHM) is a capability that focuses on determining the condition (health) of every element in a complex System (detect anomalies, diagnose causes, prognosis of future anomalies), and provide data, information, and knowledge (DIaK)-not just data-to control systems for safe and effective operation. This capability is currently done by large teams of people, primarily from ground, but needs to be embedded on-board systems to a higher degree to enable NASA's new Exploration Mission (long term travel and stay in space), while increasing safety and decreasing life cycle costs of spacecraft (vehicles; platforms; bases or outposts; and ground test, launch, and processing operations). The topics related to this capability include: 1) ISHM Related News Articles; 2) ISHM Vision For Exploration; 3) Layers Representing How ISHM is Currently Performed; 4) ISHM Testbeds & Prototypes at NASA SSC; 5) ISHM Functional Capability Level (FCL); 6) ISHM Functional Capability Level (FCL) and Technology Readiness Level (TRL); 7) Core Elements: Capabilities Needed; 8) Core Elements; 9) Open Systems Architecture for Condition-Based Maintenance (OSA-CBM); 10) Core Elements: Architecture, taxonomy, and ontology (ATO) for DIaK management; 11) Core Elements: ATO for DIaK Management; 12) ISHM Architecture Physical Implementation; 13) Core Elements: Standards; 14) Systematic Implementation; 15) Sketch of Work Phasing; 16) Interrelationship Between Traditional Avionics Systems, Time Critical ISHM and Advanced ISHM; 17) Testbeds and On-Board ISHM; 18) Testbed Requirements: RETS AND ISS; 19) Sustainable Development and Validation Process; 20) Development of on-board ISHM; 21) Taxonomy/Ontology of Object Oriented Implementation; 22) ISHM Capability on the E1 Test Stand Hydraulic System; 23) Define Relationships to Embed Intelligence; 24) Intelligent Elements Physical and Virtual; 25) ISHM Testbeds and Prototypes at SSC Current Implementations; 26) Trailer-Mounted RETS; 27) Modeling and Simulation; 28) Summary ISHM Testbed Environments; 29) Data Mining - ARC; 30) Transitioning ISHM to Support NASA Missions; 31) Feature Detection Routines; 32) Sample Features Detected in SSC Test Stand Data; and 33) Health Assessment Database (DIaK Repository).

Figueroa, Fernando↗

GAMMA SPECTRUM STABILIZATION FOR ENVIRONMENTAL RADIATION MONITORING STATIONS USING NAI(TL) DETECTOR

Abstract Gamma spectrum measured by an NaI(Tl) detector is known to be unstable with the in situ temperature. In the present work, an advanced method has been applied to stabilize the gamma spectrum measured by the NaI(Tl) detector at environmental radiation monitoring (ERM) stations. The method is based on experimental data obtained under controlled conditions in laboratory. In the temperature range from 4 to 45°C, the relative deviation of the peak positions within the stabilized gamma spectrum is less than 2%. To test this method in a real scenario, it has been integrated into the ERM station at the Military Institute of Chemical and Environmental Engineering in Hanoi, Vietnam. The results show that the proposed method is ready for a real application.

Hung, Dinh Tien↗

Main propulsion system test requirements for the two-engine Shuttle-C

The Shuttle-C is an unmanned cargo carrying derivative of the space shuttle with optional two or three space shuttle main engines (SSME's), whereas the shuttle has three SSME's. Design and operational differences between the Shuttle-C and shuttle were assessed to determine requirements for additional main propulsion system (MPS) verification testing. Also, reviews were made of the shuttle main propulsion test program objectives and test results and shuttle flight experience. It was concluded that, if significant MPS modifications are not made beyond those currently planned, then main propulsion system verification can be concluded with an on-pad flight readiness firing.

