Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Integration and test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

Resolve instrument onboard XRISM: design, integration, and instrument test results

The Resolve instrument onboard the X-Ray Imaging and Spectroscopy Mission (XRISM) consists of an array of 6 × 6 silicon-thermistor microcalorimeters cooled down to 50 mK and a high-throughput X-ray mirror assembly (XMA) with a focal length of 5.6 m. XRISM is a recovery mission of ASTRO-H/Hitomi, and the Resolve instrument is a rebuild of the ASTRO-H Soft X-ray spectrometer (SXS) and the Soft X-ray Telescope (SXT) that achieved energy resolution of ∼ 5 eV FWHM on orbit, with several important changes based on lessons learned from ASTRO-H. The flight models of the Dewar and the electronics boxes were fabricated, and the instrument test and calibration were conducted in 2021. By tuning the cryocooler frequencies, energy resolution better than 4.9 eV FWHM at 6 keV was demonstrated for all 36 pixels and high-resolution grade events, as well as energy-scale accuracy better than 2 eV up to 30 keV. The immunity of the detectors to microvibration, electrical conduction, and radiation was evaluated. The instrument was delivered to the spacecraft system in April 2022. The XMA was tested and calibrated separately. Its angular resolution is 1.27′, and the effective area of the mirror itself is 570 cm 2 at 1 keV and 424 cm 2 at 6 keV. We report the design and the major changes from the ASTRO-H SXS, the integration, and the results of the instrument test.

X-ray↗

Integrated Vehicle Ground Vibration Testing of Manned Spacecraft: Historical Precedent

For the first time in nearly 30 years, NASA is developing a new manned space flight launch system. The Ares I will carry crew and cargo to not only the International Space Station, but onward for the future exploration of the Moon and Mars. The Ares I control system and structural designs use complex computer models for their development. An Integrated Vehicle Ground Vibration Test (IVGVT) will validate the efficacy of these computer models. The IVGVT will reduce the technical risk of unexpected conditions that could place the vehicle or crew in jeopardy. The Ares Project Office's Flight and Integrated Test Office commissioned a study to determine how historical programs, such as Saturn and Space Shuttle, validated the structural dynamics of an integrated flight vehicle. The study methodology was to examine the historical record and seek out members of the engineering community who recall the development of historic manned launch vehicles. These records and interviews provided insight into the best practices and lessons learned from these historic development programs. The information that was gathered allowed the creation of timelines of the historic development programs. The timelines trace the programs from the development of test articles through test preparation, test operations, and test data reduction efforts. These timelines also demonstrate how the historical tests fit within their overall vehicle development programs. Finally, the study was able to quantify approximate staffing levels during historic development programs. Using this study, the Flight and Integrated Test Office was able to evaluate the Ares I Integrated Vehicle Ground Vibration Test schedule and workforce budgets in light of the historical precedents to determine if the test had schedule or cost risks associated with it.

Lemke, Paul R.↗

Liquid Nitrogen Testing of an Integrated Reaction Control System

Integrated Reaction Control Systems (IRCS) are considered an enabling technology for future human exploration of the solar system. An IRCS uses the same fuel and oxidizer as the main propulsion system, allowing for increased performance and simplified cryogenic fluid management operations. The IRCS team at Marshall Spaceflight Center is currently evaluating an IRCS system that uses a combination of electric pumps and pressure-regulation devices to provide a constant flow of conditioned propellant to a thruster bank during operation. In contrast to accumulator and gasifier designs, the recirculation loop design is less massive and can provide large, sustained flowrates to the thruster inlet. In the summer 2021 test series presented herein, the feasibility of this concept was evaluated using liquid nitrogen as a simulant for liquid oxygen. The goals of this test series were to demonstrate the ability of the pump and pressure regulator to maintain adequate thruster inlet conditions during transient operation, and to demonstrate the ability for the system to operate in an “idle mode” that maintains system chill between activations. During test operations, the back-pressure regulator responded more slowly than the opening/closing of valves in the thruster simulant, but it was still able to attenuate the pressure fluctuation at the pump discharge and ensure a stable flowrate through the pump. Similarly, the pump was able to be run far below its nominal operating point and successfully flow sufficient fluid to maintain chill conditions.

