Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

Navigating United States Standards and Regulation for Digital Energy Systems

This report provides an analysis of the U.S. standards and regulatory landscape for digital energy systems, focusing on cybersecurity, safety, and reliability requirements. It examines the interplay between federal mandates, state regulations, voluntary industry standards, and utility-specific policies, highlighting critical gaps between compliance and real-world risk mitigation. While NERC CIP standards enforce cybersecurity for Bulk Electric System assets, distribution-level infrastructure and emerging technologies often fall outside mandatory oversight, creating vulnerabilities. The report identifies systemic challenges such as reliance on self-attestation, uneven state adoption of safety codes, and lagging standards for advanced technologies like battery energy storage and inverter-based resources. Through a detailed gap analysis, it underscores the urgency of proactive risk-based approaches, independent verification, and strategic engagement with state and federal entities. Recommendations include adopting tiered security frameworks, strengthening procurement practices, and addressing emerging technology risks to ensure resilient and secure digital energy infrastructure. This guidance is intended for utilities, regulators, and stakeholders navigating compliance obligations and seeking to enhance cybersecurity and safety beyond minimum standards.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

District Geothermal Heating + Cooling Deployment in a CT Environmental Justice Community

The report marks the team’s completion of all required tasks and milestones. Work completed for Task 1 (Technical and Economic Feasibility Assessment & Procurement Drafting) included development of analysis and design model; completion of technical, economic, and environmental assessments; and technical outreach and coalition design. Components for Task 2 (Outreach & Community Engagement) involved broad outreach and community-engagement efforts (including stakeholder meetings and a webinar as well as development of a formal engagement plan) and development of a web page and a case study. For Task 3 (Workforce Transition, Development, & Training Plan), the team undertook a formal statewide geothermal workforce needs assessment, developed corresponding recommendations for both the state as a whole and the Wallingford project, and held several workshops. For Task 4 (Project Management & Data Sharing), the team drafted a data-sharing plan.

15 GEOTHERMAL ENERGY↗

Federal Water Management Planning Manual

FEMP developed this Federal Water Management Planning Manual to provide a resource for designing a comprehensive water management program. The manual describes strategies to optimize water use at federal facilities, use water balance analysis methods, identify design elements and procurement best practices, and expand use of alternative water.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Bridging Cloud and Edge Computing at NREL Using CONNECT: Cloud Optimized Networking for Next-Gen Edge Computing Technologies [Slides]

CONNECT is an innovative on-premise hardware and software solution that integrates edge and cloud computing infrastructure at NREL. Built on the AWS Greengrass middleware and leveraging the MQTT protocol, CONNECT enables real-time data streaming from IoT devices and gateways to both cloud and local services, empowering researchers to rapidly capture, analyze, and act upon edge-generated data while leveraging cloud capabilities. The platform addresses research infrastructure challenges by providing a pre-approved platform which is already configured with the correct networking and cybersecurity baselines thus eliminating procurement delays and enabling on-demand availability. CONNECT's hybrid architecture efficiently manages burstable workloads, allowing research teams to dynamically scale computational capacity, handle peak data loads, and reduce operational bottlenecks. Advanced capabilities include built-in GPU support for executing machine learning models which enables low-latency inference at the edge from models trained in the cloud. This architecture supports real-time analytics and filtering, providing a mechanism to allow only transmitting and processing high-value data. Cloud-based configuration management permits engineers to manage on-premise systems remotely, optimizing operational efficiency. By bridging edge and cloud computing, CONNECT provides NREL researchers with a flexible, scalable platform that accelerates scientific discovery while maintaining robust security and performance standards.