Lynn, E. E.↗

STS-114: Discovery Post Landing Press Briefing

Dean Acosta, NASA Public Affairs Deputy Assistant Administrator hosted this press briefing. Michael Griffin, NASA Administrator; Bill Parsons, Shuttle Program Manager; Michael Leinbach, Shuttle Launch Director; and Bill Ready, Space Operations Associate Administrator were present. The Panel specifically honored the Columbia crew as they praised Commander Eileen Collin's performance in bringing the Discovery and crew safe back to Earth. Re-entry, test flight and next test flight, thermal insulation, heat, vehicle inspection, turn around processing, and ferrying Discovery back to the Kennedy Space Center were topics covered with the News media. Michael Griffin announced the launching of Mars Reconnaissance Orbiter will take place the following morning.

Source record↗

Low Temperature Shape Memory Alloys for Adaptive, Autonomous Systems Project

The objective of this joint activity between Kennedy Space Center (KSC) and Glenn Research Center (GRC) is to develop and evaluate the applicability of 2-way SMAs in proof-of-concept, low-temperature adaptive autonomous systems. As part of this low technology readiness (TRL) activity, we will develop and train low-temperature novel, 2-way shape memory alloys (SMAs) with actuation temperatures ranging from 0 C to 150 C. These experimental alloys will also be preliminary tested to evaluate their performance parameters and transformation (actuation) temperatures in low- temperature or cryogenic adaptive proof-of-concept systems. The challenge will be in the development, design, and training of the alloys for 2-way actuation at those temperatures.

Falker, John↗

The Balloon Experimental Twin Telescope for Infrared Interferometry (BETTII): Towards the First Flight

The Balloon Experimental Twin Telescope for Infrared Interferometry (BETTII) is a balloon-borne, far-infrared direct detection interferometer with a baseline of 8 m and two collectors of 50 cm. It is designed to study galactic clustered star formation by providing spatially-resolved spectroscopy of nearby star clusters. It is being assembled and tested at NASA Goddard Space Flight Center for a first flight in Fall 2016. We report on recent progress concerning the pointing control system and discuss the overall status of the project as it gets ready for its commissioning flight.

Rizzo, Maxime J.↗

NASA Environmental Control and Life Support Technology Development for Exploration: 2021 to 2022 Overview

Over the past year, significant progress has occurred in technology development, ground testing, and ISS technology demonstrations within the NASA Environmental Control and Life Support (ECLSS) community. This paper provides a technology development update in the following capability areas: life support, environmental monitoring, fire safety, and logistics. Technologies for exploration missions must be reliable in their operation which support crewed mission phases. However, they also need to be put into a reduced use or dormant states to support uncrewed mission phases and then successfully and reliably returned to a nominal state to support crew. Multi-year demonstration of systems operation across this range of conditions are essential to mission success. Project overviews will include how the current activity supports the goal of multi-year demonstrations, planned follow-on activities, and what type of exploration mission elements are targeted for infusion. Technologies must be demonstrated and validated early enough to inform early exploration element milestone reviews (mission concept reviews, systems requirement reviews and no later than preliminary design reviews) so that supporting vehicle systems can also be matured. Consequently, for low technology readiness activities, it is important to also identify which mission elements they might infuse into and how they may offer potential operational, dormancy, or mass benefits. While low TRL technology timelines may not support initial mission needs, early infusion is still reasonable with sufficient testing to validate performance and reliability.

Life Support↗

Conceptual Design for a Dual-Bell Rocket Nozzle System Using a NASA F-15 Airplane as the Flight Testbed

The dual-bell rocket nozzle was first proposed in 1949, offering a potential improvement in rocket nozzle performance over the conventional-bell nozzle. Despite the performance advantages that have been predicted, both analytically and through static test data, the dual-bell nozzle has still not been adequately tested in a relevant flight environment. In 2013 a proposal was constructed that offered a NASA F-15 airplane as the flight testbed, with the plan to operate a dual-bell rocket nozzle during captive-carried flight. If implemented, this capability will permit nozzle operation into an external flow field similar to that of a launch vehicle, and facilitate an improved understanding of dual-bell nozzle plume sensitivity to external flow-field effects. More importantly, this flight testbed can be utilized to help quantify the performance benefit with the dual-bell nozzle, as well as to advance its technology readiness level. Toward this ultimate goal, this paper provides plans for future flights to quantify the external flow field of the airplane near the nozzle experiment, as well as details on the conceptual design for the dual-bell nozzle cold-flow propellant feed system integration within the NASA F-15 Propulsion Flight Test Fixture. The current study shows that this concept of flight research is feasible, and could result in valuable flight data for the dual-bell nozzle.