integrated RCS↗

Liquid Nitrogen Testing of an Integrated Reaction Control System

Integrated Reaction Control Systems (IRCS) are considered an enabling technology for future human exploration of the solar system. An IRCS uses the same fuel and oxidizer as the main propulsion system, allowing for increased performance and simplified cryogenic fluid management operations. The IRCS team at Marshall Spaceflight Center is currently evaluating an IRCS system that uses a combination of electric pumps and pressure-regulation devices to provide a constant flow of conditioned propellant to a thruster bank during operation. In contrast to accumulator and gasifier designs, the recirculation loop design is less massive and can provide large, sustained flowrates to the thruster inlet. In the summer 2021 test series presented herein, the feasibility of this concept was evaluated using liquid nitrogen as a simulant for liquid oxygen. The goals of this test series were to demonstrate the ability of the pump and pressure regulator to maintain adequate thruster inlet conditions during transient operation, and to demonstrate the ability for the system to operate in an “idle mode” that maintains system chill between activations. During test operations, the back-pressure regulator responded more slowly than the opening/closing of valves in the thruster simulant, but it was still able to attenuate the pressure fluctuation at the pump discharge and ensure a stable flowrate through the pump. Similarly, the pump was able to be run far below its nominal operating point and successfully flow sufficient fluid to maintain chill conditions.

integrated RCS↗

Characterization of the onboard imaging unit for the first clinical magnetic resonance image guided radiation therapy system

Purpose: To characterize the performance of the onboard imaging unit for the first clinical magnetic resonance image guided radiation therapy (MR-IGRT) system. Methods: The imaging performance characterization included four components: ACR (the American College of Radiology) phantom test, spatial integrity, coil signal to noise ratio (SNR) and uniformity, and magnetic field homogeneity. The ACR phantom test was performed in accordance with the ACR phantom test guidance. The spatial integrity test was evaluated using a 40.8 × 40.8 × 40.8 cm{sup 3} spatial integrity phantom. MR and computed tomography (CT) images of the phantom were acquired and coregistered. Objects were identified around the surfaces of 20 and 35 cm diameters of spherical volume (DSVs) on both the MR and CT images. Geometric distortion was quantified using deviation in object location between the MR and CT images. The coil SNR test was performed according to the national electrical manufacturers association (NEMA) standards MS-1 and MS-9. The magnetic field homogeneity test was measured using field camera and spectral peak methods. Results: For the ACR tests, the slice position error was less than 0.10 cm, the slice thickness error was less than 0.05 cm, the resolved high-contrast spatial resolution was 0.09 cm, the resolved low-contrast spokes were more than 25, the image intensity uniformity was above 93%, and the percentage ghosting was less than 0.22%. All were within the ACR recommended specifications. The maximum geometric distortions within the 20 and 35 cm DSVs were 0.10 and 0.18 cm for high spatial resolution three-dimensional images and 0.08 and 0.20 cm for high temporal resolution two dimensional cine images based on the distance-to-phantom-center method. The average SNR was 12.0 for the body coil, 42.9 for the combined torso coil, and 44.0 for the combined head and neck coil. Magnetic field homogeneities at gantry angles of 0°, 30°, 60°, 90°, and 120° were 23.55, 20.43, 18.76, 19.11, and 22.22 ppm, respectively, using the field camera method over the 45 cm DSV. Conclusions: The onboard imaging unit of the first commercial MR-IGRT system meets ACR, NEMA, and vendor specifications.

60 APPLIED LIFE SCIENCES↗

Tension and Bending Testing of an Integral T-Cap for Stitched Composite Airframe Joints

