Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “HARDWARE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

Post-test Inspection of NASA’s Evolutionary Xenon Thruster Long-Duration Test Hardware: Discharge Chamber

The NEXT Long-Duration Test is part of a comprehensive thruster service life assessment intended to demonstrate overall throughput capability, validate service life models, quantify wear rates as a function of time and operating condition, and identify any unknown life-limiting mechanisms. The test was voluntarily terminated in February 2014after demonstrating 51,184 hours of high-voltage operation, 918 kg of propellant throughput, and 35.5 MN-s of total impulse. The post-test inspection of the thruster hardware began shortly afterwards with a combination of non-destructive and destructive analysis techniques, and is presently nearing completion. This paper presents relevant results of the post-test inspection for the discharge chamber as well as other miscellaneous components such as the high-voltage propellant isolators and electrical cabling. Comparison of magnetic field measurements taken during pretest and post-test inspections indicate that the field strength did not degrade, consistent with performance data obtained during the test. Inspection of discharge chamber mesh samples show a deposition coating primarily composed of grid material that is approximately 15 μm in thickness. This thickness is well within the retention capability of the mesh and is therefore not expected to present any issues. Approximately 3.1 grams of deposition flakes were found at the bottom of the discharge chamber, composed primarily of grid material and carbon. Calculated size histograms of these flakes indicate that 99% have a maximum dimension of 200 μm or smaller, which is significantly less than the ion optics grid gap. Larger flakes that are capable of causing a grid-to-grid short will be analyzed to determine if their formation will occur in flight or is a facility effect. The high-voltage propellant isolators as well as numerous other electrical insulators were inspected and no evidence of arcing or any other issues were found.

Rohit Shastry↗

Post-test Inspection of NASA’s Evolutionary Xenon Thruster Long-Duration Test Hardware: Discharge and Neutralizer Cathodes

The NEXT Long-Duration Test is part of a comprehensive thruster service life assessment intended to demonstrate overall throughput capability, validate service life models, quantify wear rates as a function of time and operating condition, and identify any unknown life-limiting mechanisms. The test was voluntarily terminated in February 2014 after demonstrating 51,184 h of high-voltage operation, 918 kg of propellant throughput, and 35.5 MN-s of total impulse. The post-test inspection of the thruster hardware began shortly afterwards with a combination of non-destructive and destructive analysis techniques, and is presently nearing completion. This paper presents relevant results of the post-test inspection for both discharge and neutralizer cathodes. Discharge keeper erosion was found to be significantly reduced from what was observed in the NEXT 2 kh wear test and NSTAR Extended Life Test, providing adequate protection of vital cathode components throughout the test with ample lifetime remaining. The area of the discharge cathode orifice plate that was exposed by the keeper orifice exhibited net erosion, leading to cathode plate material building up in the cathode-keeper gap and causing a thermally-induced electrical short observed during the test. Significant erosion of the neutralizer cathode orifice was also found and is believed to be the root cause of an observed loss in flow margin. Deposition within the neutralizer keeper orifice as well as on the downstream surface was thicker than expected, potentially resulting in a facility-induced impact on the measured flow margin from plume mode. Neutralizer keeper wall erosion on the beam side was found to be significantly lower compared to the NEXT 2 kh wear test, likely due to the reduction in beam extraction diameter of the ion optics that resulted in decreased ion impingement. Results from the post-test inspection have led to some minor thruster design improvements.

Ion engine↗

Mars 2020 sample caching system contamination: how to clean hardware and keep it clean

The Mars 2020 Rover will have the capability to collect and cache samples for potential Mars sample return. Specifically, the sample caching system (SCS) is designed for coring Mars samples and acquiring regolith samples as well as handling, sealing and caching on Mars. As the potential first Martian samples that could be returned to Earth, assuring low levels of terrestrial contamination is of the utmost concern. In developing the SCS, the project prioritizes limiting sample contamination in organic, inorganic and biological areas. The focus of this paper is on the strategies being implemented to clean the assemble the sampling hardware to meet and maintain stringent contamination requirements.

