Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “System Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

A synchronous motor chopper for laboratory testing of detector systems in infrared astronomy

Airborne and ground-based IR telescopes have oscillating secondary mirrors to permit subtraction of background emission from the sky and telescope. These chopping mirrors are synchronized to a clock which may originate in the data acquisition system. For laboratory testing of detecting instruments with such data systems, externally synchronized chopped IR sources are required. We describe a laboratory chopper in which a synchronous motor is driven by 2-phase sinusoidal currents in sync with an external clock at frequencies from 5 to 50 Hz. This design is used with the KAO's facility sources, the Chopped Hotplate and the Portable Chopped Light Source (PCLS).

Baltz, James A.↗

Aerospace Flywheel Technology Development for IPACS Applications

The National Aeronautics and Space Administration (NASA) and the Air Force Research Laboratory (AFRL) are cooperating under a space act agreement to sponsor the research and development of aerospace flywheel technologies to address mutual future mission needs. Flywheel technology offers significantly enhanced capability or is an enabling technology. Generally these missions are for energy storage and/or integrated power and attitude control systems (IPACS) for mid-to-large satellites in low earth orbit. These missions require significant energy storage as well as a CMG or reaction wheel function for attitude control. A summary description of the NASA and AFRL flywheel technology development programs is provided, followed by specific descriptions of the development plans for integrated flywheel system tests for IPACS applications utilizing both fixed and actuated flywheel units. These flywheel system development tests will be conducted at facilities at AFRL and NASA Glenn Research Center and include participation by industry participants Honeywell and Lockheed Martin.

McLallin, Kerry L.↗

MIUS Integration and Subsystem Test (MIST) data system

A data system for use in testing integrated subsystems of a modular integrated utility system (MIUS) is presented. The MIUS integration and subsystem test (MIST) data system is reviewed from its conception through its checkout and operation as the controlling portion of the MIST facility. The MIST data system provides a real time monitoring and control function that allows for complete evaluation of the performance of the mechanical and electrical subsystems, as well as controls the operation of the various components of the system. In addition to the aforementioned capabilities, the MIST data system provides computerized control of test operations such that minimum manpower is necessary to set up, operate, and shut down subsystems during test periods.

Pringle, L. M.↗

Comparison of Analytical Predictions and Experimental Results for a Dual Brayton Power System (Discussion on Test Hardware and Computer Model for a Dual Brayton System)

NASA Glenn Research Center (GRC) contracted Barber-Nichols, Arvada, CO to construct a dual Brayton power conversion system for use as a hardware proof of concept and to validate results from a computational code known as the Closed Cycle System Simulation (CCSS). Initial checkout tests were performed at Barber- Nichols to ready the system for delivery to GRC. This presentation describes the system hardware components and lists the types of checkout tests performed along with a couple issues encountered while conducting the tests. A description of the CCSS model is also presented. The checkout tests did not focus on generating data, therefore, no test data or model analyses are presented.

Johnson, Paul K.↗

Optimal mitigation and control over power system dynamics for stochastic grid resilience

Optimal mitigation planning for highly disruptive contingencies to a transmission-level power system requires optimization with dynamic power system constraints, due to the key role of dynamics in system stability to major perturbations. We formulate a generalized disjunctive program to determine optimal grid component hardening choices for protecting against major failures, with differential algebraic constraints representing system dynamics (specifically, differential equations representing generator and load behavior and algebraic equations representing instantaneous power balance over the transmission system). We optionally allow stochastic optimal pre-positioning across all considered failure scenarios, and optimal emergency control within each scenario. This novel formulation allows, for the first time, analyzing the resilience interdependencies of mitigation planning, preventive control, and emergency control. Using all three strategies in concert is particularly effective at maintaining robust power system operation under severe contingencies, as we demonstrate on the western system coordinating council 9-bus test system using synthetic multi-device outage scenarios.

30 DIRECT ENERGY CONVERSION↗

Quantitative Small-Signal Stability Analysis of Grid-Forming Inverters in Large-Scale Power Systems

In this paper, the challenges induced by the integration of inverter-based resources (IBRs) into existing power systems are discussed. Although the grid-forming (GFM) control has been used to enhance system performance in multiple sections of electric power systems (e.g., transmission and distribution systems, microgrids, among others), the coupling mechanism between GFM inverter and various types of other components in modern power systems should be clearly explored. Existing analyses mainly focus on qualitative investigations that verify the effectiveness of deploying GFM inverters for stability enhancement. A holistic system-level quantitative analysis is still missing to verify the detailed benefits of GFM inverters and their interactions with other generation units (e.g., synchronous generators [SGs], conventional grid-following [GFL] inverters, synchronous condensers, among others). To fill in the technical gaps, a holistic small-signal model of the entire system with both rotating generation units and IBRs is established along with the customized power flow analysis for varying steady-state operating points. Further, a quantitative method is proposed to identify the impacts of GFM inverters on system performance with an emphasis on a quantifiable stability margin and a complete modal analysis at the system level. Finally, a realistic test system is used to verify the proposed approach.