The Pultruded Rod Stitched Efficient Unitized Structure (PRSEUS) is a structural concept that was developed by The Boeing Company to address the complex structural design aspects associated with a pressurized hybrid wing body aircraft configuration. An important design feature required for assembly is the integrally stitched T-cap, which provides connectivity of the corner (orthogonal) joint between adjacent panels. A series of tests were conducted on T-cap test articles, with and without a rod stiffener penetrating the T-cap web, under tension (pull-off) and bending loads. Three designs were tested, including the baseline design used in large-scale test articles. The baseline had only the manufacturing stitch row adjacent to the fillet at the base of the T-cap web. Two new designs added stitching rows to the T-cap web at either 0.5- or 1.0-inch spacing along the height of the web. Testing was conducted at NASA Langley Research Center to determine the behavior of the T-cap region resulting from the applied loading. Results show that stitching arrests the initial delamination failures so that the maximum strength capability exceeds the load at which the initial delaminations develop. However, it was seen that the added web stitching had very little effect on the initial delamination failure load, but actually decreased the initial delamination failure load for tension loading of test articles without a stiffener passing through the web. Additionally, the added web stitching only increased the maximum load capability by between 1% and 12.5%. The presence of the stiffener, however, did increase the initial and maximum loads for both tension and bending loading as compared to the stringerless baseline design. Based on the results of the few samples tested, the additional stitching in the T-cap web showed little advantage over the baseline design in terms of structural failure at the T-cap web/skin junction for the current test articles.

Lovejoy, Andrew E.↗

On-Site Inspection RadioIsotopic Spectroscopy (Osiris) System-Integration and Field-Testing Report

We have designed a system for the acquisition and analysis of high-resolution gamma-ray spectra during on-site inspections under the Comprehensive Nuclear-Test-Ban Treaty (CTBT). The On-Site Inspection RadioIsotopic Spectroscopy—OSIRIS —gamma-ray spectrometer is a mechanically-cooled, battery-powered ORTEC IDM-200V, chosen to avoid the need for liquid nitrogen during on-site inspections. The spectrometer is controlled and the spectral data analyzed by a Panasonic Toughbook notebook computer. Spectral data analysis is similar to that performed by traditional gamma-ray spectrometers, except the OSIRIS gamma-ray spectral data are filtered to display only radioisotopic information relevant to CTBT on-site inspections, for example, the fission-product isotope Zr-95 and its daughter isotope Nb-95. The OSIRIS software assists the user during operation with software checklists for startup and shutdown, and menu-selected display windows during energy calibration and data acquisition. OSIRIS can be operated in either sample-counting mode or the in-situ mode. In this report, the extensive system-integration tests of the OSIRIS system carried out in 2015-2017 are described, including tests at Idaho National Laboratory, at the Nevada National Security Site (formerly, the Nevada Test Site), and at Pacific Northwest National Laboratory in Richland, Washington. We also note recent software enhancements and the steps to our successful commercialization of OSIRIS.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Phase 3 integrated water recovery testing at MSFC: Single loop test results and lessons learned

A series of tests has been conducted at the NASA Marshall Space Flight Center (MSFC) to evaluate the performance of the Space Station Freedom (SSF) water recovery system. Potable and urine reclamation processors were integrated with waste water generation equipment and sucessfully operated for a total of 144 days. This testing marked the first occasion in which the waste feed sources for the previous potable and hygiene loops were combined into a single loop and processed to potable water quality. Reclaimed potable water from the combined waste waters routinely met the SSF water quality specifications.In the last stage of testing, data was obtained that indicated that the water processor (WP) presterilizer may not be required to meet the potable water quality specification. The removal of the presterilizer from the Water Processor design would provide a significant power savings, though an increase in the residence time of the catalytic oxidation reactor may be required to meet the potable microbial and total Organic Carbon specifications. This paper summarizes the test objectives, system design, test activities/protocols, significant results/anomalies and major lessons learned.

Carter, Donald Layne↗

UAS-NAS Integrated Human in the Loop: Test Environment Report

The desire and ability to fly Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) is of increasing urgency. The application of unmanned aircraft to perform national security, defense, scientific, and emergency management are driving the critical need for less restrictive access by UAS to the NAS. UAS represent a new capability that will provide a variety of services in the government (public) and commercial (civil) aviation sectors. The growth of this potential industry has not yet been realized due to the lack of a common understanding of what is required to safely operate UAS in the NAS. NASA's UAS Integration in the NAS Project is conducting research in the areas of Separation Assurance/Sense and Avoid Interoperability (SSI), Human Systems Integration (HSI), and Communication to support reducing the barriers of UAS access to the NAS. This research was broken into two research themes namely, UAS Integration and Test Infrastructure. UAS Integration focuses on airspace integration procedures and performance standards to enable UAS integration in the air transportation system, covering Sense and Avoid (SAA) performance standards, command and control performance standards, and human systems integration. The focus of the Test Infrastructure theme was to enable development and validation of airspace integration procedures and performance standards, including the execution of integrated test and evaluation. In support of the integrated test and evaluation efforts, the Project developed an adaptable, scalable, and schedulable relevant test environment incorporating live, virtual, and constructive elements capable of validating concepts and technologies for unmanned aircraft systems to safely operate in the NAS. To accomplish this task, the Project planned to conduct three integrated events: a Human-in-the-Loop simulation and two Flight Test series that integrated key concepts, technologies and/or procedures in a relevant air traffic environment. Each of the integrated events were built on the technical achievements, fidelity and complexity of previous simulations and tests, resulting in research findings that support the development of regulations governing the access of UAS into the NAS. The purpose of this document is to describe how well the system under test was representative

