Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Ground testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

Active/passive scanning

The paper deals with the design, construction, and applications of an active/passive multispectral scanner combining lasers with conventional passive remote sensors. An application investigation was first undertaken to identify remote sensing applications where active/passive scanners (APS) would provide improvement over current means. Calibration techniques and instrument sensitivity are evaluated to provide predictions of the APS's capability to meet user needs. A preliminary instrument design was developed from the initial conceptual scheme. A design review settled the issues of worthwhile applications, calibration approach, hardware design, and laser complement. Next, a detailed mechanical design was drafted and construction of the APS commenced. The completed APS was tested and calibrated in the laboratory, then installed in a C-47 aircraft and ground tested. Several flight tests completed the test program.

Woodfill, J. R.↗

Oral presentation of first year final report, appendix A

Plans for self contained in-house capability to test Large Space Structures (LSS) and their control prior to flight are presented. A ground test facility which demonstrates and validates LSS control theory is defined. An experiment is designed which assures a high success rate for flight test. A strapdown algorithm is developed. Research on the astromast is reported, as is the development of an overall system model.

Source record↗

Integrated failure detection and management for the Space Station Freedom external active thermal control system

This paper presents the integrated approach toward failure detection, isolation, and recovery/reconfiguration to be used for the Space Station Freedom External Active Thermal Control System (EATCS). The on-board and on-ground diagnostic capabilities of the EATCS are discussed. Time and safety critical features, as well as noncritical failures, and the detection coverage for each provided by existing capabilities are reviewed. The allocation of responsibility between on-board software and ground-based systems, to be shown during ground testing at the Johnson Space Center, is described. Failure isolation capabilities allocated to the ground include some functionality originally found on orbit but moved to the ground to reduce on-board resource requirements. Complex failures requiring the analysis of multiple external variables, such as environmental conditions, heat loads, or station attitude, are also allocated to ground personnel.

Mesloh, Nick↗

Study Of Radiation Effects Electronics at Atmospheric Altitudes

A test bed for the in situ evaluation of electronic devices for high altitude aircraft was developed. A prototype of the test bed, suitable for operation on a research aircraft, was built and readied for ground tests. The principle investigator established a working relationship with the Project APEX team at Dryden with the intent of flying the test bed "piggyback" on an Project APEX balloon in 1998. Contact was also established with NASA contractors charged with operating the ER-2 aircraft now at Dryden.

Wilkins, Richard↗

Propelling Exploration to the Moon and Beyond

As the Constellation Program enters its fourth year, the Ares Projects have made substantial progress toward sending human explorers beyond Earth orbit. The Ares I crew launch vehicle, which will take six astronauts or cargo to the International Space Station or four astronauts to rendezvous with Ares V for missions to the Moon, is the first human-rated vehicle NASA has developed in over 30 years. Since the Exploration Systems Architecture Study in 2005, the Ares Projects have completed a successful system requirements review, system definition review, and preliminary design review for the Ares I crew launch vehicle. The Ares I elements are well into development, beginning with the Shuttle-derived, five-segment solid rocket motor that will provide first-stage propulsion. The first stage team has poured its first production simulation article motor and will be pouring and firing the first five-segment development motor in 2009. Large-scale tooling has been installed and tested to produce propellant tanks for the liquid-fuel upper stage at Marshall Space Flight Center (MSFC) in Alabama. The initial upper stage units and main propulsion test article will be manufactured and tested at MSFC before transferring to Michoud Assembly Facility in Louisiana. The upper stage engine team has completed powerpack testing using Apollo J-2 heritage hardware and begun construction of a new altitude test stand at Stennis Space Center in Mississippi. The flight and integrated testing group has designed and built hardware for the Ares I-X test flight scheduled for 2009, as well as begun refurbishing existing infrastructure to support ground testing. Additionally, a base configuration has been selected for the Ares V cargo launch vehicle, which will send the Altair lunar lander and Orion to the Moon. Today, the Ares Projects are well on the way to building America s next generation of exploration-capable launch vehicles.