Rainen, Richard↗

Hold Down and Release Mechanism Hardware Simulator for Ground Deployment Testing

Hold Down and Release Mechanisms (HDRMs) are a common piece of spacecraft hardware which restrain components during launch, transit, and later allow them to be extended, jettisoned, separated, etc. at the spacecraft’s destination. Due to prohibitively high cost, long lead times, and limited reset capability, testing of mechanisms that require HDRMs is often difficult. This project explored the possibility of designing HDRM-analogue devices that would replicate the function of flight HDRMs during ground-based testing for a fraction of the cost of a flight HDRM. These devices were designed with the requirements of the Spin Eject Mechanism to be used on the Mars Sample Return (MSR) Capture, Containment, and Return System (CCRS) in mind. A trade study was conducted to determine the optimal internal mechanism design of the device, comparing several mechanisms from existing HDRMs to several simpler, more novel mechanisms. CAD software was used to create a preliminary design of the device utilizing a mix of commercial off-the-shelf parts and custom-manufactured parts. Several straightforward analyses were conducted to determine the most effective models for the off-the-shelf parts. A prototype largely composed of 3D-printed components was also created to proof the design concept. Although this HDRM simulator was designed for a particular mechanism for the CCRS mission, its general design is useful for ground testing of a variety of mechanisms requiring similar HDRM simulators.

Kian Vilhauer↗

Classifications and Requirements for Testing Systems and Hardware to be Exposed to Dust in Planetary Environments

The purpose of this NASA Technical Standard is to establish minimum requirements and provide effective guidance regarding methodologies and best practices for testing systems and hardware to be exposed to dust in dust laden and generating environments. The intent is to facilitate consistency and efficiency in testing space systems, subsystems, or components with operations and missions in dusty environments.

Kristen Kathleen John↗

NASA Universal Waste Management System and Toilet Integration Hardware Operations on ISS – Issues, Modifications and Accomplishments

The Universal Waste Management System (UWMS), which has the ISS operational nomenclature “Toilet”, was initially installed on the International Space Station (ISS) in 2020with final installation completed in 2021. Although technical issues were encountered that delayed installation and operations, progress was made towards the objectives of the project. Technical issue work arounds resulted in operation of the Toilet with use by male and female crew members in a controlled extended checkout and a longer nominal use. This paper will summarize operations of the Toilet and Toilet Integration Hardware in both of those configurations, problems encountered during installation and checkout, the modifications made to allow further usage on ISS, and the future modifications planned for nominal use. It will also describe the portions of the technology demonstration that were completed and the benefits from that work and how that knowledge informs the Orion-installed UWMS unit and future manifesting of consumables for both Orion and ISS.

life support↗

NASA Universal Waste Management System and Toilet Integration Hardware Operations on ISS – Issues, Modifications and Accomplishments

The Universal Waste Management System (UWMS), which has the ISS operational nomenclature “Toilet”, was initially installed on the International Space Station (ISS) in 2020 with final installation completed in 2021. Although technical issues were encountered that delayed installation and operations, progress was made towards the objectives of the project. Technical issue work-arounds resulted in operation of the Toilet with use by male and female crew members in a controlled extended checkout. This paper will summarize operations of the Toilet and Toilet Integration Hardware in this limited configuration, problems encountered during installation and checkout, the modifications made to allow further usage on ISS, and the future modifications planned for nominal use. It will also describe the portions of the technology demonstration that were completed and the benefits from that work and how that knowledge informs the Orion-installed UWMS unit and future manifesting of consumables for both Orion and ISS.

