Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ORION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

STS-134 Re-Rendezvous Design History

In preparation to provide the capability for the Orion spacecraft to rendezvous with the International Space Station (ISS), a new suite of relative navigation sensors are in development and will be tested on one of the final Space Shuttle missions to ISS. The National Aeronautics and Space Administration (NASA) commissioned a flight test of prototypes of the instruments on STS-134, in order to test their performance in the space environment during the nominal rendezvous and docking, as well as a re-rendezvous dedicated to testing the prototype sensors following the undocking of the Space Shuttle Orbiter at the end of the mission. Unlike the initial rendezvous and docking, the re-rendezvous profile would replicate the newly designed Orion coelliptic approach trajectory, something never before attempted with the Shuttle Orbiter. Therefore, there were a number of new parameters that needed to be conceived of, designed, and tested for this re-rendezvous to make the flight test successful. And all of this work had to be integrated with the normal operations of the ISS and Shuttle and had to conform to the constraints of the mission and vehicles. The result of this work is a separation and re-rendezvous trajectory design that will prove not only the design of the relative navigation sensors for the Orion vehicle, but also will serve as a proof of concept for the Orion rendezvous trajectory itself. This document presents the analysis and decision making process involved in attaining the final STS-134 re-rendezvous design.

Stuit, Timothy D.↗

Integration Assessment of Visiting Vehicle Induced Electrical Charging of the International Space Station Structure

The International Space Station (ISS) undergoes electrical charging in low Earth orbit (LEO) due to positively biased, exposed conductors on solar arrays that collect electrical charges from the space plasma. Exposed solar array conductors predominately collect negatively charged electrons and thus drive the metal ISS structure electrical ground to a negative floating potential (FP) relative to plasma. This FP is variable in location and time as a result of local ionospheric conditions. ISS motion through Earth s magnetic field creates an addition inductive voltage up to 20 positive and negative volts across ISS structure depending on its attitude and location in orbit. ISS Visiting Vehicles (VVs), such as the planned Orion crew exploration vehicle, contribute to the ISS plasma charging processes. Upon physical contact with ISS, the current collection properties of VVs combine with ISS. This is an ISS integration concern as FP must be controlled to minimize arcing of ISS surfaces and ensure proper management of extra vehicular activity crewman shock hazards. This report is an assessment of ISS induced charging from docked Orion vehicles employing negatively grounded, 130 volt class, UltraFlex (ATK Space Systems) solar arrays. To assess plasma electron current collection characteristics, Orion solar cell test coupons were constructed and subjected to plasma chamber current collection measurements. During these tests, coupon solar cells were biased between 0 and 120 V while immersed in a simulated LEO plasma. Tests were performed using several different simulated LEO plasma densities and temperatures. These data and associated theoretical scaling of plasma properties, were combined in a numerical model which was integrated into the Boeing Plasma Interaction Model. It was found that the solar array design for Orion will not affect the ISS FP by more than about 2 V during worst case charging conditions. This assessment also motivated a trade study to determine acceptable plasma electron current levels that can be collected by a single or combined fleet of ISS-docked VVs.

Kramer, Leonard↗

Venting of a Water/Inhibited Propylene Glycol Mixture in a Vacuum Environment-Characterization and Representative Test Results

