Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Practices”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

PNNL Review of Federal and State Agency Regulatory Streamlining Practices

All major federal actions that have the potential to significantly affect the environment (e.g., land purchases and/or issuing grants, permits, leases, or licenses) are subject to multiple statutes including the following: • an environmental analysis under the National Environmental Policy Act (NEPA) • potential consultations with the U.S. Fish and Wildlife Service (USFWS) and/or National Marine Fisheries Service (NMFS) under the Endangered Species Act of 1973, as amended (ESA) • potential consultations with State Historical Preservation Officers (SHPOs) and/or tribal nations [often Tribal Historic Preservation Officers (THPOs)] under the National Historic Preservation Act of 1966 (NHPA). Given the size of the federal government and the corresponding variability and complexity in its missions, different branches within the federal government have a fairly wide range of approaches to fulfill their NEPA and consultation requitements. Many of these approaches are founded on the desire to streamline their NEPA and consultation processes while meeting the spirit and letter of the regulations. Some federal and state environmental/engineering agencies have developed web-based dashboards that provide a single web location for permit application submittals. They also use general permits in their various permitting processes. General permits can streamline the permitting process by establishing identical requirements for all eligible applicants. This reduces the time these agencies need to spend reviewing individual permits and setting specific requirements. In addition, general permits do not require a case-specific permit application. This paper presents a sampling of effective agency examples of streamlining the NEPA process and associated agency consultations. It also includes several examples of federal and state agency web portals, online application systems, and general permits that make application processes more efficient and accessible.

54 ENVIRONMENTAL SCIENCES↗

Planning Roadmap for DER Integration in India: Industry Best Practices and Resource Guide

Ensuring safe, reliable, cost-effective DER integration at scale requires holistic planning, broad stakeholder engagement, and should address key development areas such as standards adoption, equipment testing and certification, interoperability and cybersecurity, interconnection procedures, and advanced forecasting and DER management. Each of these areas currently represent significant challenges for utilities, regulators, OEMs, developers, and even consumers worldwide. India has already seen significant growth of DERs and has announced targets for substantial growth yet to come, with the potential for DERs to make up a non-negligible portion of the country's overall generation capacity. As such, it is of critical importance that Indian stakeholders consider the potential impacts of wide-spread adoption of DERs and take preemptive action related to the five development areas listed here, among others. India should consider strategies including the adoption of key DER standards related to interconnection, testing, and cybersecurity; enabling effective and secure communication channels for DER interoperability; testing and certifying DER equipment in accredited testing laboratories; building robust, streamlined interconnection procedures; and revamping legacy system planning structures to incorporate DERs in a holistic planning framework.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Platform for Remote Deployment and Training for Enhanced Building Operation Practices (Building Re-Tuning and On-going Commissioning)

While a building’s energy usage is driven largely by its design and use, building operator behavior has a strong influence on its energy consumption. This project developed and piloted a specific, data-driven coaching methodology to help operators understand how they can adjust operations and/or affect no/low-cost repairs or upgrades to their specific building HVAC systems to reduce energy consumption. Named BuildingCoach, the operational optimization method used is based on the Building Re-tuning approach developed by the Pacific Northwest National Laboratory. A building operations analytics market has matured over the past decade, though its potential to affect energy-saving changes has not been fully realized. Training operators to understand the methods for operational optimization with the explicit approach of using building-system performance data is hypothesized to create a more effective, longer lasting result in building energy efficiency, and this strategy is the fundamental premise of this project. With the support of an Industry Advisory Board, the project succeeded in developing materials and recruiting for and delivering three pilot cohorts. Deliverables included twenty-two self-paced training modules (accessed via a Learning Management System) and a web-based platform that includes access to real-time building system data and a repository for building system documentation. The project set out to have 100 participants from 50 buildings in three pilot cohorts. In the end, there were 28 participants from 17 buildings, i.e., a significant shortfall. The first two pilot cohorts had only two buildings in each, and this was partially due to difficulties in deploying the Building Operator Coaching Solution (“the BOCS”), which is technology that extracts the data from the controls network and presents it as prescribed for coaching. In the third cohort, the project team deployed the BOCS successfully to 13 buildings, the methodology was piloted as intended, and numerous opportunities for optimization were identified. The BuildingCoach business plan charts a path to an economically sustainable effort. However, even with a licensing model captured in the final version of the business plan, the scalability is still limited to keeping less than 1,000 buildings affected by 2033. Even so, there are unexplored paths to greater scalability that are being considered. CUNY BPL is working to perpetuate and grow the use of BuildingCoach. As of this writing, about twenty buildings have either been connected or will be connected with operators coached / to be coached in the NYC municipal portfolio, twelve buildings across four campuses in NY State will use BuildingCoach, a NY upstate county wishes for six or seven buildings to participate with the support of funding from NYSERDA, and others have also expressed interest. In the decades to come, there will be an increasing percentage of large and mid-sized buildings that incorporate automated system optimization (ASO), and the building operators’ role will shift to spend more time on maintenance and monitoring. Meanwhile, programs such as BuildingCoach will play a critical role in optimizing operations. And, regardless of the emergence of ASO, operators will still need to understand how their systems operate so that they can monitor them properly. Within that context, BuildingCoach is an important step towards operators’ understanding of efficient building system operations.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Consequential Analysis of the Greenhouse Gas Emissions Impacts of Actions That Influence the Electric Grid: The Theory and Practice of Using Marginal Emissions Rates

This paper discusses consequential greenhouse gas emissions analysis for actions that influence the electric grid that is, the analytical approach of estimating how such actions change greenhouse gas emissions, relative to what they otherwise would have been without the action. Although the paper starts with general considerations, it ultimately focuses on consequential analysis with marginal emissions rates as an option likely more scalable than others.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Review of Value of Solar Studies In Theory and In Practice

This brief summarizes a collection of state- and utility-commissioned value-of-solar (VoS) studies and related literature, with a focus on who commissioned the study, which value and cost categories were discussed and/or quantified, and the methods used. Our objective is to compile information on prior VoS studies to inform state regulators and other stakeholders that may pursue related studies or integrate findings into rate design. The brief is organized into three parts: 1) an introduction to distributed solar photovoltaic (DPV) compensation; 2) a review of theoretical research on VoS; and 3) a review of VoS studies. The vast majority of VoS studies have served an informational role of quantifying the net benefits of PV. Three studies were commissioned in states or utility service territories that subsequently implemented VoS tariffs in California, New York, and Austin, Texas. When applied as a tariff, VoS aims to compensate PV output as efficiently as possible by doing so at rates that reflect the marginal benefits and costs of PV through value and cost categories that may vary temporally and/or geographically. This could lead to higher compensation in locations and times where more PV output is more valuable and consequently drive adoption in those locations to provide more societal benefits. Value and cost factors can be broadly grouped into five categories: generation, transmission, distribution, other utility, and other social categories. Those conducting VoS studies must weigh various tradeoffs when deciding which categories to include and quantify. Tradeoffs include prioritizing values based on their magnitude of value or cost impact, as well as taking into account the feasibility of data collection and accurate quantification. Values of higher magnitude and estimation feasibility are quantified in the majority of studies, including the earliest of studies conducted in the 2000s and 2010s. Additionally, some values of higher magnitude but low feasibility in the earliest of studies have become quantifiable in recent years. There are some values with low average system-wide levels but very high magnitude in specific locations or hours. The value magnitude in some cases can be tied to DPV penetration with low value in areas with little congestion and/or low penetration and vice versa. In these cases, values that are easier to quantify are often incorporated, while those that are more difficult are often addressed via a placeholder value. The placeholder value is paired with a discussion around data needs and methods to improve future estimates, as well as a conversation about when these value categories may increase in magnitude and necessitate more rigorous quantification. This brief summarizes findings from two meta-analyses of VoS studies that took place between 2005 and 2018, as well as findings from four additional studies published from 2018 to 2023. Table ES-1 summarizes the various value and cost categories included in each respective study and whether they were quantified, discussed, or omitted. Values such as avoided energy, capacity, transmission capacity, line losses, and avoided environmental costs are quantified in every study. Some categories were deemed harder to quantify and less impactful at the time of the study, so they were discussed but not quantified (e.g., ancillary services). Other categories, including many at the distribution level, were very locationally and/or temporally specific and dependent on high DPV penetration. These were sometimes quantified and at other times discussed. Notably, when it came to utility costs, integration costs were discussed in all cases, though they were deemed to have a small impact. Other utility costs were omitted for the most part; however, the utility-commissioned study (by NorthWestern Energy in Montana) included both lost utility revenue and programmatic/administrative cost categories. While there are some similarities across studies, each had fairly unique methods that are detailed in the body of this brief.

14 SOLAR ENERGY↗

Best practice guidelines for the use of economic and technical KPIs

Key Performance Indicators (KPIs) are an important set of metrics used to assess various aspects of photovoltaic (PV) systems, including their long-term performance, economic viability and carbon footprint. Technical KPIs support data-driven and informed decision-making when optimizing PV systems and provide a comprehensive overview of how PV systems operate across different conditions and climates. Different KPIs are commonly employed throughout the entire value chain of PV projects and can be categorized into technical, economic and sustainability aspects.

14 SOLAR ENERGY↗

Timeouts Best Practices

This study investigates common timeouts encountered in the electric vehicle (EV) charging communications process. Many different timeouts are defined within the EV charging communications protocols. These timeouts can either be a fixed value or a defined range of values. In both cases, the timeout defines the duration of time for which one or both parties in the communications session are expected to wait for some action or process to complete before terminating the charge attempt. These timeout-based terminations are intended to prevent the charging process from becoming stuck indefinitely in any particular step. These terminations also enable a retry of the terminated charging session to begin. However, misaligned timeout values can have a significant negative impact on the user experience. Premature termination of charging sessions due to inappropriate timeout settings can lead to charging failures, causing inconvenience, wasted time, and frustration for users. These disruptions can degrade the overall user experience, making it essential to carefully manage and align timeout values with the relevant actions and processes to ensure reliable and satisfactory EV charging sessions. The core objective of this study is to boost reliability and enhance user experience by conducting a thorough review of timeout-based issues in EV charging and delivering a set of recommendations to modify these existing timeouts. These recommendations are informed by feedback gathered from multiple EV charging partners. This document is intended to inform electric vehicle supply equipment (EVSE) and EV manufacturers, EV charging infrastructure developers, and policymakers responsible for designing and implementing EV charging protocols and systems.

33 ADVANCED PROPULSION SYSTEMS↗

Community Charging: Emerging Multifamily, Curbside, and Multimodal Practices

Approximately 44 million households—31% of the United States total—are in multifamily housing. This encompasses both rented and owned homes in apartment buildings, condominiums, townhouses, and mixed-use developments. Regardless of where they live, nearly one-third of Americans do not drive. As U.S. transportation is electrified, it will be imperative to support car-free or car-light households, as well as residents living in multifamily and rental housing, with tailored solutions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