97 MATHEMATICS AND COMPUTING↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2024

Energy Savings Performance Contracts (ESPCs)are a contractual mechanism that allow a federal agency to procure energy savings and facility improvements without upfront capital costs to reduce costs and resiliency. ESPCs are covered under FAR Part 23.2, and 42 USC § 8287. Section 8287(a)(2)(A) of Title 42 of the U.S. Code requires that each energy savings performance contract (ESPC) undergo an annual energy audit, resulting in a separate audit report for every project. The objective of the present report is to compile and analyze all annual ESPC audit reports issued between October 1, 2023, and September 30, 2024, for projects awarded under Generations 1, 2, and 3 of DOE’s ESPC IDIQ contracts. During this period, 205 measurement and verification (M&V) reports were produced for 200 projects; the total number of reports exceeds the number of projects because some projects generated more than one report(for example, a few projects measure savings twice per year and produce two audit reports annually, each covering a different six-month period). By aggregating the results from these individual audits, the report determines the portfolio-wide realization rate of energy and cost savings for all active ESPC projects awarded under DOE’s IDIQ program. For all 205audit reports, sufficient information was available to compare project-level estimated, reported, and guaranteed cost savings. Reported cost savings accounted for ESCO verified savings per each project’s M&V plan. The total reported cost savings for the period addressed were $\$$647.8million,compared with the total guaranteed cost savings of $\$$601.6million. On average across the reported projects: •ESPC contractors guaranteed 92.8% of the estimated cost savings• projects reported achieving 100.0% of the estimated cost savings• projects reported achieving 107.7% of the guaranteed cost savings. The M&V performed for the period indicated adjustments for government operations and maintenance impacts to savings amount to$\$$43.9millionandcould be restored with the original operational parameters for impacted projects. Accounting for this potential cost savings impact, these projects still realized 100.4% of the guaranteed cost savings. The information on estimated and reported energy savings was collected and compared for all 205of the reports examined. Based on site energy, estimated savings totaled 14.88million MMBtu, and reported savings were 15.33million MMBtu; 3.1% greater than the estimated energy savings. All of the reports examined contained sufficient information to calculate source energy savings. Based on site-adjusted source energy, total estimated energy savings were 20.90 million MMBtu, and reported savings were 21.22million MMBtu, 101.5% of the estimated energy savings. For water savings, the estimated savings were 11,539,055 kGal and the reported savings were 13,315,930 kGal. This means 1,776,875 kGal more water was saved than estimated, which is about 15% higher than the estimate. These results indicate that, overall, the reported energy savings slightly exceeded the estimated values, while estimated water savings significantly exceeded estimated values, suggesting that the projects achieved greater cost savings than originally projected. The total annual expense for the ESCOs to perform annual M&V audits and reporting was $\$$10.02million. Through this effort, $\$$647.8 million in annual cost savings was verified. The M&V results indicated that $\$$43.9 million of these verified savings reflected adjustments due to government operations A-6and maintenance impacts, which could be restored under the original operational parameters for the affected projects. These findings show the value of M&V that only costs 1.7%of the guaranteed cost savings to ensure guarantees are met.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2024

Energy Savings Performance Contracts (ESPCs) are a contractual mechanism that allow a federal agency to procure energy savings and facility improvements without upfront capital costs to reduce costs and enhance mission resiliency. ESPCs are covered under FAR Part 23.2, and 42 USC § 8287. Section 8287(a)(2)(A) of Title 42 of the U.S. Code requires that each energy savings performance contract (ESPC) undergo an annual energy audit, resulting in a separate audit report for every project. The objective of the present report is to compile and analyze all annual ESPC audit reports issued between October 1, 2023, and September 30, 2024, for projects awarded under Generations 1, 2, and 3 of DOE’s ESPC IDIQ contracts. During this period, 205 measurement and verification (M&V) reports were produced for 200 projects; the total number of reports exceeds the number of projects because some projects generated more than one report (for example, a few projects measure savings twice per year and produce two audit reports annually, each covering a different six-month period). By aggregating the results from these individual audits, the report determines the portfolio-wide realization rate of energy and cost savings for all active ESPC projects awarded under DOE’s IDIQ program.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Manufacturing Full-Scale High Gradient Copper Accelerators: Electron Beam Welding and Allied Processes

This DOE ARDAP-funded study examines the technical and business feasibility of manufacturing high-gradient normal conducting RF (NCRF) copper accelerating structures using electron beam welding (EBW) instead of conventional high-temperature brazing. The core motivation is material performance: brazing softens copper significantly, while hard copper alloys have demonstrated ~75% higher operational gradients in SLAC tests, making cold-joining techniques highly attractive. EBW, applied to split-cell (half or quadrant) structure designs, preserves copper hardness away from the weld joint and simplifies machining — but industrial process optimization remains immature and a substantial learning curve is expected. The business case was modeled for two scenarios: a greenfield EBW linac company (> $10M upfront costs, viable above ~30 units/year) and an EBW division added to an existing accelerator firm to reduce risk and upfront costs, at the expense of being less optimal structure for the higher volume production. The study concludes that without a significant increase in demand, private investment alone cannot sustain this capability, and recommends federal support through R&D grants, procurement incentives, and CAPEX cost-sharing to incubate domestic EBW-NCRF manufacturing — with the existing-company model.