nozzle↗

NASA’s Space Launch System: Exploration Mission-1 Hardware Nears Completion

The Space Launch System (SLS) Program completed several significant production milestones in 2018 for the launch vehicle’s first mission (Fig. 1) and is poised for greater accomplishments in 2019. With manufacturing and hardware installation finished, Boeing completed the core stage forward join and shipped the liquid hydrogen tank structural test article to Marshall Space Flight Center for testing. The core stage aft join and LOX tank STA are expected to be completed in 2019 on the way to final stage integration. The four EM-1 engines are poised for stage integration in 2019. The Launch Vehicle Stage Adapter completed outfitting at Marshall and will be shipped to Kennedy Space Center in 2019. All solid rocket motor segments for the EM-1 boosters are cast, inspected and ready for shipment to KSC. The upper stage, the Interim Cryogenic Propulsion Stage (ICPS), and the Orion Stage Adapter (OSA), where 13 6U CubeSats will ride to deep space on EM-1, were completed and delivered to Exploration Ground Systems at KSC in 2017 and 2018, respectively. The Program continues to work toward first launch of the nation’s new super heavy lift deep space capability in fiscal 2020. SLS is designed, engineered and tested to launch the most challenging exploration missions, minimizing risk and providing the greatest opportunity for mission success. This paper will discuss the technical and programmatic successes and challenges of the past year and look ahead to plans for 2019.

Honeycutt, John↗

Proposed Flight Research of a Dual-Bell Rocket Nozzle Using the NASA F-15 Airplane

For more than a half-century, several types of altitude-compensating rocket nozzles have been proposed and analyzed, but very few have been adequately tested in a relevant flight environment. One type of altitude-compensating nozzle is the dual-bell rocket nozzle, which was first introduced into literature in 1949. Despite the performance advantages that have been predicted, both analytically and through static test data, the dual-bell nozzle has still not been adequately tested in a relevant flight environment. This presentation proposes a method for conducting testing and research with a dual-bell rocket nozzle in a flight environment. We propose to leverage the existing NASA F-15 airplane and Propulsion Flight Test Fixture as the flight testbed, with the dual-bell nozzle operating during captive-carried flights, and with the nozzle subjected to a local flow field similar to that of a launch vehicle. The primary objective of this effort is not only to advance the technology readiness level of the dual-bell nozzle, but also to gain a greater understanding of the nozzle mode transitional sensitivity to local flow-field effects, and to quantify the performance benefits with this technology. The predicted performance benefits are significant, and may result in reducing the cost of delivering payloads to low-Earth orbit.

rocket↗

C3F: Collaborative Container-based Model Coupling Framework

Solving complex real-world grand challenge problems requires in-depth collaboration of researchers from multiple disciplines. Such collaboration often involves harnessing multiscale and multi-dimensional data and combining models from different fields to simulate systems. However, the progress on this front has been limited mainly due to significant gaps in domain knowledge and tools that are typically employed in silos of the domains. Researchers from different fields face considerable barriers to understanding and reusing each other’s data/models in order to collaborate effectively. For example, in solving the global sustainability problems, researchers from hydrology, climate science, agriculture, and economics need to run their respective models to study different components of the global and local food, energy and water systems while, at the same time, need to interact with other researchers and integrate the results of one model with another. Developing this kind of model coupling workflow calls for (1) a large amount of data being processed and exchanged across domains and organizations, (2) identifying and processing the output of one model to make it ready for integration into another model, (3) controlling the workflow dynamically so that it runs until a certain convergence condition or other criteria is met, and (4) close collaboration among the modelers to explore, tune, and test the configuration and data transformation needed to link the models. We have developed C3F, a flexible collaborative model coupling framework to help researchers accelerate their model integration and linking efforts by leveraging advanced cyberinfrastructure such as high-performance computing and virtual containers. In this paper, we describe our experience and lessons learned in developing this cyberinfrastructure solution to support the linking of Water Balance Model (WBM) and SIMPLE-G agricultural economic model in an NSF funded INFEWS project and a DOE-funded Program on Coupled Human and Earth Systems (PCHES) to study the implications of groundwater scarcity for food-energy-water systems. The C3F model coupling framework can be extended to facilitate other model linkages as well.

