Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “MAINTENANCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

An Alternative Approach to Human Servicing of Crewed Earth Orbiting Spacecraft

As crewed spacecraft have grown larger and more complex, they have come to rely on spacewalks, or Extravehicular Activities (EVA), for assembly and to assure mission success. Typically, these spacecraft maintain all of the hardware and trained personnel needed to perform an EVA on-board at all times. Maintaining this capability requires up-mass, volume for storage of EVA hardware, crew time for ground and on-orbit training, and on-orbit maintenance of EVA hardware. This paper proposes an alternative methodology, utilizing either launch-on-need hardware and crew or regularly scheduled missions to provide EVA capability for space stations in low Earth orbit after assembly complete. Much the same way that one would call a repairman to fix something at their home these EVAs are dedicated to maintenance and upgrades of the orbiting station. For crew safety contingencies it is assumed the station would be designed such the crew could either solve those issues from inside the spacecraft or use the docked Earth to Orbit vehicles as a return lifeboat, in the same manner as the International Space Station (ISS) which does not rely on EVA for crew safety related contingencies. This approach would reduce ground training requirements for long duration crews, save Intravehicular Activity (IVA) crew time in the form of EVA hardware maintenance and on-orbit training, and lead to more efficient EVAs because they would be performed by specialists with detailed knowledge and training stemming from their direct involvement in the development of the EVA. The on-orbit crew would then be available to focus on the immediate response to any failures such as IVA systems reconfiguration or jumper installation as well as the day-to-day operations of the spacecraft and payloads. This paper will look at how current unplanned EVAs are conducted on ISS, including the time required for preparation, and offer an alternative for future spacecraft. As this methodology relies on the on-time and on-need launch of spacecraft, any space station that utilized this approach would need a robust transportation system, possibly including more than one launch vehicle capable of carrying crew. In addition, the fault tolerance of the future space station would be an important consideration in how much time was available for EVA preparation after the failure. Ideally the fault tolerance of the station would allow for the maintenance tasks to be grouped such that they could be handled by regularly scheduled maintenance visits and not contingency launches. Each future program would have to weigh the risk of on-time launch against the increase in available crew time for the main objective of the spacecraft. This is only one of several ideas that could be used to reduce or eliminate a station's reliance on rapid turnaround EVAs using on-board crew. Others could include having shirt-sleeve access to critical systems or utilizing low pressure temporarily pressurized equipment bays.