43 PARTICLE ACCELERATORS↗

Development of a Test-Bed for Testing and Refining EarthEn’s Supercritical CO 2 Based Energy Storage System

EarthEn’s energy storage concept leverages supercritical carbon dioxide (sCO 2 ) as a working fluid and relies on compact, high-performance components operating at elevated pressures and temperatures. To accelerate component development and reduce technical risk prior to larger-scale demonstrations, Oak Ridge National Laboratory (ORNL) developed a 100 kW-scale sCO 2 test-bed under a Cooperative Research and Development Agreement with EarthEn (CRADA NO. NFE-24-10050). The objective of the work was to design and construct a flexible experimental facility capable of reproducing key thermodynamic state points and heat-transfer conditions relevant to EarthEn’s thermal energy storage (TES) cycle, with particular emphasis on enabling development and evaluation of next-generation heat exchangers and TES concepts. The test-bed consists of a closed-loop sCO 2 circulation system housed within an open-topped enclosure. In its as-installed configuration, dense-phase sCO 2 is recirculated through a printed circuit recuperator, an electrically heated section, a throttling device used to simulate turbine expansion, and a water-cooled printed circuit heat exchanger that rejects heat to the building chilled-water system before returning to the pump. The pump is driven by a variable frequency drive, enabling controlled adjustment of flow and operating point. A comprehensive instrumentation suite was integrated to support both safe operation and high-quality data collection. Installed sensors include Coriolis flow meters for sCO 2 flow rate and density, resistance temperature detectors and thermocouples distributed throughout the loop (including the heated section and key heat exchanger ports), and pressure transducers for absolute and differential pressure measurements. The facility was designed to support high-pressure (19 MPa nominal) and high-temperature (575°C nominal) operation with credited overpressure protection provided by a rupture disk. Nominal operating conditions were selected to support 100 kW-class testing while maintaining flexibility for non-heated and heated shakedown, control development, and future integration of advanced TES test sections. In parallel with facility development, a system-level thermal-hydraulic model was created using Modelica-based tools to support component sizing, anticipate performance over targeted test conditions, and establish a framework for future model calibration against experimental data. At the conclusion of the project performance period, the facility was in final assembly, and the pressure boundary was nearly completed. However, several practical challenges associated with high-pressure/high-temperature systems and specialized component procurement impacted schedule and prevented initial pump-driven operation and full commissioning within the available resources. This report documents the as-built design, operating capabilities, and instrumentation, and it summarizes key lessons learned related to heater fabrication and testing, first-of-a-kind assembly factors, specialty flange supply constraints, and fill pump corrective actions. Finally, it outlines a phased plan for future commissioning and experimental campaigns, including control and instrumentation shakedown, heater characterization, model calibration, and testing at state points representative of EarthEn’s TES cycle.

25 ENERGY STORAGE↗

Speed to Power: Solutions for Accelerating Large Load Connections

Rapid growth in demand from data centers and other large loads is creating a range of new challenges for electricity planners, investors, system operators, and regulators, leading to bottlenecks that have slowed connection of large loads to the electric grid. In response, innovative solutions for accelerating large load connections are beginning to emerge across the U.S. Drawing on an extensive document and literature review, this report identifies more than 40 potential solutions for accelerating large load connections, organized into five functional areas: load forecasting, interconnection, resource planning and procurement, markets and operations, and cost allocation and ratemaking. The five functional areas provide a framework for organizing challenges and solutions to large load connection bottlenecks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Corrosion Testing of Refractory in Contact with Molten Glasses Designed for Waste Vitrification – VSL Touchpoint Matrix Glasses (Revision 1)

It is known that the predictive life of the refractory ceramic liner of nuclear waste glass melters is conservative, as demonstrated by performance of these materials such as in the Defense Waste Processing Facility (DWPF).[1] The motivation for this task is to maximize the useful life of the melters that will be operated at the Waste Treatment and Immobilization Plant (WTP), which will in turn minimize procurement and disposal costs and melter outage times, as well as to identify maximum loadings in the waste glass of those species that corrode melter components. This task was initiated jointly with Pacific Northwest National Laboratory (PNNL) with the objective to develop a methodology and model to enable more accurate prediction of refractory service life under prototypic conditions from laboratory-scale material corrosion tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Complete the Design, Cost Estimate, Assembly Plan, and Operating Instructions for a Bench-Scale Packed-Bed Tubular Methanol Catalyst Testing System