Cook, Stephen A.↗

Innovative Test Operations to Support Orion and Future Human Rated Missions

This paper describes how the Orion program is implementing new and innovative test approaches and strategies in an evolving development environment. The early flight test spacecraft are evolving in design maturity and complexity requiring significant changes in the ground test operations for each mission. The testing approach for EM-2 is planned to validate innovative Orion production acceptance testing methods to support human exploration missions in the future. Manufacturing and testing at Kennedy Space Center in the Neil Armstrong Operations and Checkout facility will provide a seamless transition directly to the launch site avoiding transportation and checkout of the spacecraft from other locations.

Koenig, William J.↗

Highlights of Aeroacoustic Tests of a Metal Spacecraft Cabin Ventilation Fan Prototype

A metal spacecraft cabin ventilation fan suitable for aerodynamic and acoustic ground tests was designed and tested in the NASA Glenn Research Center Acoustical Testing Laboratory. The fan design featured a low-noise blade-vane count that was chosen to reduce the rotor-stator interaction tone noise. The fan was throttled through its operating range, and results indicate that the measured aerodynamic and acoustic performance was in good agreement with predictions. Recommendations for further research of quiet high-performance fans intended to support long duration human space exploration missions are offered. This small fan aerodynamic and acoustic test rig and the NASA Glenn Acoustical Testing Laboratory are valuable resources available for supporting NASA’s aeronautics research and space exploration missions.

Fan↗

Highlights of Aeroacoustic Tests of a Metal Spacecraft Cabin Ventilation Fan Prototype

A metal spacecraft cabin ventilation fan suitable for aerodynamic and acoustic ground tests was designed and tested in the NASA Glenn Research Center Acoustical Testing Laboratory. The fan design featured a low-noise blade-vane count that was chosen to reduce the rotor-stator interaction tone noise. The fan was throttled through its operating range, and results indicated that the measured aerodynamic and acoustic performance was in good agreement with predictions. Recommendations for further research of quiet high-performance fans intended to support long duration human space exploration missions are offered. This small fan aerodynamic and acoustic test rig and the NASA Glenn Acoustical Testing Laboratory are valuable resources available for supporting NASA’s aeronautics research and space exploration missions.

Fan, Noise, Ventilation↗

Passive Rocket Diffuser Testing: Reacting Flow Performance of Advanced Configurations

Upper stage rocket engines are optimized for operation at the edge of space. Ground testing often requires simulation of high-altitude environments to prevent damage from off-design operation. Passive supersonic diffusers are an effective means of establishing the partial vacuum needed around the nozzle exit. The low cost of diffusers relative to active vacuum sources (ejectors, pumps, etc.) provides a perpetual incentive to improve their performance and expand the envelope of passively testable engines. Second-throat diffusers have been the de facto standard for rocket testing since the 1950s, and numerous studies have focused on parametric optimization of the topology. Yet, even the best second-throat designs may require more driving pressure than an upper stage engine can provide. To overcome conventional limits, engineers at NASA’s Stennis Space Center (SSC) adapted an obscure cold-flow diffuser topology to the extremes of immersion in supersonic combustion products. Aerodynamic experimentation was conducted at SSC’s E-3 test stand to quantify the performance of prototypical hot-fire spike diffuser hardware and enable direct comparison to prior states of the art. A LO X /GH 2 thruster was contoured to approximate the regeneratively-cooled nozzle of an upper-stage engine and fired into 28 downstream diffuser configurations: 16 second-throat, 2 centerbody, and 10 spike. Temperature and pressure were recorded along the test article walls for a range of chamber pressures spanning 3.5 - 5.0 MPa. The second-throat configurations with the lowest start and unstart pressure ratios were shown to outperform equivalent systems in literature and taken as baselines for evaluation of advanced diffuser performance. Compared to these exemplars, centerbody diffusers decreased start pressure ratio by 11% but increased unstart pressure ratio by 15%. Spike diffusers reduced start and unstart pressure ratios by 24% and 9%, respectively.

Rocket↗

Four Bed Carbon Dioxide Scrubber Engineering Development Unit Cabin Air Inlet Testing

This paper reviews a test series conducted on the Four Bed Carbon Dioxide Scrubber Engineering Development Unit, a ground test analog for the Four Bed Carbon Dioxide Scrubber Technology Demonstration currently operating on the International Space Station. For this test series conducted in mid-2022, an alternate FBCO2 inlet air location (direct from the cabin) was evaluated. This paper presents test results, rationale for observed performance changes, and possible ramifications for the flight FBCO2 Scrubber.