Toilet↗

Instrumentation and Testing of Ground and Flight Hardware

The goal of this white paper is to highlight some of the key issues associated with the instrumentation and testing of ground and flight hardware. The information is arranged topically and follows a line of organization that begins with the development of test objectives, the development of requirements, the purchase and installation of instrumentation, and covers many considerations to ensure that measurements will provide the required data during the conduct of the test. Ideally, all of these considerations would be factored into a test program; however, due to programmatic, budgetary, and calendar restraints, only a subset of these factors will typically be considered. Although the primary emphasis of this text is on thermal measurements, all disciplines can benefit from these recommendations.

Thermocouple↗

Hardware Autonomy for Space Infrastructure

NASA prioritizes autonomous systems development with the expectation that it will continue to drive significant improvements in human and science exploration capability. Crew operations benefit from a spectrum of machine assistance to complete replacement of dangerous or highly repetitive tasks. Many science operations have a teleoperation component, and similarly benefit from a range of autonomy implementations that make long distance applications feasible. As we consider longer duration deep space missions, we also consider higher levels of autonomy in order meet emergent safety, maintenance, and logistics needs. One of the challenges within this scope is installation and maintenance of infrastructure, such as large scale instrumentation and communications equipment, crew habitats, and operational facilities. We describe how a programmable meta-material architecture may shift the paradigm of how we design, build, and operate future space infrastructure and assets. A primary objective of this strategy is to free the design space from launch vehicle constraints and fundamentally shift how a mission is designed and conducted. This integrates advances in materials (mechanical meta-materials), manufacturing (cooperative mobile robotics), and autonomy (multi-agent planning algorithms). Engineering systems that utilize a modular and reconfiguration building block approach, such as digital communication and computation systems, currently lead in terms of size and complexity scalability. NASA is extending the benefits and flexibility of digital systems to hardware systems, to optimize materials life-cycle management and expand our space exploration mission capabilities to meet long duration and deep space infrastructure needs, in accordance with long term NASA goals of "in-space reliance" and "mass-less exploration."

In space assembly↗

Hardware-in-the-Loop Simulation of Modular Antenna Assembly

Robots are playing an increasing role in space exploration and in-space servicing. Robotic arms are good for performing in-space tasks such as modular assembly. The SPIDER arm (SPace Infrastructure Dexterous Robot) of the OSAM-1 mission represents an example of a system that can perform modular antenna assembly tasks in environmental conditions that would be dangerous for astronauts. One of the WVRTC activities is to perform independent verification and validation of the SPIDER assembly operations. Space robotic systems adopting large manipulators such as the SPIDER arm are complex to test and verify under normal 1-G conditions. Our work involves proof-of-principle testing of a hardware-inthe-loop (HIL) simulator operating in 1-g conditions, which replicates the motion of the space robot end-effector under the same geometric, kinematic and dynamic conditions, and in response to externally applied forces from its space environment. In particular, our software simulates in real-time the robot dynamics inclusive of flexibility, an important aspect in case of a long robotic arms operating in 0-G conditions. For example, the same oscillatory motions of the space manipulator’s end-effector can be mimicked on ground through our industrial manipulator, allowing us to test the feasibility of complex operation such as assembling modular components.

Robotic Assembly↗

Tutorial: Electrified Aircraft Propulsion Approaches for Modeling and Electrical Hardware-in-the-Loop Testing

This tutorial session outlines capabilities made available by the National Aeronautics and Space Administration for testing electrified aircraft propulsion (EAP) hardware and software prior to using turbomachinery. Removing these components from the experimentation process until necessary significantly reduces the development and testing costs and safety risks. Three facilities, the NASA Electric Aircraft Testbed (NEAT) and the Hybrid Propulsion Emulation Rig (HyPER) are unique facilities that provide the following capabilities: (i) the verification of megawatt-scale electrical and electromechanical system components at altitude, (ii) the verification of EAP control systems on sub-scale representative electromechanical architectures. The importance, operation, and specifications of each facility is described with detail. Provided examples of past testing showcase the abilities of each facility. Simple and complex methods for replicating the steady state and dynamical mechanical loading on the electrical power system are discussed