A planned use of the Orion space vehicle involves its residence at the International Space Station for six months at a time. One concept of operations involves temporarily venting portions of the idle Orion active thermal control system (ATCS) during the docked phase, preventing freezing. The venting would have to be reasonably complete with few, if any, completely filled pockets of frozen liquid. Even if pockets of frozen liquid did not damage the hardware during the freezing process, they could prevent the system from filling completely prior to its reactivation. The venting of single component systems in a space environment has been performed numerous times and is well understood. Local nucleation occurs at warm, relatively massive parts of the system, which creates vapor and forces the bulk liquid out of the system. The remnants of the liquid will freeze, then evaporate over time through local heating. Because the Orion ATCS working fluid is a 50/50 mixture of water and inhibited propylene glycol, its boiling behavior was expected to differ from that of a pure fluid. It was thought that the relatively high vapor pressure water might evaporate preferentially, leaving behind a mixture enriched with the low vapor pressure propylene glycol, which would be vaporization ]resistant. Owing to this concern, a test was developed to compare the evaporation behavior of pure water, a 50/50 mixture of water and inhibited propylene glycol, and inhibited propylene glycol. The test was performed using room temperature fluids in an instrumented thin walled stainless steel vertical tube. The 1 in x 0.035 in wall tube was instrumented with surface thermocouples and encased in closed cell polyurethane foam. Reticulated polyurethane foam was placed inside the tube to reduce the convection currents. A vacuum system connected to the top of the tube set the pressure boundary condition. Tests were run for the three fluids at back pressures ranging from 1 to 18 torr. During each test, the mass of the test article was measured as it changed over time, as was its temperature and backpressure. The tests were successful. Somewhat surprisingly, the results showed that the evaporation behavior of the three fluids had more similarities than differences. The 50/50 mixture evaporated similarly to the pure water - albeit at a slower rate. The test results indicate that our extensive space - based experience with venting of single component fluids can be applied to the problem of Orion ATCS venting as long as the appropriate puts, takes, and caveats are applied.

Ungar, Eugene K.↗

Use of Heritage Hardware on MPCV Exploration Flight Test One

Due to an aggressive schedule for the first orbital test flight of an unmanned Orion capsule, known as Exploration Flight Test One (EFT1), combined with severe programmatic funding constraints, an effort was made to identify heritage hardware, i.e., already existing, flight-certified components from previous manned space programs, which might be available for use on EFT1. With the end of the Space Shuttle Program, no current means exists to launch Multi Purpose Logistics Modules (MPLMs) to the International Space Station (ISS), and so the inventory of many flight-certified Shuttle and MPLM components are available for other purposes. Two of these items are the Shuttle Ground Support Equipment Heat Exchanger (GSE Hx) and the MPLM cabin Positive Pressure Relief Assembly (PPRA). In preparation for the utilization of these components by the Orion Program, analyses and testing of the hardware were performed. The PPRA had to be analyzed to determine its susceptibility to pyrotechnic shock, and vibration testing had to be performed, since those environments are predicted to be significantly more severe during an Orion mission than those the hardware was originally designed to accommodate. The GSE Hx had to be tested for performance with the Orion thermal working fluids, which are different from those used by the Space Shuttle. This paper summarizes the certification of the use of heritage hardware for EFT1.

Rains, George Edward↗

Multi Purpose Crew Vehicle Environmental Control and Life Support Development Status

The Orion Multi Purpose Crew Vehicle (MPCV) is the first crew transport vehicle to be developed by the National Aeronautics and Space Administration (NASA) in the last thirty years. Orion is currently being developed to transport the crew safely beyond Earth orbit. This year, the vehicle focused on building the Exploration Flight Test 1 (EFT1) vehicle to be launched in 2014. The development of the Orion Environmental Control and Life Support (ECLS) System, focused on the completing the components which are on EFT1. Additional development work has been done to keep the remaining component progressing towards implementation for a flight tests in of EM1 in 2017 and in and EM2 in 2020. This paper covers the Orion ECLS development from April 2012 to April 2013.

Lewis, John F.↗

Application of a Smart Parachute Release Algorithm to the CPAS Test Architecture

One of the primary test vehicles for the Capsule Parachute Assembly System (CPAS) is the Parachute Test Vehicle (PTV), a capsule shaped structure similar to the Orion design but truncated to fit in the cargo area of a C-17 aircraft. The PTV has a full Orion-like parachute compartment and similar aerodynamics; however, because of the single point attachment of the CPAS parachutes and the lack of Orion-like Reaction Control System (RCS), the PTV has the potential to reach significant body rates. High body rates at the time of the Drogue release may cause the PTV to flip while the parachutes deploy, which may result in the severing of the Pilot or Main risers. In order to prevent high rates at the time of Drogue release, a "smart release" algorithm was implemented in the PTV avionics system. This algorithm, which was developed for the Orion Flight system, triggers the Drogue parachute release when the body rates are near a minimum. This paper discusses the development and testing of the smart release algorithm; its implementation in the PTV avionics and the pretest simulation; and the results of its use on two CPAS tests.