containerization↗

Apollo experience report: Ground-support equipment

The experience gained in management of the ground-support-equipment and site-readiness activity for the Apollo Program is summarized. The design of equipment and facilities are examined as well as some operational aspects. The organization for ensuring site readiness and the maintenance of ground-support equipment are discussed. Recommendations for use in future programs are given in the areas of design considerations, cleanliness requirements, periodic evaluation of changing requirements, maintenance and overhaul, special test equipment, site-activation schedule coordination, and schematics for ground-support equipment.

Cooper, J. S.↗

The 20 GHz solid state transmitter design, impatt diode development and reliability assessment

A single drift gallium arsenide (GaAs) Schottky barrier IMPATT diode and related components were developed. The IMPATT diode reliability was assessed. A proof of concept solid state transmitter design and a technology assessment study were performed. The transmitter design utilizes technology which, upon implementation, will demonstrate readiness for development of a POC model within the 1982 time frame and will provide an information base for flight hardware capable of deployment in a 1985 to 1990 demonstrational 30/20 GHz satellite communication system. Life test data for Schottky barrier GaAs diodes and grown junction GaAs diodes are described. The results demonstrate the viability of GaAs IMPATTs as high performance, reliable RF power sources which, based on the recommendation made herein, will surpass device reliability requirements consistent with a ten year spaceborne solid state power amplifier mission.

Picone, S.↗

NASA's approach to flight confidence

NASA's confidence in the flight readiness of aerospace hardware and software is achieved by a thorough integration of safety activities into every program facet, from concept through the mission. This involves technical and administrative personnel, organizations that specify requirements, design, manufacturing, test and the operators. Reviews by inhouse and external specialists form an integral part of the assurance process. Examples of safety issues and their resolution for some power and propulsion functions are given (lithium cells, autoignition/fretting in high pressure oxygen environments, ignition sources from auxiliary power unit, and low thrust rocket engines). Finally, some comments on NASA's integrated safety activities and the Aerospace Safety Advisory Panel's role in the NASA review and assessment process all of which provides added confidence in achieving a high level of mission safety and success.

Roth, G. L.↗

Perspective on the National Aero-space Plane program instrumentation development

Development of advanced measurement technology for the NASP program is reviewed. The technical need and the program commitment are discussed which are required to ensure that adequate and timely measurement capabilities are provided for ground and flight testing in the NASP program. Particular attention is given to an assessment of the current development status and a perspective on the features of the NASP program that contributed to the current state of instrumentation technology readiness.

Bogue, Rodney K.↗

Development of a Production Ready Automated Wire Delivery System

The current development effort is a Phase 3 research study entitled "A Production Ready Automated Wire Delivery System", contract number NAS8-39933, awarded to Nichols Research Corporation (NRC). The goals of this research study were to production harden the existing Automated Wire Delivery (AWDS) motion and sensor hardware and test the modified AWDS in a range of welding applications. In addition, the prototype AWDS controller would be moved to the VME bus platform by designing, fabricating and testing a single board VME bus AWDS controller. This effort was to provide an AWDS that could transition from the laboratory environment to production operations. The project was performed in two development steps. Step 1 modified and tested an improved MWG. Step 2 developed and tested the AWDS single board VME bus controller. Step 3 installed the Wire Pilot in a Weld Controller with the imbedded VME bus controller.

Source record↗