Electrified Aircraft Propulsion↗

SUbsonic Single Aft eNgine (SUSAN) Power/Propulsion System Hardware-in-the-Loop Test Results

Electrified Aircraft Propulsion (EAP) technology offers a promising path forward for reducing greenhouse gas emissions and other negative environmental effects from the commercial aviation sector. EAP systems can reduce fuel burn and improve performance over state-of the-art designs, however the increased complexity and highly coupled nature of these systems present challenges that require new control approaches. The SUbsonic Single Aft eNgine (SUSAN) Electrofan is a concept aircraft developed by NASA as a reference design for a commercial transport aircraft with a highly integrated hybrid-electric powertrain. This paper summarizes the results of a Hardware-in-the-Loop (HIL) test of a control architecture developed for the SUSAN power/propulsion system (PPS). The test was performed in the Hybrid Propulsion Emulation Rig (HyPER) facility at the NASA Glenn Research Center (GRC) and involved a real-time reference model of the SUSAN PPS and control system running with a sub-scale electro-mechanical system replacing one of the PPS subsystems. A side-by-side comparison of the simulated and real systems in the HIL test results shows that the control architecture functions well in both the simulation and the real-time HIL environment. In both cases the controller is able to simultaneously deliver the required thrust response and balance power levels between the electrical and turbomachinery subsystems.

Jonah J Sachs-Wetstone↗

SUbsonic Single Aft eNgine (SUSAN) Power/Propulsion System Hardware-in-the-Loop Test Results

Electrified Aircraft Propulsion (EAP) technology offers a promising path forward for reducing greenhouse gas emissions and other negative environmental effects from the commercial aviation sector. EAP systems can reduce fuel burn and improve performance over state-of the-art designs, however the increased complexity and highly coupled nature of these systems present challenges that require new control approaches. The SUbsonic Single Aft eNgine (SUSAN) Electrofan is a concept aircraft developed by NASA as a reference design for a commercial transport aircraft with a highly integrated hybrid-electric powertrain. This paper summarizes the results of a Hardware-in-the-Loop (HIL) test of a control architecture developed for the SUSAN power/propulsion system (PPS). The test was performed in the Hybrid Propulsion Emulation Rig (HyPER) facility at the NASA Glenn Research Center (GRC) and involved a real-time reference model of the SUSAN PPS and control system running with a sub-scale electro-mechanical system replacing one of the PPS subsystems. A side-by-side comparison of the simulated and real systems in the HIL test results shows that the control architecture functions well in both the simulation and the real-time HIL environment. In both cases the controller is able to simultaneously deliver the required thrust response and balance power levels between the electrical and turbomachinery subsystems.

EAP↗

Subscale Hardware-In-The-Loop Results for Hybrid Electric Turbofan Controls Use Cases

NASA is investigating hybrid electric turbine engine systems for commercial transport aircraft due to the potentially significant improvements hybrid electric technology offers in performance, fuel consumption, and operational and design flexibility. Recently, the technology has been tested at full scale in partnership with industry and advanced to Technology Readiness Level 4. This presentation will focus on a recent subscale hardware-in-the-loop test of an open source turbofan engine model developed by NASA. The Advanced Geared Turbofan 30,000 lbf – electrified (AGTF30-e) engine is used as a reference model to demonstrate control system design and use cases for an example mild hybrid electric system with no large-scale energy storage. This model is run in real-time in NASA’s Hybrid Propulsion Emulation Rig (HyPER) and is used to drive an emulation of the turbomachinery system using subscale electric machines. This dynamic scaled shaft emulation interacts with a subscale (<100 kW) hybrid system consisting of electric machines, motor controllers, and a programmable electronic load. Specific use cases demonstrated include the use of Turbine Electrified Energy Management to improve operation during transients, megawatt-scale power extraction from the AGTF30-e, and power transfer between engine spools. Results related to the effectiveness of hybrid systems are qualitatively compared to results from industry testing.

Hybrid↗