Human in the Loop↗

Test circuits for integrated circuit counterfeit detection

Described herein are various technologies pertaining to identifying counterfeit integrated circuits (ICs) by way of allowing the origin of fabrication to be verified. An IC comprises a main circuit and a test circuit that is independent of the main circuit. The test circuit comprises at least one ring oscillator (RO) signal that, when energized, is configured to output a signal that is indicative of a semiconductor fabrication facility where the IC was manufactured.

42 ENGINEERING↗

Test circuits for integrated circuit counterfeit detection

Described herein are various technologies pertaining to identifying counterfeit integrated circuits (ICs) by way of allowing the origin of fabrication to be verified. An IC comprises a main circuit and a test circuit that is independent of the main circuit. The test circuit comprises at least one ring oscillator (RO) signal that, when energized, is configured to output a signal that is indicative of a semiconductor fabrication facility where the IC was manufactured.

Helinski, Ryan↗

Human-in-the-Loop Integrated Life Support Systems Ground Testing

Human exploration missions beyond low earth orbit will be long duration with abort scenarios of days to months. This necessitates provisioning the crew with all the things they will need to sustain themselves while carrying out mission objectives. Systems engineering and integration is critical to the point where extensive integrated testing of life support systems on the ground is required to identify and mitigate risks. Ground test facilities (human-rated altitude chamber) at the Johnson Space Center are being readied to integrate all the systems for a mission along with a human test crew. The relevant environment will include deep space habitat human accommodations, sealed atmosphere of 8 psi total pressure and 32% oxygen concentration, life support systems (food, air, water), communications, crew accommodations, medical, EVA, tools, etc. Testing periods will approximate those of the expected missions (such as a near Earth asteroid, Earth-Moon L2 or L1, the moon). This type of integrated testing is needed for research and technology development as well as later during the mission design, development, test, and evaluation (DDT&E) phases of an approved program. Testing will evolve to be carried out at the mission level fly the mission on the ground . Mission testing will also serve to inform the public and provide the opportunity for active participation by international partners.

Henninger, Donald L.↗

Human in the Loop Integrated Life Support Systems Ground Testing

Human exploration missions beyond low earth orbit will be long duration with abort scenarios of days to months. This necessitates provisioning the crew with all the things they will need to sustain themselves while carrying out mission objectives. Systems engineering and integration is critical to the point where extensive integrated testing of life support systems on the ground is required to identify and mitigate risks. Ground test facilities (human-rated altitude chambers) at the Johnson Space Center are being readied to integrate all the systems for a mission along with a human test crew. The relevant environment will include deep space habitat human accommodations, sealed atmosphere capable of 14.7 to 8 psi total pressure and 21 to 32% oxygen concentration, life support systems (food, air, and water), communications, crew accommodations, medical, EVA, tools, etc. Testing periods will approximate those of the expected missions (such as a near Earth asteroid, Earth-Moon L2 or L1, the moon, Mars). This type of integrated testing is needed for research and technology development as well as later during the mission design, development, test, and evaluation (DDT&E) phases of an approved program. Testing will evolve to be carried out at the mission level fly the mission on the ground . Mission testing will also serve to inform the public and provide the opportunity for active participation by international, industrial and academic partners.

