Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Requirements Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

Demonstration of automated proximity and docking technologies

An autodock was demonstrated using straightforward techniques and real sensor hardware. A simulation testbed was established and validated. The sensor design was refined with improved optical performance and image processing noise mitigation techniques, and the sensor is ready for production from off-the-shelf components. The autonomous spacecraft architecture is defined. The areas of sensors, docking hardware, propulsion, and avionics are included in the design. The Guidance Navigation and Control architecture and requirements are developed. Modular structures suitable for automated control are used. The spacecraft system manager functions including configuration, resource, and redundancy management are defined. The requirements for autonomous spacecraft executive are defined. High level decisionmaking, mission planning, and mission contingency recovery are a part of this. The next step is to do flight demonstrations. After the presentation the following question was asked. How do you define validation? There are two components to validation definition: software simulation with formal and vigorous validation, and hardware and facility performance validated with respect to software already validated against analytical profile.

Anderson, Robert L.↗

Assessment of a career development program for executive amd mid-level managers

This project sought to validate the competencies required of mid-level and executive managers at the Kennedy Space Center (KSC), in order to enable an assessment of the Resident Management Education Program (RMEP). Forty (40) statements describing management competencies were presented to a sample of 37 KSC managers, who judged each as essential, useful but not essential, or not needed at each of two management levels. A content validity ratio (CVR) was calculated for each competency statement at the two management levels. There was general agreement on the validity of 36 or the 40 competency statements. Based on the content validity ratios and comments from respondents, recommendations for improvement of the RMEP were made.

Swanson, James R., Sr.↗

Crystal Growth of ZnSe and Related Ternary Compound Semiconductors by Physical Vapor Transport

Preliminary definition of all of the necessary materials, labor, services, and facilities necessary to provide science requirement definition, initiate hardware development activities, and provide an updated flight program proposal consistent with the NRA selection letter. The major tasks identified in this SOW are in the general category of science requirements determination, instrument definition, and updated flight program proposal. The Contractor shall define preliminary management, technical and integration requirements for the program, including improved cost/schedule estimates. The Contractor shall identify new technology requirements, define experiment accommodations and operational requirements and negotiate procurement of any long lead items, if required, with the government.

Su, Ching-Hua↗

Crystal Growth of ZnSe and Related Ternary Compound Semiconductors by Physical Vapor Transport

Preliminary definition of all of the necessary materials, labor, services, and facilities necessary to provide science requirement definition, initiate hardware development activities, and provide an update flight program proposal consistent with the NRA selection letter. The major tasks identified in this SOW are in the general category of science requirements determination, instrument definition, and updated flight program proposal. The Contractor shall define preliminary management, technical and integration requirements for the program, including improved cost/schedule estimates. The Contractor shall identify new technology requirements, define experiment accommodations and operational requirements and negotiate procurement of any long lead items, if required, with the government.

Cushman, Paula P.↗

Meeting the Challenges of Exploration Systems: Health Management Technologies for Aerospace Systems With Emphasis on Propulsion

The constraints of future Exploration Missions will require unique Integrated System Health Management (ISHM) capabilities throughout the mission. An ambitious launch schedule, human-rating requirements, long quiescent periods, limited human access for repair or replacement, and long communication delays all require an ISHM system that can span distinct yet interdependent vehicle subsystems, anticipate failure states, provide autonomous remediation, and support the Exploration Mission from beginning to end. NASA Glenn Research Center has developed and applied health management system technologies to aerospace propulsion systems for almost two decades. Lessons learned from past activities help define the approach to proper ISHM development: sensor selection- identifies sensor sets required for accurate health assessment; data qualification and validation-ensures the integrity of measurement data from sensor to data system; fault detection and isolation-uses measurements in a component/subsystem context to detect faults and identify their point of origin; information fusion and diagnostic decision criteria-aligns data from similar and disparate sources in time and use that data to perform higher-level system diagnosis; and verification and validation-uses data, real or simulated, to provide variable exposure to the diagnostic system for faults that may only manifest themselves in actual implementation, as well as faults that are detectable via hardware testing. This presentation describes a framework for developing health management systems and highlights the health management research activities performed by the Controls and Dynamics Branch at the NASA Glenn Research Center. It illustrates how those activities contribute to the development of solutions for Integrated System Health Management.