Life Support↗

Four Bed Carbon Dioxide Scrubber Engineering Development Unit Cabin Air Inlet Testing

This paper reviews a test series conducted on the Four Bed Carbon Dioxide Scrubber Engineering Development Unit, a ground test analog for the Four Bed Carbon Dioxide Scrubber Technology Demonstration currently operating on the International Space Station. For this test series conducted in mid-2022, an alternate FBCO2 inlet air location (direct from the cabin) was evaluated. This paper presents test results, rationale for observed performance changes, and possible ramifications for the flight FBCO2 Scrubber.

Life Support↗

Development of the structural technology of a large deployable antenna

The current NASA-sponsored Antenna Technology Development Program of the offset wrap-rib antenna concept is based on a ground test program of 'proof of concept' hardware whose potential on-orbit performance is based on analytical estimates. The ground demonstration hardware represents a partial 55-meter diameter reflector and feed support structure. Testing will include automated deployment, reflector surface quality evaluation and validation of analytical performance models. Test results and hardware fabrication costs will be used to refine the models that will be the basis for the preliminary design of a 100-meter diameter wrap-rib antenna system. Additionally, the design, processes, tooling, fabrication techniques, fixturing and assembly approaches used for the 'proof of concept' hardware are directly applicable to building flight systems up to 100 meters in diameter.

Wada, B. K.↗

Active control test on the Mini-Mast

A Linear Quadratic Gaussian (LQG) design process is presented and applied to a large flexible ground test facility, the Mini-Mast, for validation. For the design, nine displacement sensors were used. Three torque wheel actuators were used for damping augmentation. Results were dramatic, indicating an improvement in damping from 3 percent to 30 percent of critical. The tests proved the effectiveness of the procedure in designing effective vibration damping systems.

Montgomery, Raymond C.↗

Orion Ammonia Boiler System Preflight Test Preparations

The Environmental Controls and Life Support Systems (ECLSS) branch at Kennedy Space Center (KSC) is currently undergoing preparations for ground testing of the Orion Multi-Purpose Crew Vehicle (MPCV) to prepare its subsystems for EM-1 (Exploration Mission-1). EM-1, Orions second unmanned flight, is a three-week long lunar mission during which the vehicle will complete a 6-day retrograde lunar orbit before returning to Earth. This paper focuses on the work done during the authors 16-week internship with the Mechanical Engineering Branch of KSCs Engineering Directorate. The authors project involved assisting with the preparations for testing the Orion MPCVs ammonia boiler system. The purpose of the ammonia boiler system is to keep the spacecraft sufficiently cool during the reentry portion of its mission, from service module (SM) separation to post-landing. This system is critical for keeping both the spacecraft (avionics and electronics) and crew alive during reentry, thus a successful test of the system is essential to the success of EM-1. XXXX The author was able to draft a detailed outline of the procedure for the ammonia system functional test. More work will need to be done on the vehicle power-up and power-down portions of the procedure, but the ammonia system testing portion of the procedure is thorough and includes vehicle test configurations, vehicle commands, and GSE. The author was able to compile a substantial list of questions regarding the ammonia system functional test with the help of her mentors. A significant number of these questions were answered in the teleconferences with Lockheed Martin.

Ammonia↗

TRL Assessment of Solar Sail Technology Development Following the 20-Meter System Ground Demonstrator Hardware Testing