Bledsoe, Kristin↗

Simulation/Emulation Techniques: Compressing Schedules With Parallel (HW/SW) Development

NASA has always been in the business of balancing new technologies and techniques to achieve human space travel objectives. NASA's Kedalion engineering analysis lab has been validating and using many contemporary avionics HW/SW development and integration techniques, which represent new paradigms to NASA's heritage culture. Kedalion has validated many of the Orion HW/SW engineering techniques borrowed from the adjacent commercial aircraft avionics solution space, inserting new techniques and skills into the Multi - Purpose Crew Vehicle (MPCV) Orion program. Using contemporary agile techniques, Commercial-off-the-shelf (COTS) products, early rapid prototyping, in-house expertise and tools, and extensive use of simulators and emulators, NASA has achieved cost effective paradigms that are currently serving the Orion program effectively. Elements of long lead custom hardware on the Orion program have necessitated early use of simulators and emulators in advance of deliverable hardware to achieve parallel design and development on a compressed schedule.

Mangieri, Mark L.↗

Antenna Measurements: Test & Analysis of the Radiated Emissions/Immunity of the NASA/Orion Spacecraft Dart Parachute Simulator & Prototype Capsule - The Crew Exploration Vehicle

For future NASA Manned Space Exploration of the Moon and Mars, a blunt body capsule, called the Orion Crew Exploration Vehicle (CEV), composed of a Crew Module (CM) and a Service Module (SM), with a parachute decent assembly is planned for reentry back to Earth. A Capsule Parachute Assembly System (CPAS) is being developed for preliminary prototype parachute drop tests at the Yuma Proving Ground (YPG) to simulate high-speed reentry to Earth from beyond Low-Earth-Orbit (LEO) and to provide measurements of position, velocity, acceleration, attitude, temperature, pressure, humidity, and parachute loads. The primary and secondary (backup) avionics systems on CPAS also provide mission critical firing events to deploy, reef, and release the parachutes in three stages (extraction, drogues, mains) using mortars and pressure cartridge assemblies. In addition, a Mid-Air Delivery System (MDS) is used to separate the capsule from the sled that is used to eject the capsule from the back of the drop plane. Also, high-speed and high-definition cameras in a Video Camera System (VCS) are used to film the drop plane extraction and parachute landing events. Intentional and unintentional radiation emitted from and received by antennas and electronic devices on/in the CEV capsule, the MDS sled, and the VCS system are being tested for radiated emissions/immunity (susceptibility) ~ (RE/RS). To verify Electromagnetic Compatibility (EMC) of the Orion capsule, Electromagnetic Interference (EMI) measurements are being made inside a semi-anechoic chamber at NASA/JSC on the components of the CPAS system. Measurements are made at 1m from the components-under-test (CUT). In addition, EMI measurements of the integrated CEV system are being made inside a hanger at YPG. These measurements are made in a complete circle, at 30◦ angles or less, around the Orion Capsule, the spacecraft system under-test (SUT). Near-field B-Dot probe measurements on the surface of the Orion capsule are being extrapolated outward to the 1m standard distance for comparison to the MIL-STD radiated emissions limit, and far-field hybrid antenna measurements at 3m are being extrapolated inward to the 1m distance for similar comparisons.