grid-following↗

Voltage Violation Prediction in Unobservable Distribution Systems

Recently, distributed energy resources (DERs) such as photovoltaic (PV) systems have garnered significant attention due to their economic and environmental benefits. However, DERs can also pose new technical challenges to distribution system operation including under/over voltage issues. In this regard, voltage violation prediction (VVP) becomes an essential component of system operation as it enables proactive control strategies. Unfortunately, classical voltage monitoring techniques assume full availability of state measurements across all nodes in the system. In real-world scenarios, distribution systems are limited with few measurement devices, rendering the system unobservable. Therefore, this paper proposes a new Bayesian matrix completion (BMC) based VVP technique that accurately predicts the probability of nodal voltage violations in unobservable (and unbalanced) distribution systems. The proposed approach is tested via simulations on the IEEE 37 test system. Results show that the proposed method offers over 90% violation prediction accuracy with as low as 50% fraction of available data.

Abujubbeh, Mohammad↗

Skylab experiment integration overview

The complex Skylab experiment integration task entailed extensive technical interfacing and liaison. The integrator provided continuity as the experiment evolved through the major program phases. The phases included experiment proposal, experiment development, module integration testing, operations support planning, integrated systems testing, and mission support and evaluation. Skylab experiment program responsibilities are discussed along with a compatibility analysis, questions of documentation, status reviews, and aspects of design philosphy.

Schrock, S. R.↗

DSS 14 X-band radar feedcone

A high-power 400-kW continuous-wave (CW) X-band radar feed system was described for use with the Goldstone, California, 64-m DSS 14 antenna system. Design considerations, their solutions, and final system testing are discussed. The radar system, unique in terms of antenna size, radiated power, and efficiency, became operational in December 1974.

Neff, D. E.↗

Helios mission support

The Helios-1 third solar occultation and fourth perihelion is covered. A Helios-2 spacecraft emergency and third solar conjunction (occultation) are also discussed. Additional topics include STDN-DSN telemetry and command cross-support, Ground Data System tests, tracking coverage, plus DSN system performance for August and September 1976.

Goodwin, P. S.↗

Prototype solar heating and cooling systems

Prototype solar heating and cooling systems are described. Development, manufacture, test, system installation, maintenance, problem resolution, and performance evaluation are discussed.

Source record↗

Active controls for transports

It is shown that the integration of active controls into advanced commercial transport designs yields increased efficiency (by as much as 12%), reduced fuel consumption, and improved safety. These conclusions are based on a NASA development program considering various design configurations, wind tunnel tests (e.g., tests of static and dynamic control effects, aerodynamic loads, flutter tests, and active flutter suppression system tests), and extensive flight testing.

Taylor, L. W., Jr.↗

Analysis of misalignment in the tension test

Many experimenters fail to appreciate the significance of test system alignment during a tensile test. Poor alignment can increase data scatter and significantly influence some of the test results. In this paper a comprehensive analytical study of the misalignment problem in the plastic strain range is presented and errors caused by misalignment estimated. The results show that the stress-strain curve is not significantly affected by misalignment. However, the strains at the outermost fibers of the specimen cross-section are strongly affected by misalignment. Therefore, the effect of misalignment is most important when properties sensitive to local strain concentrations are being investigated.

Wu, H. C.↗

Payload test philosophy

The general philosophy of how JPL views payload qualification/acceptance testing for programs that are done either in-house or by contractors is described. Particular attention is given to mission risk classifications, preliminary critical design reviews, environmental design requirements, the thermal and dynamics development tests, and the flight spacecraft system test.

Gindorf, T.↗

Development and testing of the Shenandoah collector

The test and development of the 7-meter Shenandoah parabolic dish collector incorporating an FEK-244 film reflective surface and cavity receiver are described. Four prototypes tested in the midtemperature Solar System Test Facility indicate, with changes incorporated from these development tests, that the improvements should lead to predicted performance levels in the production collectors.

Kinoshita, G. S.↗

Restoration of the Hypersonic Tunnel Facility at NASA Glenn Research Center, Plum Brook Station

The NASA Glenn Research Center's Hypersonic Tunnel Facility (HTF), located at the Plum Brook Station in Sandusky, Ohio, is a non-vitiated, free-jet facility, capable of testing large-scale propulsion systems at Mach Numbers from 5 to 7. As a result of a component failure in September of 1996, a restoration project was initiated in mid- 1997 to repair the damage to the facility. Following the 2-1/2 year effort, the HTF has been returned to an operational condition. Significant repairs and operational improvements have been implemented in order to ensure facility reliability and personnel safety. As of January 2000, this unique, state-of-the-art facility was ready for integrated systems testing.

Woodling, Mark A.↗