Henninger, Donald L.↗

Integral and Separate Effects Tests for Thermal Hydraulics Code Validation for Liquid-Salt Cooled Nuclear Reactors

The objective of the 3-year project was to collect integral effects test (IET) data to validate the RELAP5-3D code and other thermal hydraulics codes for use in predicting the transient thermal hydraulics response of liquid salt cooled reactor systems, including integral transient response for forced and natural circulation operation. The reference system for the project is a modular, 900-MWth Pebble Bed Advanced High Temperature Reactor (PB-AHTR), a specific type of Fluoride salt-cooled High temperature Reactor (FHR). Two experimental facilities were developed for thermal-hydraulic integral effects tests (IETs) and separate effects tests (SETs). The facilities use simulant fluids for the liquid fluoride salts, with very little distortion to the heat transfer and fluid dynamics behavior. The CIET Test Bay facility was designed, built, and operated. IET data for steady state and transient natural circulation was collected. SET data for convective heat transfer in pebble beds and straight channel geometries was collected. The facility continues to be operational and will be used for future experiments, and for component development. The CIET 2 facility is larger in scope, and its construction and operation has a longer timeline than the duration of this grant. The design for the CIET 2 facility has drawn heavily on the experience and data collected on the CIET Test Bay, and it was completed in parallel with operation of the CIET Test Bay. CIET 2 will demonstrate start-up and shut-down transients and control logic, in addition to LOFC and LOHS transients, and buoyant shut down rod operation during transients. Design of the CIET 2 Facility is complete, and engineering drawings have been submitted to an external vendor for outsourced quality controlled construction. CIET 2 construction and operation continue under another NEUP grant. IET data from both CIET facilities is to be used for validation of system codes used for FHR modeling, such as RELAP5-3D. A set of numerical models were developed in parallel to the experimental work. RELAP5-3D models were developed for the salt-cooled PB-AHTR, and for the simulat fluid CIET natural circulation experimental loop. These models are to be validated by the data collected from CIET. COMSOL finite element models were used to predict the temperature and fluid flow distribution in the annular pebble bed core; they were instrumental for design of SETs, and they can be used for code-to-code comparisons with RELAP5-3D. A number of other small SETs, and numerical models were constructed, as needed, in support of this work. The experiments were designed, constructed and performed to meet CAES quality assurance requirements for test planning, implementation, and documentation; equipment calibration and documentation, procurement document control; training and personnel qualification; analysis/modeling software verification and validation; data acquisition/collection and analysis; and peer review.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Phase III integrated water recovery testing at MSFC - Partially closed hygiene loop and open potable loop results and lessons learned

A series of tests has been conducted at the NASA Marshall Space Flight Center (MSFC) to evaluate the performance of a predevelopment water recovery system. Potable, hygiene, and urine reclamation subsystems were integrated with end-use equipment items and successfully operated in open and partially closed-loop modes, with man-in-the-loop, for a total of 28 days. Several significant subsystem physical anomalies were encountered during testing. Reclaimed potable and hygiene water generally met the current Space Station Freedom (SSF) water quality specifications for inorganic and microbiological constituents, but exceeded the maximum allowable concentrations for Total Organic Carbon (TOC). This paper summarizes the test objectives, system design, test activities/protocols, significant results/anomalies, and major lessons learned.