The NASA In-Space Propulsion Technology (ISPT) Projects Office has been sponsoring 2 separate, independent system design and development hardware demonstration activities during 2002-2005. ATK Space Systems of Goleta, CA was the prime contractor for one development team and L'Garde, Inc. of Tustin, CA was the prime contractor for the other development team. The goal of these activities was to advance the technology readiness level (TRL) of solar sail propulsion from 3 towards 6 by the year 2006. Component and subsystem fabrication and testing were completed successfully, including the ground deployment of 10-meter and 20-meter ground demonstration hardware systems under vacuum conditions. The deployment and structural testing of the 20-meter solar sail systems was conducted in the 30 meter diameter Space Power Facility thermal-vacuum chamber at NASA Glenn Plum Brook in April though August, 2005. This paper will present the results of the TRL assessment following the solar sail technology development activities associated with the design, development, analysis and testing of the 20-meter system ground demonstrators. Descriptions of the system designs for both the ATK and L'Garde systems will be presented. Changes, additions and evolution of the system designs will be highlighted. A description of the modeling and analyses activities performed by both teams, as well as testing conducted to raise the TRL of solar sail technology will be presented. A summary of the results of model correlation activities will be presented. Finally, technology gaps identified during the assessment and gap closure plans will be presented, along with "lessons learned", subsequent planning activities and validation flight opportunities for solar sail propulsion technology.

Montgomery, Edward E.↗

TRL Assessment of Solar Sail Technology Development Following the 20-Meter System Ground Demonstrator Hardware Testing

The NASA In-Space Propulsion Technology (ISPT) Projects Office has been sponsoring 2 separate, independent system design and development hardware demonstration activities during 2002-2005. ATK Space Systems of Goleta, CA was the prime contractor for one development team and L'Garde, Inc. of Tustin, CA was the prime contractor for the other development team. The goal of these activities was to advance the technology readiness level (TRL) of solar sail propulsion from 3 towards 6 by the year 2006. Component and subsystem fabrication and testing were completed successfully, including the ground deployment of 10-meter and 20-meter ground demonstration hardware systems under vacuum conditions. The deployment and structural testing of the 20-meter solar sail systems was conducted in the 30 meter diameter Space Power Facility thermal-vacuum chamber at NASA Glenn Plum Brook in April though August, 2005. This paper will present the results of the TRL assessment following the solar sail technology development activities associated with the design, development, analysis and testing of the 20-meter system ground demonstrators. Descriptions of the system designs for both the ATK and L'Garde systems will be presented. Changes, additions and evolution of the system designs will be highlighted. A description of the modeling and analyses activities performed by both teams, as well as testing conducted to raise the TRL of solar sail technology will be presented. A summary of the results of model correlation activities will be presented. Finally, technology gaps identified during the assessment and gap closure plans will be presented, along with "lessons learned", subsequent planning activities and validation flight opportunities for solar sail propulsion technology.

Young, Roy M.↗

NASA refan program status

The objective of the refan program is to demonstrate the technical feasibility of substantially reducing the noise levels of existing JT8D powered aircraft. The program consists of the design, manufacturing and testing of the refan engines and modified nacelles and airplanes. Experimental testing was completed for the refan engine both at sea level and at altitude conditions. Ground testing for the B727 side- and center-engine installations and flight testing of the DC-9 with refan engines and acoustic nacelles were performed. Preliminary results presented show that substantial noise reductions were achieved.

Abdalla, K. L.↗

New potentials of NIICHIMMASH's thermal vacuum facilities

The potentialities of existing test facilities as to simulating space environment governing factors for spacecraft successful development thermal vacuum testing are analyzed, ways of modernizing existing test facilities and specific proposals on their redesign are considered. The problem of spacecraft (S/C) ground development in simulated external environments, the solution of which started more than 30 years ago, has not lost its urgency today. Stringent requirements on S/C active lifetime under space conditions, module large dimensions, great number of extension elements and complicated mode of their interaction in long mission do not allow S/C designers to abandon ground tests. S/C thermal modes development is a combination of calculations, thermal vacuum tests and actions on improving S/C design and its thermal control system. Traditionally, tests are carried out by stages from component and end unit level verifications to complex tests of modules and S/C as a whole. In our opinion, sufficient correctness of calculated models and experience gained in organizations designing space systems allow to reduce cost and time of autonomous tests. Unfortunately, this is not true for complex (integrated) thermal vacuum tests. More than that, their recent programs include tasks of verifying other (than thermal control system) systems if S/C for operation under space simulated conditions. The outlined circumstances are the main reason for critical review of the potentialities of the existing test base, and of NIICHIMMASH's two large thermal vacuum chambers, first of all. The reasons for and ways of enlargement of these facilities potentially are analyzed and the results attained are described.

Afanassiev, N. A.↗