Melcher, Kevin J.↗

Design Requirements and Software Specification for the Autonomous Energy Management Software System for Small Commercial Buildings

Commercial buildings are responsible for approximately 20 percent of the total United States energy consumption and greenhouse gas emissions. Over 85 percent of these buildings lack building automation systems. Many of these buildings are small (<50,000 square feet), underserved, and use rooftop units for heating, ventilation, and air-conditioning needs. Because these buildings lack proper energy management systems, they have several operational deficiencies that lead to excess energy consumption. Studies have shown that managing the rooftop units heating and cooling set points, schedules, setbacks, and optimal start can result in 20 to 25 percent reduction in electricity consumption in small commercial buildings. In addition, improving demand flexibility of these buildings will result additional cost savings for the building owner. Therefore, the Department of Energy’s Building Technologies Office approved a project to address the needs for small commercial buildings. The project is led by Pacific Northwest National Laboratory (PNNL) with Intellimation LLC as the cooperative research and development agreement partner. The primary goal of the project is to develop and validate an autonomous energy management software (AEMS) system that will continuously optimize small commercial building operations by minimizing energy consumption and cost, while providing a solution for maximizing decarbonization benefits from electrification of buildings. The work will leverage the vast experience of PNNL research and development staff who have over two decades of experience in developing and successfully transferring software technologies to the private sector. This solution will be jointly developed with Intellimation, a company that plans to use it to scale their building energy efficiency (EE) and grid services offering. Widespread deployment of the AEMS system will improve the EE and demand flexibility of the building commercial building stock. It should also support cities and states in meeting their climate change mitigation goals. This document describes the various EE and grid service features of the AEMS system, infrastructure and data required to implement those features, and how the features should be automated. It also details how the various features will be tested and validated, including field validation. The document also details what flexibility the users have and how they will be able to leverage those capabilities exercise those. The intent is to create an AEMS system that would support scalable deployment, requires minimal configuration, and is easy to maintain over its expected lifespan. The initial alpha release of AEMS system is planned for March 2023, and the beta release is planned for the summer of 2023. The final release is planned for March 2024. Section 2 of the report documents the relevant building types that AEMS is suitable for. Section 3 documents EE features that will be supported. It will also include the data requirements, hardware requirements, implementation details, and how EE features will be tested and validated. Grid service features will be documented in section 4, including data requirements, hardware requirements, implementation details, and how the services will be tested and validated. Planned next steps are described in section 5.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cryogenic fluid management in space

Many future space based vehicles and satellites will require on orbit refuelling procedures. Cryogenic fluid management technology is being developed to assess the requirements of such procedures as well as to aid in the design and development of these vehicles. Cryogenic fluid management technology for this application could be divided into two areas of study, one is concerned with fluid transfer process and the other with cryogenic liquid storage. This division is based upon the needed technology for the development of each area. In the first, the interaction of fluid dynamics with thermodynamics is essential, while in the second only thermodynamic analyses are sufficient to define the problem. The following specific process related to the liquid transfer area are discussed: tank chilldown and fill; tank pressurization; liquid positioning; and slosh dynamics and control. These specific issues are discussed in relation with the required technology for their development in the low gravity application area. In each process the relevant physics controlling the technology is identified and methods for resolving some of the basic questions are discussed.

Antar, Basil N.↗

Technical Area V (TA-V) transformation project close-out report.

Sandia National Laboratories (SNL) Technical Area V (TA-V) has provided unique nuclear experimental environments for decades. The technologies tested in TA-V facilities have furthered the United States Nuclear Weapons program and has contributed to the national energy and homeland security mission. The importance of TA-V working efficiently to produce an attractive and effective platform for experiments should not be underestimated. Throughout its brief history, TA-V has evolved to address multiple and diverse sets of requirements. These requirements evolved over many years; however, the requirements had not been managed nor communicated comprehensively or effectively. A series of programmatic findings over several years of external audits was evidence of this downfall. Today, these same requirements flow down through a new TA-V management system that produces consistently applied and reproducible approaches to work practices. In 2008, the TA-V department managers assessed the state of TA-V services and work activities to understand how to improve customer interfaces, stakeholders perceptions, and workforce efficiencies. The TA-V management team initiated the TA-V Transformation Project after they deemed the pre-June 2008 operational model to be ineffective in managing work and in providing integrated, continuous improvement to TA-V processes. This report summarizes the TA-V Transformation Project goals, activities, and accomplishments.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Challenges of designing, operating, and managing brine extraction at a carbon dioxide storage site