This report details the design of a test stand that converts carbon dioxide and hydrogen into methanol via a two-step process. The first step is a reverse water-gas shift reaction, carried out at 600°C and 25 bar to reduce carbon dioxide to carbon monoxide, and the second is a synthesis reaction that forms methanol at 260°C and 75 bar. The purpose of the system is to test catalysts for each of these steps. The test stand produces approximately 1.5 gallons of crude methanol (methanol mixed with water) per day, and recycles unreacted syngas for increased efficiency. At peak recycle, the stand is expected to consume 0.29 cylinders per day of carbon dioxide and 1.43 cylinders per day of hydrogen. It is planned to be built next to the Blue Star electrolysis unit in the Energy Systems Laboratory (ESL) and includes future plans of acquiring hydrogen from that stand rather than gas cylinders. At this phase of research, three key documents have been produced, as summarized in Table 1. These documents are primarily intended to describe the system and its operation, demonstrate that selected components are appropriate for the intended application, identify potential hazards, safeguards, and mitigation strategies, and ensure that the system is designed to appropriate standards. The body of the report and its appendices provide a narrative of the work completed in FY25. The parts required to build the test stand will be procured and assembled in FY26. Testing will be conducted in the final quarter.

10 - SYNTHETIC FUELS↗

Bldg. 7930 Cell G Neutron Detector New Electronics Testing

The Cell G neutron assay system within 7930 provides an important function in the production of Californium-252 in the quantitative determination of the amount of Cf-252 present in a sample. The assay system consists of a Uranium-238 fission chamber coupled to the necessary counting electronics including preamplifier, amplifier, discriminator and counter/timer. The original electronics date back to the 1970s but were replaced back in 2011 with little documentation detailing the testing and replacement efforts. This work focused on procuring a new spare set of electronics, their subsequent testing as a backup in case any of the currently in use electronics were to fail and documentation of the existing and new setups.

Taylor, Neil [Oak Ridge National Laboratory (ORNL)↗

CYVET: A Cyber-Physical Assurance Framework Based on a Semi-Supervised Vetting Approach

The project is designed to directly address the needs described in the Topic Area 4 (“Cybersecurity Verification and Validation”) of the CEDS’19 Research Call. The proposed CYVET system directly addresses the need to elevate the current industry capabilities to verify and validate OT cybersecurity and associated control system infrastructure. Currently, there is a significant gap in the energy sector’s capability in that regard during infrastructure improvement, equipment procurement, and compliance certification. CYVET provides that needed capability. CYVET is device and architecture agnostic and thus broadly applicable across the energy sector. The goal of this project is to develop and deliver a cybersecurity verification and validation framework testing capability to verify and validate OT equipment, software, and the underlying control system architecture. The primary project objectives are (i) Verification: the synthesis and reconciliation of standards and vendor supplied features, (ii) Validation: the generation, execution, and presentation of testing scripts of verified security features, and (3) Demonstration: apply the developed technology capabilities for verification and validation at a relevant end-user facility in the energy sector.

Lopez Jr, Juan↗

PIP-II SRF Couplers Fabrication Status and Addressing Ceramic Yield Challenges

The PIP-II project requires reliable SRF couplers to deliver high RF power to the cavities. This talk presents the current status of coupler fabrication, including progress on procurement, assembly, and testing. In particular, it focuses on the challenges encountered with ceramic window production, where limited yield has become a concern. Observed issues and inspection results will be discussed, together with the actions taken to improve quality and consistency. The path forward, including ongoing work with vendors and process adjustments, will also be outlined.