Mularski, John R.↗

Uncrewed Lunar Surface Operations and Support Activities

Sustained human presence on the surface of the Moon and future missions to Mars require increased independence from surface crews and Earth-based mission control to operate efficiently, safely, and reliably. The time for surface crews to perform tasks will be limited. Extravehicular activities by surface personnel are burdensome and time-consuming, even when a continuous human presence on the surface occurs. Identifying and balancing human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle will be essential to achieve mission objectives. Among these objectives are attaining a sustained human presence, improving performance and mission effectiveness, reducing operations and maintenance (O&M) costs, and ensuring operations that are robust to communication delays. To achieve these objectives, an operational shift toward increased automation and autonomy with less reliance on humans is needed. Uncrewed lunar surface operations and support activities occur when surface crews are not present or are independent of surface crew timeline activities requiring no surface crew oversight or intervention. These uncrewed surface opportunities can also be planned to minimize crew workload that avoids routine maintenance and support tasks, thus maximizing crew exploration time. Uncrewed preparations such as staging and prepositioning equipment and materials before the crew arrives could improve crew task efficiency. Additional opportunities exist to conduct uncrewed science, exploration, and utilization. Uncrewed surface architecture functions can include science and exploration; habitation; launch and landing support; surface communication and navigation; surface power generation and distribution; human surface mobility; lifting, handling, manipulating; excavation, construction, and site preparation; logistics management; maintenance and repair; surface resource utilization; integrated site operations and shared support services (e.g., site scheduling/prioritization, dust mitigation/contamination control, and surface safety). Early robotic lunar surface campaigns will provide information on the availability of resources, such as oxygen and water, and demonstrate surface-based technologies. After the Artemis III human lunar return mission, a series of landers will deliver surface systems, cargo, supplies, science packages, spare parts, and commodities. A balance of crewed and uncrewed surface operations will enable a sustained lunar surface presence at the South Pole of the Moon at a site that will be known as the Artemis Base Camp (ABC). It is envisioned that base camp operations on and around the Moon will then help prepare for the mission durations and activities needed to support the first human mission to Mars. Before long-duration crew missions to the base camp can occur, the necessary surface infrastructure will be pre-deployed and verified operational. Surface assets will be teleoperated and remotely managed from Earth. Additionally, robotic and short-duration crewed missions to the ABC will ensure the site’s merit to achieve long-term science objectives, availability of usable resources, and that terrain, seasonal variations, and illumination conditions are acceptable. ABC will consist of different areas where specific functions and services are rendered, including: • Launch and Landing Area • Habitation Area • Power Production Area • Resource Areas Launch and Landing Area—The launch and landing area will support associated functions for the arrival and departure of vehicles, such as crewed landing and ascent and uncrewed cargo deliveries and offloading. It will evolve from an unimproved site at the beginning of the exploration campaign to a more sustainable landing and launch area that can support repeated arrivals and departures. Initial uncrewed Lunar Terrain Vehicle (LTV) surface operations may include emplacement of navigation beacons and communication equipment, real-time video and photography of landing/liftoff events, and element repositioning, such as portable utility power (PUP) (applicable for other landed assets at other areas). Site preparations, such as surface leveling, soil compaction, and berm/path construction, may be needed for a more sustainable launch and landing area capable of accommodating vehicles that are increasingly more reusable and reduce the effects of plume surface interactions and ejecta impacts on nearby surface assets. During the ABC missions, cargo and logistics will be delivered to the lunar surface via robotic cargo landers before the crew arrives. These shipments, which can arrive in pressurized logistics carriers, will deliver the logistics necessary to support a crewed mission and include items such as food, water, equipment spares, etc. Providing the capability to retrieve, offload, and transport the logistics closer to the ABC site before the arrival of the crew will increase the overall efficiency of crew operations once they arrive. In the sustained phase of exploration, other supporting services may be needed, such as lander propellant servicing, surface power services, commodity refreshes, and additional inspection, maintenance, and repair capabilities, to sustain a cadence of extended personnel stays and cargo arrivals and departures. Habitation Area—Uncrewed support to surface habitation could involve supporting activation and pre-entry operations of the habitat while the crew is in orbit at the Gateway outpost preparing for a surface landing. Surface Habitat (SH) uncrewed operations may include bringing the cabin environment to a habitable temperature and air mix and activating other critical crew support systems. Potential crop production uncrewed tasks in the SH could also include autonomous watering and tending. Additionally, when the crew departs, the SH enters dormancy for the long period of uncrewed operation. A logistical staging area could also be collocated near the SH. If so, staging operations for crew supplies, waste re-location, and recycling operations may be opportunities for uncrewed operations. Power Production Area—The Fission Surface Power (FSP) element and its supporting distribution equipment provide power to surface elements as needed across the ABC to supplement day-to-day operations and survive lunar nights. Uncrewed support of this power system includes any initial LTV-assisted deployments of cables and other distributed equipment, associated electrical connections, and system testing and activation operations. Robotically performing some inspections, maintenance, or repair tasks on the power distribution equipment could reduce the surface crew workload. Resource Area— Uncrewed resource prospecting, mapping, and characterizing possible resource sites is likely to be time-consuming and represents an opportunity for uncrewed operations between crewed missions. Uncrewed mobile equipment operations will be needed in the extreme environments of permanently shadowed locations where resource extractions occur. As In-Situ Resource Utilization (ISRU) pilot plant operations begin, uncrewed surface support activities with available mobile and portable assets (LTV, PUP, etc.) will better support these operations. Any produced commodities can be stored at a centralized storage location for future use. Also associated with these operations is the use of mobile robotic excavators for resource acquisition and robotic/autonomous regolith processing. The waste tailings generated during excavation and regolith processing would also need to be transported and deposited at a dedicated location. Surface assets will continue operating between crew visits to maintain surface capabilities, conduct lunar surface science, technology demonstrations, and public outreach opportunities. Additionally, certain sustaining tasks that would consume valuable crew time could be performed before crew arrival, or after their departure. This capability may offer more affordable options to construct, activate, test, and maintain a broad set of surface assets. Telerobotically operated human surface mobility systems, such as the LTV and Pressurized Rover (PR), can be utilized for various tasks. Surface environmental conditions pose a distinct challenge for all these activities. Surface illumination and localized shadows are one such factor. Night-survival operations could consist of thermal management, battery pre-charging, and load shedding. Some surface systems may hibernate through the night and then awake and continue nominal operations. Uncrewed mobile assets may use a more adaptive approach to optimize their power and operations; one method is to follow the sunlight. Night-survival operations may be initiated remotely by teleoperation, automated, or accomplished by supervised autonomous operation. The ability to pre-deploy and control remote assets in orbit or on Mars before the arrival of the mission crew is a key capability that can be simulated on the moon. The base camp provides a venue where these advanced operational concepts, technologies, and autonomous methods and techniques, including the incorporation of time delays to simulate Earth-Mars latency can be replicated to help buy down future Mars mission risks. This paper will examine the evolution of uncrewed lunar surface operations and support activities. It will also discuss the lunar surface environmental conditions (thermal, lighting, terrain, topography, communications) along with the challenges they pose on uncrewed surface operations, and the performance of these activities with limited to minimal human interaction and/or teleoperation. Since lunar missions include Mars mission analogs, such investigation provides the framework for future uncrewed Mars mission support.