Developing and deploying commercial-scale carbon dioxide (CO 2 ) storage at a site requires operational strategies to manage pressure and CO 2 plume distribution. In the natural gas storage and oil and gas industries, fluid extraction has been successfully implemented as a strategy to manage pressure and control fluid distribution (i.e., hydrocarbon recovery and natural gas storage efficiency, respectively). The technical challenges of integrating brine extraction at CO 2 storage sites are expected to be similar, if not identical, to those in the natural gas storage and petroleum industries. Major technical challenges of using brine extraction to manage storage in a storage unit include (1) designing and completing the brine extraction wells, (2) locating the brine extraction well, (3) assessing the efficacy of brine extraction, and (4) handling the extracted brine. The design and completion of the brine extraction well include the well type (i.e., vertical or horizontal) and perforated interval. The location of the well is influenced by the timing of extraction operations (i.e., prior or after CO 2 injection starts) and project objectives (i.e., desired directional movement of the CO 2 plume and avoid or minimize CO 2 extraction). The efficacy of brine extraction requires a baseline projection of the pressure and CO 2 plume distribution. Options for handling extracted brine include subsurface disposal, surface disposal, and industrial use. Here this paper addresses means of overcoming technical challenges that may likely be encountered before or after CO 2 injection starts.

25 ENERGY STORAGE↗

Trust Management in Swarm-Based Autonomic Computing Systems

Reputation-based trust management techniques can address issues such as insider threat as well as quality of service issues that may be malicious in nature. However, trust management techniques must be adapted to the unique needs of the architectures and problem domains to which they are applied. Certain characteristics of swarms such as their lightweight ephemeral nature and indirect communication make this adaptation especially challenging. In this paper we look at the trust issues and opportunities in mobile agent swarm-based autonomic systems and find that by monitoring the trustworthiness of the autonomic managers rather than the swarming sensors, the trust management problem becomes much more scalable and still serves to protect the swarms. We also analyze the applicability of trust management research as it has been applied to architectures with similar characteristics. Finally, we specify required characteristics for trust management mechanisms to be used to monitor the trustworthiness of the entities in a swarm-based autonomic computing system.

97 MATHEMATICS AND COMPUTING↗

Augmented Reality for Enabling Smart Nuclear Infrastructure

This work presents a novel, comprehensive framework that leverages emerging augmented reality headset technology to enable smart nuclear industrial infrastructure that a human can easily interact with to improve their performance in terms of safety, security, and productivity. Nuclear industrial operations require some of the most complicated infrastructure that must be managed today. Nuclear infrastructure and their associated industrial operations typically features stringent requirements associated with seismic, personnel management (e.g., access control, equipment access), safety (e.g., radiation, criticality, mechanical, electrical, spark, and chemical hazards), security (cyber/physical), and sometimes international treaties for nuclear non-proliferation. Furthermore, a wide variety of manufacturing and maintenance operations take place within these facilities further complicating their management. Nuclear facilities require very thorough and stringent documentation of the operations occurring within these facilities as well as maintaining a tight chain-of-custody for the materials being stored within the facility. The emergence of augmented reality and a variety of Internet of Things (IoT) devices offers a possible solution to help mitigate these challenges. This work provides a demonstration of a prototype smart nuclear infrastructure system that leverages augmented reality to illustrate the advantages of this system. It will also present example augmented reality tools that can be leveraged to create the next generation of smart nuclear infrastructure. The discussion will layout future directions of research for this class of work.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Requirements, Verification, and Compliance (RVC) Database Tool