Bagdigian, R. M.↗

Performance Testing of an Integrated Magnetic Power Take-Off

A wave energy converter (WEC) and the power take-off (PTO) generator system can be represented by using a mass-spring-dampener model. By incorporating a negative stiffness spring within the PTO, the overall stiffness of the PTO can be lowered allowing the impedance of the PTO to be more closely matched with the WEC. By designing for impedance matching the WEC can greatly enhance its power generation capability. This project has involved the design, fabrication and testing of a new type of linear-stroke length and rotary stroke length adjustable negative stiffness magnetic springs for use within a wave energy converter (WEC). The magnetic springs were studied by using 3-D finite element analysis with the objective of creating high energy density and a long linear stroke length. After the construction and testing of both a proof-of-principle adjustable linear and rotary magnetic spring prototype the rotary (torsional) magnetic spring was selected for scaling up analysis. The selected scaled-up proof-of-principle magnetic spring had a peak torque of 850 Nm with a ±45 degree stroke length. By translating the inner rotor relative to the outer rotor, the stiffness could be adjusted to be either negative or positive stiffness. During this project a magnetic lead screw was also studied, and it was shown that by combining the magnetic lead screw with a linearly translating magnetic spring a very long rotary stroke length could be attained. However, as the magnetic lead screw increased complexity and reduced overall energy density relative to a rotary (torsional) spring, this design approach was not further pursed. Dynamometer testing of the variable stiffness magnetic springs was first completed by Portland State University and following this the magnetic spring performance was independently verified by Sandia National Laboratory (Sandia). A WEC analysis when using a variable stiffness magnetic spring was completed by using the WecOptTool. WecOptTool is an open-source WEC optimization software developed by Sandia that supports efficient power take-off (PTO) and control optimization. Wave condition data from the Oregon PacWave test-site was used in this study. The analysis showed that a WEC with a tunable stiffness value could consistently achieve about 80% of its maximum theoretical power production. The use of a tunable stiffness WEC, rather than zero-stiffness or a constant stiffness WEC was also shown to lead to a smaller maximum PTO force requirement. The variable stiffness magnetic spring was integrated into an experimental WEC developed by Sandia, called a Wave-Bot. Sandia successfully completed water-tank testing of the Wave-Bot at the Navy’s Carderock, Maryland, wave-basin test site. The wave-basin testing helped to experimentally demonstrate the operating capabilities and increased power generation capability of a WEC containing an integrated variable stiffness magnetic spring. A WEC capacity factor analysis was also completed. The capacity factor was defined as the ratio of annual average WEC generator power to the maximum (RMS) generated power. This capacity factor provided a means of identifying the ratio of potential revenue to cost. It was calculated that if a tunable variable stiffness magnetic spring has RMS constraints it could operate with a capacity factor above 30%. This is comparable to a wind turbine’s capacity factor.

16 TIDAL AND WAVE POWER↗

Alternative Setup for Long-Duration Low-Duty-Cycle 600°C Ambient Testing of SiC Integrated Circuits

A scalable, compact oven testbed system for simultaneously evaluating a multitude of high temperature integrated circuits (ICs) for prolonged operating times of up to 600 °C has been prototyped. The new testbed system enables long-duration high temperature testing in sufficient statistical quantities consistent with standard aerospace electronics engineering standards. This setup is comprised of multiple compact ovens housing chips or packages mounted to ceramic circuit boards. Each oven is a compact 15.2 cm length by 15.2 cm width by 12.7 cm depth with a maximum 400 Watts of heating power. The custom-made silicon oxide ceramic heating block inside each oven is based on a 3D printed design adapted for the easy insertion of the IC device under test (DUT). This innovative design provides the quick insertion of ICs with or without a ceramic package into a 600 °C environment by utilizing a movable 11.43 cm long ceramic substrate with electrical traces extending from the oven hot zone to external standard plastic-based board connectors. Another key oven design feature is the minimization of the DUT exposure to electromagnetic interference (EMI) by utilizing a filtered DC power source to reduce heating element noise. Additionally, the ovens can be configured in a parallel arrangement allowing global data monitoring over a single industrial RS422 serial port. This feature is important for scaling up to test multiple ICs semi-simultaneously. A USB serial port is provided to independently control the operating parameters of each oven such as the oven target temperature and oven ramp rate. The oven temperature can reach up to 600 °C with a confirmed +/- 4 °C maximum deviation across the test zone region. The ramp rate can be programmed from 1 °C/minute up to 10 °C/minute. Furthermore, a programmable switchboard is used to interface with the DUT. This switchboard comprises a National Instruments Peripheral Component Interconnect eXtension for Instrumentation (NI PXI) system and a breakout board to send and receive power, analog or digital test signals. By using this unique oven testbed system, a variety of ICs can now be tested in parallel using the same test components configured for a diverse set of requirements.

DC Powered Oven↗

Aircraft Integration and Flight Testing of 4STAR

Under funding from the U.S. Dept. of Energy, in conjunction with a funded NASA 2008 ROSES proposal, with internal support from Battelle Pacific Northwest Division (PNWD), and in collaboration with NASA Ames Research Center, we successfully integrated the Spectrometer for Sky-Scanning, Sun-Tracking Atmospheric Research (4STAR-Air) instrument for flight operation aboard Battelle’s G-1 aircraft and conducted a series of airborne and ground-based intensive measurement campaigns (hereafter referred to as “intensives”) for the purpose of maturing the initial 4STAR-Ground prototype to a flight-ready science-ready configuration.

47 OTHER INSTRUMENTATION↗