Mark E Lewis↗

Bridging Equipment Reliability Data and Risk Informed Decisions in a Plant Operation Context

Industry equipment reliability and asset management programs are essential elements that help ensure the safe and economical operation of nuclear power plants. The effectiveness of these programs is addressed in several industry-developed and regulatory programs. The Risk-Informed Asset Management (RIAM) project is tasked to develop tools in support of the equipment reliability and asset management programs at nuclear power plants. These tools are designed to create a direct bridge between component health/lifecycle data and decision making (e.g., maintenance scheduling and project prioritization). The goal of this article is to provide a guide for specific use cases that the RIAM project is targeting. We have grouped uses cases into three main areas. The first area focuses on the analysis of equipment reliability data with a particular emphasis on condition-based data, such as test/surveillance reports and component monitoring data. The second area focuses on the integration of equipment reliability into system/plant reliability models to determine system/plant health and identify the components that are critical to maintain an operational system. Lastly, the third area manages plant resources, such as maintenance activities and replacement scheduling using optimization methods. Here the primary focus is on supporting typical system engineer decisions regarding maintenance activity scheduling and component aging management. This is performed in a risk-informed context where the term “risk” is broadly constructed to include both plant reliability and economics. This framework combines data analytics tools to analyze equipment reliability data with risk-informed methods designed to support system engineer decisions (e.g., maintenance and replacement schedules, optimal maintenance posture) in a customizable workflow.

97 - MATHEMATICS AND COMPUTING↗

Risk-informed Graded Approach for Reliability and Performance Assessment of Machine Learning and Artificial Intelligence for Advanced Condition Monitoring Techniques

With the shift away from time-based maintenance and toward condition-based maintenance, and to reduce overall maintenance costs, there has been an upsurge in the usage and development of advanced condition monitoring (ACM) techniques for real-time monitoring of nuclear power plant (NPP) components. ACM is particularly useful in the development of digital twins, which are designed to predict the failure or degradation of plant components. Successful implementation of ACM requires an assessment to inform the development of a risk-informed approach to evaluate the use of ACM to meet Nuclear Regulatory Committee (NRC) regulations for in-service testing (IST) programs. This includes the monitoring and diagnostics of reactor components and systems in current, new, and advanced reactors. A key component in ACM is the usage of machine learning (ML) and artificial intelligence (AI) algorithms that can employ real-time data from instrumentation and sensors to detect and predict reactor component degradations. Such predictive capabilities enable early detection of component degradation so as to help plant personnel plan and execute necessary maintenance. For successful implementation of ML/AI in ACM such that regulatory requirements are met, a risk-informed graded approach is needed to assess the reliability and performance of ML/AI for ACM. The American Society for Mechanical Engineers (ASME) developed their Operations and Maintenance (O&M) Code to provide guidance on safe, reliable O&M of NPPs. The IST section of the O&M Code specifically establishes requirements for IST and examination to gauge operational readiness of components in water-cooled NPPs. This paper presents a state-of-the-art review of how reliability and risk assessment can be integrated with ACM to assess component performance by non-nuclear industries. This is followed by different methodologies and approaches for conducting performance and reliability assessments so as to meet IST requirements for NPP components.

97 - MATHEMATICS AND COMPUTING↗

INTEGRATION OF DATA ANALYTICS WITH SYSTEM HEALTH PROGRAMS

Industry equipment reliability and asset management programs are essential elements that help ensure the safe and economical operation of nuclear power plants. The effectiveness of these programs is addressed in several industry developed and regulatory programs. However, these programs have proven to be labor intensive and expensive. There is an opportunity to significantly enhance the collection, analysis, and use of this information to provide more cost-effective plant operation. Additionally, there is an acute industry need to leverage advanced technology to reduce costs and improve operational effectiveness. The goal of this paper is to provide effective and efficient analytical methods and tools to support risk-informed decisions for the equipment reliability and asset management programs at nuclear power plants. This is accomplished by creating a direct bridge between component health/lifecycle data and decision making (e.g., maintenance scheduling and project prioritization). Here we are supporting typical system engineer decisions regarding maintenance activity scheduling and component ageing management. This is performed in a risk-informed context where herein the term “risk” is broadly constructed to include both plant reliability and economics. This framework combines data analytics tools to analyze equipment reliability data with risk-informed methods designed to support system engineer decisions (e.g., maintenance and replacement schedules, optimal maintenance posture) in a customizable workflow. A challenge is that the structure of this workflow strongly depends on the decision that needs to be made, the type of data available, and the constraints that need to be considered. Current methods are designed to provide specific answers to specific problems; however, these methods might prove to be inadequate even when problem settings slightly change (e.g., different types of requirements, additional dependencies between system reliability and economics). We tackled this challenge by designing framework in a flexible and modular fashion such that the user can assemble and customize his/her own workflow that integrates SSC economic lifecycle models (e.g., maintenance and replacement costs), system reliability models, and optimization methods.

97 - MATHEMATICS AND COMPUTING↗

Risk-informed Graded Approach for Reliability and Performance Assessment for Advanced Condition Monitoring Techniques

With the shift away from time-based maintenance and toward condition-based maintenance, and to reduce overall maintenance costs, there has been an upsurge in the usage and development of advanced condition monitoring (ACM) techniques for real-time monitoring of nuclear power plant (NPP) components. ACM is particularly useful in the development of digital twins, which are designed to predict the failure or degradation of plant components. Successful implementation of ACM requires an assessment to inform the development of a risk-informed approach to evaluate the use of ACM to meet Nuclear Regulatory Committee (NRC) regulations for in-service testing (IST) programs. This includes the monitoring and diagnostics of reactor components and systems in current, new, and advanced reactors. A key component in ACM is the usage of machine learning (ML) and artificial intelligence (AI) algorithms that can employ real-time data from instrumentation and sensors to detect and predict reactor component degradations. Such predictive capabilities enable early detection of component degradation so as to help plant personnel plan and execute necessary maintenance. For successful implementation of ML/AI in ACM such that regulatory requirements are met, a risk-informed graded approach is needed to assess the reliability and performance of ML/AI for ACM. The American Society for Mechanical Engineers (ASME) developed their Operations and Maintenance (O&M) Code to provide guidance on safe, reliable O&M of NPPs. The IST section of the O&M Code specifically establishes requirements for IST and examination to gauge operational readiness of components in water-cooled NPPs. This paper presents a state-of-the-art review of how reliability and risk assessment can be integrated with ACM to assess component performance by non-nuclear industries. This is followed by different methodologies and approaches for conducting performance and reliability assessments so as to meet IST requirements for NPP components.

99 - GENERAL AND MISCELLANEOUS↗

Systematic Enterprise Risk Management by Integrating the RISMC Toolkit and Cost-Benefit Analysis (Final Report)

The goal of this research is to theorize and quantify the relationships between safety and the financial performance of nuclear power plants (NPPs). The Socio-Technical Risk Analysis (SoTeRiA) theoretical framework, which connects the social aspects (e.g., safety culture) and structural features (e.g., safety practices) of an organization with organizational safety and financial risks, is used to theorize the direct and indirect relationships between safety and the financial performance of NPPs. An Integrated Enterprise Risk Management (I-ERM) methodological framework is developed to operationalize SoTeRiA to quantify NPP safety and financial performance in a unified platform where their underlying physical degradation mechanisms, coupled with maintenance performance (considering human and organizational factors), are explicitly incorporated to depict the interconnections and dependencies between safety and financial performance. In this study, NPP safety refers to both occupational safety and system safety (estimated from Probabilistic Risk Assessment, PRA), and financial performance refers to the monetary values associated with NPP operation and maintenance (O&M) strategies. This report covers a case study demonstrating the feasibility of the I-ERM methodological framework. More detailed development of one of the I-ERM modules, i.e., Probabilistic Physics-of-Failure (PPoF) analysis, and its connection with other I-ERM modules is demonstrated in a second case study. The outcome of this research will help NPP decision-makers create cost-saving maintenance strategies while maintaining safety by providing cost- and risk-informed recommendations regarding maintenance work processes and operational strategies.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Prognostics and Health Management of Wind Turbines -- Current Status and Future Opportunities

The global wind industry has seen tremendous growth during the past two decades. However, the industry is challenged by premature component failures, which lead to increased turbine downtime and subsequently, cost of energy for wind power. To mitigate the impacts from these failures, the wind industry has been exploring various areas for improvements ranging from product design, new materials or lubricants, to operation and maintenance (O&M) practices. Condition-based maintenance or prognostics and health management (PHM) has been explored as one enabling technology for improving O&M practices. This chapter provides a brief overview of wind turbine PHM with a focus on operational data mining and condition monitoring of drivetrains. Some future research and development opportunities in wind turbine PHM are also briefly discussed.

17 WIND ENERGY↗

Machine Learning–Based Condition Monitoring of a Circulating Water System of a Canadian Nuclear Plant

With the need to maintain long-term reliable energy using nuclear power plants, there is an underlying demand to ensure that the maintenance of plant components and systems is also done in an efficient and cost-effective manner. One way to achieve this is by moving from time-based maintenance to condition-based maintenance. The research presented in this paper focuses on applying statistical and machine-learning-based methods to capture anomalies within data for fault detection to further develop into condition monitoring. This paper focuses on system data for a circulating water system (CWS) of a pressurized heavy-water reactor for detecting anomalies. The different methodologies used for detecting and capturing anomalies in the CWS data are matrix profile, density-based spatial clustering of applications with noise (DBSCAN), and support vector machines (SVMs). Matrix profile and DBSCAN are used to distinguish between normal data and anomalous data. This paper presents a hybrid method using DBSCAN and SVM when a portion of the data is used for DBSCAN to generate clusters. This portion of data is then used to train the SVM along with the clusters generated by DBSCAN as output. SVM is then tested on unseen data as a predictive tool, which can work in real time to categorize data points as either normal or anomalous. This paper presents results that show the high accuracies of DBSCAN and SVM in capturing anomalies within the data for a CWS for fault detection. Thus, the maintenance plan would be focused on component condition rather than a time-based schedule by switching to an automated system to identify and predict faults within a CWS.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

NLR CSP Optical Facilities: Illuminating the Path Forward Through Innovation and Impact: Agreement 38490

This initiative is a multi-faceted project at the National Laboratory of the Rockies (NLR) aimed at strengthening its Concentrating Solar Power (CSP) Optical Facilities to advance the development of low-cost, high-performance materials for solar and other applications. The project's strategy is built on three pillars: strategic stakeholder engagement, diligent facility maintenance and utilization, and the development of new research capabilities. The overarching goal is to ensure the facilities remain state-of-the-art resources for industry and academia, thereby accelerating the conversion of concentrated sunlight into energy. A key driver of the project is an international Advisory Board, which provides critical guidance on research priorities and industry needs, leading to new collaborations and secured funding. This external engagement, combined with proactive outreach to industry partners, ensures the lab's work remains aligned with real-world challenges, including materials durability and performance certification. Significant efforts in facility maintenance have addressed challenges with aging infrastructure. Notable achievements include the complete refurbishment of the hail-damaged Ultra-Accelerated Weathering System (UAWS) and the successful replacement of a failing 15-year-old Lambda 1050 spectrophotometer with a new-generation model, substantially upgrading material characterization capabilities. These maintenance activities were complemented by achieving a prestigious ISO 9001:2015 certification for the Advanced Optical Materials Labs, formally recognizing the quality and reliability of NLR's measurement capabilities. Despite these successes, challenges remain, including high demand for the High Flux Solar Furnace (HFSF) and intermittent failures of other key instruments. The project has delivered major advancements in research techniques and capabilities. At the Flatirons campus, a new indoor laboratory, was established to house advanced deflectometry and photogrammetry systems for heliostat characterization. For on-sun testing, a novel, actively cooled turning mirror was developed for the HFSF, enabling more realistic testing of particle receivers and components. A collaboration with Virginia Tech successfully demonstrated the high-temperature durability of a new solar absorber coating through extensive cyclic testing. Concurrently, new modeling took place to better predict material degradation on rough, fractal surfaces. In summary, this project has systematically enhanced NLR's CSP Optical Facilities through strategic upgrades, rigorous maintenance, and stakeholder-guided research. By overcoming equipment failures, budgetary constraints, and logistical hurdles, the project has reinforced NLR's role as a central hub for CSP innovation and materials testing. Future work will focus on securing diverse funding, expanding collaborations, and continuing to provide the critical infrastructure needed to accelerate the development and deployment of next-generation technologies.

14 SOLAR ENERGY↗

Servicing and Repair of High-Performance Equipment

Smooth transition from maintenance of high-performance equipment on the basis of time (after a fixed number of runs or cycles) to maintenance in terms of its condition is considered. A proposal is made for increasing the period between maintenance sessions and also decreasing the time and cost of each session. Approaches have been developed at Irkutsk Aviation Plant for the formulation and implementation of maintenance protocols on the basis of operational experience with the specific equipment.

42 ENGINEERING↗

3-60B Type-B shipping cask enhanced operational features to facilitate leakage rate testing - 15585

EnergySolutions is fabricating a new 3-60B Type B Shipping Cask that will be ready for use in spring 2015, designed for shipping Type B quantities of activated and/or non-fuel-bearing reactor or accelerator components. EnergySolutions, in consult with Leak Testing Specialists, Inc., has implemented an improved design of the 3-60B cask closures to better facilitate periodic and maintenance leakage rate testing and to allow end users to more easily perform pre-shipment leakage rate testing to confirm proper assembly of the cask closures. A typical Type B cask closure lid design incorporates a double O-ring configuration, where the inner O-ring provides containment and the outer O-ring is used for leakage rate testing of the containment O-ring seal. Leakage rate testing of a double O-ring configuration is typically accomplished by filling the cask cavity with helium, pulling a vacuum on the annular space between the two O-rings and monitoring for helium leakage through the containment O-ring. One issue is the potential for helium saturation of the O-ring elastomeric material, which can result in leakage rate test failures. The cask cavity volume is typically large, and takes a significant amount of time to fill with helium. As a result, the saturation time for certain elastomeric compounds may be exceeded, leading to potential false-negative leakage rate testing results. To avoid this, that the cask cavity typically is loaded with sealed container(s) to reduce the free volume and the fill time. The improved 3-60B cask closure lid incorporates a triple O-ring seal configuration that facilitates maintenance leak rate testing of the closure lid containment O-ring seal and eliminates the issues discussed above. The triple O-ring configuration uses the middle O-ring as the containment seal, with the inner and outer test O-rings creating relatively small annular volumes for testing purposes. These small annular volumes are quick to fill, minimizing the issue of Helium saturation of the O-ring material. This seal configuration also makes it possible to detect and replace a damaged O-ring seal during loading operations, or dress a damaged sealing surface, and perform the required maintenance leakage rate testing of the replacement O-ring at the plant site without the need to unload the cask and send it to a maintenance facility. Also, a second test port has been added to each O-ring annulus to allow leakage rate testing to be accomplished using a formal system calibration that complies with the requirements and recommendations of ASME Section V, Article 10 [4], ANSI N14.5-97 [2], and ANSI N14.5-2014 [3]. This provides a simple, reliable, and accurate means to perform leakage rate testing with a test confidence level that cannot be achieved without the second test port. The improved closure and test port design simplifies and shortens the time required to perform leakage testing, resulting in reduced operating costs, greater schedule security, and dose savings for the cask users. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned Concerning the Onsite Disposal Facility at the Fernald Preserve, Harrison, Ohio - 16176

An onsite disposal facility (OSDF) was constructed at the Fernald Preserve, Ohio, for the disposal of contaminated soil and debris generated during a Comprehensive Environmental Response, Compensation, and Liability Act site cleanup. Completed in October of 2006, the 30 ha facility contains 2.26 million m{sup 3} of waste materials, has a maximum height of approximately 19.8 m, and consists of eight individual cells. The dimensions of cells 1-7 are approximately 213 m x 122 m each, or 26,000 m{sup 2} (2.60 ha). The dimensions of cell 8 (the last cell constructed) are larger than those of the other cells (approximately 3.8 ha). Each cell was constructed with a leachate collection system (LCS) that collected rainwater and storm-water runoff during waste placement and prevented it from entering the underlying environment. Other engineered features include a multilayer composite liner system, a leak detection system (LDS) positioned beneath the primary liner, and a multilayer composite cover that was placed over each cell following the completion of waste-placement activities. The LCS and LDS layers are designed to convey (by gravity) any leachate/fluid that enters the system through pipes to the west side of the facility and into tanks located in valve houses. From there, leachate can be sampled and conveyed to treatment. Groundwater is monitored beneath each cell via monitoring wells. In November 2006, the US DOE Office of Legacy Management (LM) assumed responsibility for the long-term care and maintenance of the OSDF. LM has nine years of monitoring and maintenance experience with the Fernald OSDF. Monitoring data is reported each year in the Fernald Annual Site Environmental Report. The data collected and inspections conducted indicate that the facility is operating as designed. The past nine years has provided LM with the opportunity to evaluate how well many of the design and as-built features of the facility have functioned over time as they pertain to environmental monitoring, valve-house operation and maintenance, and leachate transmission. Lessons learned concerning the long-term care and maintenance of the OSDF at the Fernald Preserve are presented. The main lessons learned include the following: How bivariate plots can be used to address environmental monitoring challenges created by installing an engineered disposal facility in a location where contamination is above the background level but below cleanup standards. How valve-house design decisions can help to alleviate long-term monitoring challenges. How scale buildup can lead to leachate transmission issues. Some additional minor lessons learned are also presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote In-bore Laser Cutting and Welding Tools for use in Future Nuclear Fusion Reactors - 18348

The maintenance, replacement and decommissioning of future nuclear fusion reactors will require quick and reliable cutting and joining of in-vessel pipework. Initial design studies for nuclear fusion reactors for power generation have estimated cutting and welding could account for up to 60% of the maintenance duration using conventional in-situ processing techniques (dry-mechanical cutting and arc welding) and that new methods are required to expedite the process. Additionally, the expected radioactivity and limited access at the cutting and welding sites mean that these processes cannot be done manually and robotic tools are required. To this end, remote in-bore laser cutting and welding tools have been developed for use in 90 mm internal diameter steel pipes. Here, we will present the designs of the remote in-bore laser cutting and welding tools, and how the tools fit within the overall remote maintenance strategy of a nuclear fusion reactor. Initial high-power laser trials were performed with prototype tools which successfully demonstrated their laser processing, thermal management and dust protection functionality. Although the tools described herein have been developed specifically for use within the fusion reactor environment, however the tool design and technology demonstrated here is readily transferable to many remote applications in challenging environments such as fission reactor maintenance, nuclear decommissioning and other in-accessible pipework. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Visual Servoing System for the Removal of the Elements of a Prefilter in a NPP - 18429

The maintenance of the prefilters of the condensate demineralizers in a BWR reactor nuclear plant, could represents a real problem given the substances (radioactive particles) captured by the filtering elements (called 'candles'). This trapped material can produce high doses on the personnel participating in this maintenance work. Thus, it is desirable to automate the maintenance activities required to remove the used filtering elements. Then we designed a robotic manipulator capable of detaching, one by one, the filtering elements from their fastening structure. The manipulator deposits the 'candles' into a container as they are detached, and at the end, it is automatically transported, to a storage area. The work here presented, proposes the application of the 'visual servoing control' technique to automate the operation of the robotic arm. This would minimize the intervention of human operators, reducing maintenance times and radiation dose to the personnel. The methodology is based on techniques of artificial vision and uses, in addition to a video camera, a device capable of generating a laser line, which when projected onto 3D space, creates what is known as a laser plane. This plane upon striking the candles will generate circumferential arcs in the video camera images, and these figures will be used to detect the 3D point that will guide the manipulator to take the filtering element. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Successful Implementation of a Natural Resource Restoration Plan at the Fernald Preserve - 19568

The Fernald Preserve, Ohio, Site is a former uranium-processing plant that underwent extensive remediation pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). It is situated on a 425-hectare (ha) (1050-acre) tract of land, approximately 29 kilometers (km) (18 miles) northwest of Cincinnati, Ohio. The US Department of Energy (DOE) Office of Legacy Management is responsible for management of the site. Site remediation and subsequent ecological restoration have converted the site from an industrial production facility to an undeveloped park, encompassing a series of wetlands, prairies, and forested communities. The remediation of buildings and contaminated soil was completed in 2006, but aquifer remediation is ongoing. Portions of the site are open to the public, including approximately 11 km (7 miles) of walking trails that are open year-round and a Fernald Preserve Visitors Center open four days a week. Stakeholders were instrumental in providing recommendations for final land use of the site as an undeveloped park with an emphasis on wildlife. Final land use decisions were also instrumental in the resolution of a CERCLA natural resource damage claim. The State of Ohio sued DOE in 1986 for damages to state natural resources under Section 107 of CERCLA. The suit was stayed until completion of all Records of Decision (RODs) for the site. The last ROD was signed in 1996. DOE, which was both a Natural Resource Trustee (NRT) and a potentially responsible party (PRP) under CERCLA, initiated consultation with other site NRTs in 1993. A Trustee Council was formed that included DOE, Ohio Environmental Protection Agency (representing the State of Ohio), and the US Fish and Wildlife Service (representing the US Department of the Interior). The NRTs agreed collectively to conduct sitewide ecological restoration, consistent with the stakeholder vision of final land use. A conceptual restoration plan was drafted in 1998. This Natural Resource Restoration Plan (NRRP) developed goals for site restoration, as well as provisions for monitoring and maintenance of restored areas. The NRTs signed a Memorandum of Understanding in 2001, and DOE integrated ecological restoration design and construction into remediation and closure activities for the site. The NRT relationship became contentious in the following years as a result of a disagreement over monitoring commitments and compensation for groundwater injury. Final settlement was reached in 2008. As part of the settlement, DOE paid $13.75 million into the NRT fund as compensation for natural resource damages. In addition, the NRRP was finalized, and long-term commitments for monitoring and maintenance of ecologically restored areas were put in place. An Environmental Covenant was established and recorded with Hamilton and Butler Counties that ensures site activity and use limitations remain in place. The NRTs used a portion of the settlement funds to initiate the Paddys Run Conservation Project. This effort is a means to secure development rights and conservation easements within the Paddys Run watershed. Paddys Run is a third-order stream located on the western side of the Fernald Preserve. The NRTs partnered with Three Valley Conservation Trust to obtain assistance with land acquisition and conservation easement management, and since the program's inception in the Fall of 2012, more than 1820 ha (4500 acres) have been permanently protected via easement or purchase. Future decisions by the NRTs regarding monitoring and maintenance of restored areas will be negotiated in 2020. The site Restored Area Maintenance Plan (RAMP) was developed in 2010. The RAMP is a requirement within the NRRP and is scheduled for review following 10 years of implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Retail Hydrogen Station Reliability Status and Advances

One of the most vital emerging commercial markets for hydrogen is fuel cell-powered mobility including cars, trucks, and buses. These vehicles are refueled via a network of hydrogen fueling stations, with the highest number of U.S. stations being in California. The numbers of both fuel cell electric vehicles (FCEVs) and hydrogen stations have increased in the last two years, with anecdotal information from FCEV drivers indicating that station reliability is hurting the consumer acceptability of FCEV technologies. Therefore, this study benchmarks the current state of hydrogen station reliability in practice and presents on-going research that is investigating the failures that are contribute to hydrogen station reliability issues. This is accomplished with an analysis of operation, safety, and maintenance data from hydrogen stations and fuel cell electric vehicles to benchmark the maintenance and failure of hydrogen stations and their components. This analysis, of over 5,000 station maintenance events, presents the leading maintenance categories and failure rates, and is a prerequisite to the development of data-driven reliability improvement plans. We present a reliability growth analysis and on-going research into the root causes of failure for dispensers, a particularly failure-prone subsystem.

08 HYDROGEN↗

An alternative electrode design for accurate spectral induced polarization measurements in variably saturated porous media

SUMMARY Applications of spectral induced polarization (SIP) require electrodes that maintain hydrologic contact with surrounding soils to capture small electrical responses, often observed as phase shifts in milliradians. For unsaturated soils, electrodes must overcome increased electrical contact impedance due to reduced pore fluid. Traditional designs use a ceramic membrane electrode (CME) with a water reservoir and metal conductor, requiring periodic maintenance to retain electrolytic solution. For field applications where maintenance is impractical, alternative designs are needed. This study evaluated a new electrode design (silica flour electrode, SFE) alongside a CME. SFEs use packed silica flour to store water via capillary forces against a metal conductor. This study examined both designs in three variably saturated soils at soil suctions up to 700 mbar and soil water contents below 1 percent, with SIP measurements across 0.01 to 10 000 Hz frequencies. SFEs match CMEs at high frequencies and perform better at lower frequencies, without requiring ongoing maintenance, making them ideal for field use. In water-only experiments, CMEs produced errors and high noise below 1.5 Hz, whereas SFEs were more accurate. However, CMEs performed better above 300 Hz. In fine sand, SFEs performed better due to the relatively lower contact impedance as compared to CMEs. Both electrode types performed comparably in silty sand and silt loam soils, although CMEs required ongoing maintenance, suggesting potential for long-term reliability issues.

58 GEOSCIENCES↗