This paper describes the development, design, and implementation of the Requirements, Verification, and Compliance (RVC) database used on the International Space Welding Experiment (ISWE) project managed at Marshall Space Flight Center. The RVC is a systems engineer's tool for automating and managing the following information: requirements; requirements traceability; verification requirements; verification planning; verification success criteria; and compliance status. This information normally contained within documents (e.g. specifications, plans) is contained in an electronic database that allows the project team members to access, query, and status the requirements, verification, and compliance information from their individual desktop computers. Using commercial-off-the-shelf (COTS) database software that contains networking capabilities, the RVC was developed not only with cost savings in mind but primarily for the purpose of providing a more efficient and effective automated method of maintaining and distributing the systems engineering information. In addition, the RVC approach provides the systems engineer the capability to develop and tailor various reports containing the requirements, verification, and compliance information that meets the needs of the project team members. The automated approach of the RVC for capturing and distributing the information improves the productivity of the systems engineer by allowing that person to concentrate more on the job of developing good requirements and verification programs and not on the effort of being a "document developer".

Rainwater, Neil E., II↗

The ORNL Overhead Vehicle Dataset (OOVD)

Roadways are critical to meeting the mobility and economic needs of the nation. The United States uses 28% of its energy in moving goods and people, with approximately 60% of that utilized by cars, light trucks, and motorcycles. Thus, improved transportation efficiency is vital to America’s economic progress. The increasing congestion and energy resource requirements of transportation systems for metropolitan areas require research in methods to improve and optimize control methods. Coordinating and optimizing traffic in urban areas may introduce hundreds of thousands of vehicles and traffic management systems, which can require high performance computing (HPC) resources to model and manage. This data set was created to understand the potential for machine learning, computer vision, and HPC to improve the energy efficiency aspects of traffic control by leveraging GRIDSMART traffic cameras as sensors for adaptive traffic control, with a sensitivity to the fuel consumption characteristics of the traffic in the camera’s visual field. GRIDSMART cameras—an existing, fielded commercial product—sense the presence of vehicles at intersections and replace more conventional sensors (such as inductive loops) to issue calls to traffic control. These cameras, which have horizon-to-horizon view, offer the potential for an improved view of the traffic environment which can be used to generate better control algorithms.

Karnowski, Thomas P.↗

Reinforcement Learning-based Traffic Control to Optimize Energy Usage and Throughput (CRADA report)

The US roadways are critical to meeting the mobility and economic needs of the nation. The United States uses 28% of its energy in moving goods and people, with approximately 60% of that utilized by cars, light trucks, and motorcycles. Thus, improved transportation efficiency is vital to America’s economic progress. The increasing congestion and energy resource requirements of transportation systems for metropolitan areas require research in methods to improve and optimize control methods. Coordinating and optimizing traffic in urban areas may introduce hundreds of thousands of vehicles and traffic management systems, which can require high performance computing (HPC) resources to model and manage. In this work, we seek to use machine learning, computer vision, and HPC to improve the energy efficiency aspects of traffic control by leveraging GRIDSMART traffic cameras as sensors for adaptive traffic control, with a sensitivity to the fuel consumption characteristics of the traffic in the camera’s visual field. Traffic control use cases using reinforcement learning have been published and achieved good results. Surveys from DOE national laboratories estimate that the fuel cost of idling is 6 billion gallons wasted annually [Argonne National Laboratory, 2019]. GRIDSMART cameras—an existing, fielded commercial product—sense the presence of vehicles at intersections and replace more conventional sensors (such as inductive loops) to issue calls to traffic control. These cameras, which have horizon-to-horizon view, offer the potential for an improved view of the traffic environment which can be used to generate better control algorithms.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

In-Time Safety Management for Part 139 Airports

Today’s airports are complex multi-faceted ecosystems. Currently, of the 517 certificated airports, 270 are required to use safety management systems (SMSs) to identify and mitigate known hazards and emergent risks and to voluntarily share safety data with commercial operators and tenants. Airports manage a wide variety of hazards. These traffic hubs have direct responsibilities, such as removing foreign object debris from runways and taxiways and configuring runways to help prevent against incursions and tail strikes during takeoff. To ensure safety in the future NAS, the National Academies recommended an In-time Aviation Safety Management System (IASMS). An IASMS will employ services, functions, and capabilities (SFCs) to identify and mitigate hazards that are proactively and predictively managed based on data analytics of detected anomalies, precursors, and trends. SFCs would scale with airport complexity and environmental conditions using increasingly automated systems to respond proactively to hazards and, by using integrated data sources and predictive safety analytical methods, discover new, never before seen risks.