Aiazzi, Tommaso [Fermilab] (ORCID:0009000297503407↗

LASER ABLATION-INDUCTIVELY COUPLED PLASMA-ATOMIC EMISSION SPECTROSCOPY STUDY AT THE 222-S LABORATORY USING HOT-CELL GLOVE BOX PROTOTYPE SYSTEM

This report describes the installation, testing, and acceptance of the Waste Treatment and Immobilization Plant (WTP) procured laser ablation-inductively coupled plasma-atomic emission spectroscopy (LA-ICP-AES) system for remotely analyzing high-level waste (HLW) samples in a hot cell environment. The work was completed by the Analytical Process Development (APD) group in accordance with Task Order 2005-003; ATS MP 1027, Management Plan for Waste Treatment Plant Project Work Performed by Analytical Technical Services. The APD group at the 222-S Laboratory demonstrated acceptable turnaround time (TAT) and provide sufficient data to assess sensitivity, accuracy, and precision of the LA-ICP-AES method.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LASER ABLATION-INDUCTIVELY COUPLED PLASMA-ATOMIC EMISSION SPECTROSCOPY STUDY AT THE 222-S LABORATORY USING HOT-CELL GLOVE BOX PROTOTYPE SYSTEM

This report describes the installation, testing and acceptance of the Waste Treatment and Immobilization Plant procured laser ablation-inductively coupled plasma-atomic emission spectroscopy (LA-ICP-AES) system for remotely analyzing high-level waste samples in a hot cell environment. The 2005-003; ATS MP 1027, Management Plan for Waste Treatment Plant Project Work Performed by Analytical Technical Services. The APD group at the 222-S laboratory demonstrated acceptable turnaround time (TAT) and provide sufficient data to assess sensitivity, accuracy, and precision of the LA-ICP-AES method.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Examination of the Regional Supply and Demand Balance for Renewable Electricity in the United States through 2015: Projecting from 2009 through 2015 (Revised)

This report examines the balance between the demand and supply of new renewable electricity in the United States on a regional basis through 2015. It expands on a 2007 NREL study that assessed the supply and demand balance on a national basis. As with the earlier study, this analysis relies on estimates of renewable energy supplies compared to demand for renewable energy generation needed to meet existing state renewable portfolio standard (RPS) policies in 28 states, as well as demand by consumers who voluntarily purchase renewable energy. However, it does not address demand by utilities that may procure cost-effective renewables through an integrated resource planning process or otherwise.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Environmental Management System Plan

Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These DOE Orders and associated policies establish goals and sustainable stewardship practices that are protective of environmental, natural, and cultural resources, and take a life cycle approach that considers aspects such as: (1) Acquisition and use of environmentally preferable products; (2) Electronics stewardship; (3) Energy conservation, energy efficiency, and renewable energy; (4) Pollution prevention, with emphasis on toxic and hazardous chemical and material reduction; (5) Procurement of efficient energy and water consuming materials and equipment; (6) Recycling and reuse; (7) Sustainable and high-performance building design; (8) Transportation and fleet management; and (9) Water conservation. LBNL's approach to sustainable environmental stewardship required under Order 450.1A poses the challenge of implementing its EMS in a compliance-based, performance-based, and cost-effective manner. In other words, the EMS must deliver real and tangible business value at a minimal cost. The purpose of this plan is to describe Berkeley Lab's approach for achieving such an EMS, including an overview of the roles and responsibilities of key Laboratory parties. This approach begins with a broad-based environmental policy consistent with that stated in Chapter 11 of the LBNL Health and Safety Manual (PUB-3000). This policy states that Berkeley Lab is committed to the following: (1) Complying with applicable environmental, public health, and resource conservation laws and regulations. (2) Preventing pollution, minimizing waste, and conserving natural resources. (3) Correcting environmental hazards and cleaning up existing environmental problems, and (4) Continually improving the Laboratory's environmental performance while maintaining operational capability and sustaining the overall mission of the Laboratory. A continual cycle of planning, implementing, evaluating, and improving processes will be performed to achieve goals, objectives, and targets that will help LBNL carry out this policy. Each year, environmental aspects will be identified and their impacts to the environment will be evaluated. Objectives and targets will be developed (or updated) for each aspect that is determined to have a significant impact. Environmental Management Programs (EMPs) will be prepared (or updated) to document actions necessary for reducing certain environmental impacts. Each EMP will identify responsible parties and associated target deadlines for each action. Quarterly, environmental programs will be reviewed for compliance issues and effectiveness. Annually, an internal assessment will be performed to evaluate the progress of the EMS, and LBNL senior management will review the results. In addition, at least once every 3 years a third-party audit will be performed to validate that the EMS is being implemented according to plan.

99 GENERAL AND MISCELLANEOUS↗