Norgard, John D.↗

Multi Purpose Crew Vehicle Active Thermal Control and Environmental Control and Life Support Development Status

The Orion Multi Purpose Crew Vehicle (MPCV) is the first crew transport vehicle to be developed by the National Aeronautics and Space Administration (NASA) in the last thirty years. Orion is currently being developed to transport the crew safely beyond Earth orbit. This year, the vehicle focused on building the Exploration Flight Test 1 (EFT1) vehicle to be launched in September of 2014. The development of the Orion Active Thermal Control (ATCS) and Environmental Control and Life Support (ECLS) System, focused on the integrating the components into the EFT1 vehicle and preparing them for launch. Work also has started on preliminary design reviews for the manned vehicle. Additional development work is underway to keep the remaining component progressing towards implementation on the flight tests of EM1 in 2017 and of EM2 in 2020. This paper covers the Orion ECLS development from April 2013 to April 2014

Lewis, John F.↗

SSL Freeform Generator v1.00

The Orion spacecraft utilizes a system of Compact Unique Identifiers (CUIs) to identify telemetry measurements in the process of communicating with the ground. While avionic systems are still in development, simulation of telemetric data must be used for the development of dependent systems. The SuperScript Language (SSL) developed by Honeywell Aerospace provides users a programming language for simulation of this data. The use of tools that provide SSL generation capabilities at a higher level allows for faster and more efficient generation of simulation waveforms. Previous SSL Generator implementations such as Orion Scripted Interface Generator (OrionSIG) relied on software supported routines to generate simulation points for the SSL scripts. This provided relevant simulation capabilities, but was reduced in flexibility by the available software routines available. For this approach, software supported routines have been entirely dropped. Rather, the user is required to enter their own simulation waveform input. This allows arbitrarily complex functions to be utilized simulated with maximum degree of freedom for the user.: The idea for this version of the SSL Generator was a mapping of arbitrary waveforms to Orion CUI telemetry data. The SSL Generator implemented offers a higher degree of freedom to the user than previous versions while attempting to maintain abstraction from the underlying SSL script and the Orion CUI data types. As such, many mappings of waveforms to CUIs will simply not work. Certain implementation decisions were made to minimize the damage caused by these unintended side-effects, such as saturation of values exceeding the maximum or minimum bounds of the data type. Other details, such as signed values being represented in unsigned data types, present problems which cant be fixed to an acceptable degree of intended behavior without user input. Awareness of the limitations of all layers of the software stack will increase the productivity of the end-user.

telemetry↗

Supporting Multiple Programs and Projects at NASA's Kennedy Space Center

With the conclusion of the shuttle program in 2011, the National Aeronautics and Space Administration (NASA) had found itself at a crossroads for finding transportation of United States astronauts and experiments to space. The agency would eventually hand off the taxiing of American astronauts to the International Space Station (ISS) that orbits in Low Earth Orbit (LEO) about 210 miles above the earth under the requirements of the Commercial Crew Program (CCP). By privatizing the round trip journey from Earth to the ISS, the space agency has been given the additional time to focus funding and resources to projects that operate beyond LEO; however, adding even more stress to the agency, the premature cancellation of the program that would succeed the Shuttle Program - The Constellation Program (CxP) -it would inevitably delay the goal to travel beyond LEO for a number of years. Enter the Space Launch System (SLS) and the Orion Multipurpose Crew Vehicle (MPCV). Currently, the SLS is under development at NASA's Marshall Spaceflight Center in Huntsville, Alabama, while the Orion Capsule, built by government contractor Lockheed Martin Corporation, has been assembled and is currently under testing at the Kennedy Space Center (KSC) in Florida. In its current vision, SLS will take Orion and its crew to an asteroid that had been captured in an earlier mission in lunar orbit. Additionally, this vehicle and its configuration is NASA's transportation to Mars. Engineers at the Kennedy Space Center are currently working to test the ground systems that will facilitate the launch of Orion and the SLS within its Ground Services Development and Operations (GSDO) Program. Firing Room 1 in the Launch Control Center (LCC) has been refurbished and outfitted to support the SLS Program. In addition, the Spaceport Command and Control System (SCCS) is the underlying control system for monitoring and launching manned launch vehicles. As NASA finds itself at a junction, so does all of its associated centers across the US. KSC has found itself at the blunt end of change as the entire center has transitioned from an operations mindset to a development mentality. The author of this paper has had the fortunate privilege and opportunity to be part of a transforming NASA during the fall months of 2014. The following is a high level account of projects that he had the chance to work on including the Spaceport Command and Control System, the Advanced Ground System and Maintenance Program Project, Customer Avionics Development & Analysis (CAIDA) Lab and Swamp Works.

Advanced Ground System Maintenance↗

Wallops' Low Elevation Link Analysis for the Constellation Launch/Ascent Links

Prior to the redirection of the Constellation Program, the Wallops 11.3-meter ground station was tasked to support the Orion's Dissimilar Voice (DV) link and the Ares's Development Flight Instrument (DFI) link. Detailed analysis of the launch trajectories indicates that during the launch and ascent operation, the critical events of Orion-Ares main engine cut off (MECO) and Separation occur at low elevation angle. We worked with engineers from both Wallops Flight Facility (WFF) and Johnson Space Center (JSC) to perform an intensive measurement and link analysis campaign on the DV and DFI links. The main results were as follows: (1) The DV links have more than 3 dB margin at MECO and Separation. (2) The DFI links have 0 dB margin at Separation during certain weather condition in summer season. (3) Tropospheric scintillation loss is the major impairment at low elevation angle. (4) The current scintillation models in the Recommendation ITU-R P.618 (Propagation data and prediction methods required for the design of Earth-space telecommunication systems), which are based on limited experimental and theoretical work, exhibit idiosyncratic behaviors. We developed an improved model based on the measurements of recent Shuttle mission launch and ascent links and the ITU propagation data. (5) Due to the attitude uncertainty of the Orion-Ares stack, the high dynamics of the launch and ascent trajectory, and the irregularity of the Orion and Ares antenna patterns, we employed new link analysis approach to model the spacecraft antenna gain. In this paper we discuss the details of the aforementioned results.

Cheung, Kar-Ming↗

Water Phase Change Heat Exchanger System Level Analysis for Low Lunar Orbit

In low Lunar orbit (LLO) the thermal environment is cyclic - extremely cold in the eclipse and as warm as room temperature near the subsolar point. Phase change material heat exchangers (PCHXs) are the best option for long term missions in these environments. The Orion spacecraft will use a n-pentadecane wax PCHX for its envisioned mission to LLO. Using water as a PCM material is attractive because its higher heat of fusion and greater density result in a lighter, more compact PCHX. To assess the use of a water PCHX for a human spacecraft in a circular LLO, a system level analysis was performed for the Orion spacecraft. Three cases were evaluated: 1) A one-to-one replacement of the wax PCHX on the internal thermal control loop with a water PCHX (including the appropriate control modifications), 2) reducing the radiator return setpoint temperature below Orion's value to enhance PCHX freezing, and 3) placing the water PCM on the external loop. The model showed that the water PCHX could not be used as a drop-in replacement for the wax PCHX. It did not freeze fully during the eclipse owing to its low freezing point. To obtain equivalent performance, 40% more radiator area than the Orion baseline was required. The study shows that, although water PCHXs are attractive at a component level, system level effects mean that they are not the best choice for LLO.

Navarro, Moses↗

Spin Forming Aluminum Crew Module (CM) Metallic Aft Pressure Vessel Bulkhead (APVBH) - Phase II

The principal focus of this project was to assist the Multi-Purpose Crew Vehicle (MPCV) Program in developing a spin forming fabrication process for manufacture of the Orion crew module (CM) aft pressure vessel bulkhead. The spin forming process will enable a single piece aluminum (Al) alloy 2219 aft bulkhead resulting in the elimination of the current multiple piece welded construction, simplify CM fabrication, and lead to an enhanced design. Phase I (NASA TM-2014-218163 (1)) of this assessment explored spin forming the single-piece CM forward pressure vessel bulkhead. The Orion MPCV Program and Lockheed Martin (LM) recently made two critical decisions relative to the NESC Phase I work scope: (1) LM selected the spin forming process to manufacture a single-piece aft bulkhead for the Orion CM, and (2) the aft bulkhead will be manufactured from Al 2219. Based on the Program's new emphasis related to the spin forming process, the NESC was asked to conduct a Phase II assessment to assist in the LM manufacture of the aft bulkhead and to conduct a feasibility study into spin forming the Orion CM cone. This activity was approved on June 19, 2013. Dr. Robert Piascik, NASA Technical Fellow for Materials at the Langley Research Center (LaRC), was selected to lead this assessment. The project plan was approved by the NASA Engineering and Safety Center (NESC) Review Board (NRB) on July 18, 2013. The primary stakeholders for this assessment were the NASA and LM MPCV Program offices. Additional benefactors are commercial launch providers developing CM concepts.

Hoffman, Eric K.↗

NASA's Space Launch System: A New Opportunity for CubeSats

Designed for human exploration missions into deep space, NASA's Space Launch System (SLS) represents a new spaceflight infrastructure asset, enabling a wide variety of unique utilization opportunities. Together with the Orion crew vehicle and ground operations at NASA's Kennedy Space Center in Florida, SLS is a foundational capability for NASA's Journey to Mars. From the beginning of the SLS flight program, utilization of the vehicle will also include launching secondary payloads, including CubeSats, to deep-space destinations. Currently, SLS is making rapid progress toward readiness for its first launch in 2018, using the initial configuration of the vehicle, which is capable of delivering 70 metric tons (t) to Low Earth Orbit (LEO). On its first flight, Exploration Mission-1, SLS will launch an uncrewed test flight of the Orion spacecraft into distant retrograde orbit around the moon. Accompanying Orion on SLS will be 13 CubeSats, which will deploy in cislunar space. These CubeSats will include not only NASA research, but also spacecraft from industry and international partners and potentially academia. Following its first flight and potentially as early as its second, which will launch a crewed Orion spacecraft into cislunar space, SLS will evolve into a more powerful configuration with a larger upper stage. This configuration will initially be able to deliver 105 t to LEO and will continue to be upgraded to a performance of greater than 130 t to LEO. While the addition of the more powerful upper stage will mean a change to the secondary payload accommodations from Block 1, the SLS Program is already evaluating options for future secondary payload opportunities. Early discussions are also already underway for the use of SLS to launch spacecraft on interplanetary trajectories, which could open additional opportunities for CubeSats. This presentation will include an overview of the SLS vehicle and its capabilities, including the current status of progress toward first launch. It will also explain the opportunities the vehicle offers for CubeSats and secondary payloads, including an overview of the CubeSat manifest for Exploration Mission-1 in 2018.

Hitt, David↗

Space Launch System Spacecraft and Payload Elements: Making Progress Toward First Launch

Significant and substantial progress continues to be accomplished in the design, development, and testing of the Space Launch System (SLS), the most powerful human-rated launch vehicle the United States has ever undertaken. Designed to support human missions into deep space, SLS is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development directorate. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit, and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. SLS will deliver a near-term heavy-lift capability for the nation with its 70 metric ton Block 1 configuration, and will then evolve to an ultimate capability of 130 metric tons. The SLS program marked a major milestone with the successful completion of the Critical Design Review in which detailed designs were reviewed and subsequently approved for proceeding with full-scale production. This marks the first time an exploration class vehicle has passed that major milestone since the Saturn V vehicle launched astronauts in the 1960s during the Apollo program. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS - Exploration Mission-1 (EM-1), an uncrewed mission to orbit the moon and return, and progress in on track to meet the initial targeted launch date in 2018. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. This paper will particularly focus on work taking place at Marshall Space Flight Center (MSFC) and United Launch Alliance (ULA) in Alabama, where upper stage and adapter elements of the vehicle are being constructed and tested. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) Element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on EM-1. Construction is already underway on the EM-1 Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter is set to begin at the Friction Stir Facility located at MSFC while structural test articles are either completed (OSA) or nearing completion (Launch Vehicle Stage Adapter). An overview is provided of the launch vehicle capabilities, with a specific focus on SPIE Element qualification/testing progress, as well as efforts to provide access to deep space regions currently not available to the science community through a secondary payload capability utilizing CubeSat-class satellites.

Schorr, Andrew A.↗

Space Launch System Spacecraft and Payload Elements: Making Progress Toward First Launch

Significant and substantial progress continues to be accomplished in the design, development, and testing of the Space Launch System (SLS), the most powerful human-rated launch vehicle the United States has ever undertaken. Designed to support human missions into deep space, SLS is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development directorate. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit, and the Ground Systems Development and Operations program is transforming Kennedy Space Center into next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. SLS will deliver a near-term heavy-lift capability for the nation with its 70 metric ton (t) Block 1 configuration, and will then evolve to an ultimate capability of 130 t. The SLS program marked a major milestone with the successful completion of the Critical Design Review in which detailed designs were reviewed and subsequently approved for proceeding with full-scale production. This marks the first time an exploration class vehicle has passed that major milestone since the Saturn V vehicle launched astronauts in the 1960s during the Apollo program. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS -- Exploration Mission-1 (EM-1), an un-crewed mission to orbit the moon and return. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress in on track to meet the initial targeted launch date in 2018. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. This paper will particularly focus on work taking place at Marshall Space Flight Center (MSFC) and United Launch Alliance in Alabama, where upper stage and adapter elements of the vehicle are being constructed and tested. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) Element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on EM-1. Construction is already underway on the EM-1 Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter is set to begin at the Friction Stir Facility located at MSFC while structural test articles are either completed (OSA) or nearing completion (Launch Vehicle Stage Adapter). An overview is provided of the launch vehicle capabilities, with a specific focus on SPIE Element qualification/testing progress, as well as efforts to provide access to deep space regions currently not available to the science community through a secondary payload capability utilizing CubeSat-class satellites.

Schorr, Andrew A.↗

Flat H Redundant Frangible Joint Development

Orion and Commercial Crew Program (CCP) Partners have chosen to use frangible joints for certain separation events. The joints currently available are zero failure tolerant and will be used in mission safety applications. The goal is to further develop a NASA designed redundant frangible joint that will lower flight risk and increase reliability. FY16 testing revealed a successful design in subscale straight test specimens that gained efficiency and supports Orion load requirements. Approach / Innovation A design constraint is that the redundant joint must fit within the current Orion architecture, without the need for additional vehicle modification. This limitation required a design that changed the orientation of the expanding tube assemblies (XTAs), by rotating them 90deg from the standard joint configuration. The change is not trivial and affects the fracture mechanism and structural load paths. To address these changes, the design incorporates cantilevered arms on the break plate. The shock transmission and expansion of the XTA applies force to these arms and creates a prying motion to push the plate walls outward to the point of structural failure at the notched section. The 2014 test design revealed that parts could slip during functioning wasting valuable energy needed to separate the structure with only a single XTA functioning. Dual XTA functioning fully separated the assembly showing a discrepancy can be backed up with redundancy. Work on other fully redundant systems outside NASA is limited to a few patents that have not been subjected to functionality testing Design changes to prevent unwanted slippage (with ICA funding in 2015) showed success with a single XTA. The main goal for FY 2016 was to send the new Flat H RFJ to WSTF where single XTA test failures occurred back in 2014. The plan was to gain efficiency in this design by separating the Flat H RFJ with thicker ligaments with dimensions baselined in 2014. Other modifications included geometry changes to better disperse loads paths and to minimize air gaps. The design additionally added more structural strength to enhance the structural limits in static loads testing. The design also implemented a smoother load line through the assembly. Results / Knowledge Gained The new Flat H RFJ successfully fractured at WSTF with thicker ligaments and lower cord size. Where failure to separate occurred earlier, there is now excessive energy available for structural separation. The new challenge to provide some structural support to prevent secondary fracturing of the break plate remains to be completed. This future work is being funded by the JSC Engineering Directorate in 2017 to elevate the TRL on curved Flat H RFJs that configure with the Orion Service Panel Separation. Additional funding from JSC Engineering will provide new design testing to avoid secondary fracturing.

Brown, Chris↗