IASMS↗

Command Center Training Tool (C2T2)

This abstract presents the training approach taken to create a management-centered, experiential learning solution for the Virginia Port Authority's Port Command Center. The resultant tool, called the Command Center Training Tool (C2T2), follows a holistic approach integrated across the training management cycle and within a single environment. The approach allows a single training manager to progress from training design through execution and AAR. The approach starts with modeling the training organization, identifying the organizational elements and their individual and collective performance requirements, including organizational-specific performance scoring ontologies. Next, the developer specifies conditions, the problems, and constructs that compose exercises and drive experiential learning. These conditions are defined by incidents, which denote a single, multi-media datum, and scenarios, which are stories told by incidents. To these layered, modular components, previously developed meta-data is attached, including associated performance requirements. The components are then stored in a searchable library An event developer can create a training event by searching the library based on metadata and then selecting and loading the resultant modular pieces. This loading process brings into the training event all the previously associated task and teamwork material as well as AAR preparation materials. The approach includes tools within an integrated management environment that places these materials at the fingertips of the event facilitator such that, in real time, the facilitator can track training audience performance and resultantly modify the training event. The approach also supports the concentrated knowledge management requirements for rapid preparation of an extensive AAR. This approach supports the integrated training cycle and allows a management-based perspective and advanced tools, through which a complex, thorough training event can be developed.

Jones, Phillip↗

Study of power management technology for orbital multi-100KWe applications. Volume 2: Study results

The preliminary requirements and technology advances required for cost effective space power management systems for multi-100 kilowatt requirements were identified. System requirements were defined by establishing a baseline space platform in the 250 KE KWe range and examining typical user loads and interfaces. The most critical design parameters identified for detailed analysis include: increased distribution voltages and space plasma losses, the choice between ac and dc distribution systems, shuttle servicing effects on reliability, life cycle costs, and frequency impacts to power management system and payload systems for AC transmission. The first choice for a power management system for this kind of application and size range is a hybrid ac/dc combination with the following major features: modular design and construction-sized minimum weight/life cycle cost; high voltage transmission (100 Vac RMS); medium voltage array or = 440 Vdc); resonant inversion; transformer rotary joint; high frequency power transmission line or = 20 KHz); energy storage on array side or rotary joint; fully redundant; and 10 year life with minimal replacement and repair.

Mildice, J. W.↗

Nevada National Security Site Integrated Groundwater Sampling Plan, Revision 1, with ROTC-1

The purpose of the Nevada National Security Site (NNSS) Integrated Groundwater Sampling Plan (referred to herein as the Plan) is to provide a comprehensive, integrated approach for collecting and analyzing groundwater samples to meet the needs and objectives of the U.S. Department of Energy (DOE), Environmental Management (EM) Nevada Program’s Underground Test Area (UGTA) Activity. Implementation of this Plan will provide high-quality data required by the UGTA Activity for ensuring public protection in an efficient and cost-effective manner. The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP) (NNSA/NFO, 2015). The Plan’s scope comprises sample collection and analysis requirements relevant to assessing both the extent of groundwater contamination from underground nuclear testing and impact of testing on water quality in downgradient communities. This Plan identifies locations to be sampled by corrective action unit (CAU) and location type, sampling frequencies, sample collection methodologies, and the constituents to be analyzed. In addition, the Plan defines data collection criteria such as well purging, detection levels, and accuracy requirements/recommendations; identifies reporting and data management requirements; and provides a process to ensure coordination between NNSS groundwater sampling programs for sampling analytes of interest to UGTA. Information used in the Plan development—including the rationale for selection of wells, sampling frequency, and the analytical suite—is discussed under separate cover (N-I, 2014) and is not reproduced herein.

54 ENVIRONMENTAL